Loading...
HomeMy WebLinkAboutSW6211001_Design Calculations (Riprap)_20220128• ' ' • • DATE DESIGN PHASE 06-25-21 PRELIM PROJECT NAME PROJECT NO CONSTR / X / Wa side Road Apartments 927 REVISION RECORD LOCATION BY Hoke County, North Carolina CEK OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES-5 Q10/Qful1 = 0.89 Pipe Dia= 30 in V/Vfull = 1.13 Q10 = 26.97 cfs V = 7.0 fps Qfull = 30.44 cfs Vfull = 6.19 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in Riprap Class = 1 L Apron Thickness = 22.5 in Apron Length = 20.0 ft Apron Width @ Outlet = 7.5 ft engtn Apron Width @ End = 22.5 ft Storm Outlet Structure FES No.= FES-17 Q10/Qful1 = 0.48 Pipe Dia= 24 in V/Vfull = 0.99 Q10 = 22.03 cfs V = 14.4 fps Qfull = 45.77 cfs Vfull = 14.55 fps From Fig. 8.06.b.1: Zone = 4 From Fig. 8.06.b2: D50 = 10 in DMAX = 15 in Riprap Class = 1 y Apron Thickness = 22.5 in 3 Apron Length = 16.0 ft Apron Width @ Outlet = 6 ft e gtn Apron Width @ End = 18.0 ft 927-Storm Drainage for Spread.xls LATEST REVISION: 1/28/2022 1:57 PM PAGE 1 OF 4 ' 'DATE DESIGN PHASE PRELIM E06-25-21 rPROJIETCT NAME PROJECT NO CONSTR / XRoad A artments 927 REVISIONN RECORD BY Hoke County, North Carolina CEK OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES-22 Q10/Qful1 = 0.41 Pipe Dia= 18 in V/Vfull = 0.94 Q10 = 8.95 cfs V = 11.6 fps Qfull = 21.75 cfs Vfull = 12.29 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in Riprap Class = 1 Apron Thickness = 22.5 in Apron Length = 12.0 ft Apron Width @ Outlet = 4.5 ft e gtn Apron Width @ End = 13.5 ft Storm Outlet Structure FES No.= FES-26 Q10/Qful1 = 0.71 Pipe Dia= 18 in V/Vfull = 1.08 Q10 = 5.21 cfs V = 4.5 fps Qfull = 7.37 cfs Vfull = 4.16 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B L Apron Thickness = 18 in Apron Length = 9.0 ft Apron Width @ Outlet = 4.5 ft e gtn Apron Width @ End = 10.5 ft 927-Storm Drainage for Spread.xls LATEST REVISION: 1/28/2022 1:57 PM PAGE 2 OF 4 ' 'DATE DESIGN PHASE PRELIM E06-25-21 rPROJIETCT NAME PROJECT NO CONSTR / XRoad A artments 927 REVISIONN RECORD BY Hoke County, North Carolina CEK OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES-27 Q10/Qful1 = 0.81 Pipe Dia= 36 in V/Vfull = 1.11 Q10 = 49.40 cfs V = 9.6 fps Qfull = 61.10 cfs Vfull = 8.63 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in Riprap Class = 1 Apron Thickness = 22.5 in Apron Length = 24.0 ft Apron Width @ Outlet = 9 ft e gtn Apron Width @ End = 27.0 ft Storm Outlet Structure FES No.= FES-30 Q10/Qful1 = 0.65 Pipe Dia= 30 in V/Vfull = 1.07 Q10 = 44.45 cfs V = 14.7 fps Qfull = 68.02 cfs Vfull = 13.84 fps From Fig. 8.06.b.1: Zone = 4 From Fig. 8.06.b.2: D50 = 10 in DMAX = 15 in Riprap Class = 1 L Apron Thickness = 22.5 in Apron Length = 20.0 ft Apron Width @ Outlet = 7.5 ft e gtn Apron Width @ End = 22.5 ft 927-Storm Drainage for Spread.xls LATEST REVISION: 1/28/2022 1:57 PM PAGE 3 OF 4 ' 'DATE DESIGN PHASE PRELIM E06-25-21 rPROJIETCT NAME PROJECT NO CONSTR / X / Road A artments 927 REVISION RECORD / X / / X / N BY Hoke County, North Carolina CEK OTHER (SPECIFY) / X / CHECKED BY CSB Storm Outlet Structure FES No.= PIPE 1 OUT Q10/Qful1 = 0.20 Pipe Dia= 18 in V/Vfull = 0.78 Q10 = 1.56 cfs V = 3.4 fps Qfull = 7.64 cfs Vfull = 4.32 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 18 in Apron Length = 9.0 ft Apron Width @ Outlet = 4.5 ft e gtn Apron Width @ End = 10.5 ft Storm Outlet Structure FES No.= PIPE 2 OUT Q10/Qful1 = 0.58 Pipe Dia= 24 in V/Vfull = 1.04 Q10 = 9.38 cfs V = 5.3 fps Qfull = 16.10 cfs Vfull = 5.12 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B L Apron Thickness = 18 in Apron Length = 12.0 ft Apron Width @ Outlet = 6 ft e gtn Apron Width @ End = 14.0 ft 927-Storm Drainage for Spread.xls LATEST REVISION: 1/28/2022 1:57 PM PAGE 4 OF 4