HomeMy WebLinkAbout20071141 Ver 1_Approval Letter_20070809o~~~ w a r~9Q~
r
_~~._~
o `,`~ . Y
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
August 9, 2007
Mr. David Kay
Kay Investment Group, LLC
160 Cedar Point Boulevard
Swansboro, NC 28584
Subject Properly: John S. Jones and W I Herring Subdivision
Bogue Sound [030503, 20-36-(0.5), SA, ORW]
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mr. Kay:
Coleen H. Sullins, Dircetor
Division of Water Quality
DWQ Project # 07-1141
Carteret County
You have our approval, in accordance with the attached conditions and those listed below, to dredge
0.392 acres of shallow bottom habitat, shade 0.035 acres of coastal wetlands, shade 0.0078 acres of open
water, and incorporate 0.0078 acres of open water, for the purpose of constructing an 8 slip docking
facility, as described within your application dated March 30, 2007, and received by the N.C. Division of
Water Quality (DWQ) on June 27, 2007. After reviewing your application, we have determined that the
Division of Water Quality (DWQ) General Water Quality Certification Number 3642 covers these water
impacts. This Certification allows you to General Permit No. 198000291 when issued by the US Army
Corps of Engineers (USAGE). In addition, you should get or otherwise comply with any other federal,
state and local requirements before you go ahead with your project including (but not limited to) erosion
and sediment control regulations and CAMA. Also, this approval to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application shall expire upon
expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. If total fills for this project (now or in the future) exceed one acre of
wetland or 1501inear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general conditions
of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including
incidental impacts:
T e of Im act Amount A roved Units Plan Location or Reference
Coastal Wetlands 0.035 acres -shade DCM Field Investi ation. Re ort
401 Oversight/Express Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: htto:J/h2o enr.state nc.uslncwetlands
N ne Caro na
~tura~y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Kay Investment Group, LLC
Page 2 of 3
August 9, 2007
Shallow Bottom
Habitat 0.392 (acres) -dredge DCM Field Investigation Report
O en Water 0.0078 (acres -shade DCM Field Investi ation Re ort
O en Water 0.0078 (acres - incor orate DCM Field Investi ation Re ort
Sediment and Erosion Control:
2. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices in
order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the 404/401Permit Application. All construction activities,
including the design, installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water quality standards,
statutes, or rules occur;
4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that the
Division of Land Resources has released the project;
5. Protective Fencing -The outside buffer, wetland or water boundary and along the construction corridor
within these boundaries approved under this authorization shall be clearly marked with orange warning
fencing (or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 2H,
Section .0500;
6. Deed Notifications -Deed notifications or similar mechanisms shall be placed on all retained
jurisdictional wetlands, waters and protective buffers in order to assure compliance for future
wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any
wetlands, waters and/or buffers approved for impact under this Certification Approval and
Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit
web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be
modified as appropriate to suit to this project;
7. Construction Stormwater Permit NCGO 10000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land
Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an
NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued
to the project. This General Permit allows stormwater to be discharged during land disturbing
construction activities as stipulated by conditions in the permit. If your project is covered by this
Kay Investment Group, LLC
Page 3 of 3
August 9, 2007
permit [applicable to construction projects that disturb one (1) or more acres], full compliance
with permit conditions including the sedimentation control plan, self-monitoring, record keeping
and reporting requirements are required. A copy of this permit and monitoring report forms may
be found at http://h2o.enr.state.nc.us/su/Forms Documents.htm.;
Certificate of Completion:
8. Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality,
1650 Mail Service Center, Raleigh, NC, 27699-1650.
Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as
depicted in your application shall expire upon expiration of the 404 or CAMA Permit.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or
stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that
you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of
the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please telephone Cyndi Karoly or Ian McMillan in the Central Office in
Raleigh at 919-733-1786 or Joanne Steenhuis, in the DWQ Wilmington Reg' 1 Office at 910-796-7215.
Since / ~J
CHS/ijm
oleen H. Sullins, Director
Enclosures: GC 3642
Certification of Completion
cc: Doug Huggett, DCM
USACE Wilmington Regulatory Field Office
Joanne Steenhuis, DWQ Wilmington Regional Office
File Copy
Central Files
Mike Street, P.O. Box 769, Morehead City, NC 27557
Charles Rawls, Charles A. Rawls and Associates, P.O. Box 1126, Swansboro, NC 28584
Filename: 071141 JohhSJonesAnd W IHerringSD(Carteret)40 ] _CAMA
Certification of Completion
DWQ Project No.:
Applicant:
Project Name:
county:
Date of Issuance of Certification or Authorization:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I, ,hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature:
Agent's Certification
Date:
I, ,hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I, as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permiee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Registration No. Date