Loading...
HomeMy WebLinkAboutNCC201830_NOT Closeout Documents_20220125ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN birerror NORTH CAROLINA Environmental Quality November 5, 2021 SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER INSPECTION REPORT Strata Solar Development, LLC Attn: Mr. Markus Wilhelm, Manager 800 Taylor Street, Suite 200 Durham, North Carolina 27701 Dear Sir: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, Bradley West Environmental Specialist (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report E �� IVgrth Carolina Uepartmcnt aFErnironmental Quality I Rivisian of Energy, Mineral and Land Resources Washington Regional Office 1 943 Washington Square Mali 1 Washington, North Carolina 27889 �s ~ 252.946.0481 North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Wayne Project: Wedge Solar Farm Electric Power Plant River basin: Neuse Person financially responsible: Solar Strata Development. Inc. -Markus Wilhelm. Project #: WAYNE-2020-013 Managing Member Address. 800 Taylor St., Suite 200, Durham, NC 27701 1. Project Location: AB Barns Rd, Goldsboro Pictures: No 2. Weather and soil conditions., Rainy, cool, wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules:' Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: November 5, 2021 Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self - inspections are required. Project is in compliance and released under the 5PCA. Termination of coverage under the 10. Comments: NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the perm ittee via a Notice of Termination (NOT), The NOT is available at: https:/jedocs.deg.nc.gov/Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bradley West Others present: Date of inspection: November 4, 2021 Time arriving on site: 10:35 AM Time leaving site: l 1:00 AM cc: