HomeMy WebLinkAbout20061240 Ver 1_Certification of Completion_20070810a~r ~~
Certificate of Completion ~
DWQ Project No.: C?~ ~- 1 2HG County: Me~.kl~h~ur~
Applicant: C ~ ~N ~~~ Ckar ~o ~-~~ 5'-~-C~;~,-, ~n%~fes S~Y~ ~z 5
Project Name: yyHG K;s}~~~- Av~~tit
Date of Issuance of 401 Water Quality Certification: `f ~'S' G 6
Upon completion of all work approved within the 401 Water
Quality Certification and Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit,
North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form
may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is
not necessary to send certificates from all of these_
Applicant's Certification
I' ~~s"`~ ~ ~7" ~ ` ~ s `"'` ,hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: _~ ~~ Date: 7 l ~-~ v 7
Agent's Certification
I' ,hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I' , as a duly registered Professional
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized tole ,
observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that,
to the best of my abilities, due care and diligence was used in the observation of the construction such that
the construction was observed to be built within substantial compliance and intent of the 401 Water Quality.
Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature: ^~, Registration No.: Date:
Y ~ e r {
~aIJG ~ ~ 1007