HomeMy WebLinkAboutSW5220101_Plansheet - SCM Detail_20220124STORMWATER CONTROL MEASURE W CONSTRUCTION SPECIFICATIONS FAI GENERAL NOTES CONSTRUCTION SEQUENCE 1. PRIOR TO CONSTRUCTION, ANY DISCREPANCIES IN THE PLANS AND NOTES SHALL BE BROUGHT TO THE DESIGN ENGINEER'S ATTENTION 1. PRIOR TO CONSTRUCTION, THE OWNER SHALL OBTAIN A LAND DISTURBING (GRADING) PERMIT AND AN "APPROVAL TO CONSTRUCT" IMMEDIATELY. FROM THE NORTH CAROLINA DEPARTMENT OF ENVIRONEMNTAL QUALITY AND ALL OTHER NECESSARY PERMITS FROM APPLICABLE AGENCIES (E.G. 404/401 PERMITS) 2. THE PROJECT WILL MEET ALL OF THE REQUIREMENTS RELATIVE TO BEST MANAGEMENT PRACTICES AND ENGINEERED STORMWATER CONTROL STRUCTURES AS OUTLINED IN NORTH CAROLINA STORMWATER CONTROL DESIGN MANUAL. 2. INSTALL ALL SEDIMENT AND EROSION CONTROL MEASURES PER THE APPROVED SEDIMENT AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL MAINTAIN ALL APPROVED SEDIMENT AND EROSION CONTROL MEASURES THROUGHOUT THE ENTIRE PROJECT, AS 3. THE FINAL CERTIFICATION FOR THIS FACILITY WILL INCLUDE A CERTIFICATION BY THE ON -SITE GEOTECHNICAL ENGINEER THAT THE REQUIRED. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE EROSION CONTROL INSPECTOR, AS REQUIRED BY GOVERNING PROJECT WAS CONSTRUCTED PER THE APPROVED PLANS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE AGENCIES, PRIOR TO ANY CLEARING. ON -SITE GEOTECHNICAL ENGINEER FOR OBSERVATION AND TESTING SUCH THAT THE ON -SITE GEOTECHNICAL ENGINEER CAN CERTIFY THE CONSTRUCTION OF THE DAM EMBANKMENT AND SPILLWAY. THIS CERTIFICATION MUST ADDRESS THE TESTING FOR MATERIALS AND 3. CLEAR AND GRUB AREA WITHIN THE LIMITS OF THE PROPOSED DAM CONSTRUCTION. ALL TREES AND THEIR ENTIRE ROOT SYSTEMS MUST COMPACTION OF THE DAM EMBANKMENT AND SPILLWAY. BE REMOVED FROM THE DAM FOOTPRINT AREA AND BACKFILLED WITH SUITABLE SOIL MATERIAL. THE BACKFILLED AREAS SHALL BE COMPACTED TO THE SAME STANDARDS AS THE DAM EMBANKMENT. THE REMAINING AREA OF THE EMBANKMENT SHALL BE STRIPPED TO 4. ALL CONSTRUCTION ACTIVITY RELATED TO THE PROPOSED STORMWATER CONTROL MEASURE SHALL BE PER THE DETAILS AND A SUITABLE DEPTH AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. ANY RESIDUAL SOILS TO BE LEFT IN PLACE MUST BE WELL SPECIFICATIONS SHOWN IN THESE DRAWINGS. SOILS, COMPACTION, AND OTHER MISCELLANEOUS DETAILS AND SPECIFICATIONS MAY BE SCARIFIED TO PROMOTE BONDING OF THE NEW EMBANKMENT FILL. NO EMBANKMENT MATERIAL SHALL BE PLACED FOR THE DAM OR MODIFIED PER THE RECOMMENDATIONS OF THE ON -SITE GEOTECHNICAL ENGINEER. HOWEVER, PRIOR TO IMPLEMENTATION, THE DESIGN KEY TRENCH UNTIL APPROVAL OF THE DAM SUBGRADE IS OBTAINED FROM THE ON -SITE GEOTECHNICAL ENGINEER. ENGINEER SHALL BE NOTIFIED OF ANY DEVIATION FROM THESE DESIGN DRAWINGS, INCLUDING SHOP DRAWINGS FOR ANY PROPOSED MODIFICATION. 4. EXCAVATE FOR THE NEW KEY TRENCH ALONG THE CENTERLINE OF THE PROPOSED DAM EMBANKMENT. THE TRENCH SHALL EXTEND A MINIMUM OF 5 FT BELOW EXISTING GRADE OR 2 FT BELOW THE 18" 0 RCP OUTLET BARREL AND SHALL HAVE A MINIMUM BOTTOM 5. DURING THE INITIAL STAGES OF CONSTRUCTION, THE STORMWATER CONTROL MEASURE MAY BE USED AS A SEDIMENT BASIN FOR WIDTH OF 5 FEET. THE KEY TRENCH SIDESLOPES SHALL BE A MINIMUM OF 1:1 (H:V). WHEN EXCAVATING THE KEY TRENCH, IF ANY DEBRIS EROSION CONTROL PURPOSES. IF SO, THE CONTRACTOR SHALL FOLLOW THE GENERAL CONSTRUCTION SEQUENCE BELOW: IS ENCOUNTERED TO AN EXTENT THAT SUCH DEBRIS MAY EXIST IN OTHER INSITU PORTIONS OF THE DAM EMBANKMENT, IT SHOULD ALSO A. THE CONTRACTOR SHALL CONSTRUCT THE ENTIRE FACILITY (PERMANENT OUTLET STRUCTURE, DAM, ETC.) WITH THE EXCEPTION OF BE REMOVED. THE KEY TRENCH SHALL BE COMPACTED TO THE SAME SPECIFICATION LISTED IN ITEM 4 OF THE SECTION TITLED "BERM THE INTERIOR FINE GRADING FOR THE FACILITY. THE INTERIOR FINE GRADING WILL BE CONSTRUCTED ONCE THE EROSION CONTROL AND SOIL COMPACTION SPECIFICATIONS." DEPENDING UPON ON -SITE SOIL CONDITIONS ENCOUNTERED DURING EXCAVATION, THE PHASE IS COMPLETE. ON -SITE GEOTECHNICAL ENGINEER MAY VARY THE DEPTH AND DIMENSIONS OF THE KEY TRENCH AS DEEMED NECESSARY. THE ON -SITE B. THE TEMPORARY DRAW DOWN RISER (OR SKIMMER) SHALL BE CONNECTED TO THE PERMANENT 6" 0 DIP DRAIN PIPE. GEOTECHNICAL ENGINEER SHALL RETAIN DOCUMENTATION OF ANY VARIATION FOR FUTURE AS -BUILT SUBMITTALS TO THE TOWN OF C. ONCE THE UPSTREAM DRAINAGE AREA IS STABILIZED AND THE EROSION CONTROL INSPECTOR APPROVES THE REMOVAL OF THE BUNN. SEDIMENT BASIN, THE CONTRACTOR SHALL REMOVE THE TEMPORARY DRAW DOWN RISER (OR SKIMMER) AND CLEAN OUT THE BASIN. ALL SEDIMENT, TRASH, ETC. SHALL BE DISPOSED OF PROPERLY (I.E. - PLACED IN A LANDFILL) AND NOT STOCKPILED IN AN AREA 5. BEGIN PLACEMENT OF BACKFILL WITHIN THE KEY TRENCH. THE KEY TRENCH SHALL BE COMPACTED TO THE SPECIFICATIONS LISTED ITEM 4 WHERE WATER QUALITY COULD BE ADVERSELY AFFECTED. OF THE SECTION TITLED "BERM AND SOIL COMPACTION SPECIFICATIONS." THE KEY TRENCH SHALL BE TESTED PER THE SPECIFICATIONS D. ONCE THE BASIN IS CLEANED OUT, AND ALL EROSION CONTROL DEVICES REMOVED, THE CONTRACTOR SHALL CONSTRUCT THE LISTED IN THAT SECTION. INTERIOR GRADING SHOWN ON THIS SHEET. E. ONCE THE GRADING IS COMPLETE, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION AND AN AS -BUILT SURVEY PRIOR TO 6. PRIOR TO INSTALLATION, SUBGRADE CONDITIONS ALONG THE SPILLWAY PIPES SHOULD BE EVALUATED BY THE ON -SITE GEOTECHNICAL INSTALLATION OF THE STORMWATER CONTROL MEASURE PLANTS. IF THE CONTRACTOR PLANTS THE PROPOSED VEGETATION PRIOR ENGINEER TO ASSESS WHETHER SUITABLE BEARING CONDITIONS EXIST AT THE SUBGRADE LEVEL. SHOULD SOFT OR OTHERWISE TO AN AS -BUILT SURVEY (AND SUBSEQUENT APPROVAL), ANY CHANGES TO THE GRADING / RE -PLANTING OF PLANTS WILL BE AT THE UNSUITABLE CONDITIONS BE ENCOUNTERED ALONG THE PIPE ALIGNMENTS, THESE MATERIALS SHOULD BE UNDERCUT AS DIRECTED BY CONTRACTOR'S EXPENSE. THE GEOTECHNICAL ENGINEER. THE UNDERCUT MATERIALS SHALL BE REPLACED WITH ADEQUATELY COMPACTED STRUCTURAL FILL, LEAN F. ONCE THE ENGINEER HAS APPROVED THE AS -BUILT GRADING, THE CONTRACTOR SHALL PLANT THE PROPOSED STORMWATER CONCRETE OR FLOWABLE FILL AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. CONTROL MEASURE PLANTS SHOWN ON THE LANDSCAPE PLAN FOR THE FACILITY. AFTER COMPLETION OF THE PLANTING, THE LANDSCAPE CONTRACTOR SHALL PROVIDE A LETTER TO THE ENGINEER CERTIFYING THAT THE PLANTS HAVE BEEN INSTALLED PER THE 7. IN ORDER TO HELP PROTECT THE SOIL SUBGRADE FROM DETERIORATION (DUE TO EXPOSURE, RAINFALL, SEEPAGE, AND RUNOFF) BEFORE APPROVED STORMWATER CONTROL MEASURE PLANTING PLAN. THE CRADLE CAN BE POURED, IT IS STRONGLY RECOMMENDED THAT A 3" TO 4" THICK CONCRETE MUD MAT BE POURED OVER THE 6. ALL OSHA REQUIREMENTS FOR EXCAVATIONS (SHORING, DEPTH, ETC.) ARE THE RESPONSIBILITY OF THE CONTRACTOR. IF REQUIRED, THE SUBGRADE ONCE IT IS APPROVED BY THE ON -SITE GEOTECHNICAL ENGINEER. THE MUD MAT WILL ALSO PROVIDE BEARING FOR THE CONTRACTOR SHALL PROVIDE AN EXCAVATION PLAN TO BE SEALED BY A NC P.E. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BLOCKS THAT TEMPORARILY SUPPORT THE SPILLWAY PIPE UNTIL THE CRADLE CAN BE POURED. THE METHOD OF BLOCK SUPPORT FOR THE DETERMINE IF AN EXCAVATION PLAN IS REQUIRED. THE JOHN R. MCADAMS COMPANY ASSUMES NO RESPONSIBILITY FOR ANY PIPE PROPOSED BY THE CONTRACTOR SHOULD BE SUBMITTED TO THE JOHN R. McADAMS COMPANY FOR REVIEW. EXCAVATION DESIGN RELATED TO SAFETY OR OSHA REQUIREMENTS. 8. BEGIN CONSTRUCTION OF THE NEW EMBANKMENT. FILL MATERIALS SHALL BE PLACED IN MAXIMUM 8" THICK LIFTS PRIOR TO 7. ON -SITE GEOTECHNICAL ENGINEER TO DETERMINE IF IN -SITU SOILS ENCOUNTERED WOULD MAINTAIN A STORMWATER CONTROL COMPACTION, UNLESS DIRECTED OTHERWISE BY THE ON -SITE GEOTECHNICAL ENGINEER. FILL LIFTS SHALL BE CONTINUOUS OVER THE MEASURE PERMANENT POOL AT DESIGN ELEVATION. IF HIGHLY PERMEABLE SOILS ARE ENCOUNTERED THAT WOULD NOT MAINTAIN ENTIRE LENGTH OF FILL. IF IT IS NECESSARY, THE EMBANKMENT FILL MATERIAL WILL BE OVERBUILT IN HORIZONTAL LIFTS AND CUT BACK THE PERMANENT POOL ELEVATION AS DESIGNED, A CLAY LINER MAY BE REQUIRED TO MAINTAIN A PERMANENT POOL OF WATER IN THE TO FINAL GRADE IN ORDER TO ACHIEVE PROPER COMPACTION. STORMWATER CONTROL MEASURE. FINAL DETERMINATION IF A CLAY LINER IS NEEDED SHALL BE THE RESPONSIBILITY OF THE ON -SITE GEOTECHNICAL ENGINEER. UPON DETERMINATION OF HIGHLY PERMEABLE SOIL CONDITIONS, ON -SITE GEOTECHNICAL ENGINEER WILL 9. AS CONSTRUCTION OF THE EMBANKMENT MOVES FORWARD, IT WILL BE NECESSARY TO INSTALL THE CONCRETE CRADLE. SEE NOTE ON INFORM THE DESIGN ENGINEER AND RECOMMEND LINER SPECIFICATIONS. CRADLE DETAIL (SHEET C9.03). THIS MAY BE CONSTRUCTED USING ONE OF THE FOLLOWING METHODS: 8. IT IS ANTICIPATED THAT DEWATERING WILL BE NECESSARY IN THE EXCAVATION AREAS (E.G. - EMBANKMENT SUB GRADE, INTERIOR A. IF THE PROPOSED STRUCTURAL FILL MATERIAL IS UTILIZED AS THE FORMWORK FOR THE CONCRETE CRADLE, THEN THE STRUCTURAL PORTIONS OF THE STORMWATER CONTROL MEASURE, KEY TRENCH, ETC.). THEREFORE, THE CONTRACTOR SHALL FURNISH, INSTALL, FILL SHOULD BE INSTALLED AND COMPACTED UP TO THE TOP OF CONCRETE CRADLE ELEVATION. ONCE THE STRUCTURAL FILL OPERATE, AND MAINTAIN ANY PUMPING EQUIPMENT, ETC. NEEDED FOR REMOVAL OF WATER FROM VARIOUS PARTS OF THE REACHES THE NEXT DOWNSTREAM JUNCTION BOX OR HEADWALL AND IS COMPACTED TO THE ELEVATION OF THE TOP OF THE STORMWATER CONTROL MEASURE SITE. DURING PLACEMENT OF FILL WITHIN THESE AREAS, THE CONTRACTOR SHALL KEEP THE WATER CONCRETE CRADLE, EXCAVATE THE CONCRETE CRADLE TRENCH PER THE PROVIDED DETAILS AND CONSTRUCT THE CONCRETE CRADLE LEVEL BELOW THE BOTTOM OF THE EXCAVATION / CONSTRUCTION AREAS. THE MANNER IN WHICH THE WATER IS REMOVED SHALL BE AS PER THE PROVIDED CONCRETE CRADLE DETAIL. SUCH THAT THE EXCAVATION BOTTOM AND SIDE SLOPES ARE STABLE, WITH NO SEDIMENT DISCHARGED FROM THE SITE (I.E. PUMPED WATER MAY NEED TO BE DIRECTED TO AN APPROVED EROSION CONTROL DEVICE SUCH AS A DIRT BAG (ACF ENVIRONMENTAL), OR B. IF THE PROPOSED STRUCTURAL FILL IS NOT UTILIZED AS THE FORMWORK FOR THE CONCRETE CRADLE, THEN PRIOR TO ENGINEER APPROVED EQUIVALENT, PRIOR TO DISCHARGE). CONSTRUCTING THE STRUCTURAL FILL EMBANKMENT, THE FORMWORK FOR THE CONCRETE CRADLE SHOULD BE INSTALLED ON EXISTING GROUND AND/OR THE MUD MAT. THE CONCRETE CRADLE SHALL BE CONSTRUCTED PER THE PROVIDED DETAILS 9. THE GRADES SHOWN ON THIS PLAN ARE FINISHED GRADES. IF THE EXISTING SOIL LAYER AFTER CONSTRUCTION / COMPACTION IS NOT DETERMINED SUITABLE BY A LANDSCAPE PROFESSIONAL FOR THE WETLAND PLANTINGS, THEN THE CONTRACTOR SHALL AMEND THE 10. AS AN ALTERNATE TO A CONCRETE CRADLE UNDER THE BARREL PIPE (SEE SHEET C9.03), THE CONTRACTOR MAY CHOOSE TO ELIMINATE PLANTING AREA OF THE WETLAND AS DIRECTED BY A LANDSCAPE PROFESSIONAL. THE CONCRETE CRADLE AND USE COMPACTED BACKFILL IF THE ON -SITE GEOTECHNICAL ENGINEER WILL PROVIDE A NC PE SEALED LETTER CERTIFYING THAT THE COMPACTION UNDER, AROUND, AND ABOVE THE BARREL MEETS THE SPECIFICATIONS OF THE EMBANKMENT 10. PRIOR TO TOPSOIL INSTALLATION, THE CONTRACTOR SHALL SCARIFY THE TOP 2"-3" OF THE BERM SECTION TO PROMOTE BONDING OF COMPACTION REQUIREMENTS AND MOISTURE CONTENT. THIS CERTIFICATION LETTER MUST BE SUBMITTED TO THE DESIGN ENGINEER THE TOPSOIL WITH THE COMPACTED FILL. THE TOPSOIL DEPTH SHALL RANGE FROM 3C-4" ON THE DAM EMBANKMENT AND THE PRIOR TO BACKFILL. THIS SEPARATE CERTIFICATION MUST BE SPECIFIC TO THE BARREL PIPE FOR THE FACILITY AND MUST CLEARLY STATE WETLAND. PLEASE NOTE THE TOPSOIL SHALL BE AMENDED, AS DIRECTED BY A LANDSCAPE PROFESSIONAL, PRIOR TO INSTALLATION ON THAT ALL SOIL MATERIAL UNDER, AROUND, AND ABOVE THE BARREL PIPE MEETS THE BERM AND SOIL COMPACTION SPECIFICATIONS ON THE EMBANKMENT AND WETLAND. THIS SHEET. THIS CERTIFICATION IS TO INCLUDE REFERENCE TO BOTH MATERIAL AND COMPACTION, AND MUST STATE THAT ALL 0 MATERIALS UNDER AROUND AND ABOVE THE BARREL HAVE BEEN COMPACTED PER THE BERM MATERIAL SPECIFICATIONS ( AT LEAST 95/ 11. THE CONTRACTOR SHALL REFER TO THE LANDSCAPE PLAN FOR THE PERMANENT PLANTING PLAN/SCHEDULE FOR THIS FACILITY. OF MAXIMUM DRY DENSITY USING ASTM D698 STANDARD PROCTOR) WITH NO VOID SPACES PRESENT. THE CONTRACTORS INTENT TO CONTRACTOR SHALL COORDINATE WITH A LANDSCAPE PROFESSIONAL REGARDING SCHEDULING FOR PLANT INSTALLATION. PLEASE NOTE UTILIZE THIS ALTERNATIVE MUST BE STATED PRIOR TO CONSTRUCTION TAKING PLACE. THIS CONTRACTORS CERTIFICATION MUST BE THAT NO TREES/SHRUBS OF ANY TYPE MAY BE PLANTED ON THE PROPOSED DAM EMBANKMENT (FILL AREAS). PRESENTED TO THE DESIGN ENGINEER BEFORE AN AS -BUILT CERTIFICATION CAN BE ISSUED FOR THIS FACILITY. 11. INSTALL RISER / BARREL ASSEMBLY, ALONG WITH THE EMERGENCY DRAIN SYSTEM. INSTALL 18" RCP OUTLET BARREL SPILLWAY FILTER OUTLET STRUCTURE MATERIAL SPECIFICATIONS FROM THE DETAILS SHOWN ON SHEET C9.03. 1. THE 18" 0 RCP OUTLET BARREL SHALL BE CLASS III RCP, MODIFIED BELL AND SPIGOT, MEETING THE REQUIREMENTS OF ASTM C76-LATEST. 12. CONSTRUCT EMBANKMENT PER SPECIFICATIONS LISTED IN THE SECTION TITLED "BERM AND SOIL COMPACTION SPECIFICATIONS" AND THE PIPES SHALL HAVE CONFINED 0-RING RUBBER GASKET JOINTS MEETING ASTM C-443-LATEST. THE PIPE JOINTS SHALL BE TYPE R-4. REQUIREMENTS OF THE ON -SITE GEOTECHNICAL ENGINEER. ALL CHARACTERISTICS OF THE EMBANKMENT FILL MATERIAL SHALL MEETTHE STANDARDS SET FORTH IN "BERM AND SOIL COMPACTION SPECIFICATIONS" INCLUDING COMPACTION AND MOISTURE REQUIREMENTS. IF Q 2. THE STRUCTURAL DESIGN FOR THE 4' X 4' (INTERNAL DIMENSIONS) RISER BOX WITH EXTENDED BASE SHALL BE BY OTHERS. PRIOR TO NECESSARY TO ACHIEVE PROPER COMPACTION, THE EMBANKMENT FILL MATERIAL WILL BE OVERBUILT IN HORIZONTAL LIFTS AND CUT ORDERING THE STRUCTURES, THE CONTRACTOR SHALL PROVIDE, TO THE DESIGN ENGINEER FOR REVIEW, SHOP DRAWINGS AND BACK TO PROPER FINAL GRADE. ANY HAND COMPACTION ACTIVITIES AROUND SPILLWAY OR DRAIN STRUCTURES SHALL BE CONDUCTED IN SUPPORTING STRUCTURAL CALCULATIONS SEALED BY A P.E. REGISTERED IN NORTH CAROLINA DEMONSTRATING THE PERTINENT VERTICAL 4-INCH LOOSE LIFTS AND BE TO THE SAME COMPACTION AND MOISTURE REQUIREMENTS AS THE ENTIRE EMBANKMENT. ALL LOADS ARE SUPPORTED BY THE CONCRETE RISER STRUCTURE. COMPACTION AND MOISTURE TESTING SHALL BE CARRIED OUT AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER AND AS LISTED IN THE SECTION TITLED "BERM AND SOIL COMPACTION SPECIFICATIONS". 3. THE RISER BOX OUTLET STRUCTURE SHALL BE PROVIDED WITH STEPS 16" ON CENTER. STEPS SHALL BE PROVIDED ON THE INNER WALL OF THE RISER BOX. STEPS SHALL BE IN ACCORDANCE WITH NCDOT STD. 840.66. PLEASE REFER TO SHEET C9.02 FOR LOCATION OF THE RISER 13. UPON COMPLETION OF DAM EMBANKMENT, PROMPTLY STABILIZE AND SEED DAM EMBANKMENT PER SEEDING SCHEDULE. PERMANENT STEPS. NOTE THE STEPS SHALL LINE UP WITH THE ACCESS HATCH OF THE TRASH RACK. GROUND COVER SHALL BE ESTABLISHED PER THE PERMANENT SEEDING SCHEDULE FOUND ON SHEET C9.04. 4. THE CONCRETE ANTI -FLOTATION BLOCK SHALL BE CAST -IN -PLACE. STEEL REINFORCEMENT AND CONNECTION TO THE RISER SHALL BE 14. SCHEDULE A FINAL AS -BUILT INSPECTION AND AS -BUILT SURVEY WITH THE ENGINEER AND SURVEYOR. AN AS -BUILT INSPECTION AND PROVIDED IN ACCORDANCE WITH THE DETAIL ON SHEET C9.03. THE CONTRACTOR SHALL ENSURE THE WEIGHT OF THE ENTIRE RISER SURVEY SHALL BE SCHEDULED BEFORE IMPOUNDING WATER IN THE FACILITY AND A MINIMUM OF 60 DAYS PRIOR TO THE ANTICIPATED STRUCTURE IS GREATER THAN OR EQUAL TO 13,175 LBS. IN LIEU OF CAST -IN -PLACE, THE CONTRACTOR MAY OPT FOR A PRECAST DATE OF CERTIFICATION APPROVAL. ANY COMMENTS OR DEFICIENCIES IN THE SCM CONSTRUCTION MUST BE CORRECTED TO THE ANTI -FLOTATION BLOCK. SHOP DRAWINGS FOR THE PRECAST BLOCK SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW. THE PRECAST SATISFACTION OF THE ENGINEER AND OWNER BEFORE CERTIFICATION SHALL BE GRANTED. ANTI -FLOTATION BLOCK SHALL HAVE A SHIPPING WEIGHT OF 9,088 LBS. 5. THE RISER BOX JOINTS SHALL BE SEALED USING BUTYL RUBBER SEALANT CONFORMING TO ASTM-C990-LATEST. IF NECESSARY, THE CONTRACTOR SHALL INCORPORATE A WATERSTOP INTO THE RISER BOX JOINT TO ENSURE A WATERTIGHT CONNECTION. THE CONTRACTOR SHALL PARGE JOINTS ON BOTH THE INSIDE AND OUTSIDE WITH NON -SHRINK GROUT AND INSTALL GALVANIZED STEEL STRAPS PER DETAIL ON SHEET C9.02. 6. PRIOR TO ORDERING, THE CONTRACTOR SHALL SUBMIT TRASH RACK SHOP DRAWINGS TO THE ENGINEER FOR REVIEW. CONTRACTOR SHALL ENSURE THAT AN ACCESS HATCH IS PROVIDED WITHIN THE TRASH RACK (SEE DETAIL FOR LOCATION) THAT WILL ALLOW FOR FUTURE MAINTENANCE ACCESS. CONTRACTOR SHALL ALSO PROVIDE A CHAIN AND LOCK FOR SECURING THE ACCESS HATCH. NOTE THE ACCESS HATCH SHALL LINE UP WITH THE ACCESS STEPS AFTER INSTALLATION. 7. ALL POURED CONCRETE SHALL MEET THE FOLLOWING SPECIFICATIONS UNLESS OTHERWISE NOTED: -MINIMUM 3000 PSI (28 DAY) -SLUMP = 3" - 5" -ENTRAINED AIR = 5% - 7% PLEASE NOTE NO CONCRETE SHALL BE POURED WHEN THE AMBIENT AIR TEMPERATURES ARE EXPECTED TO BE ABOVE 85'F OR BELOW 40'F. CAST -IN -PLACE CONCRETE SHALL BE "WET CURED" AFTER FINISHING FOR A MINIMUM OF 48 HOURS. ON -SITE GEOTECHNICAL ENGINEER TO ENSURE AND CERTIFY ALL POURED CONCRETE MEETS THE ABOVE SPECIFICATIONS. 8. GEOTEXTILE FABRIC FOR THE 18"0 RCP OUTLET BARREL JOINTS SHALL BE MIRAFI 18ON OR ENGINEER APPROVED EQUAL (NON -WOVEN FABRIC). 9. STORMWATER CONTROL MEASURE EMERGENCY DRAW DOWN IS VIA AN 6"0 PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 1820 ECCENTRIC VALVE OR APPROVED EQUAL. THIS VALVE IS IN ACCORDANCE WITH AWWA C-517, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HAND WHEEL (SEE DETAIL SHEET C9.03). THE CONTRACTOR SHALL PROVIDE A REMOVABLE VALVE WRENCH WITH A HAND WHEEL ON TOP FOR OPERATION OF THE 6" 0 PLUG VALVE. 1. PRIOR TO CONSTRUCTION, THE ON -SITE GEOTECHNICAL ENGINEER SHALL IDENTIFY BORROW / FILL AREAS AND VERIFY THEIR SUITABILITY FOR USE WITHIN THE DAM EMBANKMENT. ALSO, THE ON -SITE GEOTECHNICAL ENGINEER SHALL PERFORM STANDARD PROCTORS ON THE PROPOSED BORROW MATERIAL TO ENSURE THAT OPTIMUM MOISTURE CONTENT AND COMPACTION CAN BE ACHIEVED / CONTROLLED DURING CONSTRUCTION. 2. ALL FILL MATERIALS TO BE USED FOR THE DAM EMBANKMENT SHALL BE TAKEN FROM BORROW AREAS APPROVED BY THE ON -SITE GEOTECHNICAL ENGINEER. THE FILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, WOOD, STONES GREATER THAN 6", AND FROZEN OR OTHER OBJECTIONABLE MATERIAL. THE FOLLOWING SOIL TYPES ARE SUITABLE FOR USE AS FILL WITHIN THE DAM EMBANKMENT AND KEY TRENCH: ML AND CL. ALL FILL MATERIALS SHALL BE APPROVED BY THE ONSITE GEOTECHNICAL ENGINEER FOR THE INTENDED USE. 3. FILL PLACEMENT FOR THE EMBANKMENT SHALL NOT EXCEED A MAXIMUM 8" LIFT (UNCOMPACTED). EACH LIFT SHALL BE CONTINUOUS FOR THE ENTIRE LENGTH OF EMBANKMENT. BEFORE PLACEMENT OF FILL FOR THE BERM SECTION, ALL UNSUITABLE MATERIAL SHALL BE REMOVED AND THE SURFACE PROPERLY PREPARED FOR FILL PLACEMENT. FILL MATERIAL ADJACENT TO ALL SPILLWAY AND DRAINAGE STRUCTURES SHALL BE PLACED IN 4-INCH (UNCOMPACTED) LIFTS AND HAND -COMPACTED TO THE SAME COMPACTION AND MOISTURE REQUIREMENTS AS THE ENTIRE EMBANKMENT. 4. ALL FILL SOILS USED IN THE EMBANKMENT CONSTRUCTION SHALL BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698). THE FILL SOILS SHALL BE COMPACTED AT A MOISTURE CONTENT WITHIN -1 TO +3 PERCENT OF ITS OPTIMUM MOISTURE CONTENT. COMPACTION TESTS SHALL BE PERFORMED BY THE ON -SITE GEOTECHNICAL ENGINEER DURING CONSTRUCTION TO VERIFY THAT THE PROPER COMPACTION LEVEL HAS BEEN REACHED. THE FILL SHOULD BE COMPACTED USING A SHEEPSFOOT TYPE COMPACTOR. IN ORDER TO PREVENT DAMAGE TO THE PIPE, NO COMPACTION EQUIPMENT SHALL CROSS ANY PIPE UNTIL MINIMUM COVER IS ESTABLISHED ALONG THE PIPE. 5. THE DESIGN ENGINEER SHALL BE PROVIDED WITH REPORTS AND CERTIFICATION, BY THE ON -SITE GEOTECHNICAL ENGINEER, THAT THE GEOTECHNICAL ASPECTS OF THE FACILITY HAVE BEEN CONSTRUCTED PER PLAN. THIS CERTIFICATION MUST ADDRESS THE TESTING FOR MATERIALS AND COMPACTION OF THE DAM EMBANKMENT AND SPILLWAY. THESE REPORTS AND CERTIFICATION WILL BE NEEDED DURING THE AS -BUILT CERTIFICATION PROCESS FOR THIS STORMWATER CONTROL MEASURE. THEREFORE, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE TESTING AND OBSERVATION WITH THE ON -SITE GEOTECHNICAL ENGINEER. 6. TESTING OF THE NEW FILL MATERIALS SHALL BE PERFORMED TO VERIFY THAT THE RECOMMENDED LEVEL OF COMPACTION IS ACHIEVED DURING CONSTRUCTION. THEREFORE, ONE DENSITY TEST SHALL BE PERFORMED FOR EVERY 2,500 SQUARE FEET OF AREA FOR EVERY LIFT OF FILL OR AS RECOMMENDED BY THE ON -SITE GEOTECHNICAL ENGINEER. 7. TESTING WILL BE REQUIRED ALONG THE 18"0 RCP OUTLET BARREL AT A FREQUENCY OF ONE TEST PER 25 LF OF PIPE PER VERTICAL FOOT OF FILL OR AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. I ......., .. it s STATEMENT OF RESPONSIBILITY 1. ALL REQUIRED MAINTENANCE AND INSPECTIONS OF THE STORMWATER CONTROL MEASURE SHALL BE THE RESPONSIBILITY OF THE OWNER, PER THE EXECUTED OPERATION AND MAINTENANCE AGREEMENT FOR THIS FACILITY. t f I t t 3 GRAPHIC SCALE 0 10 20 40 1 inch = 20 ft. STORMWATER CONTROL MEASURE W PLAN VIEW 1" = 20' 'J 1\11/11111,11111I",j The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT BODDIE-NOELL ENTERPRISES, INC. P.O. BOX 1908 ROCKY MOUNT, NC 27802 Contact PHONE: 252. 937. 2800 �=E W W W �QW J F_ F_ - z Q a� Z Z z m a J W � LL1 W o?S 0 O N a %%%'111►111j",1, J. SEAL T_ V !z-2 = TSON,% ay Watson n 20 2022 8:53 AM REVISIONS NO. DATE 1 12. 17. 2021 OWNER COMMENTS 2 1. 20. 2022 NCDEQ RESUBMISSION #1 3 4 5 6 PLAN INFORMATION PROJECT NO. 2021110321 FILENAME 2021110321-SW CHECKED BY RW DRAWN BY KEG SCALE 1"=20' DATE 12. 20. 2022 SHEET STORMWATER CONTROL MEASURE 'A' C9601 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION FzK NOTES: TRASH RACK 1. REMOVED TOPSOIL SHALL BE STOCKPILED FOR USE IN PLANTING (SEEDING) THE DAM (SEE DETAIL, SHEET C9.02) EMBANKMENT ONCE FINAL GRADES (AS SHOWN ON THE GRADING PLAN) HAVE BEEN CONCRETE COLLAR COMPACTED BERM SECTION ESTABLISHED WITH COMPACTED FILL. PRIOR TO TOPSOIL INSTALLATION, THE CONTRACTOR APPROXIMATE LOCATION OF (SEE BERM AND SOIL SHALL SCARIFY THE TOP 2- TO 3-INCHES OF THE BERM SECTION TO PROMOTE BONDING EXISTING GROUND (TO BE CONSTRUCTED IN THE FIELD BY THE COMPACTION SPECIFICATIONS, OF THE TOPSOIL WITH THE COMPACTED FILL. THE TOPSOIL DEPTH SHALL RANGE FROM 3- TOP OF HANDWHEEL CONTRACTOR, SEE DETAIL, SHEET C9.03) SHEET C9.01) TO 4-INCHES ON THE DAM EMBANKMENT. TO EXTEND 1-FOOT ABOVE TRASH RACK SPILLWAY FILTER APPROXIMATE LOCATION OF TOP OF EMBANKMENT = 274.50 PROPOSED GRADE (SEE DETAIL, EXISTING GROUND 100-YR STORM W.S.E = 274.03 F"6 FAAFR(;l l f1RAIN i TOP OF DAM WIDTH = 10' MIN. , SHEET C9.03) TOP OF EMBANKMENT = 274.50 34"L x J" o GRADE 8 a STAINLESS STEEL CONCRETE LAG SCREW 0 18" X 4" X J" GALVANIZED STEEL a STRAP (4 PER �. RISER JOINT) RISER JOINT CONNECTION DETAIL N.T.S. NOTES: 1. CONCRETE ANTI -FLOTATION BLOCK TO BE PROVIDED WITH MINIMUM TEMPERATURE AND SHRINKAGE STEEL REINFORCEMENT. 2. TRASH RACKS NOT SHOWN FOR CLARITY. 3. THE NUMBER OF GUIDES FOR THE VALVE STEM SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTOR. THE VALVE STEM MUST BE OPERABLE FROM THE TOP OF THE RISER VIA THE HANDWHEEL WITH AN INSIGNIFICANT AMOUNT OF PLAY IN THE VALVE STEM. I4. CONTRACTOR SHALL PROVIDE A JOINT IN THE OUTLET BARREL NO MORE THAN 5-FT FROM THE RISER. 5' 4' �1 3 0 0-1 RCP d d a 12" Q I F / CONCRETE ANTI -FLOTATION BLOCK 6" 0 DIP DRAIN W/ TRASH RACK INV. = 271.70 (SEE DETAIL SHEET C9.03) 6"0 DIP DRAIN W/ TRASH RACK (SEE DETAIL SHEET C9.03) INVERTED INTAKE (SEE DETAIL, SHEET C9.03) SHALL BE OPERABLE FROM TOP OF "'� `"" ENDWALL PER OUTLET STRUCTURE VIA A HANDWHEEL. COMPACTION SPECIFICATIONS, NCDOT STD. 838.80 DETAIL ON SHEET C9.01) INV. OUT (18" RCP) = 271.00 CONCRETE ANTI -FLOTATION BLOCK (SEE DETAIL SHEET C9.03) PERMANENT DAM AND SCM CROSS SECTION (SEE DETAIL) A DOUBLE LAYER OF NON -WOVEN CLASS 'B' RIP RAP GEOTEXTILE FABRIC SHALL BE PLACED VELOCITY DISSIPATOR N.T.S. AROUND EACH JOINT OF THE 18"0 0-RING RCP PAD 9.0'L X 4.0'W X 22"T BARREL IN 2' WIDE STRIPS CENTERED ON JOINT. (SEE DETAIL, SHEET C9.03) 8' 1. 5' 5now 1. 5' a 1.5' d . d 1 " THICK CONCRETE CRADLE d JOINT FILLER (SEE DETAIL 4 a d d MATERIAL SHEET C9.03) 4 4 Q Q d a 4 d d 4 d 4 ❑ - - - - - 4 d 5' 18"0 0-RIN 4RCP a FLOW as a �a 4 zi 4 d 1 " THICK 4 d JOINT FILLER 4 d MATERIAL I A 4 CONTRACTOR SHALL PROVIDE STEPS IN ACCORDNACE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. AND SHALL LINE UP WITH TRASH RACK ACCESS HATCH TOP OF HANDWHEEL TO EXTEND 1-FOOT ABOVE TRASH RACK CONTRACTOR SHALL PROVIDE STEPS IN ACCORDNACE WITH NCDOT STD. 840.66. STEPS VALVE STEM GUIDE SHALL BE PLACED AT 16" O.C. (SEE NOTE #3) AND SHALL LINE UP WITH TRASH RACK ACCESS HATCH 0.5' d 4 d 1.0 TOP OF RISER EL. = 273.50 INVERTED INTAKE ____* (SEE DETAIL C9.03) RISER INVERT EL. = 271.50 4" PVC INVERTED INTAKE / INVERT FI = 971 sn 4 Q BOTTOM EL. = 270.00 ° d CONTRACTOR SHALL FORM INVERT 6" 0 DIP DRAIN PIPE CONTRACTOR OF RISER STRUCTURE TO DRAIN SHALL CORE -DRILL THE HOLE POSITIVELY TO INVERT OF OUTLET FOR THE 6"0 DIP PIPE IN THE BARREL USING NON -SHRINK GROUT FIELD. PRECASTER SHALL OMIT INVERTED INTAKE REINFORCEMENT IN THIS AREA (SEE DETAIL, 6"0 DIP DRAIN W/ SHEET C9.03) TRASH RACK 1$" 4 CLASS III 0-RING RCP INV. = 271.70 INVERT = 271.50 (SEE DETAIL SHEET C9.03) PERMANENT OUTLET STRUCTURE DETAILS N.T.S. PRECASTER SHALL PROVIDE A BLOCK OUT FOR THE 18"0 0-RING RCP -CONCRETE COLLAR (TO BE CONSTRUCTED IN THE FIELD BY THE CONTRACTOR - SEE DETAIL) - CONTRACTOR SHALL PROVIDE STEPS IN ACCORDNACE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. AND SHALL LINE UP WITH TRASH RACK ACCESS HATCH CONCRETE COLLAR (TO BE CONSTRUCTED IN THE FIELD BY THE CONTRACTOR - SEE DETAIL) 4 2.0' PRECASTER SHALL PROVIDE A BLOCK R OUT FOR THE 18"0 O-R 0 4i 180 0-RING RCP FLOW a41 �I 4 a 4 d � a a 4 4 d 4 Q 4 �. 1 " THICK 6" PLUG VALVE. THE VALVE SHALL BE JOINT FILLER A M&H STYLE 1820 ECCENTRIC VALVE MATERIAL OR ENGINEER -APPROVED EQUAL. THIS VALVE SHALL BE IN ACCORDANCE WITH AWWA C-517, AND SHALL BE CONCRETE CRADLE OPERABLE FROM TOP OF OUTLET (SEE DETAIL STRUCTURE VIA A HANDWHEEL. SHEET C9.03) CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT AND STAINLESS STEEL HARDWARE NOTES: 1. ALL REBAR TO BE #4 REBAR. 2. ALL REBAR AND ANGLES TO BE HOT -DIPPED GALVANIZED AND BE PROVIDED WITH AN EPDXY COATING. 3. THE HOT -DIPPED, GALVANIZED 2"x2"x1/4" ANGLE SHALL BE WELDED TO THE REBAR TRASH RACK. ONCE WELDED, THE ENTIRE ASSEMBLY SHALL BE PLACED ONTO THE RISER WITH ANGLES SITTING DIRECTLY ON TOP OF RISER. 4. TRASH RACK IS TO BE SECURELY FASTENED TO THE SPILLWAY RISER WITH A MINIMUM OF FOUR CORROSION -RESISTANT ANCHORS. 5. ACCESS HATCH SHALL ALIGN WITH STEPS IN RISER. CORROSION RESI, (TYP., SEE NOTE # 7.0 LF 2"x2")4" ANGLE ACCESS HATCH TO BE PROVIDED BY THE TRASH RACK FABRICATOR PER OUTLET STRUCTURE MATERIAL SPECIFICATIONS (SHEET C9.F1) NOTES: 1. ALL REBAR TO BE #4 REBAR. 2. WRAP OUTSIDE OF PIPE WITH VOLCLAY WATERSTOP-RXO 101 (OR PRE -APPROVED EQUIVALENT) AT THE FACE OF THE PRECAST STRUCTURE WALL. PROVIDE 6" OVER LAP ON THE BOTTOM OF THE PIPE. 5' 3" CLEARANCE TO OUTSIDE OF #4 3" CLEARANCE TO REBAR) OUTSIDE OF #4 REBAR) 3" CLEARANCE WRAP OUTSIDE OF TO OUTSIDE OF PIPE WITH FLEXIBLE #4 REBAR) WATERSTOP SEAL (SEE NOTE 2) d d d 2 7' 0-RING ,. RCP / \ / 3.5' " 6" INVERT TO ANTIFLOAT Q ANCHOR DEPTH 4.6" 3.7' 4.6" /CENTER) NTER TO (CENTER TO (CENTER TO CENTER) CENTER) ETE FRONT VIEW ANTI -FLOTATION BLOCK a a d 4 a a. a 5.5' 1.0' O.C. CORROSION RESISTANT ANCHOR (TYP., SEE NOTE #4) FABRICATED HINGES FOR THE 4'X3' ACCESS HATCH. ACCESS HATCH SHALL BE POSITIONED OVER STEPS. 4'X4' RISER 3-SIDED TRASH RACK DETAIL N.T.S. 3" ANCHOR DEPTH PRECAST 1' DEPTH STRUCTURE WALL 3000 PSI CONCRETE COLLAR #4 REBAR ANCHORS. (MIN.28 DAY STRENGTH) CONTRACTOR SHALL DRILL INTO PRECAST STRUCTURE 3" CLEARANCE TO WALL AND SET ANCHORS OUTSIDE OF #4 USING EPDXY GROUT 16 REBAR) 18" 0-RING WRAP OUTSIDE OF PIPE RCP WITH FLEXIBLE a. WATERSTOP SEAL (SEE 5.5" CENTER NOTE 2) - - TO CENTER d 6" INVERT TO ANTIFLOAT 12" ANCHOR DEPTH a a d d a d d #4 REBAR ANCHORS. a CONTRACTOR SHALL 3" CLEARANCE DRILL INTO PRECAST TO OUTSIDE OF BASE AND SET ANCHORS USING EPDXY #4 REBAR) GROUT SIDE VIEW CONCRETE ANTI -FLOTATION BLOCK 18"0 CONCRETE COLLAR DETAIL N.T.S. 8" TRASH RACK (ABOVE) ANCHOR TRASH RACK TO RISER WALL WITH FOUR EQUALLY SPACED STAINLESS STEEL CONCRETE WEDGE ANCHORS. EACH CLAMP ATTACHED TO RISER BY 24'x1/4" CONCRETE ANCHOR BOLTS EACH CLAMP TO BE COATED W/ AN EPDXY COATING. #4 REBAR ANCHORS. CONTRACTOR SHALL DRILL INTO PRECAST STRUCTURE WALL AND SET ANCHORS USING EPDXY GROUT 4" (CENTER TO CENTER) 5' lllhOil 1 �111� J CONCRETE ANTI -FLOTATION BLOCK 1' DEPTH 3" CLEARANCE TO OUTSIDE OF - #4 REBAR) -� 18" 0-RING RCP 3000 PSI CONCRETE o COLLAR (MIN.28 DAY 4.6" o STRENGTH) (CENTER TO o CENTER) PRECAST STRUCTURE WALL 3" CLEARANCE WRAP OUTSIDE OF PIPE TO OUTSIDE WITH FLEXIBLE OF #4 REBAR) WATERSTOP SEAL (SEE TOP VIEW NOTE 2) or 1\111/11 ill'" A DA. PA S The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com BODDIE-NOELL ENTERPRISES, INC. P.O. BOX 1908 ROCKY MOUNT, NC 27802 Contact PHONE: 252. 937. 2800 W W J Q W W Z ama� 2 aom J M W Uj W o?S � O N a CARO �oFEssioti.�� '•� SEAL 1�2 LF TS0\ . ay Watson m 20 2022 8:54 AM REVISIONS NO. DATE 1 12. 17. 2021 OWNER COMMENTS 2 1. 20. 2022 NCDEQ RESUBMISSION #1 3 4 5 6 PLAN INFORMATION PROJECT NO. 2021110321 FILENAME 2021110321-SW CHECKED BY RW DRAWN BY KEG SCALE NITS DATE 12. 20. 2022 SHEET STORMWATER CONTROL MEASURE DETAILS C9002 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION NOTES: 1. ALL REINFORCING STEEL IN RISER ANTI -FLOTATION BLOCK TO BE GRADE 60 #4 BARS FOR HORIZONTAL CROSSING AND GRADE 60 #4 BARS FOR VERTICAL CONNECTIONS. 2. INSIDE OF RISER BOTTOM TO BE FORMED WITH NON -SHRINK GROUT TO INVERT ELEVATION OF BARREL. 3. ALL PIPE PENETRATIONS THROUGH THE CONCRETE RISER STRUCTURE INSIDE OF RISER TO BE SHALL BE MADE WATERTIGHT. FORMED WITH NON -SHRINK PRECAST GROUT TO INVERT RISER STRUCTURE ELEVATION OF BARREL I 18 0 I 0-RING #4 STEEL \ RCP / REBAR • �16„ E� e 6 [r • °.. #4 REBAR VERTICAL ° ° A' 1 e . ° CONNECTION (TYP.) d B' <. < ° . PSI CONCRETE d 8 0' ANTI ANTI FLOTATION BLOCK #4 STEEL #4 REBAR VERTICAL YP.IBAR CONNECTION (TYP.) / (TYP.) 4 `CONNECTION REBAR VERTICAL (TYP.) REBAR 0 c6 0 C6 L CROSS SECTION A' -A' N.T.S. t✓KU�� JtL, i i0iv ei -ej N.T.S. RISER/ANTI-FLOTATION BLOCK CONNECTION N.T.S. NOTES: z INSTALL ALL STEPS PROTRUDING 4" FROM INSIDE FACE OF STRUCTURE WALL. OH cn STEPS DIFFERING IN DIMENSIONS, CONFIGURATION, OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PROVIDED THE CONTRACTOR HAS FURNISHED Q Q THE ENGINEER WITH DETAILS OF THE PROPOSED STEPS AND HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE OF SUCH STEPS. 3/811 LLJ�H L 1"7 W Q Q Wcc ;UZI r QU=0H H-=~Z ~ooLu i H 0, o cn z � m UU H TT PLAN SIDE ELEVATION PLAN SIDE ELEVATION M M\ N I' o a LL W CAST IRON CAST IRON z ELEVATION ELEVATION Lu N 1 16" (> #6 BAR OR = 1l, 83/.� �;� 1,/q" #8 BAR fi \ rn GALV'D. z m 1/4 Q u% W T Qa POLYPROPYLENE z PLAN SIDE PLASTIC QSIDE �2 N ELEVATION EL VATION � Q = COMPOSITE PLAN ,/ „ P77777777-7-7q REINFORCING STEEL 12" ELEVATION NOTE: #3 DEFORMED 12" DO NOT USE IN STEEL ROD SANITARY SEWER MANHOLES. ELEVATION SHEET 1 OF 1 SECTION A -A 1840.66 (2) 4" PERFORATED, CORRUGATED HDPE PIPE (DOUBLE -WALL SMOOTH BORE HDPE TYPE "S" OR ENGINE[ APPROVED EQUIVALEN NOTE: 1. HAVILAND DRAINAGE PRODUCTS 4" ALUMINUM ANIMAL GUARD ITEM NUMBER AGSSO4 (OR ENGINEER APPROVED EQUIVALENT) TO BE INSTALLED AT OUTLET OF 4" HDPE PIPES ENDWALL PER NCDOT STD. 838.80 4" WEEPHOLES TO BI PROVIDED WITH ANIM/ GUARD ON DOWNSTRE SIDE AND GALVANIZE[ HARDWARE CLOTH ON UPSTREAM SIDE (Y4" MAXIMUM OPENINGS) PROPOSED GRADE 6" MIN. III IIIIII-III III=1 I I=1-IIN I ' r 18 "0 RCP;` FLOW- r r a . a Y < >-�� )cam c�� .y < 1' MIN . NO. 67 WASHED STONE ENCASED IN NON -WOVEN FILTER FABRIC (MIRAFI 180N OR EQUIVALENT) (2) 4" PERFORATED, CORRUGATED HDPE PIPE (DOUBLE -WALL SMOOTH BORE HDPE TYPE "S" OR ENGINEER APPROVED EQUIVALENT) WITH ANIMAL GUARD ENDWALL PER NCDOT STD. 838.80 C' C '< NO. 67 WASHED (2) 4" PERFORATED, STONE ENCASED CORRUGATED HDPE PIPE IN NON -WOVEN (DOUBLE -WALL SMOOTH BORE FILTER FABRIC HDPE TYPE "S" OR ENGINEER (MIRAFI 18ON OR APPROVED EQUIVALENT) WITH EQUIVALENT) ANIMAL GUARD 18" SPILLWAY FILTER DETAIL N.T.S. IN 'ER 8ON #4 REBAR (TYP.) W1 (FT.) 1-0" H2 CS/RCP H1 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE ELEVATION W2 (FT.) I ( a mF D I PLAN PERMANENT OUTLET SAW OFF 4"0 PVC (SCH 40) TO ADJUSTED NORMAL POOL FOLLOWING AS -BUILT SURVEY EVALUATION BY DESIGN ENGINEER. DESIGN NORMAL POOL = 272.00 4" PVC CAP i� d WITH SCREW TYPE PLUG 4"0 PVC (SCH 40) 4_ e 6 CONTRACTOR TO PROVIDE 8 WATERTIGHT CONNECTION z .:° .• :e = BETWEEN INVERTED INTAKE AND RISER 9 ° 'd4 CONCRETE ANTI -FLOATATION BLOCK 4" PVC CAP WITH SCREW TYPE PLUG TOP EL = 272.33 CONTROL EL. = 272.00 4" 0 PVC INVERT EL. = 271.50 4" PVC CAP WITH 1"0 DRILLED ORIFICE INVERTED INTAKE DETAIL (RISER N.T.S. z O Cn Q NOTES: Q D 6° * THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING STANDARDS: 838.01, 838.11, 838.21, 838.27, 838.33, H = U LL J 'L" Z 838.39, 838.51, 838.57, 838.63 AND 838.69. O Otn = * INSTALL PRECAST ENDWALLS WITH WINGS AND PAY W Q Q LL = 1 0 FOR IN ACCORDANCE WITH SPECIFICATION SECTION 838. ~ U CC O C'3 USE 4000 PSI CONCRETE. H= Z W * PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM A615 �F' LL J FOR GRADE 60 AND WELDED WIRE FABRIC CONFORMING o0 U) Cr 0 I TO ASTM A185 WITH 2" MIN. CLEARANCE. z H2 * PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH Op H r>-i OSHA STANDARD 1926.704. W H1 I * PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY *- CONTRACTOR �O ALL ELEMENTS PRECAST TO MEET ASTM C913. - L 1 0 1 WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. * CHAMFER ALL CORNERS i" OR HAVE A RADIUS OF 1". 6�� 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE UJ NOTE: THE MINIMUM BAR SIZE SHALL BE #5 BARS J �e SIDE AT 8" CIS. THE CONTRACTOR WILL HAVE THE OPTION TO INCREASE THIS BAR SIZE AS NEEDED. = O J U- Qo 3� Z ' H ENDWALL DIMENSIONS FT. MINIMUM MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. PIPE DIA. BAR SIZE H1 (FT.) H2(FT.) D (FT.) W1 W2 1.0 #5 @ 8" 1.25/2.00 2.00/3.75 1.25/1.75 3.00/3.75 5.50/6.00 1.25 #5 @ 8" 1.25/2.00 3.00/3.75 1.25/2.00 3.50/3.75 6.50/6.75 1.50 #5 @ 8" 1.25/2.00 3.00/4.25 1.50/2.50 3.50/3.75 6.50/6.75 2.0 #5 @ B" 1.50/2.50 4.00/4.75 1.75/2.50 4.00/4.25 7.50/8.25 2.5 #5 @ 8" 2.50/3.50 4.00/6.00 2.00/3.00 4.50/5.50 10.00/11.50 3.0 #5 @ 8" 3.00/3.50 5.00/6.00 2.75/3.50 5.25/5.75 11.50/11.75 3.5 #5 @ 8" 3.25/4.50 6.00/6.75 3.25/3.50 6.00/6.75 12.00/13.25 4.0 #5 @ 8" 3.50/4.50 6.50/7.00 3.25/3.50 6.50/6.75 13.00/13.25 4.5 #5 @ 8" 4.00/5.00 6.50/8.50 3.25/4.00 7.00/9.25 13.50/15.75 5.0 1 #5 @ 8" 4.50/5.00 7.00/8.50 3.25/4.00 7.25/9.25 13.75/15.75 5.5 #5 @ 8" 4.50/5.00 7.50/8.50 3.25/4.00 7.25/9.25 14.00/15.75 6.0 1 #5 @ 8" 4.50/5.00 1 7.50/8.50 3.25/4.00 7.75/9.25 14.75/16.75 NOTES: 1. A FILTER BLANKET IS TO BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. THE FILTER BLANKET WILL CONSIST OF A MINIMUM 4" THICK LAYER OF STONE (NCDOT #57) UNDERLAIN WITH MIRAFI FILTER WEAVE 700 OR ENGINEER -APPROVED EQUIVALENT. 2. RIPRAP TO EXTEND TO TOP OF CHANNEL WITH 2:1 SIDE SLOPES THROUGHOUT THE EXTENT OF CHANNEL. -L PER STD. ENDWALL PER NCDOT STD. 838.80 18"0 0-RING - RCP MINIMUM DIMENSIONS Q W d o W ° 0 ~ N CC r QOCr V z Z < p Cf)V N NUj Q (Qj z o W U) cc = CL CC 0 U- NOTE: 1. CONTRACTOR SHALL PROVIDE A JOINT IN THE OUTLET BARREL NO MORE THAN 5-FT FROM THE RISER. 1" THICK JOINT FILLER MATERIAL d � d a' . 4 18"0 0-RING RCP FLOW (� d d 4 4 d d 44 d a 1" THICK JOINT CONCRETE FILLER MATERIAL ANTI -FLOTATION BLOCK TOP VIEW CONCRETE ANTI-rLU 1 rA 11Uiv BLOCK SIDE VIEW RISER BARREL/CRADLE CONNECTION DETAIL N.T.S. #6 REBAR PERIMETER FRAME 4"x4" WELDED ° 4"x4" WELDED WIRE FABRIC (EACH SIDE & TOP OF CAGE) 0.86' WIRE FABRIC 6" MIN. (CENTER TO CENTER) (EACH SIDE & WALL CONTRACTOR SHALL SEAL TOP OF CAGE) THICKNESS THE PIPE PENETRATION d 6" MIN. WALL USING A RUBBER BOOT d THICKNESS AND STAINLESS STEEL HARDWARE 18" TYP. 2.03' 2 LF •4 6"0 DIP 2.00' 6° PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 18" (TYP.) ' 1820 ECCENTRIC VALVE OR a a' ENGINEER -APPROVED a 2 LF a. a EQUIVALENT. THIS VALVE d ; 6"0 DIP 4" ANCHOR DEPTH ' SHALL BE IN ACCORDANCE ' CONTRACTOR SHALL ° °' ' WITH AWWA C-517, AND #6 REBAR DRILL INTO SHALL BE OPERABLE FROM PERIMETER ^ PRECAST EXTENDED TOP OF OUTLET STRUCTURE BASE AND SET 0.86' VIA A HANDWHEEL. FRAME 6" PLUG VALVE. THE VALVE ANCHORS USING (CENTER TO CENTER) SHALL BE A M&H STYLE 1820 EPDXY GROUT CONTRACTOR SHALL SEAL THE ECCENTRIC VALVE OR PIPE PENETRATION USING A ENGINEER -APPROVED RUBBER BOOT AND STAINLESS EQUIVALENT. THIS VALVE SHALL STEEL HARDWARE BE IN ACCORDANCE WITH AWWA C-517, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL. 6"0 EMERGENCY DIP DRAIN TRASH RACK DETAILS NOTE: 1. AS AN ALTERNATE TO A CONCRETE CRADLE UNDER THE BARREL PIPE (THIS DETAIL), THE CONTRACTOR MAY CHOOSE TO ELIMINATE THE CONCRETE CRADLE AND USE COMPACTED BACKFILL IF THE ON -SITE GEOTECHNICAL ENGINEER WILL PROVIDE A NC PE SEALED LETTER CERTIFYING THAT THE COMPACTION UNDER, AROUND, AND ABOVE THE BARREL MEETS THE SPECIFICATIONS OF THE EMBANKMENT COMPACTION REQUIREMENTS AND MOISTURE CONTENT. THIS CERTIFICATION LETTER MUST BE SUBMITTED TO THE DESIGN ENGINEER BEFORE AS -BUILT CERTIFICATION OF THE FACILITY. THIS SEPARATE CERTIFICATION MUST BE SPECIFIC TO THE BARREL PIPE FOR THE FACILITY, AND MUST CLEARLY STATE THAT ALL SOIL MATERIAL UNDER, AROUND, AND ABOVE THE BARREL PIPE MEETS THE BERM MATERIAL SPECIFICATIONS. THIS CERTIFICATION IS TO INCLUDE REFERENCE TO BOTH MATERIAL AND COMPACTION, AND MUST STATE THAT ALL MATERIALS UNDER, AROUND, AND ABOVE THE BARREL HAVE BEEN COMPACTED PER THE BERM MATERIAL SPECIFICATIONS (AT LEAST 95% OF MAXIMUM DRY DENSITY USING ASTM D698 STANDARD PROCTOR) WITH NO VOID SPACES PRESENT. THE CONTRACTORS INTENT TO UTILIZE THIS ALTERNATIVE MUST BE STATED PRIOR TO CONSTRUCTION TAKING PLACE. THIS CONTRACTORS CERTIFICATION MUST BE PRESENTED TO THE DESIGN ENGINEER BEFORE AN AS -BUILT CERTIFICATION CAN BE ISSUED FOR THIS FACILITY. 2. CONTRACTOR SHALL PROVIDE A JOINT IN THE OUTLET BARREL NO MORE THAN 5-FT FROM THE RISER. BARREL PIPE CONCRETE CRADLE CONSTRUCTION SEQUENCE 1. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE OUTLET STRUCTURE MATERIAL SPECIFICATIONS, THEN BRING GRADE OF DAM EMBANKMENT TO SPRINGLINE OF PIPE ELEVATION. IF OPTION B IS CHOSEN FROM NOTE 9 OF THE OUTLET STRUCTURE MATERIAL SPECIFICATIONS, THEN CONSTRUCT FORMWORK FOR CONCRETE CRADLE ON EXISTING GRADE. 2. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE OUTLET STRUCTURE MATERIAL SPECIFICATIONS, THEN EXCAVATE TRENCH FOR CRADLE AND BARREL PER DIMENSIONS ON DRAWINGS. IF OPTION B IS NCDOT CLASS B RIPRAP 18"0 0-RING RCP CHOSEN FROM NOTE 9 OF THE OUTLET STRUCTURE MATERIAL SPECIFICATIONS, PROCEED TO STEP 3 BELOW. 19'L X 4'W X 22" THICK TO BE LINED WITH ENDWALL PER NCDOT STD. 838.80 3 PLACE BARREL PIPE ON CONCRETE BLOCKS TO GRADE AT THIS STEP CONTRACTOR SHALL WRAP A GEOTEXTILE FABRIC OR ENGINEER -APPROVED EQUIVALENT 7 I� FILTER BLANKET (SEE NOTE) PLAN PROFILE VIEW OUTLET BARREL VELOCITY DISSIPATER N.T.S. N.T.S. DOUBLE LAYER OF NON -WOVEN GEOTEXTILE FABRIC AROUND EACH JOINT OF THE 18"0 0-RING RCP BARREL IN 2' WIDE STRIPS CENTERED ON JOINT. 4. PLACE CONCRETE FOR CRADLE FOR EACH SECTION FROM ONE SIDE OF THE TRENCH. ALLOW CONCRETE TO FILL ENTIRE AREA UNDER PIPE AND PIPE HAUNCHES AS TO LEAVE NO VOIDS UNDER THE PIPE BEFORE PLACING CONCRETE ON THE OPPOSITE SIDE OF THE TRENCH. PLACE ENTIRE CRADLE AS ONE LIFT (VERTICALLY) PER DRAWINGS. 5. CONCRETE CRADLE MAY BE ELIMINATED PER RECOMMENDATION FROM THE ON -SITE GEOTECHNICAL ENGINEER. ANY DEVIATION FROM THIS DETAIL SHALL BE SUBMITTED TO AND REVIEWED BY THE DESIGN ENGINEER PRIOR TO IMPLEMENTATION. IF THE CRADLE IS ELIMINATED, THEN A LETTER FROM AN NC PE CERTIFYING THAT ALL SOIL MATERIAL UNDER, AROUND, AND ABOVE THE BARREL PIPE MEETS THE 22" LAYER BERM MATERIAL SPECIFICATIONS IS REQUIRED. �OF CLASS B RIPRAP 6. ALLOW CRADLE TO CURE FOR A MINIMUM OF 7 DAYS BEFORE ANY VIBRATING COMPACTION 4" FILTER EQUIPMENT IS USED IN THE VICINITY OF THE BARREL PIPE. BLANKET 7. TRENCH TO BE BACKFILLED IN 5" LIFTS WHEN COMPACTION IS BY HAND. BACKFILL IS IN 8" LIFTS WHEN CONDUCTED BY MACHINE. MINIMUM OF 2 FEET COVER MUST BE PRESENT ON 18"0 RCP BEFORE DRIVING OVER WITH HEAVY EQUIPMENT. 18" CONCRETE CRADLE DETAIL N.T.S. 'J The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com BODDIE-NOELL ENTERPRISES, INC. P.O. BOX 1908 ROCKY MOUNT, NC 27802 Contact PHONE: 252. 937. 2800 W W liiiiimm J Q W W am_ az z aom J M W Uj W o ?S � O N a - O•;-FESS/O••41 SEAL���•� � Ray Watson Jan 20 2022 8:54 AM REVISIONS NO. DATE 1 12. 17. 2021 OWNER COMMENTS 2 1. 20. 2022 NCDEQ RESUBMISSION #1 3 4 5 6 PLAN INFORMATION PROJECT NO. 2021110321 FILENAME 2021110321-SW CHECKED BY RW DRAWN BY KEG SCALE NTS DATE 12. 20. 2022 SHEET STORMWATER CONTROL MEASURE DETAILS PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION C STORMWATER CONTROL URE 'A' RANTING PLAN SPECIFICATIONS LEGEND QTY. SYM. SCIENTIFIC NAME COMMON NAME HATCH TYPE SPACING % OF TOTAL AREA PROVIDED AREA I LOW MARSH (SHALLOW WATER, TOTAL AREA = 2,594 SF) 145 JE JUNCUS EFFUSUS COMMON RUSH 4—INCH CONTAINER 24" O.C. PROVIDED PERCENTAGE = 26% 578 SF 192 PP PONTEDERIA PECTINATUS PICKEREL WEED 4—INCH CONTAINER 24" O.C. PROVIDED PERCENTAGE = 34% 767 SF 226 ZM ZIZANIOPSIS MILIACEA GIANT CUTGRASS 4—INCH CONTAINER 24" O.C. PROVIDED PERCENTAGE = 40% 904 SF HIGH MARSH (SHALLOW LAND, TOTAL AREA = 1,763 SF) 127 SC SAURURUS CERNUUS LIZARD'S TAIL 4—INCH CONTAINER 24" O.C. PROVIDED PERCENTAGE = 25% 507 SF 196 HA HELENIUM AUTUMNALE SNEEZEWEED p p p 4—INCH CONTAINER 24" O.C. PROVIDED PERCENTAGE = 38% 783 SF 191 CG CHELONE GLABRA WHITE TURTLEHEAD 4—INCH CONTAINER 24" O.C. PROVIDED PERCENTAGE = 37% 762 SF SEEDBED PREPARATION PLANTING INSTRUCTIONS 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. 5. CONTINUE TILLAGE UNTIL A WELL —PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. AFTER PERMANENT COVER IS ESTABLISHED. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT TEMPORARY SEEDING SCHEDULE SEEDING DATE SEEDING MIXTURE APPLICATION RATE JAN 1 — MAY 1 RYE (GRAIN) 120 LBS/AC KOBE LESPEDEZA 50 LBS/AC MAY 1 — AUG 15 GERMAN MILLET 40 LBS/AC AUG 15 — DEC 30 RYE (GRAIN) 120 LBS/AC SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/AC GROUND AGRICULTURE LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER (FROM AUG 15 — DEC 30, INCREASE 10-10-10 FERTILIZER TO 1000 LB/AC). MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE JAN 1 — AUG 15: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 — DEC 30: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB/AC OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. NOTE: USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN DATE IS NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE. PERMANENT SEEDING SCHEDULE (DAM EMBANKMENTS) SEEDING DATE SEEDING MIXTURE APPLICATION RATE AUG 25 — OCT (BEST) TALL FESCUE 200 LBS/AC FEB — APR 15 (POSSIBLE) SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 4,000 LB/AC GROUND AGRICULTURE LIMESTONE AND 1000 LB/AC 10-10-10 FERTILIZER. MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE INSPECT AND REPAIR MULCH FREQUENTLY. REFERTILIZE IN LATE WINTER OF THE FOLLOWING YEAR; USE SOIL TESTS OR APPLY 150 LB/AC 10-10-10 FERTILIZER. MOW REGULARLY TO A HEIGHT OF 2-4 INCHES. NOTE: PERMANENT SEEDING SCHEDULE IS FOR SLOPES OF THE BASIN, TOP OF BERM, AND BASIN FLOOR. PLANTING TECHNIQUES A. INSURE THAT ROOTS, ONCE REMOVED FROM POT, ARE STRAIGHTENED AND FACE DOWNWARD. B. CREATE PLANTING AREA FOR EACH PLANT AND EXCAVATE PIT. C. PLACE PLANTS IN PIT INSURING ROOTS ARE FACING COMPLETELY DOWNWARD. D. HEEL IN SOIL AROUND PLANT AND PROCEED TO NEXT PLANTING LOCATION. E. NEWLY PLANTED PLANTS NEED TO BE FASTENED TO THE SUBSTRATE FOR THE ESTABLISHMENT OF NEW ROOTS. F. ROOTS SHALL BE SPREAD IN THEIR NORMAL POSITION. ALL BROKEN OR FRAYED ROOTS HALL BE CUT OFF CLEANLY. G. THE DIAMETER OF THE PITS FOR ALL VEGETATIVE STOCK SHALL BE AT LEAST THREE TIMES THE DIAMETER OF THE ROOT MASS. PLANT PIT WALL SHALL BE SCARIFIED PRIOR TO PLANT INSTALLATION. H. SET THE PLANTS UPRIGHT, IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BE RESTING ON UNDISTURBED SOIL. I. PLACE THE BACKFILL AROUND THE BASE AND SIDES OF THE ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TO ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 2/3 FULL, WATER THOROUGHLY BEFORE PLACING REMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL. J. BROKEN OR DAMAGED PARTS WILL BE CUT BACK TO UNDAMAGED TISSUE, LEAVING AS MUCH GREEN BASAL TISSUE AS POSSIBLE ABOVE THE ROOTS. IF MORE THAN FIFTY PERCENT (50%) OF THE PLANT IS DAMAGED THEN CONTRACTOR SHALL REPLACE THE PLANT. CONTAINER STOCK / BARE ROOT A. STOCK SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER. B. CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTING OCCURS. C. BARE ROOT PLANTS ARE FOR IMMEDIATE PLANTING, OTHERWISE SEE D) BELOW. D. IF BARE ROOTS SPECIMENS ARE NOT TO BE PLANTED WITHIN FOUR (4) DAYS, TEMPORARY HOLDING OF BARE ROOT SPECIMENS ARE TO BE COVERED ENTIRELY BY A SUITABLE MEDIUM (ETC. SOIL, SAWDUST, MULCH OR THE LIKE) AND WATERED REGULARLY SO AS TO NOT DRY OUT. PLANT LOCATIONS A. NEW PLANTINGS SHALL BE LOCATED WHERE SHOWN ON PLAN EXCEPT WHERE CHANGES HAVE BEEN MADE IN PROPOSED CONSTRUCTION. B. NECESSARY ADJUSTMENTS SHALL BE MADE ONLY AFTER APPROVAL BY THE OWNER OR THE OWNER'S REPRESENTATIVE. WATER WATER SHALL BE POTABLE AND SHALL NOT CONTAIN ELEMENTS TOXIC TO PLANT LIFE. V STORMWATER CONTROL MEASURE'A' PLANTING PLAN 1" = 20- GRAPHIC SCALE 0 10 20 40 1 inch = 20 ft. 'J I 1\11/11111,1111'I"'j IIA DA,PAS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com BODDIE-NOELL ENTERPRISES, INC. P.O. BOX 1908 ROCKY MOUNT, NC 27802 Contact PHONE: 252. 937. 2800 �=E W W J Q W W F- _z 2z am_ az z Z CA aom J M W LLI W � o?S 0rA O N a CAR SEAL i fr ,ay Watson an 20 2022 8 : 5 5 AM REVISIONS NO. DATE 1 12. 17. 2021 OWNER COMMENTS 2 1. 20. 2022 NCDEQ RESUBMISSION #1 3 4 5 6 PLAN INFORMATION PROJECT NO. 2021110321 FILENAME 2021110321-SW CHECKED BY RW DRAWN BY KEG SCALE 1"=20' DATE 12. 20. 2022 SHEET STORMWATER CONTROL MEASURE 'A' PLANTING PLAN C960 4 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION