HomeMy WebLinkAboutNCC220573_ESC Approval Submitted_20220127ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
NORTH CAROLINA
Environmental Quatiry
March 25, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Faith Commercial Partners, LLC
Attention: G. David Cuthbertson, Manager
2627 Brekonridge Center Drive
Monroe, North Carolina 28110
RE: Project Name: Faith Church Development
Acres Approved: 6.93
Project ID: UNION-2020-032
County: Union
City: Indian Trail
Address: Faith Church Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Faith Commercial Partners, LLC
Date Received by LQS:. March 19, 2020
Plan Type: Revised
Dear Mr. Cuthbertson,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain.the COC prior to commencement
of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please
direct questions about the eNOI form to Annette Lucas at Annette. lucas,cr,ncdenr.go_v or Paul Clark
at Pau.l.clark(a_)ncdenr.9ov. If the owner/operator of this project changes in the future, the new
responsible party is required to apply for his/her own COC.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional office 1 610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115
704.663,1E+99
Letter of Approval with Modifications
Faith Church Development, LLC
March 25, 2020
Page 2 of 4
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received:
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project, it is determined that the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as
called for on the application plan, not to exceed the approved acres. Exceeding the acreage will
be a violation of this permit and would require a revised plan and additional application fee. You
are requested to file an amended form if there is any change in the information included on the
form. In addition, it would be helpful if you notify this office of the proposed starting date for this
project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Si ly,
r
Assistant Regional Engineer
Letter of Approval with Modifications
Faith Church Development, LLC
March 25, 2020
Page 3 of 4
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGOI Fact Sheet
c: Eagle Engineering
Attention: Brice L. Dimitruk, E.I.
2013-A Van Buren Avenue
Indian Trail, North Carolina 28079
Inspection Department
Letter of Approval with Modifications
Faith Church Development, LLC
March 25, 2020
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Faith Church Development
Project ID: UNION-2020-032
County: Union
1. Implement the latest NCGO1 standards for Self -Inspection and Ground Cover
approved April 1, 2019. Please include these standards in future plan submittals.