November 5, 2021
SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER
INSPECTION REPORT
Strata Solar Development, LLC
Attn: Mr. Markus Wilhelm, Manager
800 Taylor Street, Suite 200
Durham, North Carolina 27701
Dear Sir:
Attached is a copy of the inspection report prepared following an onsite inspection of the project
referenced on the report. This report is intended to inform you of the project's compliance with
the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES
Stormwater General Permit.
Please review this report carefully as it may contain corrective actions needed and/or comments
which will assist you in meeting the required performance standards.
It is our desire that any and all possible problems be discussed and resolved at the earliest
possible time. To facilitate this effort, please contact me at the address/phone number below
should you have any questions.
Sincerely,
Bradley West
Environmental Specialist
(252) 946-6481
Enclosure: Sediment/Construction Stormwater Inspection Report
E �� IVgrth Carolina Uepartmcnt aFErnironmental Quality I Rivisian of Energy, Mineral and Land Resources
Washington Regional Office 1 943 Washington Square Mali 1 Washington, North Carolina 27889
�s ~
252.946.0481
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Wayne Project: Wedge Solar Farm Electric Power Plant River basin: Neuse
Person financially responsible: Solar Strata Development. Inc. -Markus Wilhelm. Project #: WAYNE-2020-013
Managing Member
Address. 800 Taylor St., Suite 200, Durham, NC 27701
1. Project Location: AB Barns Rd, Goldsboro
Pictures: No
2. Weather and soil conditions., Rainy, cool, wet Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules:' Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: November 5, 2021
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -
inspections are required. Project is in compliance and released under the 5PCA. Termination of coverage under the
10. Comments: NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the perm ittee via a
Notice of Termination (NOT), The NOT is available at: https:/jedocs.deg.nc.gov/Forms/NCGO1-Termination. Please
note that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Bradley West Others present:
Date of inspection: November 4, 2021 Time arriving on site: 10:35 AM Time leaving site: l 1:00 AM