Loading...
HomeMy WebLinkAboutNCC205670_MODIFICATION Supporting Documents_20220124TOWN of WAKE FOREST EROSION AND SEDIMENT CONTROL LAND DISTURBING PERMIT LETTER OF APPROVAL NVR, Inc ATTN: Matt Winkler 5734 Trinity Road, Suite 200 Raleigh, NC 27607 RE: Project Name: Mason Oaks Lots: 188,189 and 196 Permit No: 2021-00003031 Location: Hwy US 1 at Mason Oaks Drive Acres Approved: 0.51 Submitted By: Morris and Ritchie Associates of NC, PC Date Approved: January 20, 2022 Dear Mr. Winkler: 301 S. Brooks Street Wake Forest, NC 27587 t 919.435.9400 www.wakeforestnc.gov January 20, 2022 This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. Final signature copies shall be submitted to the Town of Wake Forest, as well as a digital copy at least one week prior to the preconstruction meeting. The land disturbance permit will be issued at the pre -construction meeting. The land disturbance permit shall expire two (2) years from the date of issuance and can be renewed in one- year increments. Per Section 12.3.2 of the Unified Development Ordinance (UDO), a copy of the approved erosion control plan shall be on file at the job site. Also, this letter gives the notice of our right to periodically inspect the jobsite to ensure compliance with the approved plan as outlined in the UDO. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973, this office may require revisions to the plans and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and Local water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form. You are requested to file an amended form if there are any changes in the information. Please set up a preconstruction conference with all parties involved through the Engineering Department. A preconstruction meeting must be held with the Town prior to starting any work, including installation of erosion control measures, demolition, any clearing and grubbing or earth moving activities. Be aware that your project is subject to the NPDES General Stormwater Permit NCGO1000 (Construction Activities). The Town will no longer distribute the NCG01 permit, you will have to obtain the permit from NC DEMLR. To receive a Certificate of Coverage, you must submit an electronic Notice of Intent with this approval letter. You must obtain the Certificate of Coverage prior to scheduling the pre -construction meeting. You will also need to have copies of the compliance plans sheets, (Ground Stabilization and Material Handling, and Inspection, Recordkeeping, and Reporting), if they were not included in the approved erosion and sediment control plan. The NCG01 permit require that the following documentation be kept on file at the job site: • The approved E&SC plans as well as any approved deviations • The NCG01 permit and the Certificate of Coverage • Records of inspections made during the previous 12 months Sincerely, Carrie Mitchell, PE, CFM Environmental Engineering Manager