Loading...
HomeMy WebLinkAbout20141169 All Versions_Draft Meeting Minutes_20140304 SNC TATE OF ORTH AROLINA DT EPARTMENTOFRANSPORTATION PMC AJ.T AT CRORYNTHONY ATA G S OVERNOR ECRETARY March 4, 2014 To: Thomas Steffens Gary Jordan Travis Wilson Chris Militscher Steve Sollod David Wainwright Jim Speer Ron Lucas Ed Eatmon Chris Rivenbark Omar Azizi Brian Yamamoto David Harris From: Paul Atkinson, PE Project Manager TIP East Draft -2514C: Subject: US 17 from North of Maysville to South of NC 58 near Pollocksville. -2514C was held on February 20, 2014 from 2:30 PM to 3:30 PM in the NCDOT Hydraulic Design Conference Room at the Century Center Complex in Raleigh, NC. The following were in attendance. Participants: Team Members Support Staff Paul Atkinson, NCDOT Hydraulics (Present) Jim Speer, Roadway Design (Present) Thomas Steffens, USACE (Present) Brian Yamamoto, PDEA (Present) Gary Jordan, USFWS (Present) Ed Eatmon, Division 2 (Present) Travis Wilson, NCWRC (Present) Chris Rivenbark, PDEA-NES (Present) Chris Militscher, EPA (Absent) David Harris, Roadside (Absent) Steve Sollod, NCDCM (Present) David Wainwright, NCDWR (Present) Ron Lucas, FHWA (Absent) Other Attendees Brook Anderson, NCDOT Hydraulics (Present) Erik Seiler, NCDOT Hydraulics (Present) Mark Staley, NCDOT-REU (Present) Gordon Cashin, NCDOT-NES (Present) Vasim Barudawala, Roadway Design (Present) Karen Compton, USFS (Phone) Sonia Carrillo, NCDWR (Present) MAILING ADDRESS: T: 919-707-6700 LOCATION: ELEPHONE NCDOT FAX: 919-250-4108 CCC EPARTMENT F RANSPORTATIONENTURY ENTER OMPLEX HU BB YDRAULICS NITUILDING 1590MSC 1020BRD W:..// AIL ERVICE ENTER IRCH IDGE RIVE EBSITE WWWNCDOTORGDOH R NC 27699-1590 R NC ALEIGHALEIGH The 4C meeting began with Paul Atkinson (NCDOT) giving a brief introduction of the project. Paul went through the permit drawings, discussing each permit site by plan sheet. Specific comments are listed below by Roadway plan sheet number. Sheets 4&5: No comments Sheet 6: Ed Eatmon stated that the pond on parcel 20 may need to be filled for utilities or controlled access fencing. Chris Rivenbark said utility plans are not yet complete. David Wainwright said if the pond was filled, the surface water impact would be non-mitigable and to include footnote on summary sheet. Sheets 7&8: No comments Sheet 9: There was general discussion concerning the wildlife crossing construction and limits of the wildlife crossing fence. Gary Jordan stated woody debris would not be required in th . Ed Eatmon recommended putting a specification in the contract specifying which pipes are to be backfilled and what type of material is to be used. Sheets 10-15: No comments Sheet 16 There was a group discussion about Site 1 and whether the buffer zones should be arced around the beginning of the stream. The buffers are currently shown ending at the edge of existing transportation facility. The discussion ended with David Wainwright stating he would get back to NCDOT Hydraulics on the topic. This issue will be resolved prior to submission of final permit drawings to agencies. Sheet 17 David Wainwright stated that Site 19, where the retaining wall is being replaced with rip rap, can be shown as temporary impacts. In addition, he said hatching could be removed from areas within the buffer zone that are already impacted due to existing buildings or concrete/asphalt driveways. Paul Atkinson stated the TDE at Site 19 had been added after the permit drawings had been completed for the meeting. An additional 10ft of temporary surface water impacts will be added and the buffer zone impacts will include this area for the final drawings. Sheets 22&23: No comments Sheet 26: No comments General Comments: Karen Compton asked for a separate Summary Sheet just for Forestry Service impacts. Chris Rivenbark said he could provide one for her.