Loading...
HomeMy WebLinkAbout20141169 All Versions_SW Management Plan_20140130 ATN Revised 3/31/05 in the wetland summary.The pile areas are too small to show in the permit drawings, but they have been accounted forAlso, there is temporary fill in wetlands at sites 3 and 4 due to the piles for the work bridges.There is permanent fill in wetlands at sites 3 and 4 due to the piles for the proposed bridges. TOTALS: Site No. 654321 437+00 to 446+00 -L-432+00 to 434+00 -L-389+02 to 399+75 -L- 372+50 to 374+50 -L-329+50 to 331+50 -L-302+50 to 303+50 -L- 17+00 to 18+48.13 17+51 to 22+00 11+50 to 12+5017+00 to 19+00 (From/To) -Y3RPD- -Y3RPA- -DRV4--DRV3- Station Bank Stabilization 2@ 8'X8' RCBC Dual BridgesDual Bridges 36" RCP-IV48" RCP-IV36" RCP-IV48" RCP-IV Size / Type Structure WETLAND PERMIT IMPACT SUMMARY Permanent Wetlands <0.01 Fill In 5.641.600.860.760.082.34 (ac) Wetlands Temp. <0.01 Fill In 0.060.06 (ac) WETLAND IMPACTS Excavation Wetlands 0.060.06 (ac) in Mechanized in Wetlands Clearing 0.300.130.050.060.020.04 (ac) Wetlands Clearing Hand 1.971.250.72 (ac) in Permanent impacts <0.01 0.040.030.01 SW (ac) SHEET 1 of 4 SURFACE WATER IMPACTS Temp. impacts <0.01 0.010.01 (ac) SW NC DEPARTMENT OF TRANSPORTATION WBS - 34442.1.1 (R-2514D) Permanent DIVISION OF HIGHWAYS ChannelExisting Impacts 239.00 218 (ft) 16 JONES COUNTY 5 Existing Channel Impacts Temp. 81.00 (ft) 5031 2/28/2014 Natural Stream Design 0.00 (ft) ATN Revised 3/31/05 Site 7 includes 0.25 Ac. permanent fill to a pond.TOTALS: Site No. 1413121110 987 527+50 to 529+50 -L-520+07 to 520+23 -L-504+00 to 506+00 -L- 473+00 to 475+00 -L-463+00 to 463+50 -L-458+02 to 458+33 -L- 490+50 to 496+00 -L-476+50 to 480+00 -L- (From/To) Station Bank Stabilization Bank Stabilization 54" RCP-IV 36" RCP-IV36" RCP-IV36" RCP-IV36" RCP-IV Size / Type Structure WETLAND PERMIT IMPACT SUMMARY Permanent Wetlands <0.01 Fill In 2.720.340.010.310.960.380.540.18 (ac) Wetlands Temp. Fill In 0.00 (ac) WETLAND IMPACTS Excavation Wetlands 0.00 (ac) in Mechanized in Wetlands Clearing <0.01 0.060.020.01 0.260.060.090.02 (ac) Wetlands Clearing Hand 0.00 (ac) in Permanent impacts 0.060.010.05 SW (ac) SHEET 2 of 4 SURFACE WATER IMPACTS Temp. impacts <0.01 <0.01<0.01 (ac) SW NC DEPARTMENT OF TRANSPORTATION WBS - 34442.1.1 (R-2514D) Permanent DIVISION OF HIGHWAYS Existing Channel Impacts 456.00 230196 (ft) 1218 JONES COUNTY Existing Channel Impacts Temp. 41.00 (ft) 2120 2/28/2014 Natural Stream Design 0.00 (ft) ATN Revised 3/31/05 TOTALS: Site No. 21201918171615 26+00 to 30+00 -Y10-608+00 to 612+50 -L-41+00 to 41+50 -Y8A-591+50 to 592+50 -L-33+50 to 35+00 -Y8A-584+00 to 588+00 -L-11+00 to 13+50 -Y8A-562+00 to 563+00 -L-548+16 to 552+75530+12 to 531+75 -L- 535+00 to 536+67 -L- (From/To) Station Bank StabilizationBank Stabilization 36" RCP-IV36" RCP-IV18" RCP-IV36" RCP-IV42" RCP-IV78" RCP-IV Size / Type Structure WETLAND PERMIT IMPACT SUMMARY Permanent Wetlands Fill In 5.261.580.301.350.611.390.03 (ac) Wetlands Temp. Fill In 0.00 (ac) WETLAND IMPACTS Excavation Wetlands 0.010.01 (ac) in Mechanized in Wetlands Clearing 0.540.030.060.200.070.160.02 (ac) Wetlands Clearing Hand 0.00 (ac) in Permanent impacts 0.130.060.010.06 SW (ac) SHEET 3 of 4 SURFACE WATER IMPACTS Temp. impacts <0.01<0.01<0.01 (ac) SW NC DEPARTMENT OF TRANSPORTATION WBS - 34442.1.1 (R-2514D) Permanent DIVISION OF HIGHWAYS Existing Channel Impacts 1258 644282292 (ft) 1426 JONES COUNTY Existing Channel Impacts Temp. (ft) 482127 2/28/2014 Natural Stream Design (ft) 0 ATN Revised 3/31/05 OVERALL PROJECT TOTALS:TOTALS: Site No. 2322 19+00 TO 20+00 26+07 to 26+67 -Y10RPA- -Y10RPA- (From/To) Station Bank Stabilization Size / Type Structure BRIDGE WETLAND PERMIT IMPACT SUMMARY Permanent Wetlands <0.01 Fill In 0.020.02 (ac) 13.65 Wetlands Temp. Fill In 0.00 (ac) 0.06 WETLAND IMPACTS Excavation Wetlands 0.00 (ac) in 0.07 Mechanized in Wetlands Clearing 0.00 (ac) 1.10 Wetlands Clearing Hand 0.160.16 (ac) in 2.13 Permanent impacts 0.00 SW (ac) 0.23 SHEET 4 of 4 SURFACE WATER IMPACTS Temp. impacts 0.00 (ac) SW NC DEPARTMENT OF TRANSPORTATION 0.02 WBS - 34442.1.1 (R-2514D) Permanent DIVISION OF HIGHWAYS ChannelExisting Impacts 1953.00 0.00 (ft) JONES COUNTY Existing Channel Impacts Temp. 170.00 0.00 (ft) 2/28/2014 Natural Stream Design 0.00 (ft) 0.00 TOTAL: SITE NO. 87654 321 STRUCTURE SIZE / DUAL BRIDGESDUAL BRIDGES 2@8'X8' RCBC 60" RCP-IV42" RCP-IV78" RCP-IV48" RCP-IV 54"RCP-IV BRIDGE TYPE 388+28 TO 395+18 - 371+98 TO 374+73 - 507+43 TO 513+23 534+33 TO 537+28 529+50 TO 532+45 473+16 TO 474+13 301+70 TO 303+89 18+45 TO 20+27 10+65 TO 10+78 18+28 TO 22+07 (FROM/TO) -Y10RPA- STATION -DRV4- -DRV3- -L--L--L--L--L- L-L- CROSSING ROAD XXXXXX BUFFER IMPACTS SUMMARY BRIDGE TYPE XXX X PARALLEL IMPACT ZONE 1 51444 (ft 3120911778 63142143 2 ) ALLOWABLE IMPACT ZONE 2 26264 (ft 12501 4679 20836975 2 ) 26 TOTAL 77708 109934371018753(ft 4226 2 ) 26 ZONE 1 111154 (ft 3816718952190671684418124 2 ) MITIGABLE SHEET 1 OF 1 ZONE 2 73477 (ft 2550412261126151148511612 2 ) N.C. DEPT. OF TRANSPORTATION PROJECT: 34442.1.1 (R-2514D) DIVISION OF HIGHWAYS 184631TOTAL (ft 6367131213316822832929736 2 JONES COUNTY ) 2/28/2014 REPLACEMENT ZONE 1 (ft 2 BUFFER ) ZONE 2 (ft 2 ) Rev. May 2006 TOTAL: SITE NO. 8754 32 18+45 -Y10RPA- 18+28 -DRV3- (FROM/TO) 507+43 -L-529+50 -L-473+16 -L-388+28 -L-371+98 -L- STATION TO 20+27 -Y10RPA- TO 22+07 -DRV3- TO 513+23 -L-TO 532+44 -L-TO 474+13 -L-TO 395+18 -L-TO 374+73 -L- WETLANDS IN BUFFER IMPACTS SUMMARY ZONE 1 WETLANDS IN (ft 2 BUFFERS 8426728108153082413011630 ) 4163 928 ZONE 2 (ft 2 3817311272 ) 20321432839595675096 379 SHEET 1 OF 1 N.C. DEPT. OF TRANSPORTATION PROJECT: 34442.1.1 (R-2514D) DIVISION OF HIGHWAYS JONES COUNTY 2/28/2014 Rev. Jan 2009