Loading...
HomeMy WebLinkAboutNC0005363_Inspection_20040629Victoria K Will CP&L - A Progress Energy Company PO Box 327 New Hill NC 27562 SUBJECT: Dear Ms. Will: Michael F. Easley, Governor William G..Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality June 29, 2004 June 14, 2004 Compliance Evaluation Inspection CP&L - A Progress Energy Company Weatherspoon Steam Electric Plant Permit No: NC0005363 Robeson County 719 Enclosed please find a copy of the Compliance Evaluation Inspection form from the inspection conducted on June 14, 2004. The Compliance Evaluation Inspection was conducted by Ricky Revels of the Fayetteville Regional Office. The facility was found to be in Compliance with permit NC0005363. Please refer to the enclosed inspection report for additional observations and continents. If you or your staff have any questions, please call me at 910-486-1541. Sincerely, Ricky Revels Environmental Technician cc: Steven A Davis, ORC Central Files Fayetteville Files P- Ctc) 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1 800 623-7748 ILA IF) United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (Le., PCS) Transaction Code NPDES yrlmo/day Inspection 1 Li 2 Li3 I NC0005363 111 .121 04/06/14 I 17 Type Inspector Fac Type 18 U 19 LI 20 U `-' Remarks 211IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA-----------------------Reserved 67 I 169 70 U 71 U 721 I 731 I 174 751 I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Weatherspoon Steam Electric Plant 491 Power Plant Road Lumberton NC 28358 Entry Time/Date 01:45 PM 04/06/14 Permit Effective Date 00/08/01 Exit Time/Date 04:30 PM 04/06/14 Permit Expiration Date 04/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Malcolm Keith Long/ORC/910-671-1219/ Steven A Davis/ORC/910-671-1217/ /// Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number 00(r11 Victoria K Will,PO Box 327 New Hill NC 27562/%910-671-1200/9193623266acted Section C: Areas Evaluated During Inspection (Check only those areas evaluated) • Records/Reports Effluent/Receiving Waters Permit Flow Measurement Operations & Maintenance Self -Monitoring Program • Sludge Handling Disposal Facility Site Review Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date 2� Ricky Revels FRO WQ//910-486-1541/910-486-0707 . 4, -2 %'c) Aw-e.:42 '& - • Date 2F' oi"" Signature of M egrrie R iewer Agency/Office/Phone and Fax Numbers Paul E Raw lsf i 910-486-1541/910-486-0707 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. NPDES NC0005363 111 121 yr/mo/day 04/06/14 117 Inspection Type : 18 �. (cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) • 1. The facility utilizes coal to produce steam which manufactures electrical power. There are two permitted outfalls 001 and 002 for this facility. Outfall 001 discharges from a 225 acre cooling pond and only discharges during extreme weather conditions. Wastewater discharge's through Outfall 001 is made up of the following: recirculated cooling water, coal pile runoff, stormwater runoff, ash sluice water, domestic wastewater, chemical metal cleaning wastewater(boiler cleaning), internal combustion (IC) turbine. site water from associated rainfall drain system/oil-water separators, low -volume waste (incidental waste streams) not previously identifed which include gravity / sump flows for such activities as miscellaneous equipment leakage/equipment drainage.for maintenance/equipment wash down water/sampling streams and closed -cooling water system blowdown along with water softener regeneration/demineralizer wastes with assorted associated chemical usage. In addition; the facility has been reviewed/approved for a future "trial" basis to install a - reverse osmosis (RO) system for cleaning up well water prior to sending it to the demineralizer system for further purification before use in the boiler. Domestic wastewater is treated in a septic tank/sand filter system before it is discharged into the pond. A discharge from outfall 001 has not occurred since 1998. Outfall 002 is made up of non -contact cooling water from exchanger units. 2. All coal remnants from the steam generation is pumped to the ash sluice pond. The ash sluice is pumped to .. a settling pond and then decanted to the cooling pond for discharge to the receiving stream. The effluent to be free of solids. Fish life was noted in the effluent , channel flowing from the settling pond appeared from the settling pond. 3. The Oil & Water Separator process of producing. power. 4. It was confirmed as a result of for painting railings and other 5. Flow measuring is estimated. 6. All records reviewed were well organized and up to date. 7. The ORC and Backup ORC for this facility is Operator Certified for operations. 8. The following required NPDES permit monitoring parameters are analyzed at this facility's laboratory: pH, Temperature and Chlorine Residual. The facility has been certified for Field Parameters (Certification No. 5057) by NCDENR/DWQ Laboratory Certification Unit. 9. A review of the laboratory and equipment yielded all aspects inspected to be operational. All expiration dates for pH buffers were within the necessary time frame. The certified thermometer (serial # 220803) was on site and was last checked and certified on April 15, 2004. units appeared to be operating properly. The oil recovered is burned.in the this inspection that a previous recommendation areas associated with Outfall 001 had in fact been by DWQ on August 12, 2002 addressed. both Biological and Physical/chemical Permit: NC0005363 Owner - Facility: CP&L - A Progress Energy Company - Weatherspoon Steam Electric Plant Inspection Date: 06/14/04 Inspection Type: Compliance Evaluation Permit . Yes No • NA NF (If the present permit expires in 6 months or less). Has the permittee submitted a new application? • ❑ ❑ ❑ Is the facility as described in the permit? • ❑ ❑ ❑ Are there any special conditions for the permit? 0 • 0 0 Is access to the plant site restricted to the general public? 1 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 11000 Comment: �nerations & Maintehanoa Yes No NA NF • Does the plant have general safety structures in place such as rails around or covers over tanks, pits, or wells? • ❑ ❑ ❑ Is the plant generally clean with acceptable housekeeping? 1 ❑ ❑ ❑ Comment: .5P4-)tir. Tank Yes No NA NF (If pumps are used) Is an audible and visual alarm operational? 0 0 • 0 Is septic tank pumped on a schedule? 1 ❑ ❑ ❑ Is the distribution box level and watertight? 1 ❑ ❑ ❑ Are pumps or syphons operating properly? MOOD Are high and low water alarms operating properly? 0 0 0 • Comment: See Summary comments 1 ahoratory Yes No NA NF Are field parameters performed by certified personnel or laboratory? 1 ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? 1 ❑ ❑ ❑ Is the facility using a contract lab? 1 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 1 ❑ ❑ ❑ Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? 1 ❑ ❑ ❑ Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? 00011 Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? 0 0 0 • Comment: Flow Measurement - Fffluent Yes No NA NF Is flow meter used for reporting? ❑ ❑ E ❑ Is flow meter calibrated annually? ❑ ❑ E ❑ Is flow meter operating properly? 00110 (If units are separated) Does the chart recorder match the flow meter? 0 0 • 0 Comment: Flow measurements associated with outfalls 001 and 002 are estimated by pumping and/or weir overflow rates. Record Keeoing Yes No NA NF Are records kept and maintained as required by the permit? • 1 ❑ ❑ ❑ Is all required information readily available, complete and current? •1 0 0 0 Are all records maintained for 3 years (lab. reg. required 5.years)? • 1 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 1 ❑ ❑ ❑ Are sampling and analysis data adequate and include: 1 ❑ ❑ ❑ Dates, times and location of sampling 1 Name of individual performing the sampling • Results of analysis and calibration ■ Dates of analysis 1 Permit: NC0005363 Owner - Facility: CP&L - A Progress Energy Company - Weatherspoon Steam Electric Plant Inspection Date: 06/14/04 Inspection Type: Compliance Evaluation Record Keeping, Yes No NA NF Name of person performing analyses Transported COCs • Plant records are adequate, available and include 1 ❑ ❑ ❑ O&M Manual As built Engineering drawings 0 Schedules and dates of equipment maintenance and repairs • Are DMRs complete: do they include all permit parameters? 1 ❑ ❑ ❑ Has the facility submitted its annual compliance report to users? ❑ ❑ 1 ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? 0 0 • 0 Is the ORC visitation log available and current? 1 ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? 1 ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? 1 ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? 1 ❑ ❑ ❑ Is the facility description verified as contained in the NPDES permit? 1 ❑ ❑ ❑ Does the facility analyze process control parameters, for example: MLSS, MCRT, Settleable Solids, DO, Sludge 00.0 Judge, pH, and others that are applicable? Facility has copy of previous year's Annual Report on file for review? 1 ❑ ❑ ❑ Comment: Fffluent Pipe Yes No NA NF Is right of way to the outfall properly maintained? 1 ❑ ❑ ❑ Are receiving water free of solids and floatable wastewater materials? 1 ❑ ❑ ❑ Are the receiving waters free of solids / debris? 1 ❑ ❑ ❑ Are the receiving waters free of foam other than a trace? ■ ❑ ❑ ❑ Are the receiving waters free of sludge worms? ■ ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? 0 0 • 0 Comment: