Loading...
HomeMy WebLinkAbout20140111 Ver 1_Approval Letter_20140225NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Director Secretary February 25, 2014 Hyde County DWQ Project No. 20140111 APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS Mr. Lance Winslow NCDOT, Ferry Division 8550 Shipyard Rd Manes Harbor, NC 27953 Dear Mr. Winslow: You have our approval, in accordance with the conditions listed below, to dredge approximately 70,000 cubic yards of bottom material from the Hatteras to Ocracoke State Ferry Channel in Hyde County as necessary for ongoing maintenance. The project shall be constructed in accordance with your application dated received February 3, 2014. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 3894. This certification corresponds to the Nationwide Permit 35 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non - Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification. 1. Approximately 5,000 cubic yards of dredged material is authorized to be placed on the beach at the hairpin turn on Ocracoke as depicted in the application. The remaining material is to be placed in the Ocracoke spoil site. 2. No rock, sand or other materials shall be dredged from the channel except where authorized by this certification. 3. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, NCDWR may reevaluate and modify this certification. 4. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. Transportation and Permitting Unit 1650 Mail Service Center, Raleigh, NC 27699 -1650 Location: 512 N. Salisbury St. Raleigh, NC 27604 An Equal Opportunity 1 Affirmative Action Employer Phone: 919 - 707 -87851 FAX: 919 - 733 -1290 Internet: www.ncwater.or4 Page 2 of 3 5. A copy of this Water Quality Certification shall be maintained on site at the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on -site project manager. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Garcy Ward at (252) 948 -3922. Sincerel , for Thomas A. eeder Attachments (General Certification and Certificate of Completion form) cc: Tracey Wheeler, US Army Corps of Engineers; Washington Field Office Stephen Lane, DCM, Morehead City Garcy Ward, DWR, Washington Regional Office File Copy