Loading...
HomeMy WebLinkAboutNCC220384_Site Plan or Location Map_20220126ITY MAP - N.T.S. LEGEND DIVERSION BERM W/ MATTING DIVERSION BERM (TYP.) CONSTRUCTION LIMITS (TYP.) SILT FENCE (TYP.) CHECK DAM I'1,. -,8 � m GRAVEL BERM DOSOO C18�J O% REINFORCED SILT FENCE OUTLET TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 0000 00 INLET PROTECTION 00000 NOTES: 1. CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 2. ALL WATER & SEWER MAINS, LATERALS AND APPURTENANCES SHALL BE TESTED IN ACCORDANCE WITH HOKE COUNTY AND PWC TECHNICAL SPECIFICATIONS. 3. ALL DUCTILE IRON PIPE, IN SANITARY SEWER SERVICE, SHALL HAVE GRIFFIN "SEWPER" COAT OR PROTECTO 401 LINING 4. STORMWATER FOR THIS PHASE OF THE MIDLANDS WAS PREVIOUSLY APPROVED BY NCDENR STORMWATER AS PART OF BEDFORD PHASE ONE (NC STORMWATER PERMIT #:SW6140202) TEMPORARY SEDIMENT SKIMMER BASINS TSSB #1 TSSB #2 DRAINAGE AREA 5.84 1.73 DISTURBED AREA 5.84 1.73 REQUIRED STORAGE VOLUME 10507 3119 REQUIRED SURFACE AREA 5881 1746 AVG. LENGTH 150' 80' AVG. WIDTH 40' 25' DEPTH 2.0' 2.0' ACTUAL SURFACE AREA 6000 2000 ACTUAL STORAGE VOLUME 12000 6000 TOP ELEVATION 97.00 100 EMERGENCY SPILLWAY ELEVATION 95.50 98.50 S.A. ELEVATION 95.50 98.5 BOTTOM ELEVATION 93.50 96.50 SKIMMER SIZE 2.5" 1.5" SKIMMER ORFICE SIZE (DIAMETER) 1.9" 1.2" EMERGENCY SPILLWAY WIDTH 12' 12' Q=CIA (C-0.5, 1=6.2) 18.01 5.37 1, s REINFORCED ILT FENCE OUTLET 5DOUBLE ROW SILT FENCE REINFORCED SILT FENCE OUTLET Id III IIII�III FUTURE SITE S %/ x / i S 2 I I I/ ST NU `c�FSCM FOR REINFORCED��rFENCE OUTLET JJ iI j au am APRON 7 DAY STABILIZATION EQ'D TSSB #2 RIP RAP APRON moo, ° TDB - "F1" *7 DAY STABILIZATION REQ'D / " I\ / I --,W/ / I REINFORCED SILT - FENCE OUTLET P I II 1 I x II� I REINFORCED SILT FENCE OUTLET I ."1 II TDB - Cl *7 DAY STABILIZATION REQ'D oo PI: 12+ Q CONSTRUCTION LIMITS (TYP.) 00 + :7Y I AROLIN "' I I D 42 568 I �Q PI: 14+5 10 39 100 99 99 102 / C� FFE 104.25 99 �1p1� 0 / 500' r 0 TDB - "C2" W/ TURF MATTING ALONG TDB-C2 (120 S.Y. MAX) (TYP.) gg- *7 DAY STABILIZATION REQ'D � 103 ------40 CAR PARKI a3 A S3(9'X20') 10,0 W covv 'oz ee�e II I _ REINFORCED SILT FENCE OUTLET I\1 II 1 � II II I � . 1 co I I I I 1 • I I 1I 1 I e I 1 I , REINFORCED SILT FENCE OUTLET II 1 I➢4\ . `10? I5 0 GROUND STABILIZATION SITE AREA STABILIZATION EXCEPTIONS DESCRIPTION TIME FRAME PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES & SLOPES HIGH QUALITY 7 DAYS NONE WATER ZONES (HQW) SLOPES STEEPER 7 DAYS IF SLOPES ARE 10' THAN 3:1 OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR FLATTER SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS 14 DAYS NONE (EXCEPT FOR WITH SLOPES PERIMETERS AND FLATTER THAN 4:1 HQW ZONES) LEGEND SURVEYED BOUNDARY LINE MIN. BLDG. SETBACK LINE LINES NOT SURVEYED EASEMENT LINES - CENTERLINE FENCE STORM PIPE OHE OVERHEAD ELEC. LINE TREE WETLANDS TEMPORARY DIVERSION BERM VELOCITY CALCULATIONS BERM SIDE SLOPES BOTTOM WIDTH MIN. DEPTH (FT) AREA (AC) Q-CUMMULATIVE VELOCITY (F/S) LINING TDB-A1 3:1- 8:1 1' 1' 1.53 AC 4.743 cfs 2.29 NO TDB-A2 3:1- 8:1 1' 1' 3.579 AC 11.09 cfs 2.89 YES TDB-B1 3:1- 8:1 1' 1' 0.535 AC 1.4 cfs 2.33 NO TDB-C1 3:1- 8:1 1' 1' .467 AC 1.45 cfs 2.16 NO TDB-C2 3:1- 8:1 1' 1' 1.459 AC 4.53 cfs 2.89 YES TDB-E1 3:1- 8:1 1' 1' 1.598 AC 4.95 cfs 2.17 NO TDB-F1 3:1- 8:1 1' 1' 0.226 AC 0.700 cfs 1.88 NO LIMITS OF CONSTRUCTION \ / D v\ TDB - "B1" o \ 7 DAY STABILIZATION REQ'D o \ 1 339 0 1 ' I1 Rip Rap d so \ w C\ I 1 \� o 1 D: - "A I" GRAVELBERM DAY STABILIZATION REQ ACROSS R/W (TYP-.) J__ JQLk i AA - /IrVIk_ - IfJ•J/1! 1nM1WIR-i♦'/�� 110NA, "Will r ♦ � W = is + do CONSTRUCTION SCHEDULE (INITIAL CLEARING, GRUBBING & MASS GRADING) 1. Obtain all permits before beginning construction. 2. Install gravel construction entrances at the locations show, then install all silt fences around the perimeter of the construction area and 5 feet off of the wetlands to the west. 3. Construct temporary skimmer basin #20 & #30. Maintain existing skimmer basin #7. 4. Clear and grub, strip topsoil and construct all diversion berms, check dams and armor the berms noted on the erosion control plan with turf reinforcement matting. 5. Continue clearing and grubbing of the site as necessary. 6. Seed and mulch all completed diversion berms within 7 days of their completion. 7. Continue mass grading the site while maintaining all erosion control measures and diversion berms during the site's grading. 8. After completion of all site grading, re -spread topsoil, fine grade, seed and mulch all disturbed area that will not be disturbed with the subdivision's utility work by providing ground cover within 7 to 14 days per NPDES requirements. RIPRAP OUTLET PROTECTION TSSB #1 TSSB #2 PIPE SIZE (do) 4 4 Q 0.12 CFS 0.12 CFS VELOCITY 2.4 FPS 2.4 FPS 3do 12 12 d50 4' 4' La (CHART MIN.) 6' 6' PIPE SIZE (do) 7' 7' THK. 12" 12" drawn by LS checked JMK reviewed JMK date SEPT-14-2021 job no. 21-2881-01 z Z O O Z U O a z J 0 W Z C) 0 z fx A U) U z Z Q z W LU m � � a � U W � a U r� N M c 0 D 0 c ILD O > Q 4-1 O , ti co N U Z't T- L0 4 00 O O O Co 11 LL �Lo°_' FINAL RECORD DOCUMENTS (WATER & SEWER) � 0 O O THESE RECORD DOCUMENTS REPRESENT ACTUAL FIELD L- m In Q) N SEWER INVERTS AND MANHOLE RIM ELEVATIONS AFTER C C CONSTRUCTION. THEY ALSO INCLUDE FIELD CHECKED In O >, O DISTANCES BETWEEN MANHOLES. THE REVISED PIPE SLOPES r M -C-_ V ARE BASED ON ACTUAL INVERTS AND FIELD DISTANCES. THE r LL 0- J PLANS HAVE NOT BEEN REDRAWN TO REFLECT THE ACTUAL FIELD ELEVATIONS, LOCATIONS OR SLOPES. THE WATER UTILITIES HAVE BEEN BASED ON INFORMATION Z PROVIDED BY OTHERS. THE DESIGN PROFESSIONAL HAS NOT Q VERIFIED THE ACCURACY AND/OR COMPLETENESS OF THIS J INFORMATION AND SHALL NOT BE RESPONSIBLE FOR ANY W ERRORS OR OMISSIONS WHICH MAY BE INCORPORATED p HEREIN AS A RESULT. _ FINAL RECORD DOCUMENTS (STORM) THIS RECORD DOCUMENT REPRESENTS ACTUAL FIELD GATHERED INFORMATION CONCERNING THE AS CONSTRUCTED STORM WATER DRAINAGE SYSTEM. THIS INCLUDES THE STORM DRAIN INVERTS, GRATE ELEVATIONS AND DISTANCES BETWEEN N STRUCTURES. ANY REVISED PIPE SLOPES ON THIS PLAN ARE BASED ON ACTUAL INVERTS AND FIELD DISTANCES. THIS PLAN HAS BEEN MODIFIED TO INDICATE THE ACTUAL FIELD w GATHERED DATA, BUT HAS NOT BEEN REDRAWN TO REFLECT z THE ACTUAL LENGTHS OR ELEVATIONS. 0 "All construction to be in accordance with current W c o oC applicable Hoke County, North Carolina Department of pp Y p ZZ u C) O Transportation (NCDOT) and/or Hoke County Utilities W 0.Standards and Specifications. , scale 1 "=30' GRAPHIC SCALE Field Book No. -30 0 15 30 60 120 ( IN FEET ) 1 inch = 30 ft. SHEET 1 OF 1