Loading...
HomeMy WebLinkAbout20201505 Ver 1_Revised Wetland_Impact_Summary_Form_20220127 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -LDET-21+30 to 22+80 Causeway 0.08 17 Bank Stabilization 2 -L-20+95 to 22+59 Causeway 0.18 134 Bank Stabilization <0.01 66 TOTALS': <0.01 1 0.26 1 66 1 151 1 0 *Rounded totals are sum of actual impacts NOTES: 440 SQ. Ft. OF STREAM IMPACT FOR DETOUR INTERIOR BENT NC DEPARTMENT OF TRANSPORTATION 516 SQ. Ft. OF STREAM IMPACT FOR INTERIOR BENT 1 DIVISION OF HIGHWAYS 516 SQ. Ft. OF STREAM IMPACT FOR INTERIOR BENT 2 11/11/2021 SOME TEMPORARY STREAM IMPACTS FROM CAUSEWAY NOT RECORDED DUE TO PERMANENT BANK STABILIZATION ALAMANCE COUNTY IMPACTS B-5728 Revised 2018 Feb SHEET 8 OF 8