Loading...
HomeMy WebLinkAboutSW6210503_Add Info_20210928ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director C. Scott Brown, PE 409 Chicago Drive, Suite 112 Fayetteville, NC 28306 NORTH CAROLINA Environmental Quality September 28, 2021 Subject: Second Request for Additional Information Stormwater Permit No. SW6210503 Townsend Estates Subdivision Hoke County Dear Mr. Brown: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on September 3, 2021. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Original Comment 3 — "The percent impervious area for drainage area 1 does not appear to be calculated correctly (Section IV, 10). Please revise. " The percent impervious are for a drainage area is calculated as the total impervious area within the drainage area divided by the drainage area. The Required Storm Volume calculation page indicates that this value is 43.4% whereas Section IV, 10 indicates 24%. Please revise as needed. There also appears to be a discrepancy between the BUA within the drainage area to the proposed wet pond as shown in the Application/SCS Curve Number calculation (347,022 sf) and the Supplement-EZ Form/Required Storm Volume calculation (319,423 sf). Please ensure that the BUA shown within the drainage area to the proposed wet pond is consistent. 2. Original Comment 11— "...Please also ensure to include the cross-section at the permanent pool elevation in the temporary storage stage -storage tables. " The temporary pool stage -storage table was not updated to include the cross -sectional area of the temporary pool at the permanent pool surface elevation (205.5 ft). The previously provided calculations assume that cross -sectional area of the temporary pool at the permanent pool elevation is zero sf based on the calculations (The calculations show a cumulative storage between elevations 205.5 ft and 206.0 ft of 4,282 cf. The 4,282 cf volume divided by the 0.5 ft depth results in an average cross -sectional area of 8,564 sf which is exactly half of the cross -sectional area at elevation 206.0 ft, which implies the surface area at elevation 205.5 ft is zero sf, which is incorrect). Please revise as needed. D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH CAROLINA _ oeaa"em or Euimameabai many 919.707.9200 3. Original Comment 13.b.i.1. — "The surface area of the proposed wet pond does not need to be counted as impervious area. " The BUA calculations indicate that the surface area of the permanent pool is 14,745 sf, however this is less than the sum of the forebay and main pool surface areas at the permanent pool elevation (2,961 sf and 12,244 sf respectively) as provided in the revised stage -storage tables. Please revise as needed for consistency. 4. Original Comment 13.b.ii.1. — "The entire site column should be an accounting of the entire site, not just the drainage area to the proposed SCM. If there is proposed BUA that will be constructed within the project area but will not drain to the proposed SCM, it should be reflected in this column (in addition to the on -site BUA within the SCM drainage area). The `drainage area' for this column is the project area and should match the information in the Application (as should the % BUA). " The information in this column does not appear to be correct. The plans indicate that there are 61 lots that are included in this project. If each lot is allocated 4,100 sf of BUA, there should be a total of 250,100 sf of BUA located within the subdivided lots, however, Line 9 of the Entire Site Column only shows 226,000 sf of BUA located within the subdivided lots. Please ensure that all of the BUA that will be located within the project area is accounted for in this column. 5. Please clarify what the project area is for this project. Section IV, 7 and Line 5 of the Entire Site Column on the Drainage Areas Page of the Supplement-EZ Form indicate that the project area is 27.20 ac, however Line 6 of the Entire Site Column on the Drainage Areas Page of the Supplement-EZ Form indicate that the on -site portion of the project area is 26.51 ac. Please revise or clarify what this value is. 6. Please clarify some discrepancies in the SCS Curve Number calculations page: a. Using 56.5 lots at 4,100 sf per lot results in 231,650 sf of BUA whereas 226,000 sf is shown in the calculations. b. As mentioned earlier, adding up the BUA within the drainage area on this calculation page results in 347,022 sf of BUA which is different than the amount shown in the Supplement-EZ Form and Required Storm Volume calculation (319,423 sf). c. The pre -development condition table indicates that there is 60,588 sf of existing BUA within the drainage area to the proposed wet pond, but the Supplement-EZ Form only shows 54,000 sf worth of existing BUA. 7. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. a. PDFs must be uploaded using the form at: https:.//edocs.deq.nc.gov/Forms/SW-Supplemental-Upload b. Hard copies must be mailed or delivered to the following address: i. For FedEx/UPS: Suzanne McCoy 512 N. Salisbury Street, Office 640K Raleigh, NC 27604 ii. For USPS: Suzanne McCoy 1612 Mail Service Center Raleigh, NC 27699-1612 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to October 28, 2021, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW6210503 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Jim.Farkas@ncdenr.gov or (919) 707-3646. Sincerely, Jim Farkas Environmental Engineer Stormwater Program cc: Fayetteville Regional Office