Loading...
HomeMy WebLinkAbout20201505_ B-5728 Permit Application_add info requested Carpenter,Kristi From:Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent:Wednesday, January 26, 2022 4:12 PM To:Barrett, William A Cc:Conchilla, Ryan; Turchy, Michael A Subject:\[External\] RE: B-5728 Permit Application Distribution CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Bill, I hope you’re doing well. I reviewed the PCN for the above referenced bridge replacement project and have no real concerns. However, I do need clarification on the proposed impacts: For Site 1, it looks like the linear footage of temporary impacts scale out to ~81 lf instead of 17 lf. Also, I’m assuming that the 440 sq ft of impacts attributed to the detour interior bent in the notes is wrapped into the 0.08 acre of temporary surface water impacts? For Site 2, I’m clear on the 0.18 acre/134 lf of temporary surface water impacts for the causeway, as well as the ~0.01 acre/66 lf of permanent impacts due to bank stabilization. But the notes list 516 sq ft of impact due to an interior bent; I’m assuming this is a permanent impact? And, I see 2 interior bents for the replacement bridge on the plans, and both of them scale to ~500 sq ft of permanent impacts, so wouldn’t there be ~1000 sq ft of permanent impacts due to bents at Site 2, in addition to the impacts for the causeway and bank stabilization? Splitting hairs here, admittedly; I just want to make sure I have the impacts correct when I process the permit. Thanks! -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Office: (919) 554-4884, Ext. 30. Mobile: (919) 817-2436 Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: Turchy, Michael A <maturchy@ncdot.gov> Sent: Thursday, January 6, 2022 8:55 PM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Chapman, Amy <amy.chapman@ncdenr.gov>; Conchilla, Ryan <ryan.conchilla@ncdenr.gov>; Parker, Jerry A <japarker3@ncdot.gov> Cc: Barrett, William A <wabarrett@ncdot.gov>; Dagnino, Carla S <cdagnino@ncdot.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; smupef <smupef@ncdot.gov>; Davenport, Ronald E <rondavenport@ncdot.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>; Morgan, Stephen R <smorgan@ncdot.gov>; Al-Dhalimy, Nadia 1 <naaldhalimy@ncdot.gov>; Sanders, Byron <bsanders@ncdot.gov>; Hanks, Brian <bhanks@ncdot.gov>; NCDOT Service Account - Roadway Design <roadwaydesign@ncdot.gov>; Fischer, Kevin <wkfischer@ncdot.gov>; Staley, Mark K <mstaley@ncdot.gov>; Griffin, Randy W <rgriffin@ncdot.gov>; Eason, Patty P <peason@ncdot.gov> Subject: \[Non-DoD Source\] B-5728 Permit Application Distribution The permit application for B-5728 (the replacement of bridge 112 on NC 87 over Reedy Fork in Alamance County) has been posted to the NCDOT Permit Application Website. The file named “B-5728 Alamance January 8 2022.pdf” can be viewed/downloaded at: https://xfer.services.ncdot.gov/pdea/PermApps or Direct Link to Application: https://xfer.services.ncdot.gov/pdea/PermApps/B-5728%20Alamance%20January%208%202022.pdf The electronic Pre-Construction Notification (ePCN) was submitted to the USACE, NCDWR, NCWRC, and USFWS today \[1/6/2022\]. Thank you, Michael Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2