Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0022618_Regional Office Historical File Pre 2018
of NN A7FR„ Michael F. Easley, Governor • William G. Ross,Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality Coleen H. Sullins, P.E., Deputy Director Division of Water Quality June 25, 2003 Mr. Jon Dyer, Public Works Director Union County 400 N. Church Street Monroe, North Carolina 28112 Subject: Permit No. WQ0022618 Union County Indian Trail Center Wastewater Collection System Extension Union County Dear Mr. Dyer. In accordance with your application received on May 5, 2003, we are forwarding herewith Permit No. WQ0022618, dated June 25, 2003, to Union County for the construction and operation of the subject wastewater collection system extension_ This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2H .0227 or any individual system -wide collection system permit issued to the Permittee. Also note Permit Condition 12 regarding variance to gravity sewer. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1)15A NCAC 2H .0200; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. A7;7 NCDE' Mooresville Regional Office 919 N. Main Street, Mooresville, NC 28115 DENR Customer Service Center Internet http:/lh2o.enr.state.nc.us/ Telephone (704) 663-1699 Fax (704) 663-6040 Telephone 1 B00 623-6748 Mr, Jon Dyer Page 2 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Union County for the construction and operation of approximately 249 linear feet of 6-inch gravity sewer to serve a restaurant, office and grocery store as part of the Indian Trail Center project, and the discharge of 8,750 gallons per day of collected domestic wastewater into Union County's Crooked Creek WVVTP (NPDES No. NC0069841) existing sewerage system, pursuant to the application received May 5, 2003 and in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. If any parts, requirements, or limitations contained in this permit are unacceptable, you have -the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form 'of a written petition, conforming to Chapter 1508 of North Carolina General Statutes. and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this perrnit shall be final and binding. If you need additional information concerning this matter, please contact Dee Browder at (704) 663-1699. Sincerely, fbr Alan W. Klimek, P.E. cc: Union County Health Departrnent Mooresville Regional Office, Water Quality Section (WWTF Permit No. NC0069841) Kevin Herring, Frontier Land Surveying Water Quality Central Files NDPU Files - .• • NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H .0227. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2H .0227: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed prior to January 1, 2004 and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. • r1 4W. 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Upon completion of construction and prior to operation of these permitted facilities, a certification, a copy of the construction record drawings, as well as supporting design calculations for any pump stations permitted as part of this project shall be received from a North Carolina -licensed Professional Engineer certifying that the facilities have been installed in accordance with this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Main adopted June 1, 2000 as applicable; and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shall provide a final certificate of completion once the entire project has been completed. A copy of the construction record drawings, indicating the facilities constructed in the phase being certified, shall be submitted with each partial certification. Mail the Engineer's Certification, one copy of the 'Construction Record Drawings," and one copy of the supporting design calculations to the Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not Limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. prilliV .... 1 .. -1...... 11. Noncompliance Notification: The Permittee shall report by telephone to the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report in letter form within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. 12. Variance to Gravity Sewer MDC: A variance is granted to leave the 6-inch line and allow the public utility to own it after manholes and other sufficient upgrades have been completed. However the line, with the projected peak flow (2.5 times average daily flow), will have a velocity Tess than 2 feet per second. This line shall be deemed high priority. High priority lines must be evaluated once every six months and cleaned as necessary. This line shall be referenced as high priority in Union County's System wide Collection System Permit (WQCS00054) upon issuance. Documentation regarding the evaluations must be maintained for a minimum of three years. If at such time the line reaches 80% capacity (from growth or Ill problems), it shall be upgraded to 8-inch minimum. Permit issued this the 25th day of June, 2003. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan W_ Klim , P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0022618 Permit Number WQ0022618 Permit Tracking Slip 05/15/03 Program Category Non -discharge Status Project Type In review New Project Permit Type Fast Track Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer Individual Extensions Primary Reviewer Permit Contact Affiliation dee.browder Permitted Flow 8750 Facility Facility Name Indian Trail Center Location Address Owner �P—ivl 1`T- j s sur`D 6/2-4 / 03 Major/Minor Region Minor Mooresville County Union Facility Contact Affiliation Owner Name Owner Type Union County Government - County Owner Affiliation Jon Dyer 400 North Church Street Monroe NC 28112 DateslEvents Scheduled Orig Issue App Received Draft Initiated Issuance 05/05/03 Public Notice Issue Effective Expiration Regulated Activities Requested/Received Events Food preparation, other Additional Information requested Restaurant Additional information received Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 1 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: t ,� ! Zb) e (to be completed by DWQ) �! v Q �dZ 1. Owner: la. Union County Public Works Full Legal Name (company, municipality, HOA, utility, etc.) z 1 b. Jon C. Dyer PE, Director 0 Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!) F" 1 c. The legal entity who will own this system is: IN individual 0 Federal ❑ Municipality® State/County ■ Private Partnership ■ Corporation ■ Other (specify): ce Id. 400 N. Church Street 1e. Monroe 0 LL Street Address City Z 1f. NC lg. 28112 Z State Zip Code 0 1 h. 704-296-4210 1 i. 704-296-4232 1j. H Q.3 Telephone Facsimile E-mail C 2. Project (Facility) Information: 13 2a. Indian Trail Center I2b. Union d- Brief Project Name (permit will refer to this name) 1 County Where Project is Located < 3. Contact Person: Q 3a. Kevin E. Herring PE (Project Engineer) Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 704-283-9726 I3c. Phone Number 1 E-mail 1. Project is ® New ■ Modification (of an existing permit) If Modification, Permit No.: 2. Owner is >_i Public (skip to item B(3)) ■ Private (go to Item 2(a)) 2a. If ■ • ■ private, applicant will be: Retaining Ownership (i.e. store, church, single office, etc.) Leasing units (lots, townhomes, etc. - skip to Item B(3)) Selling units (lots, townhomes, etc. - go to Item B(2b)) 2b. If sold, facilities owned by a (must choose one ■ Public Utility (Instruction III) • Homeowner Assoc./Developer (instruction 1V) O3. Union County Public Works I —Owner of Wastewater Treatment Facility (VVWTF) Treating Wastewater From This Project '4a. Crooked Creek WWTP 4b. NC0069841 M Name of WWTF VTF Permit No. WV re 0 5a. UCPW 5b. 8" 5c. Unknown Lt. Z Owner of Downstream Sewer Receiving Sewer Size Permit Number of Downstream Sewer 6. The origin of this wastewater is (check all that apply): a WMIApartments/Condominiums ■ Residential Subdivision ■ Car Wash E Institution 100 % Domestic/Commercial a IN Mobile Home Park • School • ❑ Hospital Church % Industrial ' m ►_0 Restaurant ❑ NursingHome Other % (specify): 0 Office ® Other (specify): Grocery Store 7. Volume of wastewater to be permitted in this project: 8750 gallons per day 8. If the permitted flow is zero, indicate why: • Interceptor Line - Flow will be permitted is subsequent permits that connect to this line ■ Flow has already been allocated in Permit No. ■ Rehabilitation or replacement of existing sewer with no new flow expected -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 2 B. PERMIT INFORMATION (CONTINUED) 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(1)(1-2) must be approved prior to submittal of this application. Submit a separate request to the Division of Water Quality, Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 in accordance with 15A NCAC 2H .0219(I)(3). See attached Sheet 'Volume of Wastewater Generated" 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) Gravity or Force Main (pull down menu) 6" 249 Gravity Gravity Gravity Gravity Gravity Gravity Gravity ENTER TOTAL LINE LENGTH IN MILES 0.047 11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID (as shown on plans) Design Flow (MGD) Operational Point GPM © TDH Power Reliability Option (dual line feed, permanent generatorw/ATS, portable generator w/autodialer, wet well storage) 12. Does the sewer system Mains (latest version), comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .0200 as applicable? no, please reference the pertinent minimum design criteria or regulation and indicate why a is requested: met for "new" installation. Subject sewer is an existing 6" PVC line meeting minimum slope criteria. is being modified by adding manholes and will accepted and taken over by local public works dept. • Yes ® No If variance Minimum criteria is not This existing 6" line 13. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? Sedimentation and Erosion Control Plan? Stormwater? 0 Yes ❑ No Co N/A ® N/A ■ Yes 0 No ■ Yes • No e N/A -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 Z 0 p. Q 0 LL yreliability CC Von CI W 2 CO Ce W II— I V 1. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02103 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: ® A Watershed Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody; AND, ►I A Watershed Classification is not needed because the design does not depend on wet well storage as a power option for any pump station near a Class C down slope waterbody. Location ID Map Name of Waterbody County River Basin Waterbody Stream Index Waterbody Classification Submit the 8.5" x 11" topographic map as required in Instruction VI regardless of whether a classification is provided! Z 0 I— Q 0 Li. H I4 W 0 I,2g. 1. Applicant's Certification: 1 attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10, 000 as well as civil penalties up to $25,000 per violation. % 1a. iL{r 6(e/ 4(zQ D�J Signing Official Signat Dafe 2. Professional Enginee ere r t i fi c a t 1 o n : 1 attest that this application for Indian Trail Center accurate, complete and consistent with fhe information in the engineering plans, calculations, documentation to the best of my knowledge. 1 further attest that to the best of my been prepared in accordance with the applicable regulations, Gravity Sewer Minimum adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting Mains adopted June 1, 2000 and the watershed classification in accordance with Division portions of this submittal package may have been developed by other professionals, signature and seal signifies that 1 have reviewed this material and have judged it to Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person statement, representation, or certification in any application shall be guilty of a Class fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. has been reviewed and all other knowledge the proposed Design Criteria of Pump Stations guidance. Although inclusion of these be consistent with who knowingly 2 misdemeanor `,�.0111Irrr►rrr,� %���� �, . -� f ?�.���F�SS/p SEAL r 20165 r ' (:::: r.f yN6 .e�r , ms• r�lE...¢\�`:* '1 ", E. ' tU� o yy i29 Sell, signature by me and is supporting design has for Gravity Sewers and Force certain materials under my the proposed design. makes any false which may include a 2a. Kevin E. Herring PE o / 9 �� * rfti ! i �Q;.' C9 ��s z Professional Engineer Name 2b. Frontier Land Surveying Engineering Firm 2c. 1394-B Walkup Ave. Address 2d. Monroe 2e. NC 2f. 28110 City State Zip �a3 & Date 704-283-9726 2h. 704-238-8561 2i. Telephone I Facsimile 1 E-mail Project: Indian Trail Center Volume of Wastewater Generated Existing Shopping Center Grocery 53362 sf @ 120 gal / day/ 1000 sf Retail (2640 sf) 8 employees @ 25 gal / day / employee = Beauty Shop 6 booths @ 125 gal / day / booth Proposed Retail 8 units (7534 sf) Prop. Food Stand 32 employees @ 25 gal / day / employee (4 empl / unit) 1000 sf @ 50 gal / day / 100 sf 4 employees @ 25 gal / day / employee 6400 gal / day 200 gal / day 750 gal / day 800 gal / day 500 gal / day 100 gat / day Total wastewater generated = 8750 gal / day 1250 fC Salo: e : 7,200 .Detail: 14-0 .Datum: "NA P31.1 UNION COUNTY PUBLIC WORKS 400 N. Church Street Monroe, NC 28112-4804 704/296-4210 Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 919 North Main Street Mooresville, N.C. 28115 Attention: Regarding: Sanitary Sewer to serve Indian Trail Center We are sending you: El Copy of letter ❑ Plans ❑,Prints ❑ Shop Drawings ® Other TRANSMITTAL Date: 4/29/03 Copies Date No. Description 1 4/29/03 Original Non Discharge Permit Application 1 4/29/03 Copy of Non Discharge Permit Application 1 3/25/03 58488 Check for $400.00 (Application Fee) IBC f)tPT. Ur ENWKON MENT AND NATURAL RESOURCES i MOORESVILLE REGIONAL OFFICE (�rr�ann I MAY 0 5 2003 These are transmitted as checked below: WATER QUALITY SECTION ® For approval ❑ For your use ❑ As requested ['For review and comments Remarks: Signed: „AK, Received by: Date: 41rctr.ial_E�r„ ITAiiffwna- f' c t r11►y/13iL C7 EnVik.l I iiM FT.-. 'r s .111 1711E 'tffirMk. �' C., L 1r �iu$an eramait CLaiiic CERTIFIED MAIL RETURN RECEIPT REQUESTED Jon C. Dyer, Director Union County Public Works 400 N. Church Street Monroe, NC 28112 April 14, 2003 Subject Fc ra c Permit Appiii=trcra Il x a Trail Cyr W t O 1e cra �..i E scrn Union C` l, Dear Mr. Dyer The Division of Water Quality's Mooresville Regional C is ar-, - ie t: a e a cc aipirmilai package for review for the following reason(s): ✓ The application form submitted for the ±ject projeno c-..itipfe axt return the most current version of the fast -track app " 1 �t LrR.'f+L d ;A C _ hiS form is available for download from our Non -Discharge Perimng tLwe:r sta 5o=E http://h2o.enr.state.nc.us/ndou. Please tse FCRM: FTA m: greet sezer.. aip s and/or force main project submittals unless otherwise art This za n1i i� ; s:F:1 FTA. 06/00. Please note that the item(s) listed above must be iric'uded anditc-=rnoie .fcrr 1ari�irg ale permit application package for approval_ Your appEcation is ~r tined ZS tC:=1tri accordance with 15A NCAC 2H .0208. The suds of approval pu1;cn the receipt of complete and accurate appli ions. Reasa rna±re argrc ciiam c..au crm aic resubmit the application. The review process will then begin upcn r• pt ar TE c=clieziecf ai c r corrected application. Please be advised that construction and/or operation of 1`a er: 1e crn �"4-1.-.1extartstri with= a valid permit is a violation of North Carolina General �.. 143 215.t and nrofs±i tleAppfft to appropriate enforcement actions in accordance mitt Nan C ihaC- iera ] t-2t5e. CTa penalties of up to $25,000 per day per violation rray be ftitze fta sue. x a per`rn'i`rewired by North Carolina General Statute 143-215.1_ Mooresville Regional Off= 919 N. Main Street, Mooresville. NC 281:5 DENR Customer Service Cerr An Equal Opportunity Action Erpiolsr e e (I A) ��a : 7C4, -fr.73--mat3 Teiscrixe 1 MO ��TaB a ^.-ide .11C% sr— mrs:.m :tee: April 14, 2003 If you should have any questions regarding the acceptance a li' ate, please do not testae to contact me at (704) 663-1699. Thank you for your n E_D_ oweler ivircnrnenial Engineer Enclosures cc: Application return file Michael F. Easley, Govemor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality June 11, 2003 MEMORANDUM TO: Permit File W00022618 FROM: K. Marie Doklovic, PE SUBJECT: Variance to Gravity Sewer MDC The Indian Trail Center project includes a variance request for minimum line size. The existing 6-inch line was privately owned and possibly never permitted. The applicant, Union County, is willing to modify the Tine by adding manholes and then taking it over. The projected flow is 8,750 gpd for a restaurant, office and grocery. Assuming the minimum slope of .006 ft/ft, Manning's n of .013 and the peak project flow of .3 cfs, the velocity is still much less than 2 fps. SUMMARY - A variance is granted to leave the 6-inch line and allow the public utility to own it after manholes and other sufficient upgrades have been completed. However the line, with the projected peak flow (2.5 times average daily flow), will have a velocity less than 2 feet per second. This line shall be deemed high priority. High priority lines must be evaluated once every six months and cleaned as necessary. This line shall be referenced as high priority in Union Countys Systemwide Collection System Permit (WQCS00054) upon issuance. Documentation regarding the evaluations must be maintained fora minimum of three years. If at such time the line reaches 80% capacity (from growth or L4 problems), it shall be upgraded to 8-inch minimum. Non -Discharge Permitting Unit 1617 Mail Service Center, Raleigh. NC 27699-1617 DENR Customer Service Center An Equal Opportunity Action Employer Internet http•JRr2o.enr.state.nc.uslndpu Telephone (919) 733-5083 Fax (919) 715-6048 Telephone 1 800 623-7748 50% recycled/10% post -consumer paper Permit No. WQ0022618 June 25, 2003 ENGINEER'S CERTIFICATION PY Partial X Final I, Kevin E. Herring, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project Indian Trail Center Indian Trail Union County for the Project Name Location and County Permitee hereby state that to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division Water Quality `s (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature and date: 1,' ilk JUN - 8 2004 1 01%1111111rlilt., +`1.\CARP +� ="q3FSSSIO4s;:f ▪ i Q • I SEAL 1 E ▪ ' 20165 %,• 1Z<NAG 1 14.0„W ' N E HEQ` The Division of Water Quality hereby acknowledges receipt and acceptance of this Engineers Certification Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality December 1, 2004 Charles ©'Cain Union. County 400 N Church St Monroe NC 281 12-4804 SUBJECT: Indian Trail Center Permit No. WQ0022618 Wastewater Collection System Extension Final Engineering Certification Dear Permittee. The Division received a final engineering certification for the subject project on June 8, 2004. Enclosed is a copy of the certification page for your records. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the Life of the projec you have not received such copy from your consultant, please contact them immediately to obtain a copy. Lastly, you are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you, please complete Form PNOCF-S as this permit is not automatically transferable. Form PNOCF-S can be downloaded from htt ://h2o.enr.state.nc.us/ndpu/ndpuapps.html##Sewer. If you have any questions concerning this document or the completion of Fo necessary), please contact me at the letterhead address or via E-mail at marie.doklovic@ncmail.net. Sincerely, K. Marie Doklovic, PE Environmental Engineer Enclosure Cc: Mooresville Regional Office, Surface Water Protection Section (011 documents) Kevin Herring PE, Frontier Land Surveying (no enclosures) Surface Water Protection Section Central Files (w/o plan sheets) PNOCF-S (if NorthCarolina Naturally Pretreatment, Emergency Response and Collection Systems unit Internet httpi/h2o,enrancstate.us/ndpu 1617 Mail Service Center, Raleigh, NC 27699-1617 An Equal Opportunity Action Employer Telephone (919) 733-5683 Fax (919) 733-0059 50% recycled/10% p©st-consurner paper