Loading...
HomeMy WebLinkAboutSW6211001_Design Calculations (Drawdown, Pond 1)_20220128South Pointe at Wayside Pond 1 Drawdown Time Temporary storage volume = Orifice #Idiameter= Area of orifice = Orifice #2 diameter = Area of orifice = Orifice Coefficient (Cd) _ Orifice elevation -- Water elevation --- Driving head (H) _ Discharge (Q) _ Drawdown time = 27,089 cf 1.75 in 1 0.0167 sf 0 in 0 0.0000 sf 0.60 249.70 ft 251.96 ft 0.75 ft 0.0698 cfs 388012 s 107.8 hr 4_5 days 927-POND 1 drawdown.xlsx Printed 1/28/2022