Loading...
HomeMy WebLinkAbout20201505 Ver 1_Pages from LINED_B5728_Wetland_Permit (2)_20220127 o, PROJECT REFERENCE NO. SHEET NO. D, B-5728 1 2B-1 -DETOUR- We/zz�Oz/ DENOTES TEMPORARY DES SHEET NO. IMPACTS IN SURFACE WATER ROADWAY DESIGN HYDRAULICSENGINEER ENGINEER F DETAIL 304 DETAIL 302 DETAIL 303 TOE PROTECTION (No 1°Sc°le) l0 SPECIAL CUT DITCH SPECIAL CUT BASE DITCH Nalco So,el I Not to Sc°IeID Ditch wow S3 NN Natural \°cS\oPs In �. slop, ro' Front NAD Grwnd b 1't\\ U Ground 77 D T D Di F\Ott°r d Q. Di a 6= 2.0 H. Geotexrile Georexdle B Min.D= 0.5 H. Typa of Liner= Cleu B Rip-Rap 1 FROM STA.-LDET-1E+5o RT io STA.-LOFT-19+a7 RT W Mox.d= o.s Ft. DOCUMENT NOT CONSIDERED FINAL F- Q FROM STA.-LDET-23+80 LT TO STA.-LDET-25+95 LT W B= 2.0 Ft. FROM STA.-LDET-23+89 RT TO STA.-LDET-26+00 RT type of Liner= Cl—B Rip-Rap UNLESS ALL SIGNATURES COMPLETED S FROM STA.-LDET-18+75 LT TO STA.-LDET-19+20 LT(e = 2.0') ALBERT C RNEY K1 oo rE s ausc�oQ.m BETTY BEA�j SUTT 50 25 0 50 100 ,�„ n4LICt;�• NO.y IO M moffaff&nichol s�RC xLlcansecHO.:F-0105x ru PERMIT DRAWING A� M � 1rT0 BET RB R E TTON N O SHEET 2 OF 8 VISTv D. JONES d TROXLER 'STATE I L E LOWS,Tt JOSEPH H.TI v DER HEIRS ARBERMM I 3 $ /, I / � I I / �NNM4T _ /• X GLEN RAVEN VILLS INC I U NoWN 6' ca ,l m~I pW WOODS I I • / ^' 7 TOE PROTECTION ry1•� X 1 / SITE 1 m + � I SEE DETAIL 304 X I 1 1 I� I TEMP BANK SfABLIZATION, / Yn W EST 4a TONS CL B RIPRAP _ 1J I BMI /8 IMPACTS IN a i,,l (. EST 107 sY GEOTEXTILE ` I } I ;URFACE WATERS .+ y'a ,,r• SPECIA CUT BASE DITCH c) SEE DETAIL 303 BARBARA LEE EST 9 T Ns CL B RIP I� I HAIIILETT EST 5L6EOTEXTILE / o a —LDET— PRC Sta.27+26.40 X I /� 0;3 E zo'oNO T L E OW$�BARBER \\ 18 1B vli ..�'r oo s E o E x gg F SABR�A I11,BARBER O X � Pal G � x- E E E TB 2GI E E `N F -max — N 7 / , SITE 1 m Top PIDe Elev=601.05 015• / - -L-25+II.50 95.23 LT x x�X�k � — E�� G EPEE RU\N —P 6 / TJ ` TS 0 Too PIDe ERV= 78.65 LT tC irg'52TE 48 H 5 c � „ �` 6.1 E E E C JT �� ` C E I TING R/yl \ � ) — 4 EX1G11NG R/ C 3 J Elev=5 c ie C �_a TEMPORAR �-- / .. .. .. L _ TC' SHEET PILING TS_ -T-- -- _______ ______,-___ ___ _ _---- -- ----- -- ---- REMOVE --- a -L-L- BRIDGE 112 - ---�— --o F r 26'BST C -STL es - 26'Bsr Nc B7 -- — ------ --- -------- ----- - BL-6 in.PVC TOWn of^D ee ---_- _---—F --- —a— ! REMOVE _--- -- — / MrL -NC 7- �TTL r— v X— —X X X X X X—X X�X (a ` rrrr�� / 1'RCP BL-5 12•q P • O CHL ,�� 60'CHL + RIP AP r+� /GF/ 4 , 48 R ��l 9 1 I II 2,J 12 E 15"RCP-III _ —T — E I 1 —, TROXLER LN E TO OLD NC 87CONc- L-- /m e -L-24• .39 42.33 RT ci\ / J ISBLKBUS 2 TN 2 qG../ WOODS 1A WOODSO+ / IE SPEC CUT DITCH I/ TDD 24,01.87 Ipe v 63 59103 C 78 RT W '.g0 /"R v, - / E 6 I I X— SEE DETAIL 302 I CAUSEWAY NOT TO EXTEND 4� MORE THAN 50% m I I I ACROSS REEDY FORV edam \ : / I ——__________ TOE PR N a ISE I WOODS EST 44 TONSE L BARIPRAP / 1 p I I B / / �e�\„ Ia EST 97 SY EOTEXTILE IL UAq R,BOOE ~\ 1 IGAR ���� K THRYN T.BOOE \ Ilk mi I I LEE 44U�u22'I r2BER m I I SABRINA M,BARBER //• / / \\\ 30 It ,S �ti, KAY T AVLER BOOE\ // D �IUTA R.BOOE +• 1 I C E E C 0 C DETAIL 305 DETAIL 301 1 SPECIAL CUT BASE DITCH CUT DITCH I—.Scolel (Not.Smle) Fro, DNch O_ NaoVml A\°c D.h No:uml A'�of Slope Slope Groun ?7 D F\ °< 0 � e�I� L.-=..1 Min.D= .05 Ft. Min.D= 1.0 F1. 10 B= 1.0 Ft. m -LDET- FROM STA.-LDET-14+75 LT TO STA.-LDET-14+94.62 LT FROM STA.-LDET-26+05 LT TO STA.-LDET-26+40 LT FROM STA.-LDET-14+94.62 LT TO STA.-LDET-16+00 LT /Sla /8+32J3 P/Slo 25+7959 P/Sfo 28+26.12 FROM STA.-LDET-28+40 LT TO STA.-LDET-29+75.91 LT _ 12'52'06.6"(RT) A = 12'59 485'(RT) A = 13'22'56.7 QTI m = 4 24'265' D = 4'24'265' D = 6 44 264' = 29/—W L = 294.89' L = 19653 = 146.6/' T = 148,08' T = 99.72' _ 1,300A0 R = 1,300.00' R = 850.00' m S - 40 mph DS = 40 mph = 004 a = 0.04 =� 0 = 76.O(Y RO = 76.00 FOR -LDET- PROFILE SEE SHEET NO.2B-2 =o FOR -L- PLAN SEE SHEETS NO.4 AND NO 5 O' PROJECT REFERENCE NO. SHEET NO. 0 n DETAIL 401 B-5728 4 coTOE PROTECTION RAN SHEET NO. I No,ro saalel ROADWAY DESIGN HYDRAULICS NaNrol r /�/// DENOTES IMPACTS IN ENGINEER ENGINEER Grond p �`— SURFACE WATER e 4� 2A k- ceaaeue 1•r Ap 2011 (� (j1 Type of Liner= Cla%a B Rip-Rap DENOTES TEMPORARY DETAIL 501 NAB $3 FROM STA.-L-18+50 RT TO STA L-19+70 RT 4 cL FROM STA-L-23+50 RT TO STA.-L-26+00 RT IMPACTS IN SURFACE WATER SPECIAL CUT DITCH WHINGE I 1 J� (Na,o ScalelDOCUMENT NOT CONSIDERED FINAL TERRY TORAN / 50 25 0 50 100 1 UNLESS ALL SIGNATURES COMPLETED `I^ A' From TRACY Q TORAII i/ Ddch Oi p , ,.� Pe A.o' Min.D= 0.5 Ft. ALBERT GURNEY♦k ,", r y�� BETTY BEAN SU ttON moffa tt&nlchol •"NC Lleanea lqx F-0105 r� FROM STA.-L-14+00 LT TO STA.-L-14+45.11 LT FROM STA.-L-14+50 RT TO STA.-Ir 9+67. RT I �,� PERMIT D RAW I N G FROM STA.-L-25+75 RT TO STA.-L-29+67.69 RT FROM STA-L-29+67.69 LT TO STA.-L-30+00 LT -- I BET B UTTON LOUIS S. NEWTON AL R RNEY r: SHEET 4 OF 8 •s- - MISTY D. JONEs LEE LOW� RINA M. do \_---- —� 1 T L LER REAL ESTATE�BARBER / j} ya / � JOSEPN N.TRO%LER IfRS O�STgy4 I 1 X g NA• /// / 1 I �' I'` ' • X GLEN RAVEN MILLS INC I NOwry�' CP( 40' R I • / / t J`I ter. SITE 2 TEMP BANK STABILIZATION, / / L JAMBS W. M R PEGG Y��.,, / �. 8 IMPACTS IN // • E N. MCI MANSFIELD I I + cP h I BMI / } alW R° v�a SURFACE IN / o,N G S EIP i SPIKE IN 16'QU 4 o Ov t+ � � F c.:�RA LEE• � EIP � STA-Ir 18+69.15 '•WW Z �� I 115'LEFT /o 4• EIP X X 1::4LETT EIP 1 2 ELEV=615.33' R / 0,2 Q DECK L:1 YICAEL A. -- • TEMPORARY Q HTR I EI B RRLY —� 1 SHEET PILING � -E, E 1 I EIP C W I EIP zo• rt�s� LEE LONS BARBER s E— E 7EM ORA Y D 1 MCMIL o' EIP EIP SABRINA Y.BARBER O - X E \ E —r ESHEET PILINN 1 1 ROY W. MITCNELL o SHIRLEY B. YITCHELL 1 I ANT NA .f- �c ^. _- E 1 1� Wi�� NTH E_CK,s �': _ �� E—Erg PUE •e r/ 1 P �� E C GUMS / F 6 11 E _ C C I 1 IP IF 50LWOODS C C as `i^ C — X -LOFT- R OVE F O ..3•W r Ezlsrwc Ria —�_ i 1 C � Vk REMOVE _ - __ ^OCONIC HW GR .. .. .. � l• �� -� EIP � IP `� tO�—T --T-- 26'BST - L Z9 O OLD NC 7 RETAIN �6 in.. 5 f�SeSip88/ -r MTL m, MTL x X_ R x x x /j REMOVE ..C C C S� —'C- s 48 R -.REMOVE �X—X— 5 W XXXX X m Q I P F RE VE ; TOE ROTEGTION / w0 OS X m \ m w C 1 5"CSP PERM BANK STABP ZAT SITE ACTS 2 CDETAIP 401 -- �\ WOODS / ISBLKBUS / ELBOWS / � w E I ION ES T S L B E RAP i v / X— SJRFACE WATERS EST 0 SY GEOTEXTILE 7 N �M ry� PROPOSED CAUSEWAY aR / - 1 �L- TA /4*We{/{/ 1 I I MNOT TO DEND ORE THANG 0 AV % ACROSS REEDY FORK m PROPOSED CAUSEWAY C- I NOT TO EXTEND / 11 - \r I I WOODS TMB#T MORE THAN 50% 1F I I TOE PROTECTION SPIKE IN 28"P ACROSS REEDY FORK SEE DETAIL 4N _ _ J EST 26 TONS CL B RIPRAP STA-L-IGH ♦ ,f"-r"s' I I 149.60'RIGH s ♦ EST 58 SY GEOTEXTILE ELEV=591.0 ,y o, o o II 4, 15 81 1 O� I I LEE LOA M. BARBER / I I SABRINA Y.BARBER r o I I V SITE 2 J // 0� K RILLTROILER AM%R.BOOED\ N BEGIN TIP PROJECT B-5728 TEMP CAUSEWAY, % ♦ —L— PRC STA 14+45J1 SU a IMPACTS IN EST E SURFACE WATERS I C O L C W (T! t— 1 f W a / m 'o —L P/SIo/4+2036 P1 Slo 14+69M = A = LT lr l2r(RT) 0'15'2ir(LT) N D = 0e 22'37J' D - 0e 3r 00.6• L = 495r L = 49511' T m 2475' T = 24.75' m R = 15J92J2' R - 11e085.W DS = 55 MPH m e = NC _m FOR DETOUR SEE SHEET NO.2B-1 �o. FOR -L- PROFILE SEE SHEET NO.6