Ms. Noelle Lutheran
Division of Water Quality
NC Department of Environment and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405-3845
Subject: Owendon Plantation - SW8 960916 MOD
Brunswick County, North Carolina
Resubmittal of Sheet 2 of 6 of Plans
Dear Ms. Lutheran:
Enclosed are two (2) copies of Sheet 2 of 6 of the Owendon Plantation
stormwater plans. This sheet has been revised, in accordance with comments
received from you by telephone conversation, to eliminate all direct piping into
the existing pond.
It is my understanding, from our discussions, that the pipes shown on
the previously submitted plan cannot be approved as shown due to a conflict
with the stormwater rules regarding the piping allowed within low density
projects.
We trust that the revised plan conforms with the regulations and that
the modified stormwater permit can be issued. Should you require any
additional information, or have any comments, please contact our office and
we will be happy to respond immediately.
Sincerely,
a .Houston, P.E.
ton and Associates, P.A.
Enclosures
pc: Mr. Don Owen, Owendon Plantation
File: 95-0443 (Owendon Plantation - Phase II EC and SW)
Telephone (910) 754-6324
Facsimile (910) 754-2121
HOUSTON and ASSOCIATES, P.A.
Consulting Engineers
SHALLOTTE, NORTH CAROLINA 28459
117 Pine Street
Post Office Box 627
Friday, December I, 2000
Ms. Linda Lewis, Environmental Engineer
Division of Water Quality
N. C. Department of Environment and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Subject: Owendon Plantation, Phase 2
Brunswick County, North Carolina
Modification to Stormwater Project NJ. SW8 960916 MOO
Dear Ms. Lewis: P
Enclosed are two copies each of the revised subject project Stormwater
Permit Application, Low Density Supplement, applicable page of the project
deed restrictions, calculations, and Stormwater Plans. Also enclosed is a check
in the amount of $420.00 to cover the application fee.
The revisions have been made to include fifty (50) additional lots and to
modify the interior roadways from the original layout. The additional lots are
possible due to the final delineation of wetlands. The enclosed copy of a page
of the restrictive covenants, which indicates a maximum impervious area
coverage of 3,000 square feet per lot, has been in place since the conveyance of
the first lot and the deed restriction applies to all lots within the project. The
permitted maximum built -upon area is currently 4,250 SF.
We appreciate your attention in this matter. Should you have any
comments or require any additional information, please do not hesitate to
contact our office at your convenience.
E.
ciates, P.A.
Enclosures
pc: Mr. Allen Davis, COE
Mr. Don Owen, Owen Ventures, Inc.
File 99-0090 (Winding River, Phase 3, SW)
Hydrologic and Hydraulic Calculations
for
O " ENDOO N PLANTATION
OWMv s, Evc.
BRUNSWICK COUNTY, NORTH CAROZ"A
TZ000
Prepared By
MOMQTDM and oc aft@a9 p.&
CONSULTING ENGINEERS
Shallotte, North Carolina
December 2000
i3 O W V 0 W .� W N� O 0 W �! O 0 A W N -+ �'3 w
0 0 0 0 0 0 0 0 0 0 0 0 0 0 o i o o -► o o
"'0
O W W OD W W �O V U1 O O in W W N W N W O -P O
N N N W .P 0 O i C11 O O V N V W V W W i W 0
06
O
'O
m
w i J
W W OD i i v1 W W OD O OD CJI N
--► W W V O-+
O
a
N O O O O O O O O O O O O O O O O O O W Ir
C71 O O O O O O O O O O O O O O O O O O W n
O O O O O O O O O O O O O O O O O O O O
co
co M N44- W i 0 N O N i i i V i i V N M O
.i bin 6LLbooivcninin:iivVioiab�16 n
N V V1 N �D U1 CJl v1 W W V V N OD O O O W W W -+
o r
N V
9 Q
O iD V i .P O W 6 V�� V� A N� a in : in La 6 in S a
~o V W-•(710-+rnirnWODNCnwc�jNODrn-a Qr
V/
O O O O O O O O O O O O O O O O O O O O
N O i <D � �p C71 O) O � W �O W Cil N W aD CJI V Vl
N
O
0 0 0 0 0 0 0 0 0 0 p O R
CO W
W Cn W N O v di)Ol W 21, S
i
W
co Wco
g
j— ap P co .i N4, a
O w W -L i V CA � CO O Cn a
A N N
Cb
V N N
V O O
N co N coNW CA) N N C Cif N G) N 1
C!1 W O 1,, CAD as OD W i aD w 0 CD O (a] (�
-4 N CA W ,P 4 Cn 01 W -4 V (n V CD OD W sy to
O
3
000V�wooa�al�oN000
a �
V CD V C D N OD 6 6) CA N 6 'CR
W V W CO N W O -4 -N 0 CD V W N O
Lo
C
? 4 4h. 41 W W 4 4 4 A M {i �N W
n m
W O CA O co co Cn 46 W N O O N CA Co V
O.
W O CO N CA �A -4 -4Ln -4 CC 4 -A- -4
�
rt
0 0 0 000 O O P O 0 0 0 0 0 0
Z
Cn C71 (71 C11 C71 Cn C11 CT1 Cn to C1t (7t Cn Cif W C11 '"�
C7D W U1 CA Vl P W � OD CD V O „�,� CA Cn CO �
V V .p
co w W 0-4 0CA N W C1D N C11 -+
(i1 C11 CA � � A W O da P O C11 C71 CA CA W 7 I i
CA V CA C11 Wm co w—
N O .A V. co w -4W o V? (71 LIZ
oD � s inO C'' m co c
w CO C" CD -4 CR V I
= ig
CD
0 ID
Cq Q
a
O W
3
Owenclon Plantation
Storm Drainage Inverts
1 1 /9/2000
Prepared By: JRH .
Checked By: �w .
Storm Drain
Length
Inv. In
Inv. Out
Road Elev.
Culvert Diam.
I.D.
(msl
Inches
SD1
40
45.00
44.80
47.15
15
SD2
_ 30
_46.20
43.00
48.40
115
TG: 46.5
S133
160
43.00
41.00
na
18
TG A6.5
SD4
30
45.30
45.10
48.50
24
SD5
30
44.90
44.80
47.2015
SD6
30
44.20
44.10
47.45
18
SD7
40
43.60
40.80
48.60
30
TG: 45.5
S138
240
40.80
40.00
48.60
30
TG: 45.5
SD9
30
44.70
44.50
46.90
15
SD10
30
43.80
43.70
46.00
15
SD11
30
43.10
43.00
47.10
24
SD12
30
38.80
38.30
45.30
30
TGA2.8
TG:43.0
SD13
220
38.30
37.50
45.30
36
TG: 43
SD14
30
46.20
46.00
48.60
15
SD15 1
30
44.50
44.30
46.60
15
SD16
30
41.60
41.50
43.80
15
NOTE: TG designates the Top of Grate at the associated Inv.
co
CL
0
a
E
U
o �c
Z W
ORAW,001 e1hWW14,A1 - dv6 T 711S AEllf-7iM r/r*-Ae%,V A,9-
PEj4i"AAI& Ot- /WX /I76/r01
DfA'� S.
u
3 i � *-1WU�6b � rZ Af 4d-* All fc�IV77{=3p'
� l Y
V of �0/7tlf
I d/om : cif Om. ►�,�a!�O�f
✓ - -I
-COW 0— -3oa F�
s
5-
#
L= 7,�� (as�`•�
A 15�v? fps
�Ivac gtrF. = 3a. cis 4'E4vf vo t emr r So 12 aw )
-3 et�—s
_ ✓. o Ff
L = 76 F14 zip- U�` /o ' GU/
RJ614 XX2� '. V.= --- - -�; /a, -
461.:5 // , /0,) = -7,0.3
S10
Omndon
Grate Inlets
1 1 /30/00
Inlet Grate Hydrology & Hydraulics
Check most critical catch basin. Inlet grate sized for most
critical basin will be suitable for all basins.
10-Yr Flowrate: 30.00 cfs
Minimum Perimeter grate with head limited to 0.6 feet:
P = Q / (C*H)^i .a where C=2.6
Perimiter: 4.6 Feet
Minimum Open area of grate with head limited to 0.6 feet:
A = Q / C*(2*g*H)0.5 where C=0.6
Open Area: 6.2 g
7
Owendon Plantation
Culvert Hydraulics
11/9/2000
SD1
HEADWATER ELEVATION CALCULATIONS
Prepared By: JRH .
Checked Bv:
FLOWRATE =
CP5
MANNINGS n =
MINCHES
HEADWATER ELEVATION ASSUMING INLET CONTROL
DIA. FOR CULVERT PIPE =
INCHES
DIA. FOR RISER=
HEAD = 0.74
LENGTH OF CULVERT PIPE =
4 0 FEET
HEADWATER ELEVATION = 46.36
INV. IN ELEV. OF CULVERT =
45.00 FEET
INV. OUT ELEV. OF CULVERT =
44.80 FEET
INLET COEF. FOR CULV. PIPE FLOW =
0.5
HEADWATER ELEVATION ASSUMING PIPE FLOW
INLET COEF. FOR CULVERT INLET CONTROL =
0.6
RISER WEIR ELEVATION =
0.00 FEET
HEAD = 0.61
WEIR FLOW COEF. =
0
HEADWATER ELEVATION = 45.91
TAILWATER ELEVATION =
45:30.. FEET
VELOCITY=
4.13 FPS
TAILWATER UNKNOWN = ZERO()
HEADWATER ELEVATION ASSUMING WEIR FLOW
'SD2
(HEADWATER ELEVATION CALCULATIONS
FLOWRATE=
4..33 CPS
MANNINGS n =
0,012
DIA. FOR CULVERT PIPE _
', 6 INCHES
DIA. FOR RISER =
0 INCHES
LENGTH OF CULVERT PIPE =
3 0 FAT
INV. IN ELEV. OF CULVERT =
46.20 FEET
INV. OUT ELEV. OF CULVERT =
43.00 RAT
INLET COEF. FOR CULV. PIPE FLOW =
INLET COEF. FOR CULVERT INLET CONTROL
RISER WEIR ELEVATION =
RifWEIR
FLOW COEF. =
INFEEr
TAILWATER ELEVATION =
VELOCITY=
3.53 FPS
HEAD = #DIV/01
HEADWATER ELEVATION = #DIV/01
HEADWATER ELEVATION ASSUMING INLET CONTROL
HEAD = 0.54
HEADWATER ELEVATION = 47.36
HEADWATER ELEVATION ASSUMING PIPE FLOW
HEAD = 0.40
HEADWATER ELEVATION = 44.95
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION = #DIV/01
ISM
ELEVATION CALCULATIONS
Owendon Plantation
Culvert Hydraulics
1 1 /9/2000
FLOWRATE =
7. 62! CPS
MANNINGS n =
O.012
DIA. FOR CULVERT PIPE =
1 8 INCHES
DIA. FOR RISER =
0 INCHES
LENGTH OF CULVERT PIPE =
16 0 FEET
INV. IN ELEV. OF CULVERT =
43.00 FEET
INV. OUT ELEV. OF CULVERT=
41.00 FEET
INLET COEF. FOR CULV. PIPE FLOW
INLET COEF. FOR CULVERT INLET CONTROL =
= ._ 0.6
RISER WEIR ELEVATION =
4 , 0 61 FEET
WEIR FLOW COEF. =
0
TAILWATER ELEVATION =
42.OD. FEET
VELOCITY=
4.31 FPS
SD4
HEADWATER ELEVATION CALCULATIONS
LOWRATE
tANNINGS
CP5
n =
:: '- 01: 012.
DIA. FOR CULVERT PIPE =
24 INCHES
7.
DIA: FOR RISER =
-0 INCHES
LENGTH OF CULVERT PIPE =
30 FFET
INV. IN ELEV. OF CULVERT =
4;&30 FEET
INV. OUT ELEV. OF CULVERT =
45.10
INLET COEF. FOR CULV. PIPE FLOW
INLET COEF. FOR CULVERT INLET CONTROL =:
RISER WEIR ELEVATION =
. FAT
WEIR FLOW COEF. _
TAILWATER ELEVATION =
'FEET
VELOCITY=
5.86 R'S
Prepared By: JRH .
Checked By:
HEADWATER ELEVATION ASSUMING INLET
HEAD = 0.80
HEADWATER ELEVATION = 44.55
HEADWATER ELEVATION ASSUMING PIPE FLOW
HEAD = 1.15
HEADWATER ELEVATION = 43.15
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION= #DIV/0I
HEADWATER ELEVATION ASSUMING INLET CONTROL I
HEAD = 1.47
HEADWATER ELEVATION n 47.77
HEADWATER ELEVATION ASSUMING PIPE FLOW
HEAD = 0.97
HEADWATER ELEVATION = 46.57
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION = #DIV/O!
Owendon Plantation
Culvert Hydraulics
11 /9/2000
ISD5
HEADWATER ELEVATION CALCULATIONS
FLOWRATE _
;' "6 --4'E CFS
MANNINGS n=
47 2:
DIA FOR CULVERT PIPE=:.
-A INCHES
DIA FOR RISER=
INCHES
'
LENGTH OF CULVERT PIPE =
3 0 FEET
.'°'
INV. IN ELEV. OF CULVERT =
44.90 FEET
INV. OUT ELEV. OF CULVERT=
44.80 FEET
INLET COEF. FOR CULV. PIPE FLOW =
INLET COEF. FOR CULVERT INLET CONTROL
RISER WEIR ELEVATION =
FEET
OFEET
WEIR FLOW COEF. =
TAILWATER ELEVATION =
VELOCITY=
5.26 FPS
ISD6
HEADWATER ELEVATION CALCULATIONS
Prepared By: JRH .
Checked By:
HEADWATER ELEVATION ASSUMING INLET CONTROL
HEAD = 1.20
HEADWATER ELEVATION = 46.72
HEADWATER ELEVATION ASSUMING PIPE FLOW
HEAD = 0.90
HEADWATER ELEVATION = 46.20
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION = #DIV/01
FLOWRATE =
1.7.15 CF5
MANNINGS n =
D:01
HEADWATER ELEVATION ASSUMING INLET CONTROL
DIA. FOR CULVERT PIPE =
1 8. INCHES
DIA. FOR RISER=
INCHES
HEAD = 4.06
LENGTH OF CULVERT PIPE =
3.0 FEET
HEADWATER ELEVATION = 49.01
INV. IN ELEV. OF CULVERT =
44.20 FEET
INV. OUT ELEV. OF CULVERT =
44,10 FAT
INLET COEF. FOR CULV. PIPE FLOW =
......
. 0 `5
HEADWATER ELEVATION ASSUMING PIPE FLOW
INLET COEF. FOR CULVERT INLET CONTROL-..:'
0.6
RISER WEIR ELEVATION =
0.0:0: FEET
HEAD = 2,88
WEIR FLOW COEF. _
HEADWATER ELEVATION = 47.48
TAILWATER ELEVATION =
44 60 FEET
VELOCITY=
9.70 FIBS
TAILWATER UNKNOWN = ZERO (0)
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION = #DIV/01
!D
Owendon Plantation
Culvert Hydraulics
1 1 /9/2000
�SD7
HEADWATER ELEVATION CALCULATIONS
IMANNIN(a.1 n =
DIA. FOR CULVERT PIPE =
INCHES
DIA FOR RISER =
ti INCHES
LENGTH OF CULVERT PIPE =
44 FEET
INV. IN ELEV. OF CULVERT =
43.60 FEET
INV. OUT ELEV. OF CULVERT =
:80 FEET
INLET COEF. FOR CULV. PIPE FLOW =
INLET COEF. FOR CULVERT INLET CONTROL
RISER WEIR ELEVATION =
FEET
ip,
WEIR FLOW COEF. _
TAILWATER ELEVATION =
45.42 FEET
VELOCITY=
7.76 FFS
ELEVATION CALCULATIONS
Prepared By: JRH .
Checked By:
HEADWATER ELEVATION ASSUMING INLET
HEAD = 2.59
HEADWATER ELEVATION = 47.44
HEADWATER ELEVATION ASSUMING PIPE FLOW
HEAD = 1.69
HEADWATER ELEVATION = 47.12
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION = #DIV/01
FLOWRATE =
O"s
MANNINGS n =
HEADWATER ELEVATION ASSUMING INLET COM
DIA FOR CULVERT PIPE =
INCHES
DIA FOR RISER =
... INCHES
HEAD = 2.80
LENGTH OF CULVERT PIPE =
240FEET
HEADWATER ELEVATION = 44.85
INV. IN ELEV. OF CULVERT =
40:80 FEET
INV. OUT ELEV. OF CULVERT =
0.00 FEET
INLET COEF. FOR CULV. PIPE FLOW =
a.. 5
HEADWATER ELEVATION ASSUMING PIPE FLOW
INLET COEF. FOR CULVERT INLET CONTROL =
0 6
RISER WEIR ELEVATION =
q, 00 FEET
HEAD = 3.42
WEIR FLOW COEF. =
0
HEADWATER ELEVATION = 45.42
TAILWATER ELEVATION =
42-: FEET
VELOCITY=
8.06 FFS
TAILWATER UNKNOWN = ZERO (0)
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION = #DIV/01
ISD9
ELEVATION CALCULATIONS
Owendon Plantation
Culvert Hydraulics
1 1 /9/2000
=
5 -17 CFS
IFLOWRATE
MANNINGS n =
0.012.
DIA. FOR CULVERT PIPE =
1 5' INCHES
DIA. FOR RISER =
0 INCHES
LENGTH OF CULVERT PIPE =
3 Q FEET
INV. IN ELEV. OF CULVERT =
44. 7 0 FEET
INV. OUT ELEV. OF CULVERT=
44.50 FEET
INLET COEF. FOR CULV. PIPE FLOW
INLET COEF. FOR CULVERT INLET CONTROL=
RISER WEIR ELEVATION =
="Q f' FEET
WEIR FLOW COEF.
TAILWATER ELEVATION =
-410. a. FEET
VELOCITY=
4.21 FPS
ISD10
TER ELEVATION CALCULATIONS
Prepared By: JRH .
Checked By:
HEADWATER ELEVATION ASSUMING INLET CONTROL
HEAD = 0.77
HEADWATER ELEVATION = 46.09
HEADWATER ELEVATION ASSUMING PIPE FLOW
HEAD = 0.58
HEADWATER ELEVATION = 45.58
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION = #DIV/01
FLOWRATE=
7:.48 CF8
MANNINGS n =
4:.01
HEADWATER ELEVATION ASSUMING INLET CON I
DIA. FOR CULVERT PIPE =
15 INCHES
DIA FOR RISER =
0 INCHES
HEAD = 1.60
LENGTH OF CULVERT PIPE =
3 0 FEET
HEADWATER ELEVATION = 46.03
INV. IN ELEV. OF CULVERT =
43.80} FEET
INV. OUT ELEV. OF CULVERT =
43:70 FEET
INLET COEF. FOR CULV. PIPE FLOW =
0.5
HEADWATER ELEVATION ASSUMING PIPE FLOW
INLET COEF. FOR CULVERT INLET CONTROL =
. 0.6
RISER WEIR ELEVATION =
= ;:;Q:00 FEET
HEAD = 1.21
WEIR FLOW COEF. =
0
HEADWATER ELEVATION = 45.41
TAILWATER ELEVATION =
' 4} go FEET
VELOCITY=
6.10 FPS
TAILWATER UNKNOWN = ZERO (0)
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION = #DIV/01
IZ
Owendon Plantation
Culvert Hydraulics
1 1 /9/2000
ISD11
HEADWATER ELEVATION CALCULATIONS
FLOWRATE =
:' `85§ CPS
MANNINGS n
DIA. FOR CULVERT PIPE _
"4 INCHES
DIA. FOR RISER =?`
INCHES
LENGTH OF CULVERT PIPE =
3 0 FEET
INV. IN ELEV. OF CULVERT =
43.10 FEET
INV. OUT ELEV. OF CULVERT =
43.00 FEET
INLET COEF. FOR CULV. PIPE FLOW =
INLET COEF. FOR CULVERT INLET CONTROL=
RISER WEIR ELEVATION =
=` : FEET
WEIR FLOW COEF.
TAILWATER ELEVATION =
a FEET
VELOCITY=
7.91 R'S
ISD12
HEADWATER ELEVATION CALCULATIONS
Prepared By: JRH .
Checked By:
HEADWATER ELATION ASSUM!NG INLET
HEAD = 2.70
HEADWATER ELEVATION = 46.80
HEADWATER ELEVATION ASSUMING PIPE FLOW
HEAD = 1.77
HEADWATER ELEVATION = 45.27
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION= #DIV/01
FLOWRATE=
30.28 CFS
MANNINGS n =
. o'n i 2
HEADWATER ELEVATION ASSUMING INLET CONTROL
DIA. FOR CULVERT PIPE _
`., .3 0 INCHES
DIA. FOR RISER=
0 INCHES
HEAD = 1.64
LENGTH OF CULVERT PIPE _
30 I1CT
HEADWATER ELEVATION = 41.69
INV. IN ELEV. OF CULVERT =
38.80 FEET
INV. OUT ELEV. OF CULVERT =
$8.30, FEET
INLET COEF. FOR CULV. PIPE FLOW =
❑ .5'
HEADWATER ELEVATION ASSUMING PIPE FLOW
INLET COEF. FOR CULVERT INLET CONTROL =
0.6
RISER WEIR ELEVATION =
-0. 0'0 RAT
HEAD = 1.03
WEIR FLOW COEF. =
p
HEADWATER ELEVATION = 45.46
TAILWATER ELEVATION =
: 4:4: 45 FEET
VELOCITY=
6.17 R'S
TAILWATER UNKNOWN = ZEBQA
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION = #DIV/01
13
Omndon Plantation
Culvert Hydraulics
11/9/2000
SD13
HEADWATER ELEVATION CALCULATIONS
FLOWRATE _.48;
CPS
MANNINGS. n
DIA. FOR CULVERT PIPE _
-:: 3'.6:, INCHES
DIA. FOR RISER =
0 INCHES
LENGTH OF CULVERT PIPE =
2 2 0 FEET
INV. INELEV. OFCULVERT =
3 8.3 0 FEET
INV. OUT ELEV. OF CULVERT =
37,50 FEET
INLET COEF. FOR CULV. PIPE FLOW =
0: 5
INLET COEF. FOR CULVERT INLET CONTROL =
0.6
RISER WEIR ELEVATION =
0.00 FEET
WEIR FLOW COEF. =
0
TAILWATER ELEVATION =
42.00 FEET
VELOCITY=
7.42 FPS
D14
ELEVATION CALCULATIONS
FLOWRATE=
6.33 CPS
MANNINGS n =
0:012
DIA. FOR CULVERT PIPE =
1 5 INCHES
DIA. FOR RISER =
0 INCHES
LENGTH OF CULVERT PIPE =
3 0 FEET
INV. IN ELEV. OF CULVERT =
46.20 FEET
INV. OUT ELEV. OF CULVERT =
46.00 FEET
INLET COEF. FOR CULV. PIPE FLOW
INLET COEF. FOR CULVERT INLET CONTROL =
;(i}6:
RISER WEIR ELEVATION =
:-:,0 0.0 FEET
WEIR FLOW COEF. _
- 0,
TAILWATER ELEVATION =
46';'5'a' FEET
VELOCITY=
5.16 R'S
Prepared By. JRH .
Checked By.
HEADWATER ELEVATION ASSUMING INLET
HEAD = 2.38
HEADWATER ELEVATION = 42.18
HEADWATER ELEVATION ASSUMING PIPE FLOW
HEAD = 2.45
HEADWATER ELEVATION = 44.45
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION= #DIV/01
HEADWATER ELEVATION ASSUMING INLET
HEAD= 1.15
HEADWATER ELEVATION 47.97
HEADWATER ELEVATION ASSUMING PIPE FLOW
HEAD = 0.87
HEADWATER ELEVATION = 47.37
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION= #DIV/01
rm
Owendon Plantation
Culvert Hydraulics
1 1 /9/2000
SD15
HEADWATER ELEVATION CALCULATIONS
_
_.: fi4 CPS
IFLOWRATE
MANNINGS n
DIA. FOR CULVERT PIPE_
= .-1<:5 INCHES
DIA. FOR RISER =
a: INCHES
LENGTH OF CULVERT PIPE =
3 0 FEET
INV. IN ELEV. OF CULVERT =
44.50 FEET
INV. OUT ELEV. OF CULVERT =
44.30 FEET
INLET COEF. FOR CULV. PIPE FLOW
INLET COEF. FOR CULVERT INLET CONTROL
RISER WEIR ELEVATION =
:0 00 FEET
WEIR FLOW COEF.
TAILWATER ELEVATION =
4'4:go. FEET
VELOCITY=
6.23 FPS
ISM
ELEVATION CALCULATIONS
LOWRATE =
6 - 3 7 CFIS
AANNINGS n =
)IA. FOR CULVERT PIPE =
INCHES
IIA. FOR RISER =
INCHES
ENGTH OF CULVERT PIPE _?
FEET
W. IN ELEV. OF CULVERT =
41.W FEEL'
SIV. OUT ELEV. OF CULVERT =
41.E FEET
VLET COEF. FOR CULV. PIPE FLOW =
VLET COEF. FOR CULVERT INLET CONTROL
tISER WEIR ELEVATION =
FEET
mFEEr
VEIR FLOW COEF. =
AILWATER ELEVATION =
'EELOCITY=
5.19 FPS
Prepared By: JRH .
Checked By:
HEADWATER ELEVATION ASSUMING INLET
HEAD = 1.67
HEADWATER ELEVATION = 46.80
HEADWATER ELEVATION ASSUMING PIPE FLOW
HEAD = 1.26
HEADWATER ELEVATION = 46.06
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION= #DIV/01
HEADWATER ELEVATION ASSUMING INLET
HEAD= 1.16
HEADWATER ELEVATION = 43.39
HEADWATER ELEVATION ASSUMING PIPE FLOW
HEAD = 0.88
HEADWATER ELEVATION = 42.88
HEADWATER ELEVATION ASSUMING WEIR FLOW
HEAD = #DIV/01
HEADWATER ELEVATION= #DIV/01