Loading...
HomeMy WebLinkAboutSW5220103_Supplement-EZ Form_20220124SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 lProiect Name Project Area (ac) Coastal Wetland Area (ac) Surface Water Area (ac) Is this project High or Low Density? Does this project use an off -site SCM? Wave Wash Louisbu 1.011 0 0 High No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 5 8 Will the vegetated setback remain vegetated? Yes 9 Ilf BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? Yes 10 1 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration S stem 1 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 JBayfilter 26 1 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Jarrett Senkbeil / President 28 Or anization: OnSite Civil Group 29 Street address: 980 Birmingham Rd 30 City, State, Zip: Milton, GA 30004 31 Phone numbers : 404-822-9147 32 Email: jarrett@onsitecivil.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 22gLgner CAR AL 0035943 �+r INc, 'f/CHKV- Seal Signature of Designer Date ' I I 1-18-22 DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1.01 3 Does this roiect have low densit areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED AREA INFORMATION Entire Site 1 4 T pe of SCM Infiltration System Infiltration System 5 Total drainage area (sq ft 43996 43996 6 Onsite drainage area (sq ft 43996 43996 7 Offsite drainage area (sq ft 0 0 8 Total BUA in project (sq ft 32234 sf 32234 sf 9permitting) New BUA on subdivided lots (subject to s ft 0 sf 0 sf 10permitting) New BUA not on subdivided lots (subject to s 32234 sf 32234 sf 11 Offsite BUA (sq ft 0 sf 0 sf 12 1 Breakdown of new BUA not on subdivided lots: 0 0 Parking (sq ft 10980 sf 10980 sf Sidewalk (sq ft 780 sf 780 sf Roof (sq ft 3500 sf 3500 sf Roadway s ft 16974 sf 16974 sf Future (sq ft 0 sf 0 sf Other, please specify in the comment box below (sq ft 0 sf 0 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 0 sf 0 sf 14 New infiltrating permeable pavement not on subdivided lots (sq ft 0 sf 0 sf 15 Existing BUA that will remain (not subject to ermitting) (sq ft 0 sf 0 sf 16 Existing BUA that is already permitted (sq ft 0 sf 0 sf 17 Existing BUA that will be removed (sq ft 18 Percent BUA 74% 74 0 19 Design storm inches 1.5 in 1.5 in 20 Design volume of SCM cu ft 14850 cf 14850 cf 21 Calculation method for design volume Chambers Chambers ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): The offsite area bypasses the infiltration system. INFILTRATION SYSTEM 1 Drainage area number 1 2 1 Minimum required treatment volume (cu ft) 3106 cf GFNFRAI mnr FRnm n9H insn 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? na 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 lWhat is the method for dewatering the SCM for maintenance? Other 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensedprofessional? Yes 18 1 Proposed slope of the subgrade surface (%) 0% 19 jAre terraces or baffles provided? No 20 1Tvpe of pretreatment: Upstream SCM Data 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SHWT elevation (fmsl) na 23 Depth to SHWT per soils report (in) 96" 24 Ground elevation at boring in soils report (fmsl) 264.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes 26 ISoil infiltration rate (in/hr) 5.96 27 1 Factor of safety (FS) (2 is recommended): 11.92 (Elevations 29 113ottom elevation (fmsl) 258 ft 30 IStorage elevation (fmsl) 260. ft 31 1 Bypass elevation (fmsl) 265 ft Basins 32 1 Bottom surface area(ft) 3152 ft 33 Istorage elevation surface area(ft) 3152. ft For Trenches Only 34 Length (ft) na 35 Width (ft) na 36 Perforated pipe diameter, if applicable (inches) na 37 Number of laterals na 38 Total length of perforated piping na 39 Stone type, if applicable na 40 Stone porosity (%) 40% 41 Is stone free of fines? Yes 42 Is the stone wrapped in geotextile fabric? Yes 43 Has at least one inspection port been provided? Yes vo/umesiurawaown 44 IDesign volume of SCM (cu ft) 3106 cf 45 ITime to draw down (hours) 20 hrs I 46 Please use this space to provide any additional information about I the infiltration system(s): at 1-1=1.23 in/hour. At 24" depth / 1.23 in/hour = 19.5 in/hr or 20 hrs. Infiltration 3 9:12 AM 1/18/2022