Loading...
HomeMy WebLinkAbout20141169 All Versions_SW Management Plan_20140123 PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural No.(From/To)Size / TypeWetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design SiteStationStructureFill InFill Inin Clearingin SW SWImpactsImpactsStream NC DEPARTMENT OF TRANSPORTATION (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 22+67 TO 28+77 -L- RT. 0.27 0.13 224+60 TO 27+00 -L- 0.19 356+35 TO 57+13 -L- RT. < 0.01 416+26 TO 17+40 -Y1- LT. 0.01 571+09 TO 77+39 -L- 2.06 0.25 627+46 TO 32+33 -Y2A-60" RCP-IV0.20 0.09 0.02< 0.0114421 698+20 TO 101+64 -L-72" RCP-IV0.80 0.09 0.07< 0.0138124 7128+50 TO 129+44 -L- RT. 0.08 0.040.02 8131+13 TO 132+38 -L- RT. 0.05 0.02 9139+81 TO 140+61 -L-48" RCP-IV0.03 < 0.01 10140+57 TO 162+27 -L-160' BRIDGE3.320.06 0.380.43 11162+83 TO 164+07 -L- RT. 0.17 0.02 12168+10 TO 179+18 -L-1160' BRIDGE0.010.01 4.02 13206+10 TO 223+71 -L-84" RCP-IV 0.670.04129374 1413+65 TO 14+27 -Y3D-18"0.02 0.04< 0.01 15228+39 TO 231+42 -L- 1.08 0.14 1629+23 TO 32+00 -Y2- RT. < 0.01 0.030.03 0.040.0112025 TOTALS*:8.270.070.111.224.450.810.0619381440 ONSLOW AND JONES COUNTY WBS - 34442.1.3 (R-2514B) DIVISION OF HIGHWAYS Existing Existing WETLAND IMPACTSSURFACE WATER IMPACTS SHEET 62 OF 62 WETLAND PERMIT IMPACT SUMMARY Hand otal impacts above. tal impacts above. Site 10: Temporary Impacts due to Temporary Work Bridge bents in wetlands: <0.01 Acres--These impacts are not included in the t Site 12: Temporary Impacts due to Temporary Work Bridge bents in wetlands: 0.03 Acres--These impacts are not included in the to Site 10: Permanent Impacts due to bents in wetlands: <0.01 Acres--These impacts are not included in the total impacts above. Site 12: Permanent Impacts due to bents in wetlands: 0.01 Acres--These impacts are not included in the total impacts above. Site 13: 386 LF of Permanent Stream Impacts due to Relocation. *Rounded totals are sum of actual impacts Revised 2013 10 24 NOTES: