Loading...
HomeMy WebLinkAboutNCC220573_ESC Approval Submitted_20220127ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quatiry March 25, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Faith Commercial Partners, LLC Attention: G. David Cuthbertson, Manager 2627 Brekonridge Center Drive Monroe, North Carolina 28110 RE: Project Name: Faith Church Development Acres Approved: 6.93 Project ID: UNION-2020-032 County: Union City: Indian Trail Address: Faith Church Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Faith Commercial Partners, LLC Date Received by LQS:. March 19, 2020 Plan Type: Revised Dear Mr. Cuthbertson, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain.the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at Annette. lucas,cr,ncdenr.go_v or Paul Clark at Pau.l.clark(a_)ncdenr.9ov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional office 1 610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704.663,1E+99 Letter of Approval with Modifications Faith Church Development, LLC March 25, 2020 Page 2 of 4 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received: 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Si ly, r Assistant Regional Engineer Letter of Approval with Modifications Faith Church Development, LLC March 25, 2020 Page 3 of 4 Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: Eagle Engineering Attention: Brice L. Dimitruk, E.I. 2013-A Van Buren Avenue Indian Trail, North Carolina 28079 Inspection Department Letter of Approval with Modifications Faith Church Development, LLC March 25, 2020 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Faith Church Development Project ID: UNION-2020-032 County: Union 1. Implement the latest NCGO1 standards for Self -Inspection and Ground Cover approved April 1, 2019. Please include these standards in future plan submittals.