HomeMy WebLinkAboutNCC201668_Contact Update Confirmation_20220131Georgoulias, Bethany
From: laserfiche@ncdenr.gov
Sent: Monday, January 31, 2022 3:28 PM
To: dgrubbjr@solvenergy.com; jennifer.kirby@swinerton.com
Cc: Georgoulias, Bethany; Selkane, Aziza
Subject: Construction SW Permit Contact Information Update for NCC201668
This email is to notify you that contact information has been updated for Broad River Substation, under COC
No. NCC201668. You can review the information in the permit folder in our Laserfiche Reposito .
The following contact information is now associated with this permit record. If anything is in error, please
contact Bethany Georgoulias at bethany.georgoulias@ncdenr.gov.
Legally Responsible Individual
David Grubb
dgrubbjr@solvenergy.com
(415) 617-1449
(Mailing Address) 16680 West Bernardo Drive, , San Diego, CA, 92127, United States
(Street Address) 16680 West Bernardo Drive, , San Diego, CA, 92127, United States
Site Contact
Jennifer Kirby
(Organization) Swinerton Builders
jennifer.kirby@swinerton.com
(858)357-5006
(Mailing Address) 16798 West Bernardo Drive,, San Diego, CA, 92127, USA
Billing Contact (if available)
dgrubbjr@solvenergy.com
(415) 617-1449
This change was requested by: David Grubb, Jr. via Modification request submitted 1/26/2022.
Be sure to add laserfiche(a)ncdenr.go to your contacts to avoidfuture e-mails about this applicationfrom
going into Spamfilters.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
a
This email was automatically generated by Laserfiche. Please do not respond to this email address, as
responses are not monitored.