Loading...
HomeMy WebLinkAboutSW8071210_Historical File_20180711®McGill A S S O C I A T E S July 2, 2018 Ms. Kelly Johnson NC Division of Energy, Mineral & Land Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Dear Kelly: _ X 40 JUL Subject: Stormwater Permit Application Town Creek Middle School and Elementary School Classroom Addition Lake Park Drive SE Winnabow, North Carolina Please find enclosed the following items for review and approval for the above referenced project: Item Copies Description 1. 2 Stormwater Permit Application Form Pages 3--4 Revised 2. 2 Supplement-EZ Wet Pond Form - Revised 3. 2 Stormwater Design Report - Revised 4. 2 Construction Plan (Partial Plan Set) 5. 2 Land Management Group, Inc. Non -Stream Verification The following items are in response to the comments found in your review letter dated June 20, 2018: 2.b.ii.4. The low density impervious area has been maximized to 24% as recommended. Permit Application Sections IV.8. and IV.10 have been updated accordingly. The revised pages are enclosed. Additionally, Section 5 of the Stormwater Report has been updated to show the future impervious areas. 2.b.iii.5.a Drainage Area Map DAM-4 showing the entire site boundary has been added to the Stormwater Report. 2.bdii.5.b.i. All three proposed drainage areas are included on DAM-4 referenced above. 2.b.iii.5.b.ii.I DAM-3 has been revised to clarify drainage area boundaries prior to and after this modification by separating pre and post development maps. The dry pond note has been modified to clarify intent. 712 VILLAGE ROAD SW, SUITE 103, SHALLOTTE, NORTH CAROLINA 28470 1 910.755.5872 1 www.megillengineers.com Page 2 2.b.iii.5.b.ii.2 The natural drainage area boundaries are defined on DAM-1 and DAM2 on the plans and within the pre and post drainage area tables. The natural boundaries include but are not limited to the (3) pocket wetlands areas and perimeter ditches. 2.b.iii.5.b.ii.3 One copy of each drainage area map is included in each of the two reports. 2.b.iii.5.b.ii.4 Bearings and distances have been added to the overall site drainage area post development boundaries on DAM-4. 2.b.iii.5.b.ii.5 In addition to the drainage arrows shown on DAM-1 and DAM-2 defining drainage patterns, the elevation layer has been turned on for further clarification on DAM-2. 4.a.i. The design volume calculation has been modified for non -SA waters. 4.a.ii. The calculations have been updated and submitted in the requested table format. The relevant elevations have been labeled in plan view. 4.a.iii. The wet pond supplement form has been updated accordingly and is attached. The form has been emailed. 4.b. No water quality swales are proposed in the low density drainage area. 4.c. Yes, the subject ditch has been determined not to be a stream. See attached email verification from Land Management Group, Inc. However, as the site elevations allow us to pull the proposed outfall back, we have decided to do so as an extra precaution. The plan and calculations have been updated accordingly. 4.d. The pond detail has been updated to reflect a deeper forebay entrance. Please note that there are two inflow pipe systems entering the forebay on opposite sides that effects the contours at the bottom of the forebay. 4.e. SCM was modeled showing that it contains the 100 year storm (enclosed). For storm events larger than 100 year, the entire SCM 2 top of bank will serve as an overflow weir to the surrounding parking lot and drives in lieu of concentrating the flow as it is surrounded by parking lots and drives. 41 The "Front View of Typical Trash Rack" detail remains at the top of Detail Sheet C-509. 4.g. The note stating "dewatering method by portable pump" remains on Detail Sheet C-509. A box has been drawn around the note. 4.h. A fountain is not proposed for this project. 4.i. Berm velocity calculations have been added to Section 11 of the Stormwater Report. Page 3 4;j. Inflow and outflow velocity calculations have been added to Sections 10 and 11 of the Stormwater Report summarizing the results found in the Storm Sewers Design Calculations in Section 9. 4.k. The requested note "...the basin shall be completely cleaned out prior to conversion to the final basin..." remains on Erosion Control Sheet C-103. 4.1. An updated set of plans including only those sheets applicable to the stormwater review are enclosed including: I. C-001 COVER SHEET 2. C-002 GENERAL NOTES SHEET 3. C-101 INDEX SHEET and LEGEND 4. C-102 EXISTING CONDITIONS and TREE SURVEY 5. C-103 EROSION CONTROL PLAN LAKE PARK DRIVE IMPROVEMENTS 6. C-201 PLAN and PROFILE - LAKE PARK DRIVE ELEMENTARY SCHOOL ADDITION (ES) 7. C-302 LAYOUT PLAN - ELEMENTARY SCHOOL 8. C-303 STORMWATER and GRADING PLAN - ES MIDDLE SCHOOL (MS) 9. C-402A LAYOUT PLAN - MIDDLE SCHOOL 10. C-402B LAYOUT PLAN - MIDDLE SCHOOL 11. C-402C LAYOUT PLAN - MIDDLE SCHOOL 12. C-403A STORMWATER and GRADING PLAN - MS 13. C-403B STORMWATER and GRADING PLAN - MS 14. C-403C STORMWATER and GRADING PLAN - MS DETAILS 15. C-501 EROSION CONTROL DETAIL SHEET 16. C-502 EROSION CONTROL DETAIL SHEET 17. C-503 EROSION CONTROL DETAIL SHEET 18. C-504 EROSION CONTROL DETAIL SHEET 19. C-505 STORM DRAINAGE DETAIL SHEET 20. C-506 STORM DRAINAGE DETAIL SHEET 21. C-507 STORM DRAINAGE DETAIL SHEET 22. C-508 STORM DRAINAGE DETAIL SHEET 23. C-509 STORM DRAINAGE DETAIL SHEET Please note that the demolition sheets were originally included to show the impervious areas being removed within the drainage area, however, they have been removed as requested. We respectfully request that the number of requests for additional information be reconsidered due to the out of the ordinary circumstances of this project and the off -site wet pond permit and drainage area issue that needed to be resolved prior to moving forward with this permit application request, including the response time given to the original design engineer to research records. Please contact me at (910) 755-5872 or holly.cook@mcgillengineers.com should you have any questions during your review. We appreciate your help in this process. Sincerely, McGILL ASSOCIATES, E.A. 4VO4j Holly Cook, PE Shallotte Office Enclosures Page ,4 McGill • A S S O C I A T E S STORMWATER DESIGN REPORT Project: Town Creek Middle School And Elementary School Classroom Addition Brunswick County, NC For: Brunswick County Schools JUL 0 3 ��� March 15, 2018 Rev. July 2, 2018 U 7 C� 00 000 CS o � o 0 N N tn N N N OM 0 o 0 v t v N� OON O O �p 00 tT N kn to N kn �o vJI 00 00 to IL _ tn .'+ rn �' 00 ^ N to M v�'l oo oN0 a0 "" � 00 el w° c° 0 000 to 00 ° o 4. 0 0 O O 00 N v �n 00 oo ,..,°0 0^ in ti f N r ,� N o 9p 4 a tn N N n tn N O O V N O O 00 00 N N cl " +y �j rr o, .r rn o N V H 0N ae le 00 m O � r- Iry 0 v1 0 O 0 O 0 O 0 0 n O 0 Vi 0 O 0 O 0 o 0 0 0 0 0 0 a0 O N h O 00 O 4n t` O O V1 O N N °O O C7\ C C — N C; 4 4-i %6 t� t- 41 V1 N N N NNN N N N N N N N N �f � r r v o 0 0 W W c w , r, U w w U o f 00.4 Go. GQ O_ o El o o go c0 o0 o o i 0. oq to a1 ,V L1� Qn H 0 0 00 N Johnson, Kelly From: Holly Cook <holly.cook@mcgillengineers.com> Sent: Monday, July 2, 2018 12:36 PM To: Johnson, Kelly Subiect: RE: [External] Town Creek Schools - Meeting Attachments: C-403B_Grading.pdf, C-509_SW Details.pdf, DAM 1 2 3 4.pdf, 18-0627_SSW-SWU-101- App-DEMLR_Pg3-4.pdf, 18-0702_Elev.pdf Kelly, Please find attached several draft pdfs documents for our 1:00 phone meeting. Sincerely, Holly Cook, PE Project Engineer qMcGiR 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755.5872 I Fax: 910.755.5875 holly.cook@mcgilleneineers.com I www.mcgillengineers.com From: Holly Cook Sent: Friday, June 29, 20181:56 PM To:'Johnson, Kelly' <kelly.p.johnson@ncdenr.gov> Subject: RE: [External] Town Creek Schools - Meeting Kelly, Monday afternoon will have to be on the phone. I will try to send you a few items for discussion and then call you at 1:00. Thank you. Sincerely, Holly Cook, PE Project Engineer aMc-Giff 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 holly.cook@mceillensineers.com I www.mcgillengineers.com From: Johnson, Kelly <kelly.p.lohnson@ncdenr.gov> Sent: Friday, June 29, 2018 12:35 PM To: Holly Cook<holly.cook@mcgillengineers.com> Subject: RE: [External] Town Creek Schools - Meeting I just tried to call, but it sounds like you are off today. Did you want to chat Monday afternoon at 1pm? In person, or on the phone? Have a good weekend, Kelly From: Holly Cook[mailto:holly.cook@mcgillengineers.com] Sent: Thursday, June 28, 2018 11:37 AM To: Johnson, Kelly <kelly.p.lohnson@ncdenr.gov> Subject: RE: [External] Town Creek Schools - Meeting OK, no problem. Sincerely, Holly Cook, PE Project Enginee r""��'' A.43 rti t .'a"J E 5 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 holly.cook@mcgillengineers.com I www.mcgillengineers.com From: Johnson, Kelly <kelly.p.iohnson@ncdenr.gov> Sent: Thursday, June 28, 2018 11:36 AM To: Holly Cook<holly.cook@mcgillengineers.com> Subject: Re: [External] Town Creek Schools - Meeting I won't be out of the office all next week, but I will only be working for two of five days and so I need to see what else is on my plate. I am home with a sick kid today, but I will get back with you tomorrow. KJ From: Holly Cook<holly.cook@mcgillengineers.com> Sent: Thursday, June 28, 2018 11:24 AM McGill A S S O C I A T E S Stormwater Design Report Index Town Crcck Mliddic School and Elementary School Classroom Addition Brunswick County, NC SECTION 1 Stormwater Narrative 2 Map with Site Identification •8 Brunswick County GIS ❖ USGS NC Surface Water Classifications 3 Soils Data ❖ Stormwater Soil boring Elevation Table Summary 40- Preliminary Wetland Delineation for Town Creek Elementary School by Land Management Group, Inc. ❖ Preliminary Wetland Delineation for Town Creek Middle School by Land Management Group, Inc. ❖ Post COE Meeting Upland/ Wetland Delineation Sketch by Land Management Group, Inc. ❖ Geotechnical Engineering Letter for Town Creek Middle School Fire Lane by ECS Southeast, LLP ■ Seasonal High Water Table Determination ■ Soil Profiles ■ Location Map ■ Pavement Recommendations ❖ Geotechnical Engineering Report by ECS Southeast, LLP ■ Seasonal High Water Table Determination ■ Soil Profiles ■ Soil Infiltration Rates Location Map ■ Pavement Recommendations Page Iof3 McGill A S S O C I A T E S Stormwater Design Report Index Town Creek Middle School and Elcmentary School Classroom Addition Brunswick County, NC 4 Drainage Area Maps DAM-1 Pre Development: Project Area DAM-2 Post Development: Project Area ❖ DAM-3 Pre and Post Development: Existing Wet Pond ❖ DAM-4 Overall Site Drainage Boundaries i 5 Pre and Post Development Site Area Summary 6 Site Runoff Summary •'• Pre Development ♦ ■ Time of Concentration Calculations ■ Rainfall Intensity Calculations ❖ Post Development ■ Time of Concentration Calculations ■ Rainfall Intensity Calculations 7 Open Channel Flow Calculations see Flow Calculation Summary Channel Report Demonstrating Maximum Conditions — Grass f❖ Channel Report Demonstrating Maximum Conditions — Bare Soil ❖ Channel Report Temporary Swale — Grass ❖ Channel Report Temporary Swale — Bare Soil 8 Gutter Spread Calculations ❖ Gutter Spread Calculation Summary ❖ Maximum Conditions Combination Inlet Sag ❖ Maximum Conditions -- Combination Inlet On Grade Page 2 of 3 t McGill t -,dd A S S O C I A T E S Stormwater Design Report Index Town Creek Middle School and Elementary School Classroom Addition, Brunswick County, NC 9 Storm Sewers Design Calculations d• System A ❖ System B-C ❖ System D •;• System ES 10 Stormwater Control Measure SCM 1 Drainage Area Land Use Summary ❖ Design Calculations ❖ Hydraflow Hydrographs Report ❖ Inflow and Outflow Velocity Calculations ••• Weir Report 11 Stormwater Control Measure - SCM 2 ❖ Drainage Area Land Use Summary ❖ Water Quality Volume Calculations ❖ Design Calculations Hydraflow Hydrographs Report — SCM 2 ❖ Hydraflow Hydrographs Report — SCM 2 Forebay ❖ Inflow and Outflow Velocity Calculations ❖ Berm Velocity Calculations i 12 Erosion & Sediment Control Temporary Sediment Facility Calculations ❖ Temporary Sediment Trap 1 ❖ Temporary Sediment Basin 2 ❖ Orifice Sizing Calculations 13 Existing Wet Pond ❖ Built Upon Area Summary Drainage Area Summary ❖ Existing Permit Page 3 of 6 — Reference Purposes Only Page 3 of 3 Section 1 V Sc L k1,-',,,McGifl A S S 0 C i A T E S STORMWATER NARRATIVE Town Creek Middle School and Town Creek Elementary School Expansion for Brunswick County Schools PROJECT DESCRIPTION The purpose of this project is for the construction of the new Town Creek Middle School and expansion ofthe existing Town Creek Elementary School off of Lake Park Drive SE on approximately 60.67 acres of which 21.28 acres is the current Town Creek Elementary School site and 39.38 acres is the current Town Creek Middle School site. 19.4 acres will be disturbed as part of this project. The limits of disturbance are defined on the plans by the location of the silt fence (SF), tree protection (TP), and/or construction fence. LAYOUT The proposed 7,607 sf Town Creek Elementary School building expansion is to be located along the southern wing of the existing school building. The expansion consists of six (6) classrooms, vestibule, girls restroom facility, and boys restroom facility. The proposed 2-story 91,280 sf gfa Town Creek Middle School building, future 2,824 sf expansion, roadways, parking lots, sidewalks, athletic fields and associated facilities are to be located off of Lake Park Drive SE northeast of the existing Town Creek Elementary School building with shared access roadways, bus parking, and walkways between the schools. The proposed building straddles the existing school property line. The shared property line shall be vacated and the parcels combined. PHASING This project is to be phased. Phase 1— Elementary School Classroom Addition Phase 2 — Middle School Building and Site Improvements Phase 3 — Middle School Classroom Addition ADJACENT PROPERTY The project is bound to the north by a large parcel zoned CI that includes forested area nearest the proposed project, agricultural area, and a mobile home off of Governors Road. The project is bound to the south and east by a large, vacant parcel zoned R75. Plans for development of this vacant parcel were submitted to Brunswick County in 2007 and the status of the development is unknown. The project is bound to the west by a large, vacant parcel zoned R75 and the Town Creek Park zoned CP. EXISTING SITE CONDITIONS The existing Town Creek Elementary School site is currently developed and contains the school building, asphalt parking lots, walkways, playground structures, and associated facilities. A portion of the site is undisturbed woodlands. Page 1 of 3 The project area contains gradual to moderate slopes. In general, the site slopes away from the building to the perimeter of the property. The existing Town Creek Middle School site is currently undeveloped and contains dense vegetation. The project area contains gradual to moderate slopes. In general, the site slopes to the north and east. SOILS A Soil Boring Report was performed by ECS Southeast as part of this work and is included in this report. In summary, soils conditions throughout the site do not support the use of stormwater infiltration methods. Areas of significant surface wetness may be anticipated during construction. CRITICAL AREAS A wetlands investigation was completed by Land Management Group within the project areas of the site. Additional wetlands areas may or may not exist on the portion of the site outside of the project limits and were not located as part of this work. Approximately 2,169 sf of wetlands `A' and 3,546 sf of wetlands `C' will be disturbed for the installation of the fire lane and sidewalk at the southern portion of the site in order to ensure that the proposed fire lane extends to all portions of the building as required by code and is located outside of the building collapse zone. Approximately 1,200 LF of Potential Waters of the U.S. are located along the eastern parcel boundary of Parcel 840006202. This ditch is identified as a relatively permanent water and is not a stream. STORMWATER MANAGEMENT A High Density Stormwater Permit, SW8 071210, was issued by the North Carolina Department of Environment and Natural Resources Division of Water Quality (NCDENR DWQ) for the Town Creek Elementary School project in 2007 and modified on June 16, 2010. This project falls under Section 15.A. NCAC 02H .1019 Coastal Counties of the North Carolina Administrative Code Current Stormwater Rules. Vacating the shared property line between schools and combining the parcels should allow this project to apply to NCDENR DWQ for a Permit Modification for the following: Drainage Area 1, High Density: Existing Elementary School Building and Existing Site Improvements and Proposed Elementary School Classroom Addition Drainage Area 2, High Density: Proposed Middle School Building, Bus Lane Improvements, Entrance Road, Main Parking Lot, Loading Area Drainage Area 3, Low Density: Administration Parking Lot and Future Impervious Areas up to 24% The 39.38 acre Middle School portion of this project is anew review for state stormwater. No modifications to the existing Town Creek Elementary School off -site stormwater wet pond are proposed as part of this work. The stormwater runoff from the existing Town Creek Elementary School is conveyed by open channel and closed conveyance systems to an existing off -site stormwater wet pond. No net increase in impervious areas or stormwater runoff to the existing stormwater wet pond are proposed as part of this work. Outside of the limits of construction shown on this plan, no changes to the previously approved and permitted Town reek Eiementary School stormwater plan are proposed as part of this work. ,, 2 of 3 The existing off -site stormwater wet pond was designed and approved to handle 246,395 sf of impervious area with no additional capacity. The existing pond was previously certified and is assumed compliant. All stormwater runoff from the Town Creek Elementary School Expansion Addition is directed to a new dry pond via roof drain collection system to manage stormwater runoff prior to entering the existing off -site wet pond to ensure that there is no net increase in stormwater runoff for the 10 year storm event. The pond outfalls at a post -development l rate less than the pre -development rate to the existing off -site wet pond stormwater collection system during design storm conditions. All stormwater runoff from the Town Creek Middle School site will be directed to new stormwater control measures or sheet flow as allowed. The proposed Middle School Building and a portion of the site improvements are directed to a new on -site wet pond via stormwater collection system. The pond outfalls at a post -development rate less than the pre -development rate to the existing perimeter ditch. All remaining portions of the project area are considered low density and are conveyed to the perimeter ditch(es) and/or wetlands areas via grassed swales or sheet flow at non -erosive rates. The selection of the stormwater control measures was dictated by the topographic survey data and the soil boring data, groundwater elevations and soil permeability rates. Less than 20.0 acres will be disturbed as part of this work. Stormwater control measures will ensure that there will be no net increase in post construction peak stormwater discharge leaving the development area from the predevelopment conditions. All stormwater management practices shall be constructed and maintained in accordance with the State of North Carolina Stormwater Permitting Program and the Brunswick County Stormwater Management Ordinance. EROSION CONTROL All vegetative and structural erosion and sediment control practices shall be constructed and maintained in accordance with the Minimum Standards and Specifications of the North Carolina Erosion and Sediment Control Planning and Design Manual. Selection of erosion and sediment control practices takes into account the existing topography and vegetation. The primary erosion control practice for concentrated runoff from construction activities for this project is temporary sediment basins/traps. The area of the permanent stormwater control measures (SCM) shall be used as temporary sediment facilities. The temporary bottom elevations shall be six (6) inches above the final bottom elevation. The facilities shall be completely cleaned out prior to conversion to the permanent facilities. The disturbed area of Phase 1 is less than 1 acre and the concentrated runoff from construction activities will be treated by a temporary sediment trap. Sheet flow runoff will be treated by silt fence. in addition to the use of inlet protection and tree protection as shown. The disturbed area of Phase 2 is less than 19 acres and the concentrated runoff from construction activities will be treated by a temporary sediment basin. Open channels contain rock check dams and erosion control matting as required. Sheet flow runoff will be treated by silt fence, in addition to the use of inlet protection and tree protection as shown. The primary erosion control practice for Phase 3 is silt fence as the area of disturbance is less than one acre. Pa:.7e 3 of 3 L Section 12 �0 T 0 T 09 Y U o uU C CM O T M [� V O Lc) � r y O O O � p 0 U O O da � 1 1 d OF NTERMIL [h717a7 U.S. oEU.SarGEa�ioaui SURVEY ra.rrrEaEee�ef rorN M M� �• h Y ■,r.ey YANNAIOW QUADRANGLE USTopo WUHGI10LIN/rlNUNS KW. s.s�,vNua seuEs h y+ Q N 111 ARY �[�,titi 5 _ �.w. ....... 7A y HiT' y r . S �+ en Rs abtlrWeremsardetlslsuw w.0 SOME 1:24M rirwr'a..N�w...rerr � _. _-_' "Tnr'iw'ss'ov.' omuarcuvenmm�nane •rr �r�irm'w.n�e�i '..i.un we.s__..re rmr w.rs r..r +m . a. W-E amavarr InuameeAWr 4w aau.ct i..lr�r� reax.r — mtr .a 0-- pmw rn i. irr.w WINMROW, HC 2016 I 1 m C� • y U E O o °�° m cn c ! d. is CU i U i I I U •m" J 9J �. �, � - ate'' i �'� V r ® AI C W WV i UI c � i Section 3 UMcGiR A S S U V 1 A TG S SA ormwater Soil Boring Elevation Table Project: Town Creek Schools Location: Brunswick County. NC Date: March-18 Soil Ground Boring Elev 1 SHWT Depth Z Elev Groundwater Depth 2 Elev Rate Infiltration Depth Z Elev (ft) (in) (ft) (in) (ft) (in/hr) (in) (ft) Elementary School 1 26.5 l0 25.7 24 24.5 0.024 14 25.33 2 27.0 16 25.7 32 24.3 0.006 10 26.17 3 26.3 24 24.3 36 23.3 0.039 10 25.47 Average = 25.2 Middle School 4 26.8 22 25.0 40 23.5 0.000 71 24.80 5 27.3 14 26.1 20 25.6 0.011 26.30 Average = 25.6 6 26.9 12 25.9 24 24.9 0.001 12 25.90 7 25.6 18 24.1 36 22.6 0.001 12 24.60 8 27.6 16 26.3 24 25.6 0.001 18 26.10 Average = 25.4 Overall Middle School Site Average 25.5 Design Note: 1 Ground elevations per survey. 2 Groundwater depths per Soils Report by ECS. NOTE: This is not a survey. All boundaries and distances are considered approximate. t This represents a preliminary sketch prepared from field notes. A survey of delineated areas and review and approval by the US Army Corps of Engineers is recommended prior to specific site planning. A XI \ X11 40 01 �>r,, f 1�71Yrr y Legend Flagged wetlands (pending review & approval by the U.S. Army Corps of Engineers) —0.4 ac Map Source: McGill Associates Site plan, 2016 NG OneMap Aerial Photography Town Creek Elementary Brunswick County, NC February 2018 LMG # 40-17-140A LMG LAJD MANAGEMENT GROUP . Envir; nmxntnf C-'.RPPIi www.imarouo.net 3805 Wrightsville Avenue Wilmington, NC 28403 Phone:910.452.0001 Fax:910.452.0060 SCALE 1" = 100' Preliminary UplandMetland Delineation Sketch Potential Waters of the US (relatively permanent waters) — 1.200-linear feet ® Marginal Areas - Not Flagged — 2.8-acres NOTE: This is not a surrey. All boundaries and distances are considered approximate. This represents a preliminary sketch prepared from field notes. Asurvey of delineated areas and review and approval by the US Army Corps of Engineers Is recommended prior to specific site planning. LAWETLANDS12017 WETLANDS FILES140-17-140 —Town Creek Middle School. Craig EdteraAAAPS Map Source: 2016 NC OneMap Imagery I�1 SCALE 1" = 300' (when printed at IVx17') I Town Creek Middle School i LMG _ I Brunswick County, NC Figure 7 Em:ran.rx,af O •.uim::r Preliminary www.Imemuo.net UplandlWetland Sketch May 2017 3805 Wrightsville Avenue LMG # 40-17-140 Wilmington, NC 28403 Phone: 910.452.0001 Fax: 910.452.0060 NOTE: This is not a survey. All boundaries and distances are considered approximate. This represents a preliminary sketch prepared from field notes. A survey of delineated areas is recommended prior to specific site planning. This delineation was field verified by the US Army Corps of Engineers on 4/17/18. r Y� 1 - � Iy$] +4 F e 1 �1lG. Ali ,I 1 - Legend Tax parcel -21.3 ac Areas considered to be uplands -20.8 ac (98%) Wetlands originally flagged by LMG -0.4 ac (2% _ Wetlands added at COE Meeting -0.1 ac (<1 %) Waters of the U.S. -30 I.f. Map Source: 2016 NC OneMap Aerial Photography RC:AI F 1" = 9nn' Town Creek Elementary �LMG Brunswick County, NC "`�°M"N��"Post COE Meeting '� Environnentnl Cons,•Itants ants www.imorouo.net Upland/Wetland April 2018 3805 Wrightsville Avenue delineation Sketch LMG # 40-17-140A Wilmington, NC 28403 Phone:91tl.452.tl001 Fax:910.452.0060 ECS 1- H EA T, L L P "Setting the Standard for Service" w Geotechnical , Construction Materials _ Environmental • Facilities NC Regv!ered Engiro-^nng Fim+ F 1r78 NC R,gc.ntere,t aec ^gists ',,in C-ANI Reg•stcred Er:ginee.,ing Firm 3252 Mr. Craig Eckert Brunswick County Schools 35 Referendum Drive Bolivia, North Carolina 28422 Reference: Geotechnical Engineering Letter TCMS Fire Lane 6330 Lake Park Dr. SE Winnabow, Brunswick County, North Carolina Dear Mr. Eckert: March 9, 2018 ECS Project No. 22:26426 As requested, two (2) hand auger borings with Kessler Dynamic Cone Penetrometer (DCP) tests and seasonal high water table estimates were performed in the area of the proposed fire lane for the new Town Creek Middle School located near 6330 Lake Park Drive SE in Winnabow, Brunswick County, North Carolina. We understand that the proposed fire lane will be either pervious or impervious. If gravel/ABC stone is used for the fire lane, the fire lane should be considered impervious. If a pave geotextile is implemented (grass, porous aggregate, etc.) the fire lane can be considered pervious. Groundwater Observations: The apparent groundwater depths were observed at the end of the work day and appeared to range from approximately 1.7 feet below ground surface. The groundwater levels are noted on the boring logs attached to this letter. The SHWT ranged from around 0.5 to 0.8 feet at the test locations. The SHWT report is attached to this letter. Fire Lane Design Considerations: The in place subgrade soil can be modeled with a CBR value of 3. The fire lane will be designed with an ESAL of 75,000. For a pervious fire lane, fire lane can utilize a porous paver system such as Grasspave2. The use of a porous paver system that is selected should be installed per manufacturer specifications and have a bearing capacity suitable to support a fire truck. An open graded base course utilizing sand or gravel should be used under the porous paver system. The thickness of the open graded base course should be based on the water storage determined by the Civil Engineer. After the open graded base course is placed, the geotextile can be placed and back -filled with sand in accordance with manufacturer specification. For a gravel fire lane, the fire lane should be considered impervious and consist of at least 22 inches of ABC Stone. Alternatively, if approximately 2 feet of undercut is performed, the section can be reduced to 16 inches of ABC stone, and if TX140 geogrid is used, the section can be reduced to 10 inches of ABC stone. 6714 Netherlands Drive. Wilmington, NC 28405 - T 910-686-9114 • F: 910-686-9666 • www.ecslimited.com ECS Capital Services, PLLC • ECS Florida. LLC • ECS Mid -Atlantic, LLC • ECS Midwest. LLC • ECS Southeast, LLP ECS Texas, LLP TCMS Fire Lane Letter March 9, 2018 ECS Project No. 22:26426 Page 3 Materials satisfactory for use as structural fill should consist of inorganic soils classified as SM, SC, SW, SP, GW, GP, GM, and GC, or a combination of these group symbols, per ASTM D 2487. Natural fine-grained soils classified as clays or silts (CL, ML) should generally not be considered for use as engineered fill, but may be evaluated by the geotechnical engineer to determine their suitability at the contractor's request. The materials should be free of organic matter, debris, and shouid contain no particle sizes greater than 4 inches in the largest dimension. Open graded materials, such as gravels (GW and GP), which contain void space in their mass should not be used in structural fills unless properly encapsulated with filter fabric. Suitable structural fill material should have the index properties shown below. Structural Fill Index Properties Max % Fines Wcation with Respect to Final Grade LL pi Passing # 200 Sieve Fire Lane Area 35 max 9 max 20 Materials that should not be used as engineered fill include topsoil, organic materials (OH, OL), and high plasticity clays and silts (CH, MH). Such materials removed during grading operations should be either stockpiled for later use in landscape fills, or placed in approved on or off -site disposal areas. In the area of the pervious fire lane area, compaction of at least 90% and no more than 95% should be achieved. In the area of the impervious fire lane area, compaction of at least 98% should be achieved. ECS should be called on to document that proper fill compaction has been achieved. Fill Compaction Control: The expanded limits of the proposed construction areas should be well defined, including the limits of the fill zones for the proposed construction area, at the time of fill placement. Grade controls should be maintained throughout the filling operations. All filling operations should be observed on a full-time basis by a qualified representative of the construction testing laboratory to determine that the minimum compaction requirements are being achieved. Field density testing of fills will be performed at the frequencies shown in the table below but not less than 1 test per lift. Frequency of Compaction Tests in Fill Areas Location Frequency of Tests Fire Lane Area 1 test per 10,000 sq. ft. Compaction equipment suitable to the soil type being compacted should be used to compact the subgrades and fill materials. A vibratory steel drum roller should be used for compaction of coarse -grained soils (Sands) as well as for sealing compacted surfaces. Fill materials should not be placed on frozen soils, on frost -heaved soils, and/or on excessively wet soils. Borrow fill materials should not contain frozen materials at the time of placement, and all frozen or frost -heaved soils should be removed prior to placement of structural fill or other fill soils and aggregates. Excessively wet soils or aggregates should be scarified, aerated, and moisture conditioned. TCMS Fire Lane Letter March 9, 2018 ECS Project No. 22:26426 Page 4 At the end of each work day, all fill areas should be graded to facilitate drainage of any precipitation and the surface should be sealed by use of a smooth -drum roller to limit infiltration of surface water. During placement and compaction of new fill at the beginning of each workday, the Contractor may need to scarify existing subgrades to a depth on the order of 4 inches so that a weak plane will not be formed between the new fill and the existing subgrade soils. Drying and compaction of wet soils is typically difficult during the cold, winter months. Accordingly, earthwork should be performed during the warmer, drier times of the year, if practical. Proper drainage should be maintained during the earthwork phases of construction to prevent ponding of water which has a tendency to degrade subgrade soils. Where fill materials will be placed to widen existing embankment fills, or placed up against sloping ground, the soil subgrade should be scarified and the new fill benched or keyed into the existing material. Fill material should be placed in horizontal lifts. In confined areas such as utility trenches, portable compaction equipment and thin lifts of 3 inches to 4 inches may be required to achieve specified degrees of compaction. We recommend that the grading contractor have equipment on site during earthwork for both drying and wetting fill soils. We do not anticipate significant problems in controlling moisture within the fill during dry weather, but moisture control may be difficult during winter months or extended periods of rain. The control of moisture content of higher plasticity soils is difficult when these soils become wet. Further, such soils are easily degraded by construction traffic when the moisture content is elevated. TCM5 Fire Lane Letter March 9, 2018 EC5 Project No. 22.26426 Page 5 Closure: ECS has prepared this report of findings, evaluations, and recommendations to guide geotechnical-related design and construction aspects of the project. The description of the proposed project is based on information provided to ECS by McGill and Associates. If any of this information is inaccurate, either due to our interpretation of the documents provided or site or design changes that may occur later, ECS should be contacted immediately so that we can review the report in light of the changes and provide additional or alternate recommendations as may be required to reflect the proposed construction. It has been our pleasure to be of service to Brunswick County Schools during the design phase of this project. We would appreciate the opportunity to remain involved during the continuation of the design phase, and we would like to provide our services during construction phase operations as well to verify the assumptions of subsurface conditions made for this report. Should you have any questions concerning the information contained in this report, or if we can be of further assistance to you, please contact us. Respectfully submitted, ECS Southeast, LLP Mike Ellis, L:t Project Manager MEllis@ecslimited. com Attachments: Site Location Plan Exploration Location Plan Kessler DCP Test Results Reference Notes for USCS Classification Hand Auger Boring logs SHWT Report ASFE Document d I. � 3/09/18 ' ���555VVVJJ! I i`f� V 1'A\�� Winslow Gains, PE Principal Engineer WGoins @ecslimited. com 14- w WVA="mw 14"M —W, = .................. wpm LpEq2wmmwrvm&T"uk �a�.t K-1 OLD FRE LANE I'VAU FIR7 I ANP GBR LOCA"IRION K-2 44pmw",& DENOTES APPROXIMATE LOCATION Or HAND AUGER BORING WITH KESSLER DCP TEST REFERENCE McGill Associates EER EXPLORATION i uivvto — Fire Lane ENGINDRAFTING WEG I FMW LOCATION DIAGRAM SCALE Pm(,mQ NTS SHE2ET OF PROJECT NO. 22.26426 Winnabow, North Carolina DATE 3/5/2018 DCP TEST DATA Project: Location: TCMS - Fire Lane K-1 Hffmer 10.1 ItsCH 1 Q 17.6lbs. Q both hammers used Date: 5-Mar-18 Soil Type(s): SAND (SC, SM) and CLAY (CL) BoilQ y CL I Q All other soils No. of Blows Cumulative Penetration (mm) Type of Hammer c — = W O 0.1 0 5 10 15 20 25 30 35 40 0.1 1.0 CBR 10.0 100.0 0 127 254 381 508 635 762 889 1016 100.0 E E 3 d W 0 0 1 5 259 1 5 Soo 1 5 673 1 5 803 1 5 904 1 Ll 1.0 10.0 _ a20 p 0 0 5 10 16 25 30 35 40 0 2000 14 BEARING 4000 CAPACITY, psf 6000 8000 10000 12000 0 127 254 381 BOB 635 762 Based on approximate Interrelationships of CBR and Bearing values (Design of Concrete Airport Pavement Portland Cement Association, page 8,1956) 889 1016 42 56 69 83 CAPACITY, psi E E 3 W -•- —----- -- 28 BEARING DCP TEST DATA Project: Location: TCMS - Fire Lane K-2 i eT 1I HU 101lbs. I O 17.6 lbs. Q Both hammers used Date: 5-Mar-18 Soil Type(s): SAND (SM, SC) pe �YCH Q CL I QQ All other soils i I No. of Blows Cumulative Penetration (mm) Type of Hammer 01 0 5 10 15 c — = 20 w p 25 30 35 0.1 1.0 CBR 10.0 100.0 0 127 254 381 508 635 762 889 1016 100.0 E E 2 a W 0 0 1 5 358 1 5 622 1 5 759 1 J40 1.0 10.0 0 0 5 10 15 _ a20 u1 p 25 30 35 40 0 2000 14 BEARING 4000 CAPACITY, psf 6000 8000 10000 12000 0 127 21 381 508 635 762 Based on approximate Interrelationships of CBR and Bearing values (Design of Concrete Airport Pavement, Portland Cement Association, page 8.1966) 889 1016 42 56 69 83 CAPACITY, psi E E 3 a w 0 28 BEARING Unified Soil Classification System (ASTM Designation D-2487) Major Division Group Symbol Typical Names Classification Criteria GW Well -graded gravels and gravel- Co = D601DIO Greater than 4 ,�, sand mixtures, little or no fines -8 CZ = (D30)2/(DIOxD60) Between 1 and 3 8 GP Poorly graded gravels and gravel- a Not meeting both criteria for GW �° c sand mixtures, little or no fines o CA rA o �00 3 �� c GM Silty gravels, gravel -sand -silt rn `" a ,'n 0; U Atterberg limits plot below "A' line or N mixtures ° c7 C7 ; plasticity index less than 4 o 0 0 � o'a oGC Clayey gravels, gravel -sand -clay ° Atterberg limits plot above "A" line a mixtures and plasticity index greater than 7 SW Well -graded sands and gravelly c y c y Cu = D6i/D10 Greater than 6 b W, , sands, little or no fines o N N c CZ = (D30)2/(DIOxD60) Between 1 and 3 V O V V v N d z z z z SP Poorly graded sands and gravelly y Not meeting both criteria for SW B o y sands, little or no fines a ° w U tn - Cq Atterberg limits plot below "A" line or SM Silty sands, sand -silt mixtures" c plasticity index less than 4 SC Clayey sands, sand -clay mixtures o Atterberg limits plot above "A" line 2 and plasticity index greater than 7 > ML Inorganic silts, very fine sands, Note: U-line represents approximate upper limit of IL and PI combinations N rock flour, silty or clayey fine for natural soils (empircally detemtined). ASTM-132487. Nsands as '0 O N zb ��'., �„ y = ' CL Inorganic clays of low to medium f:q,cvd bra 9a.,.a.',ro 0" pl%0. ma. ++Caerlim:l &ea,,i¢r7 "•x i='urEsais- b n a .y U�� plasticity, gravelly clays, sandy „ — .... ......... ...... . ?'` �+ a e clays, silty clays, lean clays � � 40 u o OL Organic silts and organic silty c clays of low plasticity MH Inorganic silts, micaceous or to ... diatomaceous fine sands or silts, elastic silts t0 y CH Inorganic clays of high plasticidy, a 0 fat clays °° unurouurt °° ,a n° OH Organic clays of medium to high Plasticity chart for the classification of fine-grained soils. plasticity Tests made on fraction finer than No. 40 sieve Highly organic soils Pt Peat, muck and other highly Fibrous organic matter; will organic soils char, bum, or glow UNIFIED S 0 1 L CLASSIFICATION RIP SYSTEM E,M CLIENT Job#: BORING# SHEET --- � Brunswick County Schools 22:26426 K-1 1 OF 1 jjj''' PROJECT NAME ARCHITECT -ENGINEER TCMS - Fire Lane SITE LOCATION CALIBRATED PENETROMETER TONS/Fr Lake Paris Dr SE Winnabow. Brunswick Goun North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION RQD% - — - REC% PLASTIC WATER LIQUID z DESCRIPTION OF MATERIAL ENGLISH UNITS w ' w LIMIT% CONTENT% LIMIT% 9� F o BOTTOM OF CASING ]♦ LOSS OF CIRCULATION D n o a a 0 Uj > SURFACE ELEVATION 5 ® STANDARD PENETRATION o ( U) 0 M 3 W 9 ED BLows�Fr Topsoil/Rootmat Depth [6'j (SM) SILTY FINE SAND WITH CLAYEY LAYERS, dark gray, moist 1 (CL) SANDY CLAY, orange to gray, moist to saturated 2 3 4 END OF BORING @ 4.0' 5 6 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. Q WL 1.7' WS❑ WD❑ BORING STARTED 3/5/18 CAVE IN DEPTH WL(SHW) s WL(ACR) BORING COMPLETED 3/5/18 HAMMER TYPE WL RIG FOREMAN DRILLING METHOD Hand Auger L CLIENT Job BORING# SHEET — Brunswick County Schools 22:26426 K-2 1 OF 1 ri {' 1 PROJECTNAME ARCHITECT -ENGINEER TCMS - Fire Lane -i SITE LOCATION CALIBRATED PENETROMETER TONS+72 6330 Lake Park Dr SE Winnabow. Brunswick Counly, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EAST:NG STATION RQD% — — — REC% PLASTIC WATER LIQUID Z DESCRIPTION OF MATERIAL ENGLISH UNITS LIMIT% CONTENT% LIMIT% BOTTOM OF CASINGLOSS OF CIRCULATION TM� w z J g J O ¢ ~ ® STANDARD PENETRATION SURFACE ELEVATION ¢ 3 w Q m BLOWSIFT Topsoil/Rootmat Depth [61 (SM) SILTY FINE SAND WITH CLAYEY LAYERS, dark gray, moist to saturated QZ (SC) CLAYEY FINE SAND, orange to gray, saturated 3 4 END OF BORING (ig 4.0' I 5 6 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL WL 1.7' WS ❑ WD ❑ BORING STARTED 3/5/18 CAVE IN DEPTH WL(SHW) WL(ACR) BORING COMPLETED 315/18 HAMMERTYPE WL RIG FOREMAN DRILLING METHOD Hand Auger L L yrurrn,�=-�1 I Ch ECS SOUTHEAST, LLP "Setting the Standard for Service" + Geotechnical • Construction Materials • Environmental • Facilities Ott Ca �ir qq r ;,n rgllr F VJ, AIG S3G` r:'sr :es C*,rnoj;-*M F,rin Q-4CC March 8, 2018 Mr. Craig Eckert Brunswick County Schools 35 Referendum Drive Bolivia, North Carolina 28422 Reference: Report of Seasonal High Water Table Estimation Town Creek Schools Winnabow, Brunswick County, North Carolina ECS Project No. 49.6405 Dear Mr. Eckert: ECS Southeast, LLP (ECS) recently conducted a seasonal high water table (SHWT) estimation within the proposed stormwater control measure (SCM) area(s) at 6330 Lake Park Drive in Winnabow, Brunswick County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing On March 5, 2018, ECS conducted an exploration of the subsurface soil and groundwater conditions at two requested locations shown on the attached Boring Location Plan (Figure 1). ECS located the boring locations using GPS equipment. The purpose of this exploration was to obtain subsurface information of the in situ soils for the SCM area(s). ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at each of the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the SHWT and groundwater elevation observed at the time of the hand auger borings. The attached Infiltration Testing Form provides a summary of the subsurface conditions encountered at the hand auger boring locations. The SHWT and groundwater elevation was estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location SHWT Groundwater B-1 10 inches 20 inches B-2 6 inches 20 inches SHWT may vary within the proposed site due to changes in elevation and subsurface conditions. ECS observed wetland flagging within the vicinity of B-2. ECS anticipates that the SHWT be at the surface elevation within the wetland areas located in the SCM system footprint. I• GS C.Aprtol Sen/ices. PLLC • ECS Florida, L t_G • FGS Mid Atlant n, l.I_C T ECS Midwest Ll.t : • ECS Scn&e"- LLP • ECS Texas. LLP wvvw ecslimited.com Report of SHWT Estimation Town Creek Schools Winnabow, Brunswick County, North Carolina ECS Project No. 49.6405 March 8, 2018 Closure ECS's analysis of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, analysis and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us. Respectfully, ECS SOUTHEAST, LLP K. Brooks Wall Project Manager bwall(cDecslimited.com 910-686-9114 Attachments: Figure 1 - Boring Location Plan Boring Log Form ASFE Document W. Brandon Fulton, PSC, PWS, LSS Environmental Department Manager bfulton()ecslimited.com 704-525-5152 r Infiltration Testing Form Town Creek Schools Winnabow, Brunswick County, North Carolina ECS Project No. 49.6405 March 5t", 2018 Location Depth USCS B-1 n-12„ SC 12"-48" CL Soil Description Orange/gray silty clayey SAND Gray sandy CLAY Seasonal High Water Table was estimated to be at 10 inches below the existing grade elevation. Groundwater was encountered at 20 inches below the existing grade elevation. Location Depth USCS Soil Description B-2 0-24" SM Dark gray silty/clayey SAND 24"-48" SC Orange/gray clayey SAND Seasonal High Water Table was estimated to be of 6 inches below the existing grade elevation. Groundwater was encountered at 20 inches below the existing grade elevation. Geolechnicel Engineeping Repopt �, Geotechnical Services Are Performed for Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical engineering study conducted for a civil engineer may not fulfill the needs of a construction contractor or even another civil engineer. Because each geotechnical engineering study is unique, each geo- technical engineering report is unique, prepared solelyfor the client. No one except you should rely on your geotechnical engineering report without first conferring with the geotechnical engineer who prepared it. And no one - not even you - should apply the report for any purpose or project except the one originally contemplated. Read the Full Report Serious problems have occurred because those relying on a geotechnical engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only. A Gootechnical Engineering Report Is Based on A Unique Set of Project-Speclihc Factors Geotechnical engineers consider a number of unique, project -specific factors when establishing the scope of a study. Typical factors include: the client's goals, objectives, and risk management preferences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotechnical engi- neer who conducted the study specifically indicates otherwise, do not rely on a geotechnical engineering report that was: • not prepared for you, • not prepared for your project, not prepared for the specific site explored, or • completed before important project changes were made. Typical changes that can erode the reliability of an existing geotechnical engineering report include those that affect: the function of the proposed structure, as when it's changed from a parking garage to an office building, or from alight industrial plant to a refrigerated warehouse, elevation, configuration, location, orientation, or weight of the proposed structure, composition of the design team, or project ownership. As a general rule, always inform your geotechnical engineer of project changes - even minor ones - and request an assessment of their impact. Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed. Subsurface Conditions Can Change A geotechnical engineering report is based on conditions that existed at the time the study was performed. Do not rely on a geotechnical engineering report whose adequacy may have been affected by: the passage of time; by man-made events, such as construction on or adjacent to the site; or by natu- ral events, such as floods, earthquakes, or groundwater fluctuations. Always contact the geotechnical engineer before applying the report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems. Most Geotechnical Findings Are Professional Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engineers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ -sometimes significantly from those indi- cated in your report. Retaining the geotechnical engineerwho developed your report to provide construction observation is the most effective method of managing the risks associated with unanticipated conditions. A Reports Recommendations Are Not Final Do not overrely on the construction recommendations included in your re- port. Those recommendations are not final, because geotechnical engineers develop them principally from judgmentand opinion. Geotechnical engineers can finalize their recommendations only by observing actual subsurface conditions revealed during construction. The geotechnical engi- neer who developed your report cannot assume responsibility or liability for the report's recommendations if that engineer does not perform construction observation. A Geotechnical Engineering Report Is Subject to Misinterpretation Other design team members' misinterpretation of geotechnical engineer- ing reports has resulted in costly problems. Lower that risk by having your geotechnical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review pertinent elements of the design team's plans and specifications. Contractors can also misinterpret a geotechnical engineering report. Reduce that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing construction observation. Do Not Redraw the Engineers Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering report should never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk. Give contractors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give con- tractors the complete geotechnical engineering report, butpreface it with a clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/or to conduct ad- ditional study to obtain the specific types of information they need or prefer. A prebid conference can also be valuable. Be sure contractors have sufficient timeto perform additional study. Only then might you be in a position to give contractors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unantici- pated conditions. Read Responsibility Provisions Closely Some clients, design professionals, and contractors do not recognize that geotechnical engineering is far less exact than other engineering disciplines. This lack of understanding has created unrealistic expectations that have led to disappointments, claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled "limitations" many of these provisions indicate where geotechnical engineers' responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly, Geoenvironmental Concerns Are Not Covered The equipment, techniques, and personnel used to perform a gcocnvfron- mental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical engineering report does not usually re- late any geoenvironmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own geoenvironmental in- formation, ask your geotechnical consultant for risk management guidance. Do not rely on an environmental report prepared for someone else. Obtain Professional Assistance To Deal with Mold Diverse strategies can be applied during building design, construction, op- eration, and maintenance to prevent significant amounts of mold from grow- ing on indoor surfaces. To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated into a comprehensive plan, and executed with diligent oversight by a professional mold prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, a number of mold prevention strategies focus on keeping building surfaces dry. While groundwater, wa- ter infiltration, and similar issues may have been addressed as part of the geotechnical engineering study whose findings are conveyed in -this report, the geotechnical engineer in charge of this project is not a mold prevention consultant; imne of the ser*es Mlomww:d in cm neeft mM UN geotechnical NGTmft W* wore bo4wed or corwhrcted 1W the pmepose of mu prevewthm Proper ARIbmentaft of the reecowveysd 1n uds report WE wot of itself as snpwmt to invot "M from growiwg in or on se sm- MR iwYo/ve(L Rely on Your ASFE-Member Geotechnical Engmeer For Additional Assistance Membership in ASFE/The Best People on Earth exposes geotechnical engi- neers to a wide array of risk management techniques that can be of genuine benefit for everyone involved with a construction project. Confer with your ASFE-member geotechnical engineer for more information. ASPE The hest People an Earth 8811 Colesville Road/Suite G106, Silver Spring, MD 20910 Telephone:' 301/565-2733 Facsimile: 301/589-2017 e-mail: info@asfe.org www.asfe.org Copyright 2004 byASFE, Inc. Duplication, reproduction, or copying of this document in whole or In part, by any means whatsoever, is strictly prohibited, except with ASFE's specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of ASFE, and only for purposes of scholarly research or book review. only members ofASFE may use this document as a complement to or as an element of a geotachnical engineering report. Any other firm, individual, or other entity that so uses this document without being anASFE member could be committing negligent or intentional (fraudulent) misrepresentation. IIGER06045,0M ECS Southeast, LLP C Geotechnical Engineering Report Town Creek Elementary/Middle School f 6330 Lake Park Dr. SE Winnabow, North Carolina c ECS Project Number # 22:25758 December 20, 2017 - md% :- C S SOUTHEAST, LLP "Setting the Standard for Service' M Geotechnical - Construction Materials • Environmental - Facilities NO, Registered Engineering Firm F-1078 NC Registered Geologists Firm C-400 SC Registered Engineering Firm 32,12 December 20, 2017 Mr. Craig Eckert Brunswick County Schools 35 Referendum Drive Bolivia, North Carolina 28422 ECS Project No. 22:25758 Reference: Geotechnical Engineering Report Town Creek Elementary/Middle School 6330 Lake Park Dr. SE Winnabow, Brunswick County, North Carolina Dear Mr. Eckert: ECS Southeast, LLP (ECS) has completed the subsurface exploration and geotechnical engineering analyses for the above -referenced project. Our services were performed in general accordance with our Proposal No. 22:2699111-GP, dated November 21, 2017. This report presents our understanding of the geotechnical aspects of the project, the results of the field exploration conducted, and our design and construction recommendations. It has been our pleasure to be of service to Brunswick County Schools during the design phase of this project. We would appreciate the opportunity to remain involved during the continuation of the design phase, and we would like to provide our services during construction phase operations as well to verify the assumptions of subsurface conditions made for this report. Should you have any questions concerning the information contained in this report, or if we can be of further assistance to you, please contact us. Respectfully submitted, ECS Southeast, LLP Mike Ellis, Et. Project Manager MEllis@ecslimited.com J /. Winslow Goins, PE Principal Engineer WGoins@ecslimited.com 5:.. 1 J r. ! its y� _ °'{ ��y vA'-112/20/1,7 "." Pi 6714 Netherlands Drive, Wilmington, NC 28405 • T• 910-686-9114 " F: 910-686-9666 • www.ecslimited.com ECS Capitol Services, PLLC " ECS Florida. LLC " ECS Mid-Alantic. LLC " ECS Midwest. LLC • ECS Southeast, LLP • ECS Texas. LLP Town Creek Elementary/Middle School ECS Project No. 22.25758 TABLE OF CONTENTS December 20, 2017 Page EXECUTIVESUMMARY.............................................................................................................1 1.0 INTRODUCTION..................................................................................................................2 1.1 General...................................................................................................................................2 1.2 Scope of Services....................................................................................................................2 1.3 Authorization..........................................................................................................................3 2.0 PROJECT INFORMATION.....................................................................................................4 2.1 Project Location......................................................................................................................4 2.2 Current Site Conditions..........................................................................................................4 2.3 Proposed Construction...........................................................................................................4 2.3.1 Site Civil Features..........................................................................................................4 2.3.2 Structural Information/Loads....................................................................................... 5 3.0 FIELD EXPLORATION...........................................................................................................6 3.1 Field Exploration Program......................................................................................................6 3.1.1 Cone Penetrometer Soundings.....................................................................................6 3.1.2 Direct Push Borings.......................................................................................................6 3.1.3 Kessler Dynamic Cone Penetrometer Tests..................................................................7 3.2 Regional/Site Geology............................................................................................................7 3.3 Subsurface Characterization...........................................................................................:......9 3.4 Groundwater Observations....................................................................................................9 4.0 DESIGN RECOMMENDATIONS...........................................................................................10 4.1 Building Design.....................................................................................................................10 4.1.1 Foundations................................................................................................................10 4.1.2 Floor Slabs...................................................................................................................10 4.1.3 Seismic Design Considerations...................................................................................11 4.2.1 Pavement Sections.....................................................................................................12 5.0 SITE CONSTRUCTION RECOMMENDATIONS.......................................................................14 5.1 Subgrade Preparation..........................................................................................................14 5.1.1 Stripping and Grubbing...............................................................................................14 5.1.2 Proofrolling.................................................................................................................14 5.1.3 Site Temporary Dewatering........................................................................................14 5.2 Earthwork Operations..........................................................................................................15 5.2.1 Structural Fill Materials...............................................................................................15 5.2.2 Compaction.................................................................................................................15 5.3 General Construction Considerations..................................................................................17 6.0 CLOSING...........................................................................................................................19 Town Creek Elementary/Middle School ECS Project No. 22:25758 APPENDICES Appendix A — Drawings & Reports Site Location Diagram f • Exploration Location Diagram Appendix B — Field Operations • Reference Notes for Sounding Logs • CPT Sounding Logs S-1 through 5-23 and Shear Wave Velocity Profile • Kessler Logs • Reference Notes to USCS Classification • Hand Auger Boring Logs - K-1 through K-12 • Direct Push Boring Logs - DP-1 through DP-3 Appendix C — SHWT and Infiltration Test Report • SHWT and Infiltration Report Appendix D — Supplemental Report Documents • ASFE Document December 20, 2017 Page ii Town Creek Elementary/Middle School December 20, 2017 ECS Project No. 22:25758 Page 1 EXECUTIVE SUMMARY The following summarizes the main findings of the exploration, particularly those that may have a cost impact on the planned development. Further, our principal foundation recommendations are summarized. Information gleaned from the executive summary should not be utilized in lieu of reading the entire geotechnical report. • The geotechnical exploration performed for the planned development included twenty three (23) electronic cone penetration test (CPT) soundings, twelve (12) Kessler dynamic cone penetrometer (DCP) tests, and eight (8) hand augers with seasonal high water table (SHWT) estimations and infiltration tests. • The soundings generally encountered coastal plain soils consisting of Silty and Clean SAND (SM, SP), Sandy SILT (ML), Silty CLAY (CL-ML), Lean CLAY (CL), and Fat CLAY (CH). • It is important to note that the natural geology at the site may have been modified in the past. Therefore, potential fill and unsuitable materials may be present at the site. • The proposed building can be supported with a shallow foundation having an allowable bearing pressure of 2,000 psf. Undercutting in the upper two to four feet should be expected in the vicinity of soundings S-5, S-8, S-9, S-11, S-12, S.-17, and S-13 through 5-22. • Based on the results of the CPT soundings and our evaluation of the site, liquefiable soils are present and it shall be assigned a seismic class "F". • The SHWT and Infiltration Report is presented in Appendix C of this report. L Town Creek Elementary/Middle School ECS Project No. 22:25758 1.0 INTRODUCTION 1.1 GENERAL December 20, 2017 Page 2 ECS' understanding of this project is based on information provided by Mr. Craig Eckert of Brunswick County Schools. The site is located near 6300 Lake Park Dr. SE in Winnabow, Brunswick County, North Carolina. The project will consist of constructing a middle school with a gross square footage of approximately 90,000 square feet. Additionally, the project will consist of expanding the existing elementary school. We understand that associated drive and parking areas will be constructed north of the proposed middle school. This report contains the results of our subsurface explorations, site characterization, engineering analyses, and recommendations for the design of the proposed construction. 1.2 SCOPE OF SERVICES To obtain the necessary geotechnical information required for design of the proposed development, a total of twenty three (23) CPT soundings were performed. CPT soundings S-1 through 5-13 and 5-15 through 5-23 were advanced to approximately 25 feet beneath the ground surface. CPT sounding S-14 was advanced to a refusal depth of approximately 34.3 feet beneath the ground surface. Shear wave velocity tests were performed in sounding S-14 for seismic site classification and liquefaction potential. This report discusses our exploratory and testing procedures, presents our findings and evaluations and includes the following: • A brief review and description of our field test procedures and the results of testing conducted; • A review of surface topographical features and site conditions; • A review of area and site geologic conditions; e A review of subsurface soil stratigraphy with pertinent available physical properties; • Preliminary foundation recommendations; o Allowable bearing pressure; o Settlement estimates (total and differential); • Site development recommendations; • Suitability of soils for use as fill material; • Pavement design recommendations; ® Discussion of groundwater impact; • Compaction recommendations; • Special conditions encountered; • Seismic site ciassification and liquefaction potential; • Site vicinity map; • Exploration location plan; and • CPT sounding logs. 0 Town Creek Elementary/Middle School December 20, 2017 ECS Project No. 22:25758 Page 3 1.3 AUTHORIZATION Our services were provided in accordance with our Proposal No. 22.21699R?-GP, dated October 3, 2017, as authorized by Brunswick County Schools on December 7, 2017, and includes the Terms and Conditions of Service outlined with our proposal. I Town Creek Elementary/Middle School December 20, 2017 ECS Project No. 22:25758 Page 4 2.0 PROJECT INFORMATION 2.1 PROJECT LOCATION The site is located at 6300 Lake Park Dr. SE in Winnabow, Brunswick County, North Carolina. Figure 2.1.1 below shows an aerial image of the site. 2.2 CURRENT SITE CONDITIONS Figure 2.1.1 Site Location 4t The site consists of an existing elementary school and ranges from open to moderately wooded. ! Typical site elevations range from around 26 to 35 feet. y 2.3 PROPOSED CONSTRUCTION +I The project will consist of expanding the existing elementary school and constructing a new, 90,000 square foot middle school. We understand that associated drive and parking areas will be constructed north of the proposed middle school. 2.3.1 Site Civil Features • Grading for stormwater ponds, roadways and building pads • Cuts and fills less than 3 feet (assumed) L Town Creek Elementory/Middle School ECS Project No. 22.25758 December 20, 2017 Page 5 2.3.2 Structural Information/Loads Structural loading information was provided by Mr. Jeff Troutman, P.E. of Criser Troutman Tanner Consulting Engineers. The following information explains our assumed structural loads for the 1 purpose of the recommendations made in this report: Table 2.3.2.1 Design Values SUBJECT DESIGN INFORMATION / EXPECTATIONS Usage School Column Loads 50 to 86 kips Wall Loads 3 to 6 kips/ft Finish Floor Elevation 1 ±3 feet of existing grade (assumed) Town Creek Elementary/Middle School ECS Project No. 22:25758 3.0 FIELD EXPLORATION 3.1 FIELD EXPLORATION PROGRAM December20, 2017 Page 6 The field exploration was planned with the objective of characterizing the project site in general geotechnical and geological terms and to evaluate subsequent field data to assist in the determination of geotechnical recommendations. 3.1.1 Cone Penetrometer Soundings The subsurface conditions were explored by drilling twenty three (23) electronic cone penetration test (CPT) soundings within the proposed building areas. CPT sounding 5-14 was advanced to a refusal depth of approximately 34.3 feet beneath the existing ground surface. Sounding locations were located in the field by an ECS representative using a hand held GPS unit and referencing existing site features. The approximate as -drilled sounding location is shown on the Exploration Location Diagram in Appendix A. The CPT soundings were conducted in general accordance with ASTM D 5778. The cone used in the soundings has a tip area of 10 cmZ and a sleeve area of 150 cmZ. The CPT soundings recorded tip resistance and sleeve friction measurements to assist in determining pertinent index and engineering properties of the site soils. The ratio of the sleeve friction to tip resistance is then used to aid in assessing the soil types through which the tip is advanced. The results of the CPT soundings are presented in Appendix B. Within sounding 5-14, seismic tests were performed at approximately three foot intervals to refusal to measure the shear wave velocity (vs) of the subsurface materials to aid in assessing the dynamic response properties of the site subsurface materials. The seismic shear waves are generated by making impact with a 20-pound sledgehammer onto a steel beam. The impacts are initiated on the right and left sides of the CPT rig and the corresponding wave traces recorded on an oscilloscope are analyzed to determine the shear wave velocity of the tested material. The waves are measured with three geophones that are installed in the cone. The results of the CPT soundings are presented in Appendix B. 3.1.2 Direct Push Borings ECS explored the proposed stormwater pond areas by advancing three (3) direct push borings to a depth of approximately 16 feet below the existing subgrade at the site. The approximate boring locations are shown on the attached Exploration Location Diagram. The direct push boring method obtains continuous soil samples by driving four foot long sample tubes by means of a percussion hammer. The sample tubes are returned to the ECS soils laboratory in Wilmington, North Carolina and are visually classified according to the Unified Soil Classification System (USCS). The direct push Boring Logs in Appendix B contain detailed information recorded at each of the boring locations. Town Creek Elementary/Middle School December 20, 2017 ECS Project No. 22:25758 Page 7 3.1.3 Kessler Dynamic Cone Penetrometer Tests Twelve (12) Kessler Dynamic Cone Penetrometer (DCP) tests were performed in the proposed pavement areas. The Kessler DCP is used to estimate the strength characteristics of soils. The Kessler DCP was continuously driven approximately 2 feet below the existing ground surface. The Kessler DCP is driven into the soil by dropping a Dual -Mass 17.6 lb Hammer from a height of 22.6 inches. The depth of cone penetration is measured at selected penetration or hammer drop intervals and the soil shear strength is reported in terms of the Kessler DCP index. The Kessler DCP index is based on the average penetration depth resulting from one blow of the 17.6 lb hammer. The Kessler DCP index can be correlated to CBR and modulus of rigidity. The individual results of the Kessler DCP tests are presented in Appendix B. 3.2 REGIONAL/SITE GEOLOGY It is important to note that the natural geology at the site may have been modified in the past. Therefore, potential fill and unsuitable materials may be present at the site. The site is located in the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from other areas by the ocean or rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 10,000 feet near the coast. The sedimentary deposits of the Coastal Plain rest upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. In general, shallow unconfined groundwater movement within the overlying soils is largely controlled by topographic gradients. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation. Based on the U.S. Geological Surveyl,2 the proposed construct site lies within the Waccamaw Formation (Tpyw). Soils in the Waccamaw Formation typically contain alluvial silty sands and clays with shells. An overview of the general site geology Is illustrated in Figure 3.2.1 below. 1 The North Carolina Dept. of Environment, Health, and Natural Resources, Division of Land Resources, NC Geological Survey, in cooperation with the NC Center for Geographic Information and Analysis, 1998, Geology - North Carolina (1:250,000), coverage data file geol250. The data represents the digital equivalent of the official State Geology map (1:500,000 scale), but was digitized from (1:250,000 scale) base maps. 2 Rhodes, Thomas S., and Conrad, Stephen G., 1985, Geologic Map of North Carolina: Department of Natural Resources and Community Development, Division of Land Resources, and the NC Geological Survey, 1:500,000-scale, compiled by Brown, Philip M., et al, and Parker, John M. III, and in association with the State Geologic Map Advisory Committee. i Town Creek Elementary/Middle School s ECS Project No. 22:25758 *Ixki ti4' Tpyw: Waccarrtaw Formation (Ternary) I (Detailed desc iot % j '"3Cf% i3'a'i? f�?isil3is -fOSSiVeTOUS 52=: " with sift and day, bluish -gray to tan, loosely consolidated. Straddles Pleistocene - Pliocene boundary. Y5 Y r-. ci December 20, 2017 Page 8 Figure 3.2.1 i Geologic map for Figure 3.2.1 obtained from The North Carolina Dept. of Environment, Health, and Natural Resources, Division of Land Resources, NC Geological Survey, in cooperation with the NC Center for Geographic Information and Analysis, 1998, Geology - North f Carolina (1:250,000), coverage data file geo1250 and Google Earth. i Town Creek Elementary/Middle School ECS Project No. 22:25758 3.3 SUBSURFACE CHARACTERIZATION December 20, 2017 Page 9 The subsurface conditions encountered were generally consistent with published geological mapping. The following sections provide generalized characterizations of the soil encountered during our subsurface exploration. For subsurface information at a specific location, refer to the CPT Sounding Logs in Appendix B. Table 3.3.1 Subsurface Stratieraohv Approximate tratum IDescription Ranges of Depth Range (ft) I N*-Values"' blows per foot (bpf) 0-0.5 N/A Soundings performed throughout contained an N/A observed thickness of topsoil. Deeper topsoil or organic laden soils are most likely present in wet, poorly drained areas and potentially unexplored areas of the site. 0.5-6.0 1 Loose to Dense, Silty and Clean SAND (SM, SP) with 2 to 42 interbedded layers of Very Soft to Stiff, Sandy SILT (ML), Silty CLAY (CL-ML) and Lean CLAY (CL), Moist to Wet 6.0-18.0 II Very Soft to Firm, Sandy SILT (ML), Silty CLAY (CL-ML), 0 to 17 Lear CLAY (CL) and Fat CLAY (CH) with interbedded layers of Loose to Medium Dense Silty and Clean SAND (SM, SP), Wet to Saturated 18.0-34.0 111 Loose to Very Dense, Silty, and Clean SAND (SM, SP), 5 to 50+ Saturated 34.0 IV LIMESTONE 100+ Notes: (1) Equivalent Corrected Standard Penetration Test Resistances 3.4 GROUNDWATER OBSERVATIONS Porewater pressure measurements were made at the soundine locations during exploration as noted on the CPT sounding logs in Appendix B. The apparent groundwater depths were observed at the time of drilling to range from approximately 3.0 to 10.5 feet below ground surface. The highest groundwater observations are normally encountered in the late winter and early spring. Variations in the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, construction activities, and other factors not immediately apparent at the time of this exploration. If long term water levels are crucial to the development of this site, it would be prudent to verify water levels with the use of perforated pipes or piezometers. Town Creek Elementary/Middle School December 20, 2017 ECS Project No. 22:25758 Page 10 f 4.0 DESIGN RECOMMENDATIONS 1 4.1 BUILDING DESIGN The following sections provide recommendations for foundation design. 4.1.1 Foundations Deep Foundations: Provided that the subgrades are prepared as discussed herein, the proposed elementary school expansion and new middle school can be supported by conventional shallow foundations. Undercutting in the upper two to four feet should be expected in the vicinity of soundings S-5, S-8, S-9, 5-11, S-12, S-17, and S-18 through 5-22. The design of the foundation shall utilize the following parameters: Table 4.1.1.1 Foundation Design Design Parameter Column Footing Wall Footing Net Allowable Bearing Pressure 2,000 psf 2,000 psf Acceptable Bearing Soil Material Stratum I Stratum I Minimum Width 30 inches 18 inches Minimum Footing Embedment Depth (below slab or finished grade) 12 inches 12 inches Estimated Total Settlement 1 inch 1 inch Estimated Differential Settlement Less than 0.5 inches Less than 0.5 inches 1. Net allowable bearing pressure is the applied pressure in excess of the surrounding overburden soils above the base of the foundation. It will be important to have the geotechnicai engineer of record observe the foundation subgrade prior to placing foundation concrete; to confirm the bearing soils are what was anticipated. If soft or unsuitable soils are observed at the footing bearing elevations, the unsuitable soils should be undercut and removed. Any undercut should be backfilled with approved structural fill up to the original design bottom of footing elevation; the original footing shall be constructed on top of the structural fill. The depth and lateral extent of the undercut should be determined in the field during undercutting operation. An ECS representative must be on site during the undercut and backfill of the areas in order to provide a report stating that the repairs were in accordance with our recommendations. 4.1.2 Floor Slabs Assuming the lowest finished floor elevation is around the current elevation, it appears that the slabs for the structures will bear on the Stratum I soils —SANDS (SM, SP) and CLAYS (CL). Provided the subgrade recommendations of this report are followed, this material is likely suitable for the support of a slab -on -grade. t.. 11 Town Creek Elementary/Middle School December 20, 2017 ECS Project No. 22:25758 Page 11 Subgrade Modulus: Provided the Subgrade Preparations and Earthwork Operations Sections of this report are followed, the slab may be designed assuming a modulus of Subgrade reaction, k of 125 pci (lbs/cu. inch). The modulus of subgrade reaction value is based on a 1 ft by 1 ft plate load test basis. Slab Isolation: Ground -supported siabs should be isolated from the foundations and foundation - supported elements of the structure so that differential movement between the foundations and slab will not induce excessive shear and bending stresses in the floor slab. Where the structural configuration prevents the use of a free-floating slab, the slab should be designed with suitable reinforcement and load transfer devices to preclude overstressing of the slab. Maximum differential settlement of soils supporting interior slabs is anticipated to be less than 0.5 inches in 50 feet. 4.1.3 Seismic Design Considerations Seismic Site Classification: The International Building Code (IBC) 2009 requires site classification for seismic design based on the upper 100 feet of a soil profile. Three methods are utilized in classifying sites, namely the shear wave velocity (vs) method; the unconfined compressive strength (s„) method; and the Standard Penetration Resistance (N-value) method. The first method (shear wave velocity) was used in classifying this site. The results of the shear wave velocity profiles are contained in Appendix C. The seismic site class definitions for the weighted average of shear wave velocity or SPT N-value in the upper 100 feet of the soil profile are shown in the following table: Table 4.1.3.1: Seismic Site Classification Site Class Soil Profile Name Shear Wave Velocity, Vs, (ft•Is) N value (bpf) A Hard Rock Vs > 5,000 fps N/A B Rock 2,500 < Vs <_ 5,000 fps N/A C I Very dense soil and soft rock 1,200 < Vs <_ 2,500 fps >50 D Stiff Soil Profile 600 <_ Vs <_ 1,200 fps 15 to 60 E Soft Soil Profile Vs < 600 fps <15 The North Carolina Building Code (2009 International Building Code with North Carolina Amendments) requires that a seismic Site Class be assigned for new structures. The seismic Site Class for the site was determined by calculating a weighted average of the shear velocities of the overburden to the depth of rock/refusal. The CPT test data indicates that the existing natural, overburden soils at the site have shear velocities ranging from approximately 240 ft/sec to 1,260 ft/sec. The method for determining the weighted average value is presented in Section 1613.5.5 of the IBC 2009. The weighted average value for the site is 844 ft/sec. Based on the results of the CPT soundings, the site is assigned a seismic site class "D". However, liquefiable soils are present at the site that will cause liquefaction induced settlements and the IBC classifies sites with the potential for liquefaction as Seismic Site Class "F". 4 i L Town Creek Elementary/Middle School ECS Project No. 22:25758 December 20, 2017 Page 12 The IBC 2009 allows the design spectral response accelerations for a site to be determined without regard to liquefaction provided buildings have a fundamental period of less than or equal to 0.5 seconds and the risks of liquefaction are considered in design. The buildings should meet this criterion; however, this must be confirmed by the Structural Engineer. The Site Class definition should not be confused with the Seismic Design Category designation, which the Structural Engineer typically assesses. If a higher site classification is beneficial to the project, ECS would be pleased to discuss additional testing capabilities in this regard. If a Site Class F must be used, a site specific seismic hazard analysis (which is beyond our scope of work) is needed to determine the seismic design parameters. As such, additional seismic hazard analysis of the site could be needed to satisfy code requirements. Liquefaction: When a saturated soil with little to no cohesion liquefies during a major earthquake, it experiences a temporary loss of shear strength as a result of a transient rise in excess pore water pressure generated by strong ground motion. Flow failure, lateral spreading, differential settlement, loss of bearing, ground fissures, and sand boils are evidence of excess pore pressure generation and liquefaction. The potential for liquefaction at the site is considered low based upon the CPT results and the liquefaction index procedure developed by Iwasaki (1982). Based on our CPT results and our evaluation using a site peak ground acceleration of 0.14, an earthquake event with a magnitude of 7.3 and procedures developed by Robertson (2009) and Boulanger & Idriss (2014), the liquefaction induced settlement at the subject site is estimated to generally range from approximately 1 to 3 inches. This settlement would result from volumetric compression of the liquefiable sand layers which occurs as seismically -induced excess soil pore water pressures dissipate. If risks associated with liquefaction are not acceptable or the proposed structure cannot be designed to accommodate the anticipated settlement without suffering catastrophic failure, ground improvement techniques will be required. Ground improvement techniques such as vibro-replacement and geo-composite drains could be designed to mitigate or reduce the site's susceptibility to liquefaction and allow support of the structure on conventional shallow foundations. 4.2.1 Pavement Sections Subgrade Characteristics: Based on the results of our hand auger borings, it appears that the soils that will be exposed as pavement subgrades generally consist of SANDS (SM, SP) and CLAYS (CL). Based on the Kessler DCP results, a CBR value of 8 has been selected to model the in place subgrade soils. The pavement design assumes subgrades consist of suitable materials evaluated by ECS and placed and compacted to at least 98 percent of the maximum dry density as determined by the standard Proctor test (ASTM D 698) in accordance with the project specifications. Due to loose and soft soils in the upper 2 feet of the subgrade soils, isolated in place densification and undercutting up to approximately 2 feet should be anticipated in areas of the proposed parking and drive areas. Town Creek Elementary/Middle School December 20, 2017 ECS Project No. 22:25758 Page 13 Design Considerations: For the design and construction of exterior pavements, the subgrades should be prepared in strict accordance with the recommendations in the "Subgrade Preparation" and "Engineered Fill Placement" sections of this report. An important consideration with the design and construction of pavements is surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other problems related to the deterioration of the pavement can be expected. Furthermore, good drainage should minimize the possibility of the subgrade materials becoming saturated during the normal service period of the pavement. Anticipated traffic conditions were not provided to ECS. However, based on our experience for light duty traffic for similar projects, a flexible pavement section may consist of at least 2 inches of surface mix asphalt overlying at least 6 inches of grade aggregate base in the parking areas. Similarly, a heavy duty, flexible pavement section may consist of at least 3 inches of surface mix asphalt overlying at least 8 inches of graded aggregate base in the roadway areas. For a rigid pavement section, we recommend 6 inches of 650 psi flexible strength concrete underlain by 4 inches of ABC stone. The graded aggregate based course materials beneath pavements should be compacted to at least 98 percent of their modified Proctor maximum dry density (ASTM D 1557). Regardless of the section and type of construction utilized, saturation of the subgrade materials and asphalt pavement areas results in a softening of the subgrade material and shortened life span for the pavement. Therefore, we recommend that both the surface and subsurface materials for the pavement be properly graded to enhance surface and subgrade drainage. By quickly removing surface and subsurface water, softening of the subgrade can be reduced and the performance of the parking area can be improved. Site preparation for the parking areas should be similar to that for the building area including stripping, proofrolling, and the placement of compacted structural fill. L Town Creek Elementary/Middle School December 20, 2017 ECS Project No. 22:25758 Page 14 5.0 SITE CONSTRUCTION RECOMMENDATIONS 5.1 SUBGRADE PREPARATION 5.1.1 Stripping and Grubbing It should be noted that the natural geology of the site has been modified in the past; therefore potential unsuitable material may be present on the site. The subgrade preparation should consist of stripping all vegetation, rootmat, topsoil, existing fill, and any other soft or unsuitable materials from the 10-foot expanded building area and 5-foot expanded pavement areas. ECS should be called on to verify that topsoil and unsuitable surficial materials have been completely removed prior to the placement of structural fill or construction of the building and parking lot. 5.1.2 Proofrolling After removing all unsuitable surface materials, cutting to the proposed grade, and prior to the placement of any structural fill or other construction materials, the exposed subgrade should be examined by the geotechnical engineer or authorized representative. The exposed subgrade should be thoroughly proofrolled with previously approved construction equipment having a minimum axle load of 10 tons (e.g. fully loaded tandem -axle dump truck). The areas subject to proofrolling should be traversed by the equipment in two perpendicular (orthogonal) directions with overlapping passes of the vehicle under the observation of the geotechnical engineer or authorized representative. This procedure is intended to assist in identifying any localized yielding materials. In the event that unstable or "pumping" subgrade is identified by the proofrolling, those areas should be marked for repair prior to the placement of any subsequent structural fill or other construction materials. Methods of repair of unstable subgrade, such as undercutting or moisture conditioning or chemical stabilization, should be discussed with the geotechnical engineer to determine the appropriate procedure with regard to the existing conditions causing the instability. Test pits may be excavated to explore the shallow subsurface materials in the area of the instability to help in determined the cause of the observed unstable materials and to assist in the evaluation of the appropriate remedial action to stabilize the subgrade. 5.1.3 Site Temporary Dewatering Subsurface Water: Due to the relatively shallow groundwater conditions observed at select locations during this exploration, temporary construction dewatering may be necessary to facilitate efficient below -grade construction. Dewatering operations for the majority of the site can be handled by the use of conventional submersible pumps directly in the excavation or temporary trenches or French drains consisting of free draining granular stone wrapped in filter fabric to direct the flow of water and to remove water from the excavation. If temporary sump pits are used, we recommend they be established at an elevation 3 to 5 feet below the bottom of the excavation subgrade or bottom of footing. A perforated 55 gallon drum or other temporary structure could be used to house the pump. We recommend continuous dewatering of the excavations using electric pumps or manned gasoline pumps be used during construction. Town Creek Elementary/Middle School ECS Project No. 22:25758 5.2 EARTHWORK OPERATIONS 5.2.1 Structural Fill Materials December 20, 2017 Page 15 Product Submittals: Prior to placement of structural fill, representative bulk samples (about 50 pounds) of on -site and off -site borrow should be submitted to ECS for laboratory testing, which will include Atterberg limits, natural moisture content, grain -size distribution, and moisture - density relationships for compaction. Import materials should be tested prior to being hauled to the site to determine if they meet project specifications. Satisfactory Structural Fill Materials: Materials satisfactory for use as structural fill should consist of inorganic soils classified as SM, SC, SW, SP, GW, GP, GM, and GC, or a combination of these group symbols, per ASTM D 2487. Natural fine-grained soils classified as clays or silts (CL, ML) should generally not be considered for use as engineered fill, but may be evaluated by the geotechnical engineer to determine their suitability at the contractor's request. The materials should be free of organic matter, debris, and should contain no particle sizes greater than 4 inches in the largest dimension. Open graded materials, such as gravels (GW and GP), which contain void space in their mass should not be used in structural fills unless properly encapsulated with filter fabric. Suitable structural fill material should have the index properties shown in Table 5.2.1.1. Table 5.2.1.1 Structural Fill Index Properties Locationwith Respect to Final Grade LL PI Max % Fines Passing # 200 Sieve Building Area 35 max 9 max 20 Pavement Area 35 max 9 max 20 Unsatisfactory Materials: Materials that should not be used as engineered fill include topsoil, organic materials (OH, OL), and high plasticity clays and silts (CH, MH). Such materials removed during grading operations should be either stockpiled for later use in landscape fills, or placed in approved on or off -site disposal areas. On -Site Borrow Suitability: Near surface SANDS (SM, SP) with a fines content less than 20 percent should be suitable for re -use as structural fill. A majority of the soils present in the location of the proposed stormwater pond, corresponding to borings DP-1 through DP-3, are not consider suitable for re -use as structural fill. Moisture conditioning should be anticipated for the soils to achieve the optimum moisture content for fill placement. 5.2.2 Compaction Structural Fill Compaction: Structural fill within the expanded building, pavement, and embankment limits should be placed in maximum 8-inch loose lifts, moisture conditioned as necessary to within -3 and +3 % of the soil's optimum moisture content, and be compacted with suitable equipment to a dry density of at least 98% of the standard Proctor maximum dry density (ASTM D698). Beyond these areas, compaction of at least 95% should be achieved. ECS should be called on to document that proper fill compaction has been achieved. Town Creek Elementary/Middle School December 20, 2017 ECS Project No. 22.25758 Page 16 Fill Compaction Control: The expanded limits of the proposed construction areas should be well defined, including the limits of the fill zones for the proposed construction area, at the time of fill placement. Grade controls should be maintained throughout the filling operations. All filling operations should be observed on a full-time basis by a qualified representative of the construction testing laboratory to determine that the minimum compaction requirements are being achieved. Field density testing of fills will be performed at the frequencies shown in Table 5.2.2.1, but not less than 1 test per lift. Table 5.2.2.1 Freauencv of Comnaction Tests in Fill Areas Location Frequency of Tests Building Area 1 test per 2,500 sq. ft. Utility Trenches 1 test per 200 sq. ft. Pavement Areas 1 test per 10,000 sq. ft. Compaction Equipment: Compaction equipment suitable to the soil type being compacted should be used to compact the subgrades and fill materials. Sheepsfoot compaction equipment should be suitable for the fine-grained soils (Clays and Silts). A vibratory steel drum roller should be used for compaction of coarse -grained soils (Sands) as well as for sealing compacted surfaces. Fill Placement Considerations: Fill materials should not be placed on frozen soils, on frost -heaved soils, and/or on excessively wet soils. Borrow fill materials should not contain frozen materials at the time of placement, and all frozen or frost -heaved soils should be removed prior to placement of structural fill or other fill soils and aggregates. Excessively wet soils or aggregates should be scarified, aerated, and moisture conditioned. At the end of each work day, all fill areas should be graded to facilitate drainage of any precipitation and the surface should be sealed by use of a smooth -drum roller to limit infiltration of surface water. During placement and compaction of new fill at the beginning of each workday, the Contractor may need to scarify existing subgrades to a depth on the order of 4 inches so that a weak plane will not be formed between the new fill and the existing subgrade soils. Drying and compaction of wet soils is typically difficult during the cold, winter months. Accordingly, earthwork should be performed during the warmer, drier times of the year, if practical. Proper drainage should be maintained during the earthwork phases of construction to prevent ponding of water which has a tendency to degrade subgrade soils. Where fill materials will be placed to widen existing embankment fills, or placed up against sloping ground, the soil subgrade should be scarified and the new fill benched or keyed into the existing material. Fill material should be placed in horizontal lifts. In confined areas such as utility trenches, portable compaction equipment and thin lifts of 3 inches to 4 inches may be required to achieve specified degrees of compaction. Town Creek Elementary/Middle School December 20, 2017 ECS Project No. 22:25758 Page 17 We recommend that the grading contractor have equipment on site during earthwork for both drying and wetting fill soils. We do not anticipate significant problems in controlling moisture within the fill during dry weather, but moisture control may be difficult during winter months or extended periods of rain. The control of moisture content of higher plasticity soils is difficult r when these soils become wet. Further, such soils are easily degraded by construction traffic when 1 the moisture content is elevated. 5.3 GENERAL CONSTRUCTION CONSIDERATIONS Moisture Conditioning: During the cooler and wetter periods of the year, delays and additional costs should be anticipated. At these times, reduction of soil moisture may need to be accomplished by a combination of mechanical manipulation and the use of chemical additives, such as lime or cement, in order to lower moisture contents to levels appropriate for compaction. Alternatively, during the drier times of the year, such as the summer months, moisture may need to be added to the soil to provide adequate moisture for successful compaction according to the project requirements. Subgrade Protection: Measures should also be taken to limit site disturbance, especially from rubber -tired heavy construction equipment, and to control and remove surface water from development areas. It would be advisable to designate a haul road and construction staging area to limit the areas of disturbance and to prevent construction traffic from excessively degrading sensitive subgrade soils and existing pavement areas. Haul roads and construction staging areas could be covered with excess depths of aggregate to protect those subgrades. The aggregate can later be removed and used in pavement areas. Surface Drainage: Surface drainage conditions should be properly maintained. Surface water should be directed away from the construction area, and the work area should be sloped away from the construction area at a gradient of 1 percent or greater to reduce the potential of ponding water and the subsequent saturation of the surface soils. At the end of each work day, the subgrade soils should be sealed by rolling the surface with a smooth drum roller to minimize infiltration of surface water. Excavation Safety: Cuts or excavations associated with utility excavations may require forming or bracing, slope flattening, or other physical measures to control sloughing and/or prevent slope failures. Contractors should be familiar with applicable OSHA codes to ensure that adequate protection of the excavations and trench walls is provided. Excavation Considerations: Based on the results of the soundings, we expect that the natural Coastal Plain soils encountered on this site can be excavated with conventional earth moving equipment such as loaders, bulldozers, rubber tired backhoes, etc. The site soils are OSHA Type C soils for the purpose of temporary excavation support. Excavations should be constructed in compliance with current OSHA standards for excavation and trenching safety. Excavations should be observed by a "competent person," as defined by OSHA, who should evaluate the specific soil type and other conditions, which may control the excavation side slopes or the need for shoring or bracing. Regardless, site safety shall be the sole responsibiiity of the contractor and their subcontractors. Exposed earth slopes shall be protected during periods of inclement weather. Town Creek Elementary/Middle School ECS Project No. 22:25758 December 20, 2017 Page 18 r Erosion Control: The surface soils may be erodible. Therefore, the contractor should provide and I maintain good site drainage during earthwork operations to maintain the integrity of the surface soils. All erosion and sedimentation controls should be iPi accordance with sound engineering ( practices and local requirements. L Town Creek Elementary/Middle School December 20, 2017 ECS Project No. 2225758 Page 19 6.0 CLOSING ECS has prepared this report of findings, evaluations, and recommendations to guide geotechnical-related design and construction aspects of the project. The description of the proposed project is based on information provided to ECS by Brunswick County Schools. If any of this information is inaccurate, either due to our interpretation of the documents provided or site or design changes that may occur later, ECS should be contacted immediately so that we can review the report in light of the changes and provide additional or alternate recommendations as may be required to reflect the proposed construction. We recommend that ECS be allowed to review the project's plans and specifications pertaining to our work so that we may ascertain consistency of those plans/specifications with the intent of the geotechnical report. Field observations, monitoring, and quality assurance testing during earthwork and foundation installation are an extension of and integral to the geotechnical design recommendation. We recommend that the owner retain these quality assurance services and that ECS be allowed to continue our involvement throughout these critical phases of construction to provide general consultation as issues arise. ECS is not responsible for the conclusions, opinions, or recommendations of others based on the data in this report. ` APPENDIX A — Drawings & Reports I Site Location Diagram Exploration Location Diagram I W v � z N W H � N a LL =N O LLF 0 o Z(L 4 'O c j--4Rw LLI 0 O W cn W W 2 Z a Y 0m O� � - a� �� r y wa NO m 08 ' zW ~OW W OC Z 0 a nw ��Q o Ci J .� LL W N -.; r O> LL ' O Z W 4 ` OQ O j �► rf © Q L JW O fn W x MO O ILIL Z az Qz HNZ WO Omer- ~ON GHH Ww Agk 1 Town Creek LLcos EXPLORATION Elementary/Middle School � � � � ^ V LOCATION DIAGRAM N Winnabow, North Carolina cc LF z C5 WZ W N �N a LU a WLU LU W _ cc az y ❑ W 5 z r r Lli a c z a LL O O p HN aw �1-- a OQ W Q W J xN ccY a= IL a� u)3: � z z wo om o Town Creek Ul g s o� U EXPLORATION Elementary/Middle School � � � N o a LOCATION DIAGRAM Z Winnabow, North Carolina o Z WZ W N �"' I r APPENDIX B — Field Operations I Reference Notes for Sounding Logs CPT Sounding Logs -S-1 through S-23 and Shear Wave Velocity Profile Kessler Logs Reference Notes to USCS Classification Hand Auger Boring Logs — K-? through K-12 Direct Push Boring Logs — DP-1 through DP-3 L I _ REFERENCE NOTES FOR CONE PENETRATION TEST (CPT) SOUNDINGS In the CPT sounding procedure (ASTM-13-5778), an electronically instrumented cone penetrometer j is hydraulically advanced through soil to measure point resistance (Q, pore water pressure (u2), J and sleeve friction (Q. These values are recorded continuously as the cone is pushed to the desired depth. CPT data is corrected for depth and used to estimate soil classifications and I` intrinsic soil parameters such as angle of internal friction, preconsolidation pressure, and undrained I shear strength. The graphs below represent one of the accepted methods of CPT soil behavior classification (Robertson, 1990). ft) Wj ai 10", W ] 10 Friction Ratio, Fr N 1. Sensitive, Fine Grained 2. Organic Soils-Peats 3. Clays; Clay to Silty Clay 4. Clayey Silt to Silty Clay 5. Silty Sand to Sandy Silt s W -0.4 0 0.+4 04 12 Pore Pressure Ratio, Bq 6. Clean Sands to Silty Sands 7. Gravelly Sand to Sand 8. Very Stiff Sand to Clayey Sand 9. Very Stiff Fine Grained The following table presents a correlation of corrected cone tip resistance (Q to soil consistency or relative density: SAND SILT/CLAY Corrected Cone Tip Resistance is Relative Density Corrected Cone Tip Resistance is Relative Density <20 'Very Loose <5 Very Soft 20-40 Loose 5-10 Soft 40-120 Medium Dense 10-15 Firm 15-30 Stiff 120-200 Dense 30-45 1 Very Stiff >200 Very Dense 45-60 Hard >60 Ver y Hard e I � u f I O Z h e 0 r y N V N C $ L m d is Z S a 3 9 b 0 � E y� a W"DD 3 WW .fit, C C L e W �p x I i L. C..1 O O �s H F N N dtl -a'.N. N ^d W aYy,� aE atl a?Tti. -afNT. W co ca w U U U U O U) U U U cn U m co f0 C7 VJ fn ■ �"� i �"� �"� �"� H i 'i rl 'i •i -I 'i N c N N N N N (}3) 4;da(3 ... _........ . (4) yldaa `j M V Ln 0 N W m O N M v u1 o N O m O rl N M Lo "� �"� ri �"� 'i rl •i 'i •i ed N N N N N N (:}) 43daa V .+ N M o in %o NOOCIO . N M a in �o n w o o -+ N M a Ln r r r . r e r - r H N N N N N N i (:u) y;daa . . . . " " e . . . N N N N (:}) Ladaa a 0 In u o LL 0 E a g A U I : i 0 z C 7 O J O N 1 N N 8 m ZN �# CI 7 L N C'd m Z a v N� E' WLU e e W3 E� y Y W U L c O N .. VJ.. eti .. N. �VI.... s w 41 ad 6 . .6 o0 . -11 oa U y°d Z$ W o'Ti M U w CA (q (A U U U U [A U U S) a %C a n O 0 O ,-1 N m a an (.) 43daC N i1 ID N z 3 0 t IA - o� O t0 Z T � N M It to t0 n O 01 O ,-1 N m a' 1n ,-1 .-1 .-1 .i rl N N N N N N (:1) 43daa 1 ri rl ei ei ei rl rl rl wA ^1 N N N N N N (:U) y;daa O. o � 7 N w N T a c o w c ® O F u? U � o H N N N N (J) y;daa c m Ol d I ei N M d• I!1 1D I� m Of O .-1 N M V Lr" T, N M 1n - - - - , 1 , i ,-1 ,-1 r1 ,-1 N N N N (:}) yldad 0 Go o. wS ... S.S.. a ja ....... z. u m W v O L .. o ... w .dJe6aa... ..> .a ._ m Rl, v m �. a �. N a W... U O fA O O to U U U U O U fA (D (D Cl) U w O ... ..... ... O d .0 ✓ 4 O N � i i i e i T O .-1 N M It mtD I, O 01 O 'i N M v mtD I� O 01 O .-I N N N N N N N (:U) y;daQ 0 0 Z N H (:}) y;daa I f .ti N M a' Vf .O I, co CS P! 4 I!1 0 I., O . O .-I N 11 Lo +••� .'� .Y ti ei ei ei .•i e.l ..I N N N N N N (:4) 1{}daa .•� N M v Ln %o n O 01 O N . m . v . m . 1D - n " co " m e O N N N N P] N qt N VI N (:U) Lgdaa II ei N M IA SO I, O O O .-I N rn v Ln O N O m O . i N M m (:}) yjdad Ln c C Lq O o'er •L LL o � so ... U C a N a H p S Q M 0 O r-1 ..i p N N rl c 0 v 0 e. a! 0 O O L n to g% B Ln C n aS c u o � Ln n i ac m Nm L nLM IL C Lncn i J C N Ir C U ry C •E dl 0 z Y 1 1 �zr ulV E{Ua� p i W t^O W 1 mm 1 c C � E � ei W Y I� U C � 1 a � I i Gl. w V w U N V ... .iJ.. _•A .S N �Nz fi V � U z .. _ w. N . H .. .... f� w� N C.�VI N °t" N I .. N .... 00 .6 w 0 N -d w e6 .6 w w T T T T T <tl T w e0 N ^y � a t`S. t5 m U m U in c) 0 0 m m fA t!1 m u 0 m DO y In r m •O I O N m V N o m m m O .-I N M .-I rl ei •i .-I m 0 N m 01 r r e e •i �1 O . N N N N (1,) 4}daCl O z t H N N d!� . �� ekl •�.I N C *+ O = m m w NC +�1 L m O1 a O 0 N � In i t vi o O J N N N R c R n c .-I N rn v V1 O i\ m O, O ei 'i N •i cn ei v ei In rl •i n rl m 'i D• rl O N .-I N N N M N N In N �D N (41) 4adad y 3 0 a 0 %D z y 3 \tPOJ m !. L 3 p. 0 V 4' L O 7 a (n m w L L O a O. Ln .-I N m a' an O n m m O .-I N m 7 In N m a 1n ei .-I •i .� •-1 •i rl 'i eel 'i N N N N N N N 04) 43daa C O o � i+ w u � V � O GI N lL O •-I N m --r L" l0 1 m T O .-I N m v v1 10 n m T O .-I N M a m .+ .+ .+ ei •-1 .-I .-1 ri 'i ei N N N N N N (:}) 4;daa . N m -e1n m n m m o rl N m a m to 1 m m O . N m � .-I rl . ' r H ' " " " N N N N N N N (:}) 4;daa 0 O �a'. �. .ro �" �. m fie' m �• ?o as .a O Ga w U y Vf b w 7 U U U UJ e6 U w M7 .tl . co U 0 UGo al N .+ C ... .. .. ...... .. ... .. L O O � ...... En—� N M v N7 O !\ m pf O r-I N M v V7 O N 00 m O -4 N M V In e r " 09) 4;daa " r r . .-I N N N N N N (74) 4;daa 0 N . L a U, O v L C. vY W i v IL p c a 00 T O .ti N M -W N 10 n m O� O .ti N M Iry N N N N (4) 4Adaa FA .-I N m t N9 O N O m O .-1 N M -t m ID n 00 O .-1 N M v Ln (:6) 43daa .-I N M It ul tO n 00 O+ O .-I N M le u1 w N 00 OI O . i N M v Ln ri ei ."I 'i •i *i .y rl .-I .-I N N N N N N (k1) 4]daa �4- o� c 0 o u O •� LL 0 a Tq d �a O Z k FA fA H H w q o o t 7. � u. w _ 0... `� w. b U4 rU. U fD rD in o U U 65 in to y y 'n y lD CO) r .ti N m "7 LO O t` m cm O .--i N m m O (]1) ilidRQ %D r` m 0 O N m 7 Ln n N m m O .-i N m a In v7 .a .-I N m a (4) 4;daa .-I N m 7 Ln 1D r` m m O .ti N m u7 rD t\ m 01 O .ti N m m N (:}) 4;dad O 0 v C . N m a in ,0 n m . O '+ N m h b . m Ln (}}) 4;dad C c ca a Ln m n m rn o .+ ry m a m m m rn o .+ N rn a n vi rl ei .-i ri rl ei ei 'i e-1 N N N N N N (41) 44da0 a 9- 0 C 0 a) uu V a) N A N Q � U m n m 0-6 Ln C r\ y m w N C 0 , N ac m N Ln rl V i ga U N N N a� f fn c Z C 0 � M O V N — a�izz�t s � C cu m y O �7 z ' k L c c � 3 d Lr { V OQJ L3 N T N N y_..'�. 4aJ. eT0 .� mg.. N. M?. a?4. N M yad C N. _� a6 N -acu' a. T U U U ch U w U V5 C.1 U U U w w Cl) fn Cl) y -T* M � rl �"� +"� �"� rl ei •i 'i 'i 'i N N N N N N (}!) uldaQ + N M It in m a Ln 10 n w 0 o -+ N M a m (}U) g4da(i I .� N M In 10 n w 01 O ri N M a u1 t0 n w O� O ."� +"� +'� �"� •i rl ei •i rl ed N .-i N N N M N It N Ln N (:U) y3dan .-I N M a Ln %D n w CA O .-i N M It .-1 rl rl .-I .-I ri •i ei •i 'i N N N N N N N m U) O d N 7 o N N a` a � (�1) U3dad 0 V " O L N a N M a Ln %O n w 01 O .+ N M 7 In 0 n w 0 O .-i N M � In ei rl N N N N N N (4) yldaa CD a Go a.�A — — w— L .vl. w °b w o6 O '� u ..b' � 23 U ipg ® U .F ? ip% _ 9 3 i' . .. m To. 2r Mn o c enU m C.)y m m ad to u!... C� ZS U y C.) to N .+ 10 ao G) a yc to O y 9F r It co co N l�l •I I 1 1 I — -I I I I I �I O .-I .-I r1 'i .-I .-I ri 'i •i •i N N N N N N (4) Lpdaa 0 N I\A 3 FZ 3 _ o U o %D Ln z ni ei •i 'i rl rl rl ei �-i .-I N N N N N N 7 - C O N J C i N tn C U N l0 m z t d V ul0 � O y 19i Z 9 �v'E o W ko �o W Z, 1 1 y C � me m , LU d i 1 a It �-1 .-1 .-1 ri •i •i 'i rY ei ei N N N N N N m OI O .i N m It en t0 n m Of O .-I N M d' of (:U) y;daa ei N M V I!1 lD n m 01 M of (:}) y;daa O tO e u M O � N G 0 N n 0 0 n rl 0 N rl N rl c 0 to U to' G N C O .J d C � N •� Z N o = C d � # {y� 7 G N m 7 +�' 01 . oat. v o tRZ � L lu to C � 3 d r d S WIL Y V M a 9 f 0 w z N �. -6 w w -, Al' 'd N . W.. T'• �y. N. '�..N. IC N.N tC m k NailCN = N U U !A U U fn U U fq C� (A fA U U U DO f0 (q f0 tl! •-I N M {lI M0 I, w O O ."I rl *'� N M v Ln 0f, �"� 'i rl •i ei 'i w 0 'i rl O N N N N V lA N N (:4) y;daa N M 11 Y7 %0 I, m m O . N (:}) LRdaa 0 w 3 N Yl m a m L a .-I N M � Ifl .O I� O O• O N N M V u1 10 f� SD 0� O ."I N M '7 lA •'1 •'I •i rl ."� ei ei rl r1 rl N N N N N N (:}) y;daa v w .-I N m V N O n O 01 O ."I N M ,*m l0 l O o o .-I N M q M .i 'i ''1 ei •i ei 'i rl 'i 'i N N N N N N (:}) 43daa (:U) y;daa 0 0 a o N O tD Z a o y 0 0 N r, u ..c LL 0 ' o � N N ' V � I O? N I � 1 e A U I r l C C O of � p 00 N cYi iT .100 N N O a m C U N LO m Z }% .8 = a)L C y u m 7p a� O f/1 Z g a 9 tn�•E� s W ko W ' C C l[ i F 0 4T � W �p � r Y � la a I o _ O a U 07 U U U U U U U N co M ZW aLL (A � ■ N V) I I I I I I 1 I i 1 O O .-I N M ,I Ln n O . O .•i .•'I N M 4 Ill ni e ' .-I .-I . l m .-I .-I .-I . O .-1 e N N N 'n d' N N N IA N (;d) y;daa W lvv-y. .-I N M v IA .D co p. O .•i N M 1I1 w Il W 0 O .-I N M d' N (:}) tpdad .-I N M a Iry 10 N la a% O .-1 N M It 1!1 n W O O ^ N M v Ill (U) y;doa ............... . .-I N M v Ln O ^ O O1 O .-I N A V• Ln OO I, O] 01 O (4) g4daa V .-I N M a LM 0 N w 0 O .••I N M V Y7 J, (:1) 43dad 3 0 0 0 tD Loz a � O o •J lL U C L49 w a 0 f a 9 O T. C 7 O — mU N Z �# 7 C t m �. �z ca W k W ' C L C �3 d 0 W a g G7 e G 6 0 1D Z H D. H N fC b N •N .— � •y u U U y O U U U U CA U m U u U O u U fq fq y (a co (q N(0 1n 10 N OD ei eel .'i M It I. .'i .-1 rl 1D N •i ei ei rl N N N N N N (41) yidac .y N M a an t0 P ao O. O ti N M a in 1a 1� ao Of O .-i N M a in (3j) Ladaa b ce a 0 Ln d IN 7 b d a (A i0. u1 M a Ln 0 I� ao O .-� N m a m (:}) g4da4 C O w u N J9 v � C y O .> a+ � U ~ ti .ti N M a Ln 1a N 00 01 O M a in 10 I, 00 M O .+ N M a of N N N N N N (:}) y;dan VL _ V 4 (V M a of ID Il ao a1 O N M a in 10 N m 01 O .+ N M a u1 (:{) y4daa lc-� c 0 �o u u 12 i 9L > N n U C U N O 7 j lu Vl m 1 Z �� E f m c c_ c � i C� a x W Ly0 3C p 3 M h b }� O Cs t m H a C V.. a .0 fn U Z3 ZS [q m m U U U m U m U U o C5 fN U U W W y y y In 10 n m T O (}U) y}dae .+ N M 7 N9 . m m O .-I N M d' to In m (:9) y;dad 0 In In 0 N m 01 O .i N M 7 In N M � In .-1 .i ei rl rl rl •i rl rl ei N N N N N N (:y) gJda4 .+ N M a In o r, m am o -+ N M It In to 1. m 0 o .+ N M v (:}) 44daa r r .-� N M V Ln 0 1, m m O - N 10 N N N N N N (:U) Lpdap EL 7 N a` U C O 49 a in 0 L a O Z C 07Q J in N VV_i +T y N N N 4j Z *t i O i N C :0 E S a W L W CC �3 0 i E � 41 Y W m Y � m �3 Y V M J b O m a °a w. Y �. w_W N N W atl e6 xl w w w Ok l I-) C-) C.) [q q ' U U U T U U C-) Cn fA Nfn N (n /qy o ri L .0 d y o O O (n a m N N I I I I O O rl N M a IA O C1 , n co O e-1 N M � Ill tpi I� O OI O 'i N M 4 V7 rl rl +� ei .-I •i .-I 'i rl .-I N N N N N N ('.,) Llidac 0 0 Z d H O) (-U) 43da(i rl N M I u7 O n co O O .-I N M �r Ln O n W m O .-I N M of In ei ."I .i rl H rl 'i ei .1 rl N N N N N N (:U) y;daa I� O O O .-I N M v IA IO rl N M 1!1 IO I� O OI O .-I N M Ill .-1 .-I rl •i �-1 rl 'i rl ri ei N N N N N N (:}) y}dad (:U) yjdaa r Il) O n O OI O .-1 N M Ill a N o j In Ln L a O 0 E Q c+ 0 6 0 0 O N .-I ti c 0 a T u 1 �I 7 L I � V o z h e Ro o V J N V ` — g zN t k 7 1 C m Y1 a H ti v W C 45 W ' L e I E o E W Ip u a e 0 m la O �s _ _ .F ,y grw w it iH .q w V U W y.. W .m... H U U U N N N U Z3 [9 U U to C� CCU fn U fn W f!] U [3 C� fn [7S en w [n y w fD [n co MAI .-I N M a .1 .. .. .. .. . . .. .. rf .. .. 'n N N N N v in %o N N N 1� Go01 O rl N M .. N N m - 1n - - (4) y;daa •V d i U m .-I N rn 7 IA t0 F W W O N M IA O F W 01 O .-I N M {} m ID N W 00 .-I N M I N N N N N N M M M M M Z FA Vl d a F i y;daa a u1 . F W. O .ti N M I Ln tD F W O1 O .i N M I Vf t0 F W (41) Lpdaa f rl N M I 1!1 I F W OI O .ti N M I Ln o f W 01 O .-1 N M a m w N W 01 .-1 -- N N N-- N N N N—— m m m m (:}) 44dad .-I N M n ID I, W m 0 N W 0 O- N M V h O n W N N N N N N N N N N M m M m m (:U) y;daa .-I N m a n' o N Mt N O .ti ri ei .i .i .i ri ed rl rl N N N N N N N N N N m m m m M (:9) y4daa 0 0 ei O N N C ~ O CO y a 0 m O cn 0 0 ti O Ln a F O $ O o N C Ln 0. W N t0 . ip � .. W Z V .O e0 .E e6 w atl a6 w.atf. i_]d �' I -N. Ta k i w N & _w Tn . '.d ip. a � ?' �. 2 mT k it 65 U U U U C.i U Cn U U 0 CA U U U Cq U U U N U U N y y U Cn (3 1 ] ti N M � .l1 t(] 1� m rn [� N !}' •p A m rn M N � Vt •(] H H H H H H H H H H N N N N N (:U) y;daa H N m It N %G N O m O N M 7 Ln 0 N O m O H N m v m w N N N N N N N H N M � M � n m rn M H N M d• lA l[] n m LT O H N M � In � H H H H H H H H H H N N N N N (4) y;daa H H H H H H H H H H N N N N N N N (:y) y;daa F .-� N en V Cfl t0 n co 0 O H N M Q Ln O n CID T O H N fn It V) CO H H ri H H vK H N H H N N N N N N N (;j) 4;daa n Ln O p U LL w u C p 42 a Mn W v N a Cl � o N ` U 1 N `j N t rL lu f f I I I l f f U tl f ° Z C r f Ln J C O rm- O JOIN V .2 I c N U Is Z � O � O L �- J% Z C a 'O e W L L C ' G C f � 3 col W `fCA c� !� C O t_ O di a d a O a s m 0 O 0 Z t FA N w •iq N iq N - N w m w ?on ... .C�. .y. .... .y.w.N .....N o 41 U OJ co (0 U U/mA f0 CZ Wf0 IA ID n W O O .-I r1 N rl .••� 1.1 .i r! rl +-� ei T•I ei N N N N M N Ill N N (?:) 4}daQ O .••i N M d' Ill IO n Ill .••I '•I '•I rl rl rl rl '•I .-i .� N N N N N N (4) y;dad Go ei o0 O N N o 0 ♦•1 ti W m 0 a N 3 o N O w z a �.. Lo ., L y � a y v FA � L a �En v L � O a d .-I N M Ill t0 I, O7 Ol O 'i N M a' in O 11 w O O .ti N M .-I .ti rl .� rl '•I ••1 '•1 rl 'i N N N N N N (:U) y;da(3 0 C � o w V � L V 41 O O (A O ........... .-I N M d' Ifl O n m T M Ill O n m m O .••I N m d' Ill .-1 .+ .+ rl .••I rl .i rl rl rl N N N N N N (:}) yadad C C FA 111 O C O L M M H N M d' Ill 10 M M O N M d' Ill %0 a -I .-I .-� .i .�i 'i '•I '•t e-1 .••I N N N N N W) 4 dad Ej 0 0 0 Z t FA cu N C O J � J � � N V •� c N 0 Z d � # O = 7 m3 u —+ dch 07 �1 Z C O O O H �'4 a W � W ' C L C m i � E d �p IYCA o 1 1UUM '° I fl1l ' j C O d g L_ •� W Yf �i w .s ep w a e11 N of w M v y ^U OLl U U U in U U Z.3 O y W U f0 w Vl D .-i N m a m 0 m 0 m a Ln 10 N w m O .-1 N m a Ln (:}) yjdacj -+ N m a Ln w N m o N m a n (:}) y;dad (:}) y;dad I rl ao a+ o . N m a in to N coo o N N ti N l (:y) y;daa N V .ti N m a' v1 10 N W o O .ti N m a Ln .0 1l m 0 .''• ."i .-i .-1 .'� .-1 .-1 .-I .-I ei N N N N N N (:y) y;daa EL B O. 0 Q Ln Ln O P'1 O rl ri 0 N .-I c 0 a m L' u FL L A O 0 EL H C n N r N O W c n L N_ a N I rl rl O N V i ui u n i i � n 1 0 f � ` H � 0 N N £N C 47 'O Cc c �a 1 I r j o z c 7 O J Go N N _ C U Z L � � L {Q+I C N m 7 12Z �a 1 ul ,� E W I cc 3 W Z, 3 e mo CA] W Ip I LU�O d �s a W W rl w F]! !�. N. .N. V. U.. N V N St N a a V. N w N N w N N y � a .a0. ' N w M N O'f 03 W �a Zo- Fn N .0 .. L) C.) C L� C !/! fA, to w N L iS 30T N _5 N .... �'•� C U N iT Cq ZS f� U <A U N U fA 5 u c3 U U U (O [�. fq fq qJ co CD w —1 y 10 m..... .... _. __. .. ... .. IG loos � m O .-I N M 7 In I n W 1 ei 00 01 •i ei 'i .-I .-1 .+ .+ -1 -1 O N .-1 N M CF I!1 N N N N N (4) y;dac v N rl ei rl eel ei - 'i rl rl rl rl N N N N N (4) y;daa I N M a II'1 tD P 00 T O .ti N M � In ILI I� m O O .-1 N M � In (:U) y;dad e4 N m - In IO Il m m O .-I N fn a- In IO 1, 00 m O - - - •i ei ei 'i ei ei rl .+ .-I r1 N N N N N N �j �vv r f .-I N M V In n 00 !T O rl N M 4 H IO 1� OD CN O ^ N M V In (:1) 44daa a c C I O_ O a i rl o N V ~ Q N {I 1 N i a E � 0 pa Z f d N b r .T T U U fn U U U U U [n U in 0 CZ U fJ to [n rn 'm r.0 N N N N N N N N (}3) y;daQ rl N M V In M N O N W (}}) y;daa .-V N cn V Ln %o N co (n O rl N M In O N W o O rl N M v In ei .i ei Ti .i •i eY ei ei ei N N N N N N (:}) y;daa In 10 n N M It In O n m 0 O .-V N M v In (:}) y;daa .-I N M qt Ln b n W m O rl N M m Qp r% co 01 o .ti N M CF of (:U) y;daa U 0 f Q O 1 N O I J � N V •�c N U d Z C O = 7 d m ma;ECm � a W LO 3t W C C �3 �e CA^-1 j �p Y J localU C 0 H m M� o f� w ao w a0 ep = ^b. '�,. .� ..6 w.._q.. .•I C O •' _ d _ W g a IS a r O CO CO Fn U U V a w c> w ti in U io fA m ., t a .. (0 13� •� (A m N N m - 7 m w - I, O • I I 0 O •••1 N m � Ifl I I 1��-��I 0 m a Ln ei •i ei .-1 'i 'i rl rl '•1 ei N N N N N N fi 1 indpa 0 10 Z t FA zi W 01 O •-I ._._._ N ........ v, .... r Ifl n y N m v Vf O n m m O .-1 N Pl It N O (:9) 44da(i .-I N In t}' N 10 I� O 01 O •i N m v lA ID n O OI O .-I N m In .-1 •'-I rl 'i rl •i 'i 'i ei ei N N N N N N 04) 44daa rl rl rl .d r-I rl rl 'i ei •i N N N N N N (:}) y;dad v jv r rl N m I!1 t0 N w N O •••1 N m a' V7 tD I� O 01 O 'i N f�1 a Ln rl rl ei 'i 'i 'i 'i ei rl rl N N N N N N (:U) y;daa o Ln -+ 3 0 a 0 In z ri o .. O a 0 N p H O N 1 N L Ocu 9 A u .0 C O C O O J � J � � N V •� C N U 41 O V Z a a 9 B ulr EU L W ko U C C_ y3 1 C m � W 10 m ww' y iP y •w R. W M e0 m °e umi -0 �., ip ks .m 00 U U u w () Co. 0 U U fO . U U U U U U CO (D. co cl) ;V y N Cn1 4 L 7 10 1� O 01 O .-1 rl ei N M ei rl �"� I(I 10 ri rl 11 .1 � ei ei •i O N ., N M N N N d• In N N (%[) I11dF4a .� N M t 1!1 10 1, W 01 O . N M It N M 7 L•1 (:U) y4daa 0 0 i 0 08 N 0 Z Ln 'n H y a / ` '(A tn d O a d .-1 N M Cr Vl tD N w N O rl N M {} Ln 0 N O 01 O .-I N M Ifl ' .-I rl 'i �••� Ti r1 'i rl .-� .-� N N N N N N W) y;daa a ............ N M V' n l0 n O 01 O .-1 N M -0- ul 10 n 00 01 O rl N M t Ln .-I rl rl rl rl .i •i ri Ti rl N N N N N N v (:}) y;daa .-1 .-1 ' e e e e ' • ' N N N N (:}) y;daa v, j� a u C O may( I 0 w a N Nf e0 ep ep N ab Z of .N arJ �N .... ad N °� N kk Al ...9 R _s tS k w g _ N ik.. g .-I co U U U (D U U U to C7 fn U CS U U M �c N 1 1 'i--"r—� r� M O .-� N M a rn O N O MfO rl N 4 N rD N o Or O .-I N rn a :n .'+ .-1 - - - - .-1 N N N N r (31) 44daa a h O N GD T O +ti a' L" N co D1 O N .-I N M N a N rn N N N N M N A .� (:y) y;daa 3 a L f11 U, I L a d L O d .-I N M v rn O N cO .-I .-I .y .-I .-I rl •i ei .ti .-I N N N N N N !i (:U) ylda(3 .-I N M a rn N M st m O N m 01 O .+ N M a In - ."I .'i rl ei .ti +ti . i N N N N N N (3)) 4]daa .+ N rn a rn D N oo 0 O .+ N M a In rD N (:}) y;daa a u O v W in m a O L a 0 9 IL (D /D u] J 'o N 1 N i rn o �z r, LU k LU i d � W i V 1 C C V -w •w •w •w •w 0. w u. aAl w L .— w •— •y .w. ety w� .3w — w �..^� m w ..� ..`ti. At w atl... 3 O m 4.. � owtl to � .W— .V) ... .Ni C 0 U C� fn Q) IA U U U ca U 05 U) y fn .d ` 10 .c ... W N a 0 O O�hd r m N w 1 f I -,IT { sr--_.� _ iO O N M V m ID N co at O rl N M �t In 10 r% co 01 O .-� N 1.f 7 - O r + r " " " . e N N N N N N N (;j) yadaci 0 io Z t U) T � N M a N O n W OI O . N f+1 a Y'1 10 .-1 .-1 ei ei ei ei rl .-1 rl rl N N N N N N N (:}) y;daa AI' - 14 .-I N 11 a W ID r� W N O .ti N M ul Vf Ip N N N N N N N (:4) y;daa V .-I N M It m 0 N W 01 O .-I N m v m 0 n W 01 O .-I N m v m ."� �"� �"� 'i 'i ei ei .•i .•i ri N N N N N N (:U) y;daa a+ cr N u C w H 0 \flu m C O U n W T O .-1 N M L" , n W Of O N 11, VW .-I 'i 'i 'i rl •i ei ei .•i .-1 N N N N N N (:4) LAdaa Ln k! 0 u U LLL O o w o a N 0 .5 _4 Ji i DCP TEST DATA Project: Town Creek Middle/Elementary School Date: 22-Nov-17 Location: K-1 Soil Type(s): Sandy Clay, Silty and Clayey Sanc r Hammer Sal Type I Q 10.1 `0s1 1 r Q CH II 0176.0S. I Q CL Q Both har,me s of I ® AR other sd!s No. of Cumulative Type of Blows Penetration Hammer 0.1 (mm) 0 r 0 I 0 1 F 5 1 419 5 1 610 1 5 1 1 1 10 1 1 15 1 C 1 - 20 1 a. W 1 p a 25 1 30 1 1 35 1 1 1 40 0 0 0 0 0 0 1 0.1 0 5 10 15 c 20 a w p 25 30 35 40 CBR 1.0 10.0 100.0 0 127 254 381 E E 508 = I — a W 635 p 762 889 1016 1.0 10.0 100.0 BEARING CAPACITY, psf 2000 4000 6000 8000 10000 12000 0 127 254 381 E E 508 3 w 635 p Based on approximate interrelationships 762 of CBR and Bearing values (Design of Concrete Airport Pavement, Portland Ce I.ertAssociatll n,pageS, 4955) � 889 1016 0 14 28 42 56 69 83 BEARING CAPACITY, psi 0 DCP TEST DATA Project: Town Creek Meddle/Efementary School Date: 22-Nov-17 Location: K-2 Soil Type(s): Clayey Sand Hamm er Soil Type Q 10.1 i]5. Q CH I in 17.61is. Q CL Q Both ha,.: as asaC .All other soils No. of Cumulative Type of Blows Penetration Hammer 01 (mm) 0 0 0 1 5 691 1 5 1 1 1 10 I 1 . 1 15 - ....—.._..._._ i 1 C H 20 i 1 a _ 1 0 I , 25 1 30 ' — 1 35 1 1 I 1 40 1 0.1 1.0 10.0 100.0 1 BEARING CAPACITY, psf 1 0 2000 4000 6000 soon 10000 12000 0 5 10 15 C (— 20 a W C 25 30 35 40 1 1 0 127 254 381 E E 508 � a W 635 � M 889 1016 0 14 28 42 56 69 83 BEARING CAPACITY, psi DCP TEST DATA File Name: Project: Location: Town Creek MiddleiOementary School Date: 22-Nov-17 K-3 Soll Type(s): Low plasticity Clay with CBR<10 Hp3�1 lbs. Soil=ype QQ 17.6 lbs. Up CCLL Q Both hammers used Q Al other soils + j No. of Blows Accumulative Penetration (mm) Type of Hammer 0.1 0 6 10 15 c = 20 IL W 25 30 35 40 0.1 1.0 CBR 10.0 100.0 0 127 254 381 508 635 762 889 1016 100.0 E H o. W 0 0 1 5 470 1 5 701 1 77L 1.0 10.0 0 0 5 10 16 c 20 IL 0 25 30 35 40 200 BEARING 400 CAPACITY, psf 600 60o 1000 1200 Based on approximate Interrelationships of CBR and Bearing values (Design of Concrete Airport Pavement, Portland Cement Association, page 8,1966) ( DCP TEST DATA File Name: Project: Town Creek Middie(tfemenfary School Date: 22-Nov-17 Location: K-4 Soil Type(s): Low plasticity Clay with CBR<10 H(T1D1lbs. rSail=ype Q 17.6 lbs. I Q a (� Both hammers used I Q All other soils No. of Blows Accumulative Penetration (mm) Type of Hammer 0.1 0 5 10 15 c = 20 w c 25 30 35 40 0.1 1.0 CBR 10.0 100.0 0 127 264 381 E E 508 3 I-- w 635 762 9 ::is 100.0 0 0 1 5 279 1 5 566 1 3 699 1 1.0 10.0 920 240 0 5 10 15 c 20 IL W C 26 30 35 40 960 BEARING CAPACITY, psf 980 1000 1020 1040 1060 - -- Based on approximate Interrelationships of CBR and Bearing values (Design of Concrete Airport Pavement, Portland Cement Association, page 8,1985) L DCP TEST DATA File Name: Project: -Town Creek MiddleiEletnentary School Date: 22-Nov-17 Location: K-5 Soil Type(s): Low ]plasticity Clay with CBR<10 ��� 101 lbs.( CH QQ 17.6 lbs. S CL Q Both hammers used O All other soils No. of Blows Accumulative Penetration (mm) Type of Hammer 0.1 0 5 10F 15 c = 20 IL W 25 30 36 40 0.1 1.0 {CBR 10.0 100.0 0 127 264 381 E 508 = - W 636 762 889 1015 100.0 0 0 1 5 343 1 5 1 668 1 1.0 10.0 576 878 0 5 10 15 C H 20 a W O 25 30 35 40 880 BEARING 882 CAPACITY, psf 884 886 888 890 892 8. Based on approximate interrelationships of CBR and Bearing values (Design of Concrete Airport Pavement, Portland Cement Association, page 8,1955) L DCP TEST DATA Project: Town Creek Middle/Elementary School Date: 22-Nov-17 Location: K-6 Soil Type(s): Silty Sand and Sandy Clay Hammer Sol Twe Q 10,11bs. O C 0 17.61bs. Q CL Q Both ha:rmas used i All other Bois No. of Cumulative Type of Blows Penetration Hammer 01 (mm) 0 0 1 0 1 —5 _ 422 1 5 5 i 663 1 � 1 1 10 _ 1 15 1 3 20 I 1 25 1 30 t I I 1 35 1 1 ' 40 1 1 1 0.1 1 I 1 i I 0 2000 1 5 1 1 10 I 1 15 C 1 i 1 1 20 n. 1 W 1 25 I � 1 }---------- -- 30 1--- 35 ------ 1 -- 40 -----------....----� -- CBR 1.0 10.0 100.0 0 127 254 381 E E 508 o. W 635 762 889 1016 1.0 10.0 100.0 BEARING CAPACITY, psf 4000 6000 8000 10000 12000 0 127 254 381 £ E 508 3 W 635 C 762 889 1016 0 14 28 42 56 69 83 BEARING CAPACITY, psi DCP TEST DATA Project: Town Creek Middle/Elementary School Date: 22-Nov-17 Location: K-7 Soil Type(s): Silty Sand and Sandy Ciey Hammer Sail Type 0 1.ls. C 17.6 lb0 s. � CL 0 Both hammers urea 6 All other soils No. of Cumulative Type of (;13 it Blows Penetration Hammer 0.1 1.0 10.0 100.0 (mm) 0 0 I 0 1 5 89 1 5 5 152 1 5 ( 259 1 5 i 345 5 I 409 5 516 1 10 1 1 15 1 c i ---- = 20 1 W 1 p 1 25 1 30 1 1 35 1 1 40 0 127 254 381 E E 508 3 a W 635 p 762 aa9 1016 1 0.1 1.0 10.0 100.0 1 1 HEARING CAPACITY, psf 1 1 0 2000 4000 6000 8000 10000 12000 1 0 0 1 5 127 1 1 254 10 1 1 15 381 E 1 c E rrL W 20 508 a 1 p 25 635 p 1 1 30 I 762 _ Based onapprobmateInterrelationships 1 of CBR and Bearing values (Design of 1 35 Concrete Airport Pavement, Portland 889 I CementA...:ociation,page 8, 1°55) I I _....___. 40 ' 1016 0 14 28 42 56 69 83 1 BEARING CAPACITY, PSI 1 DCP TEST DATA File Name: Project: Torun Greek Middie/Etementary School gate: 22-Nov-17 Location: K-8 Soil Type(s): Low plasticity Clay with CBR<10 !i (} 101 lbs.I(J CH 0 17.6 lbs. 0 C: 0 Both hammers used I 0 All oC^er soils No. of Blows Accumulative Penetration (mm) Type of Hammer 0.1 0 5 10 15 c = 20 w p 25 30 36 40 0.1 1.0 CBR 10.0 100.0 0 127 264 381 E 608 = a tL 636 762 889 1016 100.0 0 0 1 5 97 1 5 155 1 5 267 1 5 437 1 5 569 1 5 691 1 1.0 10.0 0 1000 0 5 10 16 C F 20 IL w to 26 30 36 i F 40 BEARING CAPACITY, psf 2000 3000 4000 5000 Based on approximate iMerrelatlonships of CBR and Bearing values (Design of Concrete Airport Pavement, PorOand Cement Association, page 8,1955) 6 L DCP TEST DATA Project: Town Creek Middle/Efementary School Date: 22-Nov-17 Location: K-9 Soil Type(s): Clean Sand rHammer r 5011 Type I0 IT6Ils. I 0 CL Q Both u-ems usra I • All other sdls No. of Cumulative Type of Blows Penetration I Hammer 01 5 +- 198 5 1 353 5 572 2 673 0 1 1 5 1 1 1 10 1 1 15 1 C 1 a W 1 C i 25 1 1 30 1 1 35 1 1 40 1 0.1 1 0 0 5 10 15 C 3 W20 f] 25 30 35 40 0 1.0 10.0 100.0 0 127 254 381 E E 508 a W 635 c 762 889 1016 1.0 10.0 100.0 BEARING I-AFACITY, pst 2000 4000 6000 8000 10000 12000 0 127 254 381 E E 508 H a W 635 Based on approsimate Interrelationships 7 762 of CBR and Bearing values (Design of Concrete Airport Pavement, Portland 889 Cement Association, page 0,105) i I I I 1016 0 14 28 42 56 69 63 DCP TEST DATA Project: Town Creek !diddle/Elementary School Date: 22-Nov-17 Location: K-10 Soil Type(s): Sandy Hammer Clay and Clean Sand r i; Q1.1b I QCH 17.61bs. I Q CL Q 9.•th har^ffs uszr; I6 AN other soils No. of Cumulative Type of CBR Blows Penetration Hammer 0.1 1.0 10.0 100.0 (mm) 0 I 0 1 ! = O 0 5 10 15 20 25 30 35 40 =5= 206 5 l 330 —,1-- 1 5 I 399 1 5 500 1 5 704 1 l 1 I .._...._.. 1 1 1 ! 1 _ l —��.— ---1— — 1 1 ! 1 1 0.1 i 1 � 1 � � 1 i 1 0 I— 0 — --1 _.... _...... .__-;.... - .... ... _ _-- .... -_ 10 15 l 1 1 f= 20 In, 1 0 1 25 i 1 ---- — --- —--.—....----- - -- 40 1 2 14 28 42 56 69 33 1 BEARING CAPACITY, psi 1 DCP TEST DATA Project: Town Creek MiddWElementery School Date: 22-Nov-17 Location: K-11 Soil Type(s): Silty and Clean Sand Hammer Sail Type Q10.1la. r OCH 17n!as. � � 0CL 0 Both hanames :seL I A All other Solis No. of I Cumulative Type of Blows Penetration Hammer 01 r--i 5 1 218 5 297 5 345 5 381 5 445 5 521 5 566 0 1 5 1 1 10 1 1 15 3 20 1 r 1 O ?5 30 1 35 1 1 1 40 1 0.1 1.0 10.0 100.0 1 1 istARING CArAuti r, psi —I 0 2000 4000 6000 8000 10000 12000 a 0 5 10 15 c Fz- 20 a W O 25 30 35 40 0 127 254 381 E E sos W 635 G 762 889 1016 0 14 28 42 56 69 E3 BEARING CAPACITY, psi DCP TEST DATA Project: Town Creek Middle/Elementary School Date: 22-Nov-17 Location: K-12 Soil Type(s): Silty and Clean Sand Hammer Sop Type 010.1 tes. O CH ip 17-6 sus, 1 G C•_ Q 3Mt hammer: usa� 1 • Ali other soils E I No. of Blows Cumulative Penetration (mm) Type of Hammer 0 I 0 1 5 221 1 5 i 401 1 5 500 _ 1 it 0 0 0 f 0.1 0 5 10 15 C = 20 Lu 25 30 35 40 CBR 1.0 10.0 100.0 0.1 1.0 10.0 ,1sxA,RING uArACITY, p. 0 2000 4000 6000 8000 0 5 10 15 c F 20 a to 25 30 35 40 0 127 254 381 E E 508 3 a W 635 762 889 1016 100.0 10000 12000 0 127 254 381 E E 508 3 a W 635 762 889 —�—� 1016 0 14 28 42 56 69 33 BEARING CAPACITY, psi Based on approximate Interrelationships of CBR and Bearing values (Design of Concrete Airport Pavement, Portland Cement Association, page 8, 18:5) 4 Unified Soil Classification System (ASTM Designation D-2487) Major Division Group Symbol Typical Names Classification Criteria GW Well -graded gravels and gravel- Cn = D6d`Dl0 Greater than 4 sand mixtures, little or no fines CZ = (D30)2/(DtoxD60) Between 1 and 3 Q c GP m Poorly graded gravels and gravel- O %p m Not meeting both criteria for GW z �° c sand mixtures, little or no fines o o $y el ° GM Silty gravels, gravel -sand -silt = o e' a v 6 Atterberglimits lot below "A" line or P c mixtures 55 :a plasticity index less than 4 o 00 a o� cGC Clayey gravels, gravel -sand -clay Atterberg limits plot above "A" line 8 -8 mixtures and plasticity index greater than 7 SW Well -graded sands and gravelly o y Cu = D6o/Dlo Greater than 6 „ sands, little or no fines o g N 8 CZ = (D�2/(D10xD60) Between 1 and 3 U� �� o CJ `-;; oz . z-' z a o y z SP Poorly graded sands and gravelly N v y Not meeting both criteria for SW oy sands, little or no fines a 0 a ° "� a SM U Silty C4 Atterberg limits plot below "A" line or 0 sands, sand -silt mixtures S plasticity index less than 4 SC Clayey sands, sand -clay mixtures j o Atterberg limits plot above "A" line and plasticity index greater than 7 > ML Inorganic silts, very fine sands, Note: Wine represents approximate upper limit of id. and PI combinations a� rock flour, silty or clayey fine for natural soils (empircally determined). ASTM-132487. N sands N m0 7Oi •;•.aerlin•S: 6eun isr f°r naLral soih. -. E; is CL Inorganic clays of low to medium „ . _ _ .. ........ . plasticity, gravelly clays, sandy c c clays, silty clays, lean clays 40­ u, OL Organic silts and organic silty c clays of low plasticity.-.- 1S a ' tn MH Inorganic silts, micaceous or diatomaceous fine sands or silts, 1 elastic silts °. U CH Inorganic clays of high plasticidy, ° fat clays '° '° b manure; ,° N M itd OH Organic clays of medium to high Plasticity chart for the classification of fine-grained soils. plasticity Tests made on fraction finer than No. 40 sieve Highly organic soils Pt Peat, muck and other highly Fibrous organic matter; will organic soils char, burn, or glow UNIFIED SOIE CLASSIFICATION ISO SYSTEM TM L CLIENT Job#. BORING# SHEET - -- Brunswick County Schools 22:25758 K-1 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elementary School SITE LOCATION -0- CALIBRATED PENETROMETER TONS/Fr 6330 Lake Park Dr. Winnabow. Brunswick County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION f , RQD% - — - REC% PLASTIC WATER LIQUID Z DESCRIPTION OF MATERIAL ENGUSH UNITS w `IM T% CONTEENT% LIMIT% i F o BOTTOM OF CASING LOSS OF CIRCULATION 0 (L 11 ~ �n 8 SURFACE ELEVATION 5 STANDARD PENETRAT'.ON o 3 W g BLOWS/FT D Topsoil/Rootmat Depth [8'1 (SM) SILTY FINE SAND, orange, moist 2 3 (SC) CLAYE FINE SAND, orange to gray, moist (CL) SANDY LEAN CLAY, orange to gray, moist I 4 END OF BORING@ 4.0' 5 6� THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. WL WS ❑ WIDE] BORING STARTED 11/22/117 CAVE IN DEPTH WL(SHW) 1 WL(ACR) BORING COMPLETED t 1/22/1 7 HAMMER TYPE WL RIG FOREMAN DRILLING METHOD Hand Auger L CLIENT Job M. BORING # SHEET Brunswick County Schools 22:25758 K-2 1 OF 1 PROJECT NAME ARCHITECT-ENGINEER�-� Town Creek Middle/Elements School SITE LOCATION CALIBRATED PENETROMETER TONSIFr 6330 Lake Park Dr. Winnabow. Brunswick Coun North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION ROD% — — — REC% PLASTIC WATER LIQUID z DESCRIPTiON OF MATERIAL ENGLISH UNITS W Z LL L!Mi T% CON T ENT% LIMIT% z o BOTTOM OF CASING ]♦ LOSS OF CIRCULATION D LU > 0 v n w �° g SURFACE ELEVATION F < ® STANDARD PENETRATION W U) N cc 3 LU m BLOWS/FT D Topsoil/Rootmat Depth [8'1 (SC) CIAYEY FINE TO MEDIUM SAND, tan to 1 gray, moist to saturated 2 3 I 4 I END OF BORING @ 4.0' 5 6 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. WL 3.5 Ws El WD❑ BORING STARTED 11/22/17 CAVE IN DEPTH x- WL(SHW) 1 WL(ACR) BORING COMPLETED 11/22/17 HAMMER TYPE WL RIG FOREMAN DRILLING METHOD Hand Auger L CLIENT Job#: BORING# SHEET-� Brunswick County Schools 22:25758 K-3 1 OF 101 PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elements School �- SITE LOCATION �- CALIBRATED PENETROMETER TONS/FTZ 6330 Lake Park Dr Winnabow, Brunswick Counly, North Carolina ROCK QUALITY DESIGNATION &RECOVERY NORTHING EASTiNG STATION i RQD% - — - REC% PLASTIC WATER LIQUID Z DESCRIPTION OF MATERIAL ENGLISH UNITS w = z 3 LIMIT% CONTENT% LIMIT% 9� 0. F o BOTTOM OF CASING 10 LOSS OF CIRCULATION % > v n = d a a a g SURFACE ELEVATION O w a > 3 STANDARD PENETRATION z 3 w O m BLOWSIFT n Topsoil/Rootmat Depth [6"] (CL) SANDY LEAN CLAY, orange to gray, moist to saturated 2 3 4 END OF BORING @ 4.0- 5 Is THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. INSITU THE TRANSITION MAY BE GRADUAL. WL 3.5 WS ❑ WD❑ BORING STARTED 11/22/17 CAVE IN DEPTH WL(SHW) WL(ACR) BORING COMPLETED 11/22/17 HAMMER TYPE SZ WL RIG FOREMAN DRILLING METHOD Hand Auger CLIENT Job#: BORING# SHEET_�� Brunswick County Schools 22:25758 K-4 1 OF 1 --.-_-gal �j PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elementary School SITE LOCATION -a CALIBRATED PENETROMETER TONSIFT2 6330 Lake Park Dr. Winnabow, Brunswick Counly, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION RQD% - — - REC% PLASTIC WATER LIQUID z DESCRIPTION OF MATERIAL ENGLISH UNITS w LINCIT% CONTENT% LIMIT% a F o BOTTOM OF CASING ]♦ LOSS OF CIRCULATION � zOT�, v n LL z > SURFACE ELEVATION = a a 2a 8 > ®STANDARD PENETRATION m BLOWS/FT n y w Topsoil/Rootmat Depth [6'1 (CL) SANDY LEAN CLAY, oragne to gray, moist to saturated 2 3 4- - END OF BORING @ 4.0' 5 6 I THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. WL 3.5 WS❑ WO❑ BORING STARTED 11/22/17 CAVE IN DEPTH WL(SHW) 1 WL(ACR) BORING COMPLETED 11/22/17 HAMMERTYPE SZ WL RIG FOREMAN DRILLING METHOD Hand Auger L. CUENT Job#: BORING# SHEET Brunswick County Schools 22:25758 K-5 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elementary School SITE LOCATION CALIBRATED PENETROMETER TONS/F r' 6330 Lake Park Dr. Winnabow. Brunswick County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION RQD% - — - REC% PLASTIC WATER LIQUID z DESCRIPTION OF MATERIAL ENGLISH UNITS w = z 9 E LIMIT% CONTENT% LIIVII T% z o - BOTTOM OF CASING ]♦ LOSS OF CIRCULATION w J O v a a a SURFACE ELEVATION F > O ® STANDBARODPENNE RATION a ti An ¢ vai 3 u�, m Topsoil/Rootmat Depth [8"] (CL) SANDY LEAN CLAY, orange to gray, moist to saturated 2 3 4 END OF BORING @ 4.0' 5 6 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY UNES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. WL 3.8 WS ❑ WD ❑ BORING STARTED 11/22/17 CAVE IN DEPTH WL(SHW) 1 WL(ACR) BORING COMPLETED 11/22/17 HAMMERTYPE WL RIG FOREMAN DRILLING METHOD Hand Auger CLIENT Job#: BORING# SHEET Brunswick County Schools 22:25758 K-6 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elements School -.. SITE LOCATION Q CALIBRATED PENETROMETER TONS/Fr 6330 Lake Park Dr. Winnabow. Brunswick Counly, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION RQD% — — — REC% PLASTIC WATER LIQUID z DESCRIPTION OF MATERIAL ENGLISH UNITS I w Z v LIMIT% CONTEN i -A LIMIT% ^ Z L b BOTTOM OF CASING 10 LOSS OF CIRCULATION 29� > X _ g g¢ g > SURFACE ELEVATION ¢ > 5 ® STANDARD PENETRATION it m BLOWSIFT can cSi can 3 w D Topsoil/Rootmat Depth [6"] (SM) SILTY FINE SAND, orange, moist 2 (CL) SANDY LEAN CLAY, orange to gray, moist 3 4 END OF BORING@ 4.0' 5 6 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. Sz WL WS ❑ WD ❑ BORING STARTED 11/22/17 CAVE IN DEPTH E WL(SHW) = WL(ACR) BORING COMPLETED 11/22/17 HAMMERTYPE WL RIG FOREMAN DRILLING METHOD Hand Auger CLIENT Job BORING# SHEET - _-_�— Brunswick County Schools 22:25758 K-7 1 OF 1 jr-- PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elements School I - SITE LOCATION CALIBRATED PENETROMETER TONSlFTz ' 6330 Fake Park Dr. Winnabow. Brunswick County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION RQD% - — - REC% PLASTIC WATER LIQUID z DESCRIPTION OF MATERIAL ENGLISH UNITS w = g LIMI i to CONTENT% LiMi T % a a BOTTOM OF CASING 3D LOSS OF CIRCULATION � w 0 _ a g SURFACE ELEVATION F ¢ F w �n 5 STANDARD PENETRATION it 3 y Q BLOWS/FT 8 m TopsoiURootmat Depth [4'1 (SM) SILTY FINE SAND, gray, moist 1 2 (SC) CLAYEY FINE SAND, orange to gray, moist 3 4 END OF BORING @ 4.0- 5 6 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL Q WL WS ❑ WD ❑ BORING STARTED 11/22/17 CAVE IN DEPTH WL(SHW) t WL(ACR) BORING COMPLETED 11/22/17 HAMMERTYPE WL RIG FOREMAN DRILLING METHOD Hand Auger CLIENT Job#. BORING# SHEET 0 Brunswick County Schools 22:25758 K-8 1 OF 17 PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elementary School �- SITE LOCATION -Q- CALIBRATED PENETROMETER TONS/FTZ 6330 Lake Park Dr. Wnnabow. Brunswick County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION RQD% - — - REC% PLASTIC WATER LIQUID z DESCRIPTION OF MATERIAL ENGLISH UNITS w = g v LIMIT% CONTENT% LIMIT% v z a BOTTOM OF CASING LOSS OF CIRCULATION w LL w 0 = a a a � SURFACE ELEVATION w � O ®STANDARD PENETRATION W Q Val Val faA K ?s m BLOWS/FT D Topsoil/Rootmat [4'1 (CL) SANDY LEAN CLAY, orange to gray, moist t 2 3 4 I END OF BORING 4.0' 5 6 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL 4 WL WS ❑ WD ❑ BORING STARTED 11/22/17 CAVE IN DEPTH WL(SHW) WL(ACR) BORING COMPLETED 11/22/17 HAMMER TYPE WL RIG FOREMAN DRILLING METHOD Hand Auger CLIENT Jab#. BORING# SHEET r_ Brunswick County Schools 22:25758 K-9 1 OF 1 fj (�'`i J i PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elementary School SITE LOCATION -�-CALIBRATED PENETROMETER TONSIFr 6330 Lake Park Dr. Winnabow. Brunswick Counly, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION RQD% — — — REM — PLASTIC WATER LIQUID Z DESCRIPTION OF MATERIAL ENGLISH UNITS LIMIT% CONTENT% LIMIT % F BOTTOM OF CASING LOSS OF CIRCULATION w I v v F SURFACE ELEVATION a_ a. 0- ~ 5 ® STANDARD PENETRATION Lu 0 3 g BLOWSIFT D Topsoil/Rootmat Depth [6"] (SP Probable Fill) FINE TO MEDIUM SAND, gray, moist 1 2 3 4 END OF BORING Q 4.0' 5 6 THE STRATIFICATION LINES REPRFSFNT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. Q WL ME] WD❑ BORING STARTED 11/22/17 CAVE IN DEPTH X WL(SHW) Z WL(ACR) BORING COMPLETED 11/22/17 HAMMERTYPE WL RIG FOREMAN DRILLING METHOD Hand Auger CLIENT Job#: BORING# SHEET Brunswick County Schools 22:25758 K-10 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elementa School SITE LOCATION �- CALIBRATED PENETROMETER TONS/FTZ 6330 Lake Park Dr. Winnabow. Brunswick County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION RQD% - — - REC% PLASTIC WATER LIQUID i DESCRIPTION OF MATERIAL ENGLISH UNITS Uj - Z w LIMIT% CONTENT% LIMIT% v z H b i BOTTOM OF CASING ]♦ LOSS OF CIRCULATION 0 v A SURFACE ELEVATION x a a a w� F w > ®STANDARD PENETRATION ran ran It w m BLOWS/Fr Topsoil/Rootmat Depth [4'1 (SP/GP Probable Fill) FINE TO MEDIUM SAND , AND GRAVEL, brown, moist ';;�°J (SP Probble Fill) FINE TO MEDIUM SAND, tan to gray, moist 2 3 (CL) SANDY LEAN CLAY, orange to gray, moist 4- - END OF BORING @ 4.0' 5 r THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. WL wS❑ WD❑ BORING STARTED 11/22/17 CAVE IN DEPTH WL(SHW) t WL(ACR) BORINGCOMPLETED 11/22/17 HAMMER TYPE WL RIG FOREMAN DRILLING METHOD Hand Auger L CLIENT Job#: BORING# SHEET,— Brunswick County Schools 22:25758 K-11 1 OF 1 1 • { r�ll PROJECT NAME ARCHITECT-ENGINEER}A Town Creek Middle/Elementary School �- SITE LOCATION -Q- CALIBRATED PENETROMETER TONSlFT' 6330 Lake Park Dr. Winnabow. Brunswick County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTIKG STATION ROD% - — - REC% PLASTIC WATER LIQUID z DESCRIPTION OF MATERIAL ENGLISH UNITS w - LIMIT-' CONTENT% LIMIT-' ^ z a BOTTOM OF CASING LOSS OF CIRCULATION z X O � SURFACE ELEVATIONLU ... a a a � of~ ¢ g STANDARD PENETEa CaRATION 3 W m 0 Topsoil/Rootmat Depth [4'1 (SP Probable Fill) FINE TO MEDIUM SAND 1 WITH CLAY LENSES, oragne to gray, moist 2 (SM) SILTY FINE SAND WITH CLAY LENSES, gray, moist 3 4 END OF BORING 4.0' 5 6 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAYBE GRADUAL. WL WS❑ WD❑ BORING STARTED 11/22/17 CAVE IN DEPTH WL(SHW) WL(ACR) BORING COMPLETED 11/22/17 HAMMER TYPE WL RIG FOREMAN DRILLING METHOD Hand Auger L CLIENT Job#: BORING# SHEET —`—� Brunswick County Schools 22:25758 K-12 1 OF 1 1 PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elementary School = �- SITE LOCATION CALIBRATED PENETROMETER TONSIFl2 6330 Lake Park Dr. Winnabow. Brunswick Counly. North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION ROD% — — — REC% PLASTIC WATER LIQUID i DESCRIPTION OF MATERIAL ENGLISH UNITS LIV,!'% CONTENT.% L11AIT% O z > 0 BOTTOM OF CASING LOSS OF CIRCULATION D z ^ O a SURFACE ELEVATION a > o ® STANDARD PENETRATION BLOWSIFr Topsoil/Rootmat Depth [6'1 (SM) SILTY FINE SAND WITH CLAY LENSES, gray to brown, moist 1 2 (SP) FINE SAND WITH ROOTS, gray to brows, moist (SM) SILTY FINE SAND, brown to gray, moist 3 4- - Hill END OF BORING @ 4.0' 5- 6— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. WL WS ❑ WD❑ BORING STARTED 11/22/17 CAVE IN DEPTH WL(SHW) 1 WL(ACR) BORING COMPLETED 11/22/17 HAMMER TYPE WL RIG FOREMAN DRILLING METHOD Hand Auger L CLIENT Brunswick Count Schools Job #: 22:25758 BORING # DP-1 SHEET 1 OF 1 E�_T_Z� -y_-i PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elementary Shool- 1 SITE LOCATION -Q- CALIBRATED PENETROMETER TONS/FTZ 6330 Lake Park Dr. Winnabow. Brunswick Coun1y, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING FASTING STATION RQD% - — - REC% PLASTIC WATER LIQUID LIMIT% CONTENT% LIMIT% �✓ S r ® STANDARD PENETRATION BLOWS/FT LL o z W g W w (L caSr z ` o W g v� g W � WWW[ DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING 10 LOSS OF CIRCULATION ��� uJ F F w $ w a m SURFACE ELEVATION D TOPSOIL (11 "} (SC) CLAYEY FINE SAND, tan/gray, moist (CL) SANDY LEAN CLAY, gray/orange, moist 4 (CH) SILTY FAT CLAY, gray, moist to wet (SM) SILTY FINE SAND, wet, trace clay g (CH) SILTY FAT CLAY, gray, wet (SM) SILTY FINE TO MEDIUM SAND, gray to orange, wet, trace clay 12 (CH) SILTY FAT CLAY, gray/red, wet (CL) SANDY LEAN CLAY, tan/gray/blue, wet (SC) CLAYEY FINE TO MEDIUM SAND, dark ra /blue, wet HIGHLY WEATHERD LIMESTONE, sampled 16 as fine to coarse sand with gravel and shells, gray,saturated BORING TERMINATED @ 16.0' 20 24 I I THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. 4 WL 6 WS❑ WD❑ BORING STARTED 11-30-17 CAVE IN DEPTH 9 WL(SHW) 1 WL(ACR) BORING COMPLETED 11-30-17 HAMMER TYPE WL RIG FOREMAN RS DRILLING METHOD Direct Push Boring L L CLIENT Job #: BORING # SHEET Brunswick County Schools 22:25758 DP-2 1 OF 1 �j i J PROJECT NAME ARCHITECT -ENGINEER Town Creek Middle/Elementary Shool SITE LOCATION CALIBRATED PENETROMETER TONS1W 6330 Lake Park Dr. Winnabow. Brunswick County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION ROD% - — - REC% I PLASTIC WATER LIQUID z DESCRIPTION OF MATERIAL ENGLISH UNITS I w L: � U.LIMIT% CONTENT% LIMIT% z rl o BOTTOM OF CASING LOSS OF CIRCULATION 16 w Z a R = J J J 7 J Q ~ f0 ~a 2 2 g v SURFACE ELEVATION w ®STANDARD PENETRATION o vas vas vas Q 3 w m BLOWS/FT TOPSOIL (12') (SC) CLAYEY FINE SAND, dark brown, moist, trace roots (CL) SILTY LEAN CLAY, gray/orange, moist 4 (CH) SILTY FAT CLAY, gray/orange, moist to wet e (CL) SILTY LEAN CLAY, gray/tan, wet, trace sand 12 (CH) SILTY FAT CLAY, gray, wAwet (CL) SANDY LEAN CLAY, gray (CH) SILTY FAT CLAY, gray/da 00 is SM SILTY FINE SANDgray,BORING TERMINATED @ 16. 20 i24 poi THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. WL 7.5 WS❑ WD❑ BORING STARTED 11-30-17 CAVE IN DEPTH ff- WL(SHW) `� WL(ACR) BORING COMPLETED 11-30-17 HAMMER TYPE 4 WL RIG FOREMAN RS DRILLING METHOD Direct Push Boring CLIENT Job#: BORING# SHEET Brunswick County Schools 22:25758 DP-3 1 OF 1 y -� PROJECT NAME ARCH:TECT-ENGINEER Town Creek Middle/Elementary Shool�-��� SITE LOCATION -Q- CALIBRATED PENETROMETER TONS/Fr 6330 Lake Park Dr. Winnabow. Brunswick County, North Carolina RUCK DUALITY DESIGNATION & RECOVERY NORTHING EASTING STATION RQD% - — - REC% PLASTIC WATER LIQUID LIMIT% CONTENT% LIMIT% 0 F ij O z a 9 w Ja A z o a R O M DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING LOSS OF CIRCULATION D _ w z J - F W � w m © X ® STANDARD PENETRATION BLOWS/FT SURFACE ELEVATION TOPSOIL 6" (SM) SILTY FINE TO MEDIUM SAND, brown tan/ moist (SC) CLAYEY FINE TO MEDIUN SAND, tan, moist (CL) SANDY LEAND CLAY, tan/gray/orange, moist 4 (CH) SILTY FAT CLAY, gray/orange, moist to wet (CL) SILTY LEAN CLAY, gray, wet, trace sand 8 (CH) SILTY FAT CLAY, gray/dark gray, wet (SM) SILTY FINE TO MEDIUM SAND, gray, 12 wet trace clay (CL) SANDY LEAN CLAY, tan/gray, wet (CH) SILTY FAT CLAY, gray, wet 16 SM SILTY FINE SANDgray, wet trace cla BORING TERMINATED @ 16.0' 20 2a I I �I l THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. WL 6.5 Ws El WD❑ BORING STARTED 11-30-17 CAVE IN DEPTH WL(SHW) WL(ACR) BORING COMPLETED 11-30-17 HAMMER TYPE WL RIG FOREMAN RS DRILLING METHOD Direct Push Boring APPENDIX C — SHWT and Infiltration Report SHWT and Infiltration Report L I I L _ _ I ECS SOUTHEAST, LLP "Sefting the Standard for Service" I.. Geotechnical Y Construction Materials - Environmental ► Facilities NC atprea=1 +newm.l?irmF-107. h1C Ft•„�ieten�i Ges!ocpts F,n C•.FCI ieristu:ed En!jn",.!n.; z:nm 328t+ (December 15, 2017 Mr. Craig Eckert Brunswick County Schools 35 Referendum Drive Bolivia, North Carolina 28422 Reference: Report of Seasonal High Water Table Estimation and Infiltration Testing Town Creek Schools Winnabow, Brunswick County, North Carolina ECS Project No. 22.25758 Dear Mr. Eckert: ECS Southeast, LLP (ECS) recently conducted a seasonal high water table (SHWT) estimation and infiltration testing within the stormwater control measure (SCM) area(s) at 6330 Lake Park Drive in Winnabow, Brunswick County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing On December 12th and 13th, ECS conducted an exploration of the subsurface soil and groundwater conditions at eight requested locations shown on the attached Boring Location Plan (Figure 1). ECS located the boring locations using GPS equipment. The purpose of this exploration was to obtain subsurface information of the in situ soils for the SCM area(s). ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at each of the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the SHWT and groundwater elevation observed at the time of the hand auger borings. The attached Infiltration Testing Form provides a summary of the subsurface conditions encountered at the hand auger boring locations. The SHWT and groundwater elevation was estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location SHWT Groundwater 1-1 10 inches 24 inches 1-2 16 inches 32 inches 1-3 24 inches Winches 1-4 22 inches 40 inches 1-5 14 inches 20 inches 1-6 12 inches 24 inches 1-7 18 inches Winches 1-8 16 inches 24 inches ECS Capitol Services. PLLC • ECS Flonda. LLC • ECS 14MKi-Mantc, LLC • ECS Mid.vest. LLC • ECS Southeast LLP - ECS Texas LLP w+ww,ecslimited.com Report of SHWT Estimation and Infiltration Testing Town Creek Schools Wnnabow, Brunswick County, North Carolina ECS Project No. 22.25758 December 15, 2017 ECS has conducted eight infiltration tests utilizing a compact constant head permeameter near the hand auger borings in order to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT or in the most restrictive soil horizon. Tests in clayey conditions are conducted for durations of up to 30 minutes. If a more precise hydraulic conductivity value is desired for these locations, then ECS recommends collecting samples by advancing Shelby tubes and performing laboratory permeability testing. Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/ hour 1-1 Gray silty SAND 14 inches 0.024 1-2 Tan/grayTan/gray clayey SAND 10 inches _ 0.006 1-3 Black silty SAND 10 inches 0.039 1-4 Orange/gray CLAY 24 inches <0.001 1-5 Tan/grayTan/gray clayey SAND 12 inches 0.011 1-6 Tan/orange/gray sandy CLAY 12 inches <0.001 1-7 Tan/orange/gray sandy CLAY 12 inches <0.001 1-8 Tanlorange/gray sandy CLAY 18 inches <0.001 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation and subsurface conditions. Closure ECS's analysis of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, analysis and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. L 2 Report of SHWT Estimation and Infiltration Testing Town Creek Schools Winnabow, Brunswick County, North Carolina ECS Project No. 22.25758 December 15, 2017 ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us. Respectfully, ECS SOUTHEAST, LLP f K. Brooks Wall Project Manager bwall(cb-ecslimited.com 910-686-9114 Attachments: Figure 1 - Boring Location Plan Infiltration Testing Form ASFE Document c W. Brandon Fulton, PSC; PWS, LSS Environmental Department Manager bfulton0ecslimited.com 704-525-5152 3 Infiltration Testing Form Town Creek Schools Winnabow, Brunswick County, North Carolina f ECS Project No. 22.25785 December 12t" and 13t"72017 Location Depth USCS !-1 0-13" Sl,R! 13"-30" SM Soil Description Tan/gray fine SAND w/silt Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 10 inches below the existing grade elevation. Groundwater was encountered at 24 inches below the existing grade elevation. Test was conducted at 14 inches below existing grade elevation Infiltration Rate: 0.024 inches per hour Location Depth USCS Soil Description 1-2 0-36" Sc Tan/gray clayey SAND Seasonal High Water Table was estimated to be at 16 inches below the existing grade elevation. Groundwater was encountered at 32 inches below the existing grade elevation. Test was conducted at 10 inches below existing grade elevation Infiltration Rate: 0.006 inches per hour Location Depth USCS 1-3 0-12" SM 12"-36" SW Soil Description Black silty SAND Tan/orange fine SAND w/clay Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Groundwater was encountered at 36 inches below the existing grade elevation. Test was conducted at 10 inches below existing grade elevation Infiltration Rate: 0.039 inches per hour L u Infiltration Testing Form Town Creek Schools Winnabow, Brunswick County, North Carolina ECS Project No. 22.25785 December 12t" and 13t"1 2017 Location Depth USCS Soil Description 1-4 0-22" SC Tan/orange clayey SAND 22"-40" CL Orange/gray CLAY Seasonal High Water Table was estimated to be at 22 inches below the existing grade elevation. Groundwater was encountered at 40 inches below the existing grade elevation. Test was conducted at 24 inches below existing grade elevation Infiltration Rate: <0.001 inches per hour Location Depth USCS Sail Description 1-5 0-101, SM Black silty SAND 12"-36" SC Tan/gray clayey SAND Seasonal High Water Table was estimated to be at 14 inches below the existing grade elevation. Groundwater was encountered at 20 inches below the existing grade elevation. Test was conducted at 12 inches below existing grade elevation Infiltration Rate: 0.011 inches per hour Location Depth USCS 1-6 0-101, SC 10"-36" CL Soil Description Gray clayey SAND Tan/orange/gray sandy CLAY Seasonal High Water Table was estimated to be at 12 inches below the existing grade elevation. Groundwater was encountered at 24 inches below the existing grade elevation. Test was conducted at 12 inches below existing grade elevation Infiltration Rate: <0.001 inches per hour L Infiltration Testing Form Town Creek Schools Winnabow, Brunswick County, North Carolina ECS Project No. 22.25785 December 12th and 13th1 2017 Location Depth USCS Soil Description 1-7 0-101, SC Gray/brown clayey SAND 10"-36" CL Tan/orange/gray sandy CLAY Seasonal High Water Table was estimated to be at 18 inches below the existing grade elevation. Groundwater was encountered at 36 inches below the existing grade elevation. Test was conducted at 12 inches below existing grade elevation Infiltration Rate: <0.001 inches per hour Location Depth USCS Soil Description 1-8 0-16" Sc Gray/brown clayey SAND 16"-36" CL Tan/orange/gray sandy CLAY Seasonal High Water Table was estimated to be at 16 inches below the existing grade elevation. Groundwater was encountered at 24 inches below the existing grade elevation. Test was conducted at 18 inches below existing grade elevation Infiltration Rate: <0.001 inches per hour L APPENDIX D -- Supplemental Report Documents ASFE Document i L Geotechnical Engineeping Report - , Geotechnical Services Are Performed top Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical engineering study conducted for a civil engineer may not fulfill the needs of a construction contractor or even another civil engineer. Because each geotechnical engineering study is unique, each geo- technical engineering report is unique, prepared solelyfor the client. No one except you should rely on your geotechnical engineering report without first conferring with the geotechnical engineer who prepared it. And no one - not even you -should apply the report for any purpose or project except the one originally contemplated. Read the Full Report Serious problems have occurred because those relying on a geotechnical engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only. A r. al Engineering Report Is Based om Geotechnical engineers consider a number of unique, project -specific factors when establishing the scope of a study. Typical factors include: the client's goals, objectives, and risk management preferences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotechnical engi- neer who conducted the study specifically indicates otherwise, do not rely on a geotechnical engineering report that was: • not prepared for you, • not prepared for your project, • not prepared for the specific site explored, or • completed before important project changes were made. Typical changes that can erode the reliability of an existing geotechnical engineering report include those that affect: • the function of the proposed structure, as when it's changed from a parking garage to an office building, or from alight industrial plant to a refrigerated warehouse, L elevation, configuration, location, orientation, or weight of the proposed structure, composition of the design team, or project ownership. As a general rule, always inform your geotechnical engineer of project changes - even minor ones - and request an assessment of their impact. Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed. Subsurface Conditions Can Change A geotechnical engineering report is based on conditions that existed at the time the study was performed. Do not rely on a geotechnical engineering reportwhose adequacy may have been affected by: the passage of time; by man-made events, such as construction on or adjacent to the site; or by natu- ral events, such as floods, earthquakes, or groundwater fluctuations. Always contact the geotechnical engineer before applying the report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems. Most Geotechnical Endings Are Pr,-!' J­" Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engineers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ -sometimes significantly from those indi- cated in your report. Retaining the geotechnical engineer who developed your report to provide construction observation is the most effective method of managing the risks associated with unanticipated conditions. A Report`s Recommendations Are Not Final Do not overrely on the construction recommendations included in your re- port. Those recommendations are not final, because geotechnical engineers develop them principallyfrom judgment and opinion. Geotechnical engineers can finalize their recommendations only by observing actual subsurface conditions revealed during construction. The geotechnical engi- neer who developed your report cannot assume responsibility or liability for the report's recommendations if that engineer does not perform construction observation. A Geolechnicai Engineering Report Is Subject to Misinterpretation Other design team members' misinterpretation of geotechnical engineer- ing reports has resulted in costly problems. Lower that risk by having your geotechnical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review pertinent elements of the design teams plans and specifications. Contractors can also misinterpret a geotechnical engineering report. Reduce that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing construction observation. Do Not Redraw the Engineer's Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering report should never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk Give Contractors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give con- tractors the complete geotechnical engineering report, butpreface it with a clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage them to confer with the geotechnical engineer who prepared the report (a modest tee may be required) and/or to conduct ad- ditional study to obtain the specific types of information they need or prefer. A prebid conference can also be valuable. Be sure contractors have sufficient time to perform additional study. Only then might you be in a position to give contractors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unantici- pated conditions. Read Responsibility Provisions Closely Some clients, design professionals, and contractors do not recognize that geotechnical engineering is far less exact than other engineering disciplines, This lack of understanding has created unrealistic expectations that have led to disappointments, claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled "limitations" many of these provisions indicate where geotechnical engineers' responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly. Geoenvironmental Concerns Are Not Covered The equipment, tochniqucs, and personnel used to perform a geoenviron- mental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical engineering report does not usually re- late any geoenvironmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own geoenvi ron mental in- formation, ask your geotechnical consultant for risk management guidance. Do not rely on an environmental report prepared for someone else. Obtain Professional Assistance To Deal with Mold Diverse strategies can be applied during building design, construction, op- eration, and maintenance to prevent significant amounts of mold from grow- ing on indoor surfaces. To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated into a comprehensive plan, and executed with diligent oversight by a professional mold prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, a number of mold prevention strategies focus on keeping building surfaces dry. While groundwater, wa- ter infiltration, and similar issues may have been addressed as part of the geotechnical engineering study whose findings are conveyed in -this report, the geotechnical engineer in charge of this project is not a mold prevention consultant; none of the sw*es perlormW in cooneeft so Me geotedmlden SO* wm deem or conducted fan the purpose of Blow pr1evendM Ampler motion of the r mumdetiens COVDAd in U* ropers W Not of itself he mlfndent to preveet WN from men" or on Me strvc- Mpg involved Rely on Your ASFE-Member Geotechnical Engineer For Additional Assistance Membership in ASFE/The Best People on Earth exposes geotechnical engi- neers to a wide array of risk management techniques that can be of genuine benefit for everyone involved with a construction project. Confer with your ASFE-member geotechnical engineer for more information. ASPE The Beet People an Earth 8811 Colesville Road/Suite G106; Silver Spring, MD 20910 Telephone.' 301/565-2733 Facsimile. 301/589-2017 e-mail: infonasfe.org www.asfe.org Copyright2004 byASFE, Inc. Duplication, reproduction, or copying of this document in whole or in part, by any means whatsoever, is strictly prohibited, except with ASFE's specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission ofASFE, and only for purposes ofscholarly research or book review. Only members ofASFE may use this document as a complement to or as an element of geotechnical engineering report Any other firm, individual, or other entity that so uses this document without being anASFE member could be committing nenligent or intentional (fraudulent) misrepresentation. IIGER06045.0M Section 15 L -1 McGiR. Pre and Post Development Site Areas Project: Town Creek Middle School and Elementary School Addition Location: Winnabow, NC I. Total Project Area Elementary School Parcel: Middle School Parcel: H. Pre Development Areas 927,392 sf = 21.290 ac 1,715,393 sf = 39.380 ac Total: 2,642,785 sf = 60.670 ac Date: Land Use Area Area "C" CA (sf) (ac) Pre Pre Pervious Turf/ Vegetation/ Woodlands 89% 2,345,798 53.85 0.20 10.77 Wetlands 2% 50,592 1.16 0.20 0.23 Other 0% 0 0.00 0.20 0.00 Sub -Total 91% 2,396,390 55.01 Impervious - Elementary School Ex. Building 3% 89,656 2.06 090 1.85 i Ex. Roadways/ Parking/ Basketball 5% 142,854 3.28 0.90 2.95 Ex. Sidewalks/ Covered Walkways 1% 13,885 0.32 0.90 0.29 Sub -Total 9% 246,395 5.66 Impervious - Middle School Building 0% 0 0.00 0.90 0.00 Asphalt Roadways/ Parking 0% 0 0.00 0.90 0.00 Asphalt Bus Lane Improvements 0% 0 0.00 0.90 0.00 Sidewalks/ Covered Walkways 0% 0 0.00 0.90 0.00 Concrete Loading/ Dumpster Area 0% 0 0.00 0.90 0.00 Other i 1 0% 0 0.00 0.90 0.00 0% 0 0.00 Sub -Total Total 100% 2,642,785 60.67 0.27 16.09 Pagel of 3 mcGifl Pre and Post Develoament Site Areas iII. Post Development Areas Land Use Area Area "C" CA (SO (ac) Post Post Pervious Turf/ Vegetation/ Woodlands 65% 1,711,228 39.28 0.20 7.86 Wetlands 3 2% 44,877 1.03 0.20 0.21 Fire Lane - Grasspave 2 0% 1,041 0.02 0.20 0.00 Fire Lane - Grasspave 2 1% 23,806 0.55 0.20 0.11 Sub -Total 67% 1,780,952 40.89 Impervious - Elementary School Ex. Building 3% 89.656 2.06 0.90 1.85 Ex. Roadways/ Parking/ Basketball 5% 140,408 3.22 0.90 2.90 Ex. Sidewalks/ Covered Walkways' 0% 12,943 0.30 0.90 0.27 Future 0% 2,000 0.05 0.90 0.04 New Building Addition 0% 7,607 0.17 0.90 0.16 New Sidewalks/ Covered Walkways 0% 633 0.01 0.90 0.01 Sub -Total 10% 253,247 5.81 Impervious - Middle School Building 3% 68,894 1.58 0.90 1.42 Future Building 0% 2,824 0.06 0.90 0.06 Asphalt Roadways/ Parking 2 5% 129,758 2.98 0.90 2.68 Asphalt Bus Lane Improvements 2 1% 18A52 0.42 0.90 0.38 Sidewalks/ Covered Walkways 1% 27,412 0.63 0.90 0.57 Concrete Loading/ Dumpster Area 0% 8,036 0.18 0.90 0.17 Fire Pump House 0% 195 0.00 0.90 0.00 Future 1 13% 354,056 8.13 0.90 7.32 Sub -Total 23% 609,627 14.00 i vial 100% 2,642,785 60.69 0.43 26.00 Page 2 of 3 McGill A< S S 0 C 9A T F S Pre and Post Development Site Areas IV. Summary Imgerveous Area Area s Area ac Pre Development 9.3% 246,395 5.66 Post Development 32.7% 862,874 19.81 Total Ia Increase 23.3% 616,479 14.15 V. Notes 1 Sections of existing concrete sidewalk removed for proposed improvements and not replaced by new concrete sidewalk or covered walkways. 2 Asphalt roadway and parking areas include concrete curb and gutter. 3 Areas of wetlands to be filled as part of this work. Page 3 of 3 Section 16 I 11 M.cGifl A. 1 0 Cc r► F. s Pre Development Site Runoff Project: Town Creek Middle School and Elementary School Addition Date: May-18 ir Location: `v`dinnabow, NC Drainage Outfall Drainage Area Area (sf) Area (ac) "C" Tc (min) 110 (in/hr) Q io (cfs) Existing Off -Site Wet Pond A E 41,924 0.96 0.42 5 9.70 91,737 2.11 0.38 5 9.70 3.92 7.76 Sub -Total 133,661 3.07 11.68 Wetlands 'A' - Elementary School Site B 77,775 1.79 0.20 5 9.70 3.46 Sub -Total 77,775 1.79 3.46 Perimeter of Site C1 C2 C3 296,152 6.80 0.20 15 6.54 165,285 3.79 0.20 7 8.92 133,323 3.06 0.20 5 9.70 8.89 6.77 5.94 Sub -Total 594,760 13.65 21.60 Wetlands 'B' - Middle School Site D 37,089 0.85 0.20 5 9.70 1.65 Sub -Total 37,089 0.85 1.65 Total 843,285 19.36 38.40 Page 1 of 1 L McGiRASSOCIA Pre Development Time of Concentration Calculations Project: Town Creek Middle School and Elementary School Addition Date: Mar-18 Location: Winnabow, NC I. NRCS Segmental Method (TR-55) Unpaved Areas: Tc = 0.001 (L) / S o.53 (Eq. La) Paved Areas: Tc = 0.0008 (L) / S 0.53 (Eq. 2.a) II. Pre Development Path Pre -Development Drainage Area = A Longest Length of Flow, L = 170 ft Elevation Drop, H = 4.60 ft Average Watershed Slope, S = 0.0271 ft/ft Drainage Area is : Unpaved Use Equation Eq.: La Time of Concentration, Tc = 1.15 min Use, Tc = 5 min III. Pre Development Path Pre -Development Drainage Area = B Longest Length of Flow, L = 150 ft Elevation Drop, H = 2.00 ft Average Watershed Slope, S = 0.0133 ft/ft Drainage Area is: Unpaved Use Equation Eq.: La Time of Concentration, Tc = 1.48 min Use, Tc = 5 min Page 1 of 3 L McGill A S S O C I ATE S Pre Development Time of Concentration Calculations IV. Pre Development Path Pre -Development Drainage Area = CI Longest Length of Flow, L = 770 ft Elevation Drop, H = 3.00 ft Average Watershed Slope, S = 0.0039 ft/ft Drainage Area is : Unpaved Use Equation Eq.: La Time of Concentration, Tc = 14.57 min V. Pre Development Path Pre-Devclopment Drainage Area = C2 Longest Length of Flow, L = 350 ft Elevation Drop, H = 1.20 ft Average Watershed Slope, S = 0.0034 ft/ft Drainage Area is : Unpaved Use Equation Eq.: La Time of Concentration, Tc = 7.09 min VI. Pre Development Path Pre -Development Drainage Area = C3 Longest Length of Flow, L = 360 ft Elevation Drop, H = 2.30 ft Average Watershed Slope, S = 0.0064 ft/ft Drainage Area is : Unpaved Use Equation Eq.: La Time of Concentration, Tc = 5.24 min Page 2 of 3 Use, Tc = 15 min Use, Tc = 7 min Use, Tc = 5 min McGill A S S O C i A T C S Pre Development Time of Concentration Calculations VIL Pre Development Path Pre -Development Drainage Area = D Longest Length of Flow, L = 178 ft Elevation Drop, H = 3.10 ft Average Watershed Slope, S = 0.0174 ft/ft Drainage Area is : Unpaved Use Equation Eq.: La Time of Concentration, Tc = 0.00 min Use, Tc = 5 min VIII. Pre Development Path Pre -Development Drainage Area = E Longest Length of Flow, L = 210 ft Elevation Drop, H = 3.25 ft Average Watershed Slope, S = 0.0155 ft/ft Drainage Area is : Unpaved Use Equation Eq.: La Time of Concentration, Tc = 0.00 min Use, Tc = 5 min Page 3 of 3 @McGJH Rainfall Intensity Data Project: Town Creek Middle School and Elementary School Addition Location: Winnabow, NC Date: Mar-18 I. Intensity Duration Frequency (IDF) Table Wilmington, NC ARI 5 10 15 30 60 120 3 6 12 2.4 (years) min min min min min min hr hr hr hr 2 7.39 5.92 4.96 3.42 2.15 1.28 0.91 0.56 0.33 0.19 10 9.70 7.75 6.54 4.74 3.08 1.94 1.39 0.87 0.51 0.30 25 10.98 8.75 7.40 5.48 3.65 2.38 1.73 1.08 0.64 0.38 100 12.92 10.27 8.65 6.63 4.56 3.18 2.37 1.49 0.89 0.53 H. Pre Development Drainage Area with Tc = 5 Minutes Time of Concentration, Tc = 5 min Design Storm = 10 year Intensity, I = 9.70 in/hr * See Time of Concentration Calculations III. Pre Development Drainage Area with Tc = 7 Minutes Time of Concentration, Tc = 7 min * See Time of Concentration Calculations Design Storm = 10 year Intensity, I = 8.92 in/hr IV. Pre Development Drainage Area with Tc =15 Minutes Time of Concentration, Tc = 15 min * See Time of Concentration Calculations Design Storm = 10 year Intensity, I = 6.54 in/hr Page 1 of 1 McGill A. S 1* 0 C 1 A T E S Post Development Site Runoff Project: Town Creek Middle School and Elementary School Addition Date: Jul-18 Location: Winnabow, NC Drainage Outfall Drainage Area I Area I (SO Area (ac) licit Tc (min) I io (in/hr) Q 10 (cfs) Existing Off -Site Wet Pond Al A2 E F 15,590 0.36 26,334 0.60 0.30 5 9.70 40,428 0.93 0.55 5 9.70 22,205 0.51 0.30 5 9.70 0.40 1.76 4.95 1.48 Sub -Total 104,557 2.40 8.59 Wetlands'A' - Elementary School Site B 56,944 1.31 0.20 5 9.70 2.54 Sub -Total 56,944 1.31 2.54 Perimeter of Site C1 C2 C3 417,028 9.57 222,900 5.12 0.30 20 5.94 35,658 0.82 0.25 5 9.70 4.18 9.12 1.99 Sub -Total 675,586 15.51 15.28 Wetlands 'B' - Middle School Site D 6,198 0.14 0.20 5 9.70 0.28 0.28 Sub -Total 6,198 0.14 Total * 843,285 19.36 26.69 * Calculations include project area only. Site areas outside of project area remain undisturbed. Summary Qio Post < / = Qao Pre 26.69 cfs 38.40 cfs Page 1 of 1 OK Post Development Time of Concentration Calculations Project: Town Creek Middle School and Elementary School Addition Date: Mar-18 Location: Winnabow, NC I. NRCS Segmental Method (TR-55) Unpaved Areas: Tc = 0.001 (L) / S 0.53 Paved Areas: Tc = 0.0008 (L) / S 0.53 IL Post Development Path Pre -Development Drainage Area = B Longest Length of Flow, L = 310 ft Elevation Drop, H = 1.50 ft Average Watershed Slope, S = 0.0048 ft/ft Drainage Area is : Unpaved Use Equation Eq.: La Time of Concentration, Tc = 5.23 min III. Post Development Path Pre -Development Drainage Area = C2 Longest Length of Flow, L = 125 ft Elevation Drop, H = 0.50 ft Average Watershed Slope, S = 0.0040 ft/ft Drainage Area is : Unpaved Use Equation Eq.: La Time of Concentration, Tc = 2.33 min Use, Tc = 5 min Page 1 of 1 (Eq. La) (Eq. 2.a) Use, Tc = 5 min Longest Length of Flow, L = 205 ft Elevation Drop, H = 3.00 ft Avg Watershed Slope, S = 0.0146 ft/ft Drainage Area is : Paved Use Equation Eq.: 2.a Time of Concentration, Tc = 1.54 min @McGill A S 4 4 C( A T E S Rainfall Intensity Data Project: Town Creek Middle School and Elementary School Addition Location: Winnabow, NC Date: Mar-18 L Intensity Duration Frequency (lDF) Table Wilmington, NC ARI 5 10 15 30 60 120 3 6 12 24 (years) min min min min min min hr hr hr hr 2 7.39 5.92 4.96 3.42 2.15 1.28 0.91 0.56 0.33 0.19 10 9.70 7.75 6.54 4.74 3.08 1.94 1.39 0.87 0.51 0.30 25 10.98 8.75 7.40 5.48 3.65 2.38 1.73 1.08 0.64 0.38 100 12.92 10.27 8.65 6.63 4.56 3.18 2.37 1.49 0.89 0.53 II. Post Development Drainage Area with Tc = 5 Minutes Time of Concentration, Tc = 5 min * See Time of Concentration Calculations Design Storm = 10 year Intensity, I = 9.70 in/hr III. Post Development Drainage Area with Tc = 20 Minutes Time of Concentration, Tc = 20 min * See Time of Concentration Calculations Design Storm = 10 year Intensity, I = 5.94 in/hr Page 1 of 1 r 7 Section 17 u L L 00 W oio U G7 0 M 0 M 0 M 0 M 0 M 0 M 0 M o M a .� Ci 0 c O o CD o N O O 'C1J O o O a O O o O O 0 O o N O O 0 0 0 0 o O O o o 0 o 0 O C`J O C-1 O N O C`7 O N O N O N O O n O a O r- ps o 0 0 0 0 0 0 0 '+fir N N 00 O a, n v HLn In kn �a Vri o N O O O o o O C O O C O O C O O a u O 00 M 00 M --� kn O O W� O 00 O 00 In u b0 O O O O O O en i•' A .� 00 � oo N t` a �o m D ri CD n ^" aC11N 0 y � 3 C Ei y u A M W a H Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Swale A - Grass Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 26.00 Slope (%) = 0.50 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 1.29 Elev (ft) Section 28.00 27.50 27.00 26.50 26.00 25.50 1 2 3 4 5 Reach (ft) Highlighted Depth IT Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Mar 14 2018 = 0.36 = 1.290 = 1.11 = 1.16 = 4.28 = 0.22 = 4.16 = 0.38 6 7 8 9 10 Depth (ft) 2.00 1.50 1.00 0.50 W11 n cn Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. i Swale A - Bare Soil I Trapezoidal j Bottom Width (ft) = 2.00 I Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 26.00 Slope (%) = 0.50 N-Value = 0.020 Calculations Compute by: Known Q } Known Q (cfs) = 1.29 Elev ft () f Section ZO.UU 27.50 27.00 26.60 26.00 25.50 Wednesday, Mar 14 2018 Highlighted Depth (ft) = 0.26 Q (cfs) = 1.290 Area (sqft) = 0.72 Velocity (ft/s) = 1.78 Wetted Perim (ft) = 3.64 Crit Depth, Yc (ft) = 0.22 Top Width (ft) = 3.56 EGL (ft) = 0.31 0 1 2 3 4 5 6 7 8 9 10 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 K I1 Channel Report F I Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Temporary Swale - Grass i Trapezoidal j Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 f Invert Elev (ft) = 25.40 i Slope (%) = 0.50 N-Value = 0.035 i Calculations Compute by: Known Q Known Q (cis) I f = 3.85 Elev (ft) 27.00 i 26.50 ` 26.00 E 25,50 25.00 k 24.50 Section 0 2 4 6 8 Reach (ft) Wednesday, Mar 14 2018 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 10 12 14 = 0.62 = 3.850 = 2.39 = 1.61 = 5.92 = 0.40 = 5.72 = 0.66 Depth (ft) -LOU 1.10 1 .1 0.10 -0.40 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Temporary Swale - Bare Soil Trapezoidal I Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 25.40 E Slope (%) = 0.50 N-Value = 0.020 Calculations Compute by: Known Q f Known Q (cfs) = 3.85 Elev (ft) Section 27.00 26.50 f 26.00 25.50 25.00 24.50 2 4 6 8 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ftls) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Mar 14 2018 = 0.47 = 3.850 = 1.60 = 2.40 = 4.97 = 0.40 = 4.82 = 0.56 Depth (ft) 1.60 1.10 M 0.10 u.40 rr.Ta 10 12 14 16 v vv Section 8 L Gutter Spread Calculation Summary Project: 1 own Creek Middle School and Elementary School Addition Location: Winnabow, NC I. Combination Inlet - Sag a. Maximum Drainage Area to Gutter Pan Maximum Drainage Area, A = 0.21 ac Runoff Coefficient, C = 0.80 Intensity, I = 4.00 in/hr Design Q = 0.67 cfs b. Spread Date: Mar-18 Lane Width = 10.00 ft Gutter Width = 2.00 ft Minimum Gutter Slope = 0.50 % Spread = 3.05 ft * See Hydraflow Express Results C. Summary Spread </= 1/2 Lane Width OK H. Combination Inlet - On Grade a. Maximum Drainage Area to Gutter Pan Maximum Drainage Area, A = 0.12 ac Runoff Coefficient, C = 0.90 Intensity, I = 4.00 in/hr Design Q = 0.43 cfs b. Spread Lane Width = 10.00 ft Gutter Width = 2.00 ft Minimum Gutter Slope = 0.50 % Spread = 3.30 ft * See Hydraflow Express Results C. Summary Spread </= 1/2 Lane Width OK Page 1 of 1 Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Maximum Conditions - Sag Combination Inlet Calculations Location = Sag Compute by: Curb Length (ft) = 3.00 Q (cfs) Throat Height (in) = 4.00 Grate Area (sqft) = 3.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.020 Gutter Spread (ft) Local Depr (in) = 2.00 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = -0- Bypass Depth (in) Gutter n-value = -0- 9.I I.jI1S-1SI:r.3 M!W Wednesday, Mar 14 2018 Known Q = 0.67 = 0.67 = 0.67 _ -0- = 4.17 = 100 = 3.05 _ -0- _ -0- _ -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3130 by Autodesk, Inc. Maximum Conditions - On Grade Combination Inlet Calculations Location = On grade Compute by: Curb Length (ft) = 3.00 Q (cis) Throat Height (in) = 4.00 Grate Area (sqft) = -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) I Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.020 Gutter Spread (ft) Local Depr (in) = 2.00 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = 0.50 Bypass Depth (in) Gutter n-value = 0.013 AI I dimensions in (ed Wednesday, Mar 14 2018 Known Q = 0.43 = 0.43 = 0.43 _ -0- = 4.23 = 99 = 3.30 = 1.88 = 0.50 = 0.48 Section 19 i It CL O f+ CD L w� ♦Wn CO) E L O A c 3 m c J co O N n CD W m E O O M M r r O N N N N N N N N m N N N N N I C N N N N N N N N N N N N N N N N N N N N N ❑ s n O W IT O O O O O O O n O O O O N M O O O O N N O LO O N In w O = 0 O W) O � � to In In O 3 N CV N C C C G O O O 'VY r U U U U U U U U U U U U U U 0 ei0i d M N In In W O N N W aD O O 49 In OD aD ao O O 0 j tm m r r r r r r r r r r r r r r Z ILc N c a W w = 0 O O N n (O O v n N co r O n W M m W o r c0 0 o n co o n n n 0 o rn n n n co N M CM � a N M CM M M M M M M M C7 M M M W v "� N N N N N N N N N N N N N N N N N 04 N N m OD OD O W M W 00 O O n n W n n N CO 00 ao M OD CO r r r r r r r N N r r r r r N r — r r r r O O 'e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ci ci ci ri c+ ci J CA t+ c O O co O O O co O O n N LL7 O N n co Go O n W O n W O o n CO O n n O CO n n n O >' c W N N N N N V N V N Ic N r N M N Cl) N Cl) N M N Cl) N M N M N M N M N M N Cl) N Cl) N Cl) N Cl) N ® C O O O O O o O O O O O O O O O O O O O O 0 C E O O O O O O O O O O O O O O O O O L6 N In IC1 O O O O O O O O O O O O O O O O O O o o O c d N N W W 01 W N W W W W W W W W N W W N W W O d'UV U. C m N O N O O r r N r N O W O n O n O n O n O CO O LO O W O CO O O r O O CO O W r r W O L o 0 0 o c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o to o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C C 9(2 E E E E E E E E E E E E �7 0 0 (2 o 0 o o o 0 0 0 0 0 0 0 0 ❑ ❑ U U U U ❑ c`� U U U U U U U ❑ U U ❑ U U o CD 0 0 0 0 0 0 o 0 0 v o Cl v n o 0 0 0 0 0 O 0 o 0 0 o O o O o 0 0 0 0 0 0 C �� o o cc o 0 0 0 0 0 0 0 0 d o t; c o 0 0 m C cm 9 i W tC W wW cp O O O r °� O Pr C9 G C C o 0 0 a� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 00 00 0 0 Q m M i of o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O I U c c O_ N N M N O O M M 0 M O M n M O O M I J J I r n m w M ... .- .. N N N M N Lss n N r r N I O yam± W m i W' r c 93J 2 c C W N M M O n n W M r N N LL �i m O m aD W N C r N M O m n M W r N d JZ 1 0 c J W O N > GL j O O M M m m O tO lO LO LO LO LO LO LO O LO LO O LL7 LO O O M (M O ` I W I I Q r r N N N N N N N N m N N N N N f�hf`�ao ao r�hr�rr-r�hl�I�I:�rirriri m � I O OMMm000eO LO OLOOIO LOOLO LOOLO C o A h VL G h h h h OD h h h hh l� h h h h h hh O N N N N N N N N N N N N N N N N N N N N I N r CJ N M LO (o m o i� a w ai ih a) N N OLr qto LOm h OR m m m h h h OR LO Ln m m W o Or rr i s NNNNNNNNNNNNNNNNNN N N N I _O W Om mr —LO m CO mhm OD Wmm Wmmr M LO LO LO CO OD m m LO h h h h LO LO m m m W O r rr x 0 N N N N N N N N N N N N N N N N N N N N N N W OOr 0Lnr m N h r m Oh N m r0 h W M y r W r O r . . . OR o O. h. OR O h. hh. m O h h. h. h. m C > N N N N N N N N N N N N N N N N N N N N N p OD W Ofl N O O N m O Nr- O N Ar- N Nr*-: m lo' h 7 C � � N N N N N N N N N N N N N N N N N N N N N Q. mm mW m W-OOhhWhhN m m -OD OD OD � r r r r r r r N N r r r r r N r r r r r r N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m CL W - LO LO to m m N C M N r r r r N N — — — — — — r r r r r r r M G oMomtnvhmmomvmvvrmvhmv to MNghmr(ON W O W hMNm(�OD It(O Mm �W hO LO OMO WOD LAWN hh ��� N N m h m� O- V CO M M C O N N N N h X 0 C L ' N 4MNMmo LO V MMCV I I V w N�(hNNNr�CM .0 _a C mMvm�'h LOMmr V MMNM V V OW r OD M W O r N o r m LO W k LO h O W LO O h h N II C t M N:W P.: M h h h h m N h h O N M a h V II � C � G h h h W m W O0 m W W m W W W W W W W W W W V G a CV G G O m O m LO OR O M r O m O OD r OD h m o rA r r r Lq O� Lri i� I� Lri LC! i� (m l(i L(1 LC7 (m (m L:l tl'l tL) L(9 � C E Ln N LA L(� L() Ln Ln L(j Ln Ln Ln lQ M In l(� L(j l(J LfJ LC1 Ll7 '� a LO(9rr N Ot0 "r O Vr Or O(+1M N Nr0 x v O r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CR 0 o o o o 0 o o 0 0 0 0 0 0 0 o 0 o o 0 o 0 N N W W W W N W W W W W W W W N W W N W W O Ce N N + O) O r Mh 9 V h h r LO m W a LO W O W E Rr Pgrrq W hrOmr or q(OLO'lq:MNO e N N O r r 0 0 0 0 0 0 0 0 0 0 r O p r r p �- C) c o00000000c000000cooec I G000O000$oOQOOOOOOooOoo a W o00000400000000000000 o II co J N n M� 0 0 N N N N N Di N N r M aMD O07 IZ C V N w C FC C ��mTm W r N M M tO r h h W m r N N e J W O N Wr NN d Z Ni J rNMV Wmhm W O N N m l�0 0 O fA C O m E N w 7 m m Z m m N m N co N O N m m o N m m coin N Im O m m r N m m[V m n co m ^ pp N m U m � U O to m UN Um N m N U m U mi I s hi a m La a i—* CL 4) w L O 4) LLLLL. L '' 4)A U) P L. L '0 r•I 0 m c J W I N � I N IL O O O O O O O O O I-- M O O O LO O O CD LO O O O O O LD LD LD LD LD LO O LO LD LD r O N N N N N W LD O O Cc E C co N N N N N N N N N N N N N N N N N N N N m N i p I LD to LD O W O O O CD CD O O O O O O O LO O LO O O LD O LO O LD o LD f r N N LD O LD LD O O O O LD O LD O O O O 0 0 J a 'VY O N N O r r O r r r r r r r O r r r r m M M M M M M M M M O O O O O O O O O O O O O O o O o O O O O 0 ' 0 z >G O O O O O O O O O O O O O O O O O O O O O O O O mCL ci c% ci ci ci ci rJ rJ ci � cs U c Q :3 w O A V � T fp W N O O O It OD LD O O O LO LD OD LD W V' V' E Cl) M N— r r Cl) Cl) r r r r r — N N CM N 7 z O' O Cl) N OD O M W W M O CO W M V' O M m O CWD, cco N O L O CD c0 W W W W N Ln CD c0 >> C W r N r N r N N N N N V' N N N N M N It N It N V N N N N M N 0 N M N M N M N N N M N V' N V N Q I� c0 c0 0D GO I� h CO 00 f- 00 W W CD O n OD LD N W_ CO I-- 00 r r r r r r r r N r r r N C O O A O O O O O O O O O O O O O O O O O O O O O V C O W co co LD O OD N O O OO LO LD V LO W LO O M M O O LO O Cn CD OR O N cD q V' O O N V' CD O0 c0 CD W W r V' LO CD t: W r N r N N N N N V' N r N N M N It N V' N It N N N N N C+I N M N CO N Cl) N M N N N M N N N 19 d C O O O O O O O o O O O O O O O O O O O O O O O c F 'E LO LO 10 to LO LO LO LO LO Lri Lri Lri Lri ui to LO LD LO Ln in W W La ej O O O O 0 O O o Cl) O O LO W 0 LD O O LO O O OD O O aa-- O c0 c0 co r- LO 00 W m n W n co N h W 0 n W N OD W cD 00000000000000000000000 O U. O o CO r r r CO r Cl) r O N O r O r Cl) r O M W O LO r LD O O r c0 O N W O I, O M O LO V' W O 0 LD c g � V O O O O O O O O O O O O O O O O O O O O O O O C 3 0 0 0 0 0 0 0 g 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 Y C7 o 0 0 0 0 o c 0 C. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E E E E E E E E E E E E E E E E E 2 U U 0 0 cg 0 0 0 0 0 U 0 0 0 0 0 U 0 0 0 0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O �.. M 0 N N m CM � m c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _2M o o 0 o 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 o 0 0 0 0 0 0 0 0 0 0 0 o 0 O 0 o 0 0 H d I C C CA O v N m Cl) t\ m CO 'C a O 0 0 cn M CD -4 CM 0 CO 11 CO co 0) W Cnl I NW r- N N OO LO V' M r Cl: C`j N r N CO N J J a I oC Cb L Or Cl)r r r OD N G J Z W r N m V' LD M n co W cn N r N Ln W N C O r N M It LO CD ti W W O r r co r N r co r W O N N N N M N O a JZ fL ♦0 0 c J ao O N � - N m W O O O CC1 t) M C() Cn O O O O O O O O O W W M N N N N O O O f- 1- CO V; M Cn ym, C co N co co N N N N N N N N N N N N N N ❑ m G O LQ O Up O O n CR O Cn O CA O Uq O Lq N O O Cn O O O C{) O O O 4) O O O Lq O O J Y -i C) r r r 0 0 0 0 r N O r r r r r r r I O O O O O z 0 0 0 0 0 0 �o C L U U U U U U U U U U U U U U U U U C 0 M N N N O to N Lo N„ CD OD O N .0s m r r r N r r r r r r E CL J M z a 0)0)Go 0)0 T N N N tt N Cl) N W d O N V' 1, M O N W OR V: CD M V' V' CC) C W N N N N N N N Cl) N N N N N N N N N m W co co co co M O w co co GD co W W P W co CL r r r r r r r r r r r r r r r r r C O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 JfA� C M Nr W O 00 W O Lo O r O V W M N W m 0 CD O N N n 0D O Il CO ►l� M V; N q V• V' 9 C W �' V' N M N Cn N N N N N N N M N M N m N V' N V' N It N V' N N N N N N N N N 'c Cn L6 ui CC) ui ui L6 ui C(i ui Cn L6 Cn L6 Cn N CC) M 0 O O O t- w M O O Cn to O O O W O OD M co m co GO co co co co co m N O +� m 0 6 O O O O O O O O O O O O O O O O O 0 � V V O U. m Cp r v N 0)r N r r M r M r OD N 1(1 N r f� O CO 1, O O O O CO CC) N LO! G 2 V 0 4 -s O O O O O O O O O O O O O O O O O O o O O O O o O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 C 0 0 0 0 0 0 0 0 0 6 �c°� Q 2 Q 2 Q(2 2 2 2Co Ala C3(3c)oioo m o 0 0 0 0 0 0 0 o 0 o o IW: Im O 6 O O C? M CV O - O O O O O 6 6 O Wi 6 O y c m lam O W 9 O O O O CO W W W � U ♦7 C a=+ O O O O O o O 0 O 0 O 00 O O 0 O 0 O 00 O O O O O O o CO r Q Of Cl) �p C G G O C O O N h CV CG tC I tnl c J J r - (O C6 O CC N CO GD W N Cn :'3 0 O ti m r CV V N W O r N M N M O M W N 0 J z N N N r N N N N M M M M Cl) M N M M M M lL m It b CO I.. M W O N M V' M 0 r- W W O O C: N N N N N N M M M Cl) M co M M M M V' Jz I 0 la a c O A-8 _cc 75 L U/ E L ♦ 0 r/ o c J i I co O N n > m Op0000 OO OnM000ln Loam M OOOOO OO w Wn Wn Wn Wn0000Wn 0000 OWn Wn Wn Wn W In Wl)l()W()WOr InNNN�NN CO Wn00000 M N N N N o 00 n n Wn N W _ = W� W CO h I-t`11IhInP`r;1`1`Cor`r`t`r. n r-- n M co O OI ao w w N I- h I- � w M Co h P� 000 W tD E N N N N N N N N N N N N N N N N N N N N N M N N N N N N N N N N N N" N NM N N R 9 O OOOOOOOOn0000 W O O W 0 a 00000 a W Wn Wn Wn Wn a 0000000 OoWn LL)W WA WA In W W Wn Wn W Wn Wn NWn'tN Wn Wn Wn0000NMNN NNOOOn CO CO lq' W C E O W n hn n n n nnn n n nnn nn n nn 000 W co n nn IA nn co W W nCI W O O G O N N N N N N N N N N N N N N N N N N N N NM N N N N N N N N N N N N N N N M N I In NCO—!PMoMWn W r CD MOD ON W 0 nC8 CA m o i00i�Cu�ri�Nst ill u7 C•70 V � W WC)UI W Or ON���On W W W W W CO N Wn nON WO W 00 r N N V: IQ Wn Wn W"'I: WI) Cp0 f CL N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N m {r•1 J O M to r 0 M r r N W r Wn n n 0 Wj) W 0 W N 0 0 r 0 0 N 0 0 W V M M N M M n 0 Wn Wnnca-0—V V On W W W n W W r.e (DODO C W 00rr NMWn Wnw)WM V W n n W (O f: I-:nnnhIO tOCOCp tp CO C0 I-: n I� PP Co CD Co M r` f` r` r` r: r: rh r.: r• f: n Wit` O OCOCDOrN 00WAOrM W W W0000NM(O COON�nWOrNOhW�COM��Cp CL 'Av CVN�rCV WM��et N CVMMC9 Mc+IN CM�aWn WO WO NCV MM ��CV NNN C w > N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N O m W L y L' OWA CO WW00 W NOOWLL]tO �W001nOMMOOlnM�00W 00ri00r0 W MN0 CO WON W0 d'OON41: W W W W00r ll�III W CO E m C C 9UA O N Wn n W Or n CO M NM14:a N V r M V V V N N M M M M M N M t v 0 Wn N N N M M M A V d' N N N N Z ♦7 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N a n W CO CO CO n 1- W W n CO 0 W W O n W Wn N 0 CD n W 0 W W Co W Co W W Co W W W Co 0 n 0 O _W r r r r r r r r r r r r r r N r r r N r r r r r r r r r r r r r r r r r N 000000ccc0000000000000000000a00000000000 a N WNNNWOMMN--WIYOOWp IIYW Wn W()W NN W W lA Wln Nlll NW W WN d _ N ` 0NN N CID �� N N r M M N r r r M M v- r r r r a-- N N N r r r M N N N N r r r r r r r r r N M N r� r 0 0 W O W r W M n r M P W O O W� Wl) O r W Wn W n� N W In M CO N O N W r W r�MOtOnrr W NNWA CO W17 rWl')Wp OW1�0 W W nOM�WnN0a0 lnm W NWt)MOOrM m N N N N r O M M O r O O r r O r r O N M N N N N r r N N r r r 0 0 r O N N N M co 0-MWO 0111N CCC7N�C0Nr 0Wop0�C�WmN0L�WNmWW 6 W MROW�C+NMCOCo W vN00DM rv1. . WNCNNQNCVaCIJ 06c-j6o4�6uiCn-66 11 to V W 4N6:ui66 r d Jq W N M O n 0 CID m N W M WlY Wn O r W 0 LLi N r 0 Wn n W 0 n N N W W N O n N n N 0 CM M n M _a d O O 0 0 N g W M r CO N . a9 r• n N W W �i 0 eF r r M W r� n 0 N O N CD N W W n M If H 0 N M NCO III Orr N N O O M n r 0 N r O M r W W 0It Nnn W W V Mr Or OMMMN Cr C L Lq Wn O n 0 n ON WA n n n n n V'nN lo: n rM Wn n 0 M n OrN Cl WIC CO M n W nN"tWnn V If OCR � comaoaoaooiaoaoadadaioiccceWnoioioioioiaoaoaoaoaiair�I:r:nnl�aooinaiaitsioiai � N0 Lo r-NN0 N 6 m n sr 00 W r N W O O6 4 n Or W O M W N COOOO M M CV CV r 006O r n v 0 N E ra6nWWiWlyoi0 W f--0LrirrWl)Wc 0 0 W 0 W W 1- 11 W LO — — — — — — W W — W 0WCIW in i u 1 m 5 0000000000000000000000000000000000000000 0 EWO WO Wn WA lA Wn Wn Wn Wn l0 WA In Wn In W W Wn In W In Wn Wn In W Wn W WA Wn Wn Wn WA WJ7 WW7 lil W,n Wf) Wii In ll) lj) C a N N N N O O a W M WA et n n 0 Wn n O M W O W W W Win In 0 0 0 W n M N N V' N 0 0 0lA CO CO W 1�(prOaDMNOOMrrOMr0��00Wn�NOpC01� W �rONOMMMN 3 � x W W Q e o000000000000000000000cc000c000000000000 1k 0000WnoopMooWnWnolnooWnooWooLAD WnWnoovnlnWnWnoWnWn000W ER O C OW WWn-n qW WnOn q q.qW 0NW0WW WWWWW Wqv: Rq CM MN00W N O () 13 O O O O O O O O O O O O O G O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r + N {� W NNW�Cpnr000na 00W W WnWnWNnW WM0rOWMON0nWnWn V'aW WI1W N O NMNaMOOrCDrOMrO�r��r Win NCD I�Wn�MOrOtO OtF� V N _E F V CO CO CM0 v I 0C I ` OW�W MOOOM0�0Wn InOWr OnMWg00W11 �'Or�MM W WnNnrnrOW W G v i� O r r . N r r r M O O r O r O N 0 0 0 0 Wn r N N r r r r N r r O W p p p r N N 1) O O O 0II OOo000000000o0000U 000000000w O 0 MMn W W W OriWO M O W W 00VW0Q0 OO pp NW W W JdC 0 On CO NNWYV WW N Wn M W r m O J C O M M W n W N M d' Wn n W 0 0 r N M N Wn O n W 0 i„L C C uj I' �• O H O r N M Wn W n W 0 0 r N M Wl] W n W 0 0 r N M WA W n W 0 0 d Z N J m m is ❑ m m m c w 0 `m a E 2 3 N M ❑ ❑ N M CC 7 7 7 O N U CO ❑ I UI I � 0 ao ei ii d .o a S T m R a to E y L c m c J O O ti to O a W LP Lq � LQ ti N I C N N N N N N j >t 0 �� o oo � q V m M eo o 0 0 0 o 0 v 0 o 0 0 Z j m cL U U U U U U m O L M N N r N E a m m c N C 7 Z J fA - m n' M n 00 ORR O N O C N N N N _ W v N N m CL ao r ao ao ao r ao C O JM O O O O O O d C G O co m n 00 Goo O co co C W N N N N N N d E e E o 0 0 0 o N E L6 ui LO LO LO M N N N N N 00 9 0^ O U O O O tl O IL C m f00 co cm co0 Q Q v O O O O O O 3 O O O O O TLO 0 0 0 C. 0 0 m o 0 o 0 o rn E m E c o o R a c 65 o 0 0 0 0 0 0 0 0 o ! Q c c o s 0 � ao G J Z W T N M v M m li U m r N M It LO to d J Z I= L. 0 A c c � J co O n m U IQ LqO OhN _ Q NNNNNO m � Q 0 0 0 0 0 O O 0 0 0 0 C (E G 0NNNNN NNr-r-mP- Ommpl ran N N N N N N yCL W J 0 0 v M m M IG1 Om�1`N. + c L-) Iri Sri Iri w ui N N N N N N Q GO f0 N Go GO co Cb V7 h GD ONO C � N CO CO N 04 N N N N C d W OGO�a0000O E y C Q N N N N N 7 Z N O. co GO GO co GO T N m Q. O V It N N V a N C Cl) N N r r N N O N v w N co ^Gl rf01n OMM ((pp x 0 O r r r r W II V t1 CM L Q D F 11 O O cCR CC!DNor f.� uiLOVC3ov y C L Z NO n O U II � G ���hO10 V +± E OOON O •E f07�M�OM } V _ O O O O O N II a E Oru�oMo � M N r r 0 0 V 12 O C 0 0 Cl 0 � X OD I L7 r00000 O Q C O O O O O O O ® N N N N N O + N vuo E E o l.vwMo r�ovro 1 c fOMLO NM-O � Q C !6 I sN 606666 ' O GD O O O O CDCA O O 0 II 0 o 0 0 0 Q m 47� Go J GD C m C 2 E J W r N co M LL c F (n 0 W O M C J rCMMIWO0 a- Z � � § � � � � I ) © i R 2 G@ 8 & I 2 2 E ■_ � m k m m ■ % § § § 3 — 4u� I - - k£ d a a a d z a § c § § § § § t �e 5 \ e 2 2 a _ E � 2 ■ 2 z � ■� CL A § 2 2 w£ k k k k k E n - n ■ 0« 0 2 2 2 0 �■� r $ 8 @ e E w_ �§ k k k e£ o 0 d 0 w 2 ' 0 E/\ Lo to § § § § 2 �QE § t LL Co cc 2# q# 8 ) kk o § 8 k k § $ % 9 2 § 2 o.3 S co � § cm ] \ £ § § § 0) d 5 I§I � k aid n q © - \ cd - - © / Zz . m m IL i� I 0 c c J OD O dMOOD W cocoN N N N N N M E E I 0 0 0 0 0 c _ O M M W W I co (� O N N N N uD T rn co cm YI P POD W N N N N N IIJ J O P P M r ® U, OR W co N N N N O O . r M � m N N N N Lo N C m W 0 0 0 CO E c N N N N N 7 Z m CL O r co N N N N N N N m CL m N N N N N y N C r r r r r W Go M v M M OD Mr(D0 x CL O(AO W O .00 II 0 V r r N r r w [- 3 IgWCflW W o�v,oaDv m rO-oo m c L N P M P P V ^ c c0 01 OD c0 0) II C O W E N O O v O of L6 C6 : L6 u If If m o000o 0 ° E Lc)L6L6L6ui a C Ip CO O O P C7n O0CD m x 00000 OR Q c ccoco 0 m m v coo OOD c0D aCR CSI � � U oc000 no m Co W N Co E (j M Orr 0 N — H W� c W I LRfo co(Om u V O O O O O Q U7 O O O O O 00000 M co -CR O O O O O IO I: LA I: II J N(OMW W m C C C H W r r M lL _ J o ai W c o N J rN CO WLo (L Z Section 10 MMcGifl , 5 'S 0 C 1 A T B S Post Development SCM 1 Drainage Area Project: Town Creek Middle School and Elementary School Addition Date: Mar-18 Location: Shallotte, NC I. Drainage Area 15,590 sf = 0.358 ac II. Post Development Areas i Land Use Area Area "C" CA (s fl (ac) Post Post Pervious TurfNegetation 39% 6,041 0.14 0.20 0.03 Other 0% 0 0.00 0.20 0.00 Sub -Total 39% 6,041 0.14 Impervious Existing Elementary School Bldg 0% 0 0.00 0.90 0.00 Existing Concrete Sidewalk 8% 1,309 0.03 0.90 0.03 Proposed Building Addition 49% 7,607 0.17 0.90 0.16 Proposed Concrete Walk/Patio 4% 633 0.01 0.90 0.01 Other 0% 0 0.00 0.90 0.00 61% 9,549 0.22 Sub -Total Total 100% 15,590 0.36 0.63 0.23 Page 1 of 1 McGiff Al 3 3 0 L 1 A T" E S Stormwater Control Measure Data: SCM 1 Project: Town Creek Middle School and Elementary School Addition Location: Winnabow, NC I. Table A 2.00 ft I 1.50 Key Elevation Elevation Area I Description U (ft) (SO Top of Bank, TOB 27.30 1,550 6" Freeboard 26.80 100 Year Rise 26.57 10 Year Rise 26.50 Water Quality Elevation 26.46 1,050 1 ft Contour 26.30 966 Sediment Cleanout 25.80 Bottom Elevation 25.30 510 High Water, SHWT 24.70 Sediment Trap Contour 24.30 330 Sediment Trap Bottom 23.80 252 Page 1 of 1 Date: Mar-18 * 10" Below Existing Grade Hydraflow Table of Contents 18-0311_SCM_1.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Sunday, 03 / 11 / 2018 10 -Year HydrographReports................................................................................................... ........... 1 Hydrograph No. 1, Rationai, To SCM I .................................................................................... 1 Hydrograph No. 2, Reservoir, Out SCM 1................................................................................ 2 Pond Report - Out SCM 1 100 - Year HydrographReports................................................................................................................... 4 Hydrograph No. 1, Rational, To SCM 1.................................................................................... 4 Hydrograph No. 2, Reservoir, Out SCM 1................................................................................ 5 L j-- Hydrograph Report `, Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. A 1 Sunday, 03 / 11 / 2018 Hyd. No. 1 To SCM 1 Hydrograph type = Rational Peak discharge = 1.862 cfs Storm frequency = 10 yrs Time to peak = 9 min ' Time interval = 1 min Hyd. volume = 1,005 cuft Drainage area = 0.360 ac Runoff coeff. = 0.63 Intensity = 8.209 in/hr Tc by User = 9.00 min OF Curve = NCDOT Wilmington-hydraflovAi%fRec limb fact = 1/1 Q (cfs) 2.00 1.00 0.00 0 To SCM 1 Hyd. No. 1 —10 Year 2 4 6 8 10 12 14 16 Hyd No. 1 Q (cfs) 2.00 1.00 0.00 18 Time (min) 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. A 1 Hyd. No. 2 Out SCM 1 Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min inflow hyd. No. = 1 - '10 SCM i Reservoir name = Out SCM 1 Storage Indication method used. EAltration extracted from Outflow. Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Out SCM 1 Hyd. No. 2 —10 Year Sunday, 03 / 11 / 2018 = 0.404 cfs = 16 min = 118 cuft = 26.50 ft = 941 cult 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Hyd No. 1 I I l i E [ 1 Total storage used = 941 cuft Q (cfs) 2.00 1.00 0.00 28 Time (min) Pond Report 3 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc.. v11 Sunday, 03 / 11 ! 2018 Pond No.1 - Out SCM 1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 25.30 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 25.30 510 0 0 1.00 26.30 966 726 726 1.16 26.46 1,050 161 887 2.00 27.30 1,550 1,085 1,972 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRSr] [A] [B] [C] [D] Rise (In) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 10.00 0.00 0.00 0.00 Span (In) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 26.46 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. 3.33 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect -- -- Length (ft) 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) 0.00 0.00 0.00 n/a N-Value .013 .013 .013 n/a Orifice Coeff. 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.020 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 25.50 Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0 00 Note: Culvert/Orifice outflows are analyzed under inlet Cie) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and subinerydrwe (s) Stage / Discharge Elev (ft) 27.30 27.10 26.90 26.70 26.50 26.30 26.10 25.90 25.70 25.50 2530 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 Total Q Discharge (cis) Hydrograph Report ` Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2016 by Autodesk, Inc. v11 r Hyd. No. 1 To SCM 1 4 Sunday, 03 / 11 / 2018 Hydrograph type = Rational Peak discharge = 2.490 cfs Storm frequency = 100 yrs Time to peak = 9 min Time interval = 1 min Hyd. volume = 1,345 cuft Drainage area = 0.360 ac Runoff coeff. = 0.63 Intensity = 10.979 in/hr Tc by User = 9.00 min OF Curve = NCDOT Wilmington-hydraflovA§WRec limb fact = 1/1 To SCM 1 Q (cfs) Hyd. No. 1 -100 Year ` 3.00 2.00 0 2 L— Hyd No. 1 l 4 6 8 10 Q (cfs) 3.00 2.00 1.00 '- 0.00 12 14 16 18 Time (min) L Hydrograph Report 5 Hydraflow Hydrographs Extension for AutoCADO Civil 310 2016 by Autodesk, Inc. A 1 Hyd. No. 2 Out SCM 1 Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 1 - To SCM 1 Reservoir name = Out SCM 1 Storage Indication method used. Exfiltration extracted from Outflow. 0 KI 1.00 0.00 0 2 4 Hyd No. 2 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Out SCM 1 Hyd. No. 2 -- 100 Year Sunday, 03 / 11 / 2018 = 1.253 cfs = 13 min = 457 cuft 28.57 ft = 1,028 cuft Q (cfs) 3.00 I'm 1.00 0.00 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 111 1 1 1 Total storage used =1,028 cult Time (min) McGifl, Inflow and Outflow Velocity Calculations: SCM 1 Project: Town Creek Schools Location: Winnabow, NC I. Concentrated Flow into SCM * 10 Year Storm Event Date: Jul-18 Storm System = ES *See Storm ES Storm Sewer Tabulation Structure = EO Inflow Velocity = 2.48 ft/s </= 2.50 ft/s OK II. Concentrated Flow out of SCM * 10 Year Storm Event Structure = Berm *See Hyrdaflow Weir Report Velocity Out of SCM = 0.76 ft/s </= 2.50 ft/s OK Page 1 of 1 Weir Report i Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. r SCM 1 Outflow I Rectangular Weir Crest = Sharp Bottom Length (ft) = 10.00 Total .Depth (ft) = 0.84 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q 1 Known Q (cfs) = 0.40 Depth (ft) 1.00 0.50 ,1 1 C -0.50 0 1 2 3 4 Weir W.S. SCM 1 Outflow 5 6 7 Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Top Width (ft) Thursday, Jun 28 2018 = 0.05 = 0.400 = 0.52 = 0.78 = 10.00 Depth (ft) 1.00 0.50 OO -0.50 8 9 10 11 12 Length (ft) Section 11 McGill A. s S 0 C O A Z F S Post Development SCM 2 Drainage Area Project: Town Creek Middle School and Elementary School Addition Location: Winnabow, NC I. Total Drainage Area Total: 417,028 sf = 9.574 ac IL Post Development Areas Date: May-18 Area Area "C" CA Land Use (sf) (ac) Post Post Pervious Turf/ Vegetation/ Woodlands 43% 179,433 4.12 0.20 0.82 Wetlands 0% 0 0.00 0.20 0.00 Fire Lane - Grasspave 2 0% 1,041 0.02 0.20 0.00 43% 180,474 4.14 Sub -Total Impervious - Elementary School Ex. Building 0% 0 0.00 0.90 0.00 Ex. Roadways/ Parking/ Basketball 2% 6,572 0.15 0.90 0.14 Ex. Sidewalks/ Covered Walkways 1 0% 266 0.01 0.90 0.01 New Building Addition 0% 0 0.00 0.90 0.00 New Sidewalks/ Covered Walkways 0% 0 0.00 0.90 0.00 2% 6,838 0.16 Sub -Total Impervious - Middle School Building 17% 68,894 1.58 0.90 1.42 Future Building 1% 2,824 0.06 0.90 0.06 Asphalt Roadways/ Parking 2 27% 113,700 2.61 0.90 2.35 Asphalt Bus Lane Improvements 2 4% 17,671 0.41 0.90 0.37 Sidewalks/ Covered Walkways 4% 18,396 0.42 0.90 0.38 Concrete Loading/ Dumpster Area 2% 8,036 0.18 0.90 0.17 Fire Pump House 0% 195 0.00 0.90 0.00 Sub -Total 55% 229,716 5.27 Total 100% 417,028 9.57 0.60 5.72 Page 1 of 1 r r r cc w C O N � M O O� O Cz 00 CDM 7 00 o oo` o C N N N N N �o to N 00 GO r-, �o O\ O " N N N M N tn tn -It 00 O O m QN N N�F n~ v It to %O q� 4, cp� O2, "� CM 00 I' � o W T N 0l0 N M .� V'1 �-- 00 00 N �O� (� 00 00 1; � N 40. w0 00 M O, rN O ,n 00 00 O O O z x o ON O� 0 a tn O O O O >r 00 N O O 0^O O [� :O n rr N Lz N N M •� N N Ci �q .g iF iF C I�t N Ct .--i t- t\ N ^ CI M II II � O O O O O d 0 0 0 0 0 0 0 w O O 00 O O O N N Vl O O O W 1 O If:,O O O O O O N W 1 n t\ O In 'CON100 O �D [P w ON C1 O C \D \o �G �o �o 1` 1` O� 00 OC tn 00 r. 0 Q ° a � a • c'� C k � O _> W %" �' o py P, Cd Cd c °= o w V w w U -o o o °�' � > b o b , a. m > O O Do N O'McGifl A i0IL i A7E'3 Water Quality Volume: SCM 2 Project: Town Creek Middle School and Elementary School Addition Date: Jul-18 Location: Winnabow, NC Ia. Pre Development Data Total Drainage Area, A = 9.57 ac Drainage Area Impervious Area = 0.32 ac Impervious Area Fraction, Ia = 0.03 Ib. Post Development Data Total Drainage Area, A = 9.57 ac Drainage Area Impervious Area = 5.43 ac Impervious Area Fraction, Ia = 0.57 Runoff Coefficient, Rv = 0.05 + (0.9 * Ia) Runoff Coefficient, Rv = 0.08 ac Runoff Coefficient, Rv 0.56 ac II. Water Quality Volume Required Simple Method Design Volume, DV = 3630 * Rd * Rv * A Coastal = Yes SA Waters = No Design Storm, Rd = 1.50 in Design Volume, DV Pre = 4,174 cf Design Volume, DV Post = 29,218 cf Design Volume, DV = 29,218 cf rYI. Water Quality Volume Provided * 15A NCAC 02H . 10 19 Coastal Counties Provided Volume, DV = 29,374 cf * See Hydraflow Hydrographs Data Pagel of 3 McGill x S �S 0 C I &7 L S Stormwater Control Measure Design Calculations: SCM 2 Project: Town Creek Middle School and Elementary School Addition Date: Jul-18 Location: Winnabow, NC I. Post Development Stormwater Control Measure Project Density = Low density with areas of high density Pretreatment = Forebay Primary SWM = Wet Pond II. Main Pool Volume Required Hydraulic Residence Time,1H-RT = 14 days Time B/T Storm Events, Ts = 5 days Design Volume, DV = 29,218 cf Main Pool Volume, Vmp = 0.87 * (HRT / Ts) * Dv Main Pool Volume, Vmp = 71,174 cf III. Volume Provided IV. Summary Main Pool Volume, Vmp = 71,978 cf = * See Hydraflow Hydrographs Data Main Pool Vol Required 71,174 Main Pool Vol Provided 71,978 cf Page 2 of 3 ON t MCILIM" A :S S Ck €: r A' h S Orifice SizinLy: SCM 2 Project: Town Creek Middle School and Elementary School Addition .Location: Winnabow, NC I. Determine Flow Rate 2-Day Drawdown: Design Volume, DV = 29,374 cf Drawdown Time, Td = 2 days Flow Rate, Qd = 14,687 cf/d H. Size Orifice 5-Day Drawdown: Orifice Pipe Diameter, Do = (Qd / (2310 * (H)0.5))0.5 Storage Depth, H = 1.10 ft Driving Head, H/3 = 0.37 ft Orifice Pipe Diameter, Do = 3.24 in Use Do = 3.00 in Drawdown Time, Td = 2.34 days Drawdown Time, Td = 56.16 hours Page 3 of 3 Date: Jul-18 Design Volume, DV = 29,374 cf Drawdown Time, Td = 5 days Flow Rate, Qd = 5,875 cf/d Orifice Pipe Diameter, Do = 2.05 in Hydraflow Table of Contents 18-0626 SCM_2_Total.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2016 by Autodesk, Inc. v11 Wednesday, 06 127 / 2018 10 - Year HydrographReports................................................................................................................... 1 Hydrograph No. 11, Rational, To SCM 2................................................................................... 1 Hydrograph No. 2, Reservoir, Out SCM 2................................................................................ 2 PondReport - SCM 2.......................................................................................................... 3 100 -Year HydrographReports................................................................................................................... 4 Hydrograph No. 1, Rational, To SCM 2................................................................................... 4 Hydrograph No. 2, Reservoir, Out SCM 2................................................................................ 5 Hydrograph Report 1 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 1 ToSCM2 Hydrograph type = Rational Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 9.570 ac Runoff coeff. Intensity = 6.363 in/hr Tc by User OF Curve = NCDOT Wilmington-hydraflovADEfRec limb fact Q (cfs) 40.00 RIQUIR 10.00 To SCM 2 Hyd. No. 1 --10 Year Wednesday, 06 127 / 2018 = 36.53 cfs = 0.28 hrs = 37,265 cuft = 0.6 = 17.00 min = 1/1 Q (cfs) 40.00 30.00 20.00 10.00 0.00 J/ 1 1 I 1 1 1 1 1 1 1 1 1 1 I N 0.00 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.5 0.5 0.6 Hyd No. 1 Time (hrs) Hydrograph Report 2 a Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 2 Out SCM 2 Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 1 - To SCM 2 Reservoir name = SCM 2 Storage Indication method used. Wet pond routing start elevation = 25.00 ft Q (cfs) 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Max. elevation Max. Storage Out SCM 2 Hyd. No. 2 --10 Year Wednesday.0612712018 _ 4.178 cfs = 0.53 hrs = 9,318 cuft = 26.50 ft = 120,587 tuft 0.3 0.7 1.0 1.3 1.7 2.0 2.3 2.7 3.0 Hyd No. 2 Hyd No. 1 1 1 l 1 I 1 Total storage used = 120,587 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.00 3.3 Time (hrs) Pond Report 3 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 06 / 27 / 2018 Pond No. 1 - SCM 2 Pond Data 1 Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 17.00 ft Stage / Storage Table r Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 1 0.00 17.00 4,158 0 0 1.00 18.00 5,249 4,692 4,692 2.00 19.00 6,393 5,811 10,503 3.00 20.00 7,584 6,979 17,483 3.50 20.50 9,623 4,291 21,774 4.00 21.00 10,545 5,040 26,814 5.00 22.00 12,462 11,489 38,303 6.00 23.00 14,477 13,456 51,758 7.00 24.00 16,591 15,520 67,279 8.00 25.00 18,802 17,683 84,962 9.00 26.00 25,542 22,084 107,046 9.28 26.28 26,541 7,291 114,336 10.00 27.00 29,146 20,038 134,374 10.50 27.50 30,985 15,029 149,403 Culvert / Orifice Structures Weir Structures E [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 3.00 0.00 0.00 0.00 Crest Len (ft) = 12.00 0.00 0.00 0.00 Span (in) = 3.00 0.00 0.00 0.00 Crest El. (ft) = 26.28 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 25.00 0.00 0.00 0.00 Weir Type = Rect --- --- Length (ft) = 4.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .011 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(Inlhr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 25.77 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage (ft) Stave / Discharge Elev (ft) 12.00 1 10.00 8.00 6.00 4.00 l 2.00 0.00 29.00 27.00 25.00 23.00 21.00 i 9.00 17 00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 46.00 50.00 55.00 - Total Q Discharge (cis) Hydrograph Report 4 1- L Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 1 To SCM 2 Hydrograph type = Rational Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 9.570 ac Runoff coeff. Intensity = 8.642 in/hr Tc by User OF Curve = NCDOT Wilmington-hydraflovA&VRec limb fact Q (cfs) 50.00 40.00 30.00 20.00 10.00 To SCM 2 Hyd. No. 1 -100 Year Wednesday, 06 / 27 / 2018 = 49.62 cfs = 0.28 hrs = 50,615 tuft = 0.6 = 17.00 min = 1 /1 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 y I I I I I I I i 1 1 i i I k 0.00 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.5 0.5 0.6 Hyd No. 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 2 Out SCM 2 Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 1 min inflow hyd. No. = 1 - To SCM 2 Reservoir name = SCM 2 Storage Indication method used. Wet pond routing start elevation = 25.00 ft Q (cfs) I 50.00 40.00 I f 30.00 20.00 �. 10.00 t_. 0.00 0.0 0.3 — Hyd No. 2 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Out SCM 2 Hyd. No. 2 --100 Year 5 Wednesday, 06 / 27 / 2018 = 13.59 cfs = 0.48 h rs = 22,667 cuft = 26.78 ft = 128,199 cuft 0.7 1.0 1.3 1.7 2.0 2.3 2.7 Hyd No. 1 [ I i [ 11 Total storage used = 128,199 cuff Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 3.0 Time (hrs) Pond Report ' Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2016 by Autodesk, Inc. A 1 Pond No. 1 - SCM 2 Forebay Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 20.50 ft Stage / Storage Table Wednesday, 06 / 27 / 2018 Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 20.50 1,424 0 0 0.50 21.00 1,719 785 785 1.50 22.00 2,345 2,024 2,808 2.50 23.00 3,020 2,675 5,483 3.50 24.00 3,745 3,376 8,859 4.50 25.00 4,518 4,125 12,984 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 0.00 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = -- -- --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage No No No No Slope (°/a) = 0.00 0.00 0.00 n/a N-Value = .000 .000 .000 n/a Orifice Coeff. = 0.00 0.00 0.00 0.00 Exfll.(in/hr) = 0.000 (by Wet area) Multistage n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (tc) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 20.50 -- -- --- - - 0.000 0.50 785 21.00 --- --- -- --- --- 0.000 1.50 2,808 22.00 --- -- -- -- --- --- --- 0.000 2.50 5,483 23.00 --- --- -- -- -- -- - --- 0.000 3.50 8,859 24.00 --- --- -- -- --- 0.000 4.50 12,984 25.00 -- --- - -- - 0.000 L McGiff A 1 4 O U! A T l Inflow and Outflow Velocity Calculations: SCM 2 Project: Town Creek Schools Location: Winnabow, NC I. Concentrated Flow into SCM Forebay Storm System = A Structure = AO Inflow Velocity = 1.30 ft/s </= 2.50 Storm System = B-C Structure = BO Inflow Velocity = . 2.12 ft/s </= 2.50 II. Concentrated Flow out of SCM Main Pool Storm System = D Structure = DO Discharge Velocity = 1.15 ft/s </= 2.50 Page 1 of 1 Date: Jul-18 * 10 Year Storm Event *See Storm —A Storm Sewer Tabulation ft/s OK *See Storm B-C Storm Sewer Tabulation ft/s OK * 10 Year Storm Event *See Storm D Storm Sewer Tabulation ft/s OK Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. SCM 2 Berm Rectangular Weir Crest = Sharp Bottom Length (ft) = 62.00 Total Depth (ft) = 1.50 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 36.53 Depth (ft) 2.00 1.50 1.00 0.50 SCM 2 Berm Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Top Width (ft) Thursday, Jun 28 2018 = 0.31 = 36.53 = 19.53 = 1.87 = 62.00 Max. Velocity at Tailwater = ( Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 i f 1 1 1 1 1 1 1 1 1 1 1 1 1 -0.50 0 5 i 0 15 20 25 3U 35 40 45 50 55 60 65 70 75 Weir W.S. Length (ft) 1r- Section 112 L 1 McGilft A S S 0 C G A T E S Temporary Sediment Trap: 1 Project: Town Creek Middle School and Elementary School Addition Location: Winnabow, NC l Date: Mar-18 I Disturbed Area to Trap (SO (ac) Storage Volume Inflow Q ,o (cfs) Surface Area Min Side Slopes X:I L/W Ratio X:1 Depth (ft) Required 2 Provided (cf) (cf) Required' Provided (sf) (SO 0.36 1,288 809 966 2.00 3.5 Notes: 1 Minimum surface area required = 435 sf/cfs Q to peak inflow 2 Minimum sediment storage volume = 3,600 cf/ac disturbed area 3 Minimum depth = 3.5 ft (1.5 feet excavated below grade) Page 1 of 1 L Hydraflow Table of Contents 18-0311_SCM_1_TEMP.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Sunday, 03 / 11 / 2018 10 - Year HydrographReports................................................................................................................... 1 Hydrograph No. 1, Rational, To SCM 1.................................................................................... 1 Hydrograph No. 2, Reservoir, Out SCM 1 - Temp ................................................................... 2 PondReport - SCM 1 - Temp.............................................................................................. 3 100 - Year HydrographReports................................................................................................................... 4 Hydrograph No. 1, Rational, To SCM 1.................................................................................... 4 Hydrograph No. 2, Reservoir, Out SCM 1 - Temp a r Hydrograph Report S Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 1 To SCM 1 1 Sunday, 03 11112018 Hydrograph type = Rational Peak discharge = 1.862 cfs Storm frequency = 10 yrs Time to peak = 9 min Time interval = 1 min Hyd. volume = 1,005 cuft Drainage area = 0.360 ac Runoff coeff. = 0.63 Intensity = 8.209 in/hr Tc by User = 9.00 min OF Curve = NCDOT Wilmington-hydraflovA&VRec limb fact = 1/1 To SCM 1 Q (c) Hyd. No. 1 —10 Year 2.00 I 1.00 0.00 0 2 4 6 8 10 12 14 16 Hyd No. 1 Q (cfs) 2.00 1.00 Hydrograph Report KA Hydraflow Hydrographs Extension for AutoCAD® Civil 3136 2016 by Autodesk, Inc. v11 Hyd. No. 2 Out SCM 1 - Temp Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 1 - To SCM 1 Reservoir name = SCM 1 - Temp Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 2.00 1.00 0.00 0 Peak discharge Time to peak Hyd. volume Max. rElevation Max. Storage Out SCM 1 - Temp Hyd. No. 2 --10 Year Sunday, 03 / 11 / 2018 = 0.000 cfs = n/a = 0 cuft = 25.91 rt = 1,005 cuft V1 i\N 2 4 6 8 10 12 14 16 Hyd No. 2 Hyd No. 1 [ 1 1 I [ I Total storage used = 1,005 cuft Q (cfs) 2.00 1.00 - 0.00 18 Time (min) Pond Report 3 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Sunday, 03 1112018 Pond No.1 - SCM 1 - Temp Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 23.80 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 23.80 252 0 0 0.50 24.30 330 145 145 1.50 25.30 510 417 562 2.50 26.30 966 726 1,288 3.50 27.30 1,550 1,246 2,534 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 10.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 26.46 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect -- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage No No No No Slope I[%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.020 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 4.00 3.00 2.00 1.00 0.00 0.00 3.00 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (le) and outlet (oc) control. Weir risers checked for orMce conditions (ic) and submergence (s) Stage / Discharge 6.00 9.00 12.00 15.00 18.00 21.00 24.00 Elev (ft) 27.80 26.80 25.80 24.80 23.80 27.00 Discharge (cls) i Hydrograph Report F I Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2016 by Autodesk, Inc. v11 Hyd. No. 1 To SCM 1 4 Sunday, 03 / 11 / 2018 Hydrograph type = Rational Peak discharge = 2.490 cfs Storm frequency = 100 yrs Time to peak = 9 min Time interval = 1 min Hyd. volume = 1,345 cult Drainage area = 0.360 ac Runoff coefi. = 0.63 Intensity = 10.979 in/hr Tc by User = 9.00 min OF Curve = NCDOT Wilmington-hydraflornrP. &Mec limb fact = 1/1 2.00 1.00 0.00 0 To SCM 1 Hyd. No. 1 --100 Year 2 4 6 8 10 12 14 16 Hyd No. 1 Q (cfs) 3.00 2.00 1.00 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2016 by Autodesk, Inc. v11 Sunday, 03 / 11 / 2018 Hyd. No. 2 Out SCM 1 - Temp Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft inflow hyd. No. - 1 -TO SCM 1 Max. Elevation = 26.35 ft Reservoir name = SCM 1 - Temp Max. Storage = 1,345 cuft Storage Indication method used. Exiiiltration extracted from Outflow. Out SCM 1 - Temp Q (ems) Hyd. No. 2 —100 Year Q (S) 3.00 3.00 I f 2.00 2.00 _ I _ 1 1.00 1.00 1, - � L 0.00 0 2 4 6 8 10 12 14 16 18 Time (min) Hyd No. 2 — Hyd No. 1 I I I I Total storage used = 1,345 cult McGifl A 3 3 0 C 9 A r E S Temporary Sediment Basin: 2 Project: Town Creek Middle School and Elementary School Addition Location: Winnabow, NC Date: Mar-18 Disturbed Area to Basin (SO (ac) Storage Volume Inflow Q io (cfs) Surface Area Min Side Slopes X:1 L/W Ratio X:1 Deptb. (ft) Required 2 Provided (cf) (cf) Required' Provided (sf) (SO 801,540 18.40 33,121 84,780 44.05 19,162 19,795 3 2.00 10 Notes: 1 Minimum surface area required = 435 sf/cfs Q 30 peak inflow 2 Minimum sediment storage volume = 1,800 cf/ac disturbed area 3 Minimum depth = 3.5 ft (1.5 feet excavated below grade) Q io = CIA where, Disturbed Area, A = 18.4 Ac C = 0.42 Tc = 22 Min I = 5.7 In/Hr Page 1of1 McGill ASSOCIA.7FS Orifice Sizing: SCM 2 Temporary Skimmer Project: Town Creek Middle School and Elementary School Addition Location: Winnabow, NC I. Determine Flow Rate 2-Day Drawdown: Design Storage Volume, DV = 33,121 cf Drawdown Time, Td = 2 days Flow Rate, Qd = 16,561 cf/d H. Size Skimmer Orifice 5-Day Drawdown: Date: Apr-18 Design Storage Volume, DV = 33,121 cf Drawdown Time, Td = 5 days Flow Rate, Qd = 6,624 cf/d Orifice Pipe Diameter, Do = (Qd / (2310 * (H)0.5))0.5 Storage Depth, H = 1.73 ft Driving Head, H/3 = 0.58 ft Orifice Pipe Diameter, Do = 3.07 in Orifice Pipe Diameter, Do = 1.94 in Use Do = 2.00 in Page 1 of 1 Section 113 L L Existing Wet Pond - Built Upon Area Project: Town Creek Middle School and Elementary School Addition Location: Winnabow, NC I. Existing Permit - Existing Wet Pond * SW8 071210 High Density Stormwater Permit Total Permitted BUA: BUA Reserved for Future Use: 246,395 sf = 5.656 ac 0 sf = 0.000 ac H. Proposed Revisions to Existing Wet Pond Drainage Area Land Use Area I Area (SO (ac) Built Upon Area (BUA) Elementary School Addition 7,607 0.17 ES Addition Sidewalk 633 0.01 Concrete Sidewalks - ES South -234 -0.01 Concrete Sidewalks - ES East -708 -0.02 Asphalt Roadway - Bus Lane -10,613 -0.24 Asphalt Roadway - Lake Park Dr 1,315 0.03 -2,000 -0.05 Sub -Total III. Proposed Permit - Existing Wet Pond Proposed BUA: Bi TA Reserved for Fut��re Use: Total Permitted BUA: 244,395 sf = 5.611 ac 2,000 sf = 0.046 ac 246,395 sf = 5.656 ac Page 1 of 1 Date: May-18 McGill .O. � .% 0 4' 1 h7 E 5 Existing Wet Pond - Drainage Area Project: Town Creek Middle School and Elementary School Addition Location: Winnabow, NCL I. Existing Permit - Existing Wet Pond * SW8 071210 High Density Stormwater Permit Total Drainage Area: . 642,736 sf = 14.755 ac H. Proposed Revisions to Existing Wet Pond Drainage Area Drainage Area Area (sf) Area (ac) Perimeter Area 56,787 1.30 Lake Park Dr 8,328 0.19 Bus Lane -65,115 -1.49 Sub -Total 0 0.00 III. Proposed Permit - Existing Wet Pond Total Drainage Area: 642,736 sf = 14.755 ac Page 1 of 1 Date: May-18 EXISTING PERMIT PAGE 3 OF 6 IV. PROJECT INFORMATION FOR REFERENCE PURPOSES ONLY L 1. In the space provided below, briefly summarize how the Stormwater runoff will be treated. Stormwater runoff will be directed to an off -site wet detention basin (Pond 8 of Rice Creek Plantation - Phase 1) via stormwater collection system. 2. a. If claiming vested rights, identity the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ® Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cave Fear River basin. 4. Total Property Area: 21.29 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+: 21.29 acres * Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal Higgh Water (NHM line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MH1N) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 26.6 % 9. How many drainage areas does the project have? 1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) the following information for each drainage area identified in Project Information item 9. If there a r r n e r e a et with the information for each area provided in the same format as below. Basin Information Dra a -Area 1, :':: Dr:Aiji4 I3rarna `e Area`: Drainage Area Receiving Stream Name Rice Creek Stream Class * C, SW Stream Index Number * 18-81-6 Total Drainage Area (so -94}39 {.LA "t -S to On -site Drainage Area (so 642,736 Off -site Drainage Area (sf) -791-003r Pro osed Impervious Area** s-292;494= 2 5 % Impervious Area** total 4G--53e. Impervious" Surface Area Drain:' . Area ;i Drainage Area J Drainage Area _ Drainage Area _ On -site Buildings/Lots (so 89,656 On -site Streets (so 0 On -site Parking (so 142,854 On -site Sidewalks (sf) 13,885 Other on -site (so 0 Future (so 0 Off -site (sf) 45;2= Existing BUA*1* (so 0 Total (st): * Stream Class and Index Number can be determined at: ** Impervious area is defined as the built upon area inclue buildings, roads, parking areas, ***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA thai is to be removed and which will be replaced by new B UA. { Form SWU-101 Version 07July2009 Page 3 of 6 rN JUL 0 3 201-3 BY: From: Wes Fryar To: Kim Williams: Holly Cook; Corey Novak Subject: Re: Town Creek Schools - Potential Waters of the US ®ate: Thursday, June 21, 2018 7:34:48 AM I can confirm it is not a stream on the site I flagged. It was identified as a relatively permanent water (Waters of the us) by the Corps. In simple terms, a jurisdictional ditch! Wes Fryar Environmental Scientist - Project Manager Land Management Group, Inc. 3805 Wrightsville Ave, Suite 15, 28403 910-452-0001 *sent from my phone ' � ~� ---------~~-r~"-~-''- Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY June 20, 2018 AioD 4-3 can VA) ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. Interim !Director The County of Brunswick & Brunswick County Board of Education Attn: Colonel Les Tubb, Superintendent c/o Mr. Craig Eckert, Director of Capital Projects & Planning, Brunswick Board of Education PO Box 249 Bolivia, NC 28422 Subject: Request for Additional Information Stormwater Project No. SW8 071210 Town Creek Middle School and Elementary School Classroom Addition Brunswick County Dear Mr. Eckert: The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for the subject project on March 26, 2018. A request for additional information was made on March 27, 2018 and a response was received on March 28, 2018. A second request for additional information was made on April 4, 2018 and a response was received on April 18, 2018. This is the third request for additional information. Please respond by July 6, 2018. A preliminary in-depth review of that information has determined that the application is not complete and that additional information is needed. To continue the review, please provide the following additional information. (This is a continuation of previous discussions in order to keep all of the information together. Please see the text in blue.) 1. Additional Project Area: a. 3/27/18, KJ: i. The current proposal increases the project area from 21.29ac to 60.67ac, and the newly added 39.38ac will be subject to the 2017 rules. But, the application shows that there will be three pockets of high density, which isn't in the 2017 rules. The 2017 rules [.1003(1)(d)] has the following similar provision. I suspect that this is what you are doing, but I need a drainage area map showing the layout of all of the drainage areas and how the "natural drainage area boundaries, variations in land use, and/or construction phasing" impact that. I see several stormwater exhibits in the plans, but I do not see a drainage area map? 1. Rule Text: (d) On a case -by -case basis as determined by the Division during application review, projects may be considered to have both high and low density areas based on one or more of the following criteria: (i) natural drainage area boundaries; (ii) variations in land use throughout the project; and (iii) construction phasing. b. 3/28/18, HC: Three Drainage Area Maps are included in the Stormwater Report. All three maps a!m attached for your reference. Tables A and B on the Pre and Post DAMS define the drainage areas based on natural drainage boundaries, variations in land use, and construction phasing. i. Section 4: 1. Pre -Development DAM showing project limits 2. Post -Development DAM showing project limits State of North Carolina I Environmental Quality I Energy. Mrieral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 2 of 13 ii. Section 13: Existing off -site wet pond DAM showing existing permitted drainage area with proposed revisions c. 4/4/18, KJ: Please see 2(bxiii)(3) below. 2. Data: a. Tables: i. 3/27/18, KJ: 1. I have inserted both the table in Section 'IV (10) of the application (1st table below) and a summary table of this data compared to the 2010 permit below (2" d table below). 2. Table in Application: 10. Compk4e the following information for each drainage area identified in Prt*vt Information itim 9. If there are more than four drainage areas in the project. att4ch an additional oduvt with the information for each area provided in the came format as bwlow. Basin Information Drains _ Ala_a Ex Ikaina a Area 1 . ''° . Iurair►a �r Area 2 Ilrai a Area i Receiving Stream Name Rke Creek Rive C wt+ Rice Crwk Rice Creel. Stream Class • Ca Sw ? C:; S14 C, Sw C, S4V Stream Index.Number • 18-31-6 18•81-6 18.81.6 ISSI-6 Total Drains Area (cf1 5/411107 I_W)XI 427.438 1629450 On -site Drains a Area 00 570107 15:><!J 427 38 1629450 Off -Rite Drainage Arm (st) 1 0 0 0 0 Proposed im niousArea" s 23971 ui7N 2i7765 228i16 a; Impervious Area— total 42.0 t,1.3 55,6 1.1 Impervious. " Surface Area Drahta Area LR Drains a real. Drahta e Ama 2 Drains a Area .3 On -site Buiidin %IAIK st) 14965f, 7MV 68894 On-sitestrxvts sf 0 On -site Parkin sf) � 1:17381" 144257 15777 . On-si'+adewalks s M.' 1?651 1912 21790 7029 Other on -site (sf) �l,__w _-,Y.. �. Future (sf) 2824 I Off -site (6f) 0 Ends BU-A••• (so 0 Total sf): 239704 +1wi9 237765 22W6 Sfrmn) Clnsa card Inds Nurr:l crcart iy drfrm:iared aC btlr✓l e+rtrrl.raed�aar.ari/irrl�nrl(tralr>adild»I[in:irue. 3. 2010 Permit v/s Proposed: 6/16/2010 Proposed T atai Ti otai Existing DA1 (Al on Supplement) DA2 Ci on supplement) DA3 Offsite? Dry pond Wet Pond Low Density Project Area 21.29 50.67 Drainage Area 14.76 50.67 13.09 0.36 9.82 37.41 542,736 2,542,785 570,407 15,590 427,338 1,629,450 Impervious Area 246,395 509,824 239,704 9,549 237,765 22,805 % impervious 1 38.3%1 19.3% 42.0% 51.3% 55.6% 1.4% b. Questions: ac ac sf sf i. "Ex" Drainage Area: 1. I believe the first column in the application labeled "Ex" is intended to be the "existing", already permitted drainage area. Is that correct? 2. 3/28/18, HC: Yes ii. Offsite area: 1. 3/27/18, KJ: If so, the drainage area draining offsite to SW8 070333 reduced from 14.76ac to 13.09ac and the impervious reduced from 246,395sf to 239,704sf. If this modification will impact the configuration permitted for SW8 07033, then SW8 070333 must also be modified. Will this be the case or are corrections needed to the data? State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. NC 28405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 3 of 13 2. 3/28/18, HC: a. The calculations in Section 13 of the Stormwater Report address the reduction in drainage area and impervious area. Yes, the reduced areas are correct. However, it is not our intent to modify the existing SW8 070333 permit for the off -site wet pond. If reducing the impervious area to the pond triggers a permit modification, then we request to reserve the remaining BUA for future use. b. Would it also be possible to reserve future drainage area as well? c. By reserving both of these areas for future use, this would allow us to proceed without modifying SW8 070333. d. If we do not modify the existing permit, will this simplify the Permit Transfer issue? 3. 4/4/18, KJ: a. "Future impervious": This type of impervious area is essentially a slush fund of impervious that tracks what can "fit" into an SCM that is already designed. It is useful because if one day you want to add a sidewalk or other item, and that sidewalk is within the "future" amount, then you simply obtain a minor modification to reduce the "future impervious" and label it "sidewalk". It makes these types of future modifications easier because you don't have to re -run the pond design calculations. b. "Future Drainage Area": Any time a drainage area changes, it impacts the design of the SCM that it serves, and we have to re- run the pond design calculations which is a major modification. We therefore do not have "future drainage areas". (Even if the drainage area decreases such that the required volume for the pond decreases, that is still a major modification.) Drainage area can only be in one SCM or another. If you will remove drainage area from the SW8 070333 pond, then SW8 070333 will have to be modified to reflect that change. State ol'North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Off cc 1127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 4 of 13 4. 5/18/18 Add Info Response (H. Cook) & 6/20/18 DEMLR (K. Johnson) Recommendation: The application indicates that the project will be 19.3% impervious because it does not claim "future" impervious area to be available in the low density area. It is recommended that you claim 354,056sf of future impervious in the low density area in order to max - out the total overall impervious at 24% as shown below. This will simplify future impervious additions for the school. 6f 16/2010 Proposed 5/18118 Recommended 6/20/18 Total A:i Cf fsrte to SW8 070333) SCM 1 Total Wfsite to SW8 070333 SCM 1 Onsite Wet Pond' SCM 2 Low Density A -ea Total Offsite to SW8 070333 SCMI1 Onsite Wet Pond' 5CM2 Low Density Area Project Area 21.29 60.67 14.76 9.57 36.34 60.67 14.76 9.57 36.34 Drainage Area 14.76 60.67 14.76 9.57 36.34 60.67 14.76 9.57 36.34 542,735 2,542,795 542,735 417,029 1,583,021 2,542,785 542,735 417,028 1,583,021 % Impervious 38.3% 19.3% 38.3% 56.754 1.6% 32.7% 38.3%' 56.7% 24.0% Impervious Area 245,395 508,818 246,395 235,554 25,869 852,874 245,395 235,5541 379,925 Onsite Buildings - 165,157 97,263 68,894 0166,157 97,263 58,894 0 Onsite Streets - 0 0 0 0 0 0 0 0 Onsite Parking - 296,654 133,555 145,979 17,119 296,654 133,556 145,979 17,119 Onsite Sidewalks 41,183 13,576 18,857 8,750 41,183 13,575 18,857 8,750 Other Onsite 0 0 0 0 0 0 0 0 Future - 4,824 2,000 2,824 0 358,880 2,000 2,824 354,056 Offsite - 0 0 0 0 0 0 0 0 Exsst;n& Pre-',788 - 0 0 0 0 0 0 n 0 fhe Onsite `11iet Pond (SCM2) has a dry pond in its drainage area. The dr{ pond is for peak fiow mitigation only. iii. Dry Pond: 1. 3/27/18, KJ: The dry pond is treating a high density drainage area (61.3%), but it is not a Primary SCM [per .1002(37)]. The 2017 rule introduced two new terms; "runoff treatment" method [per .1002(43)] and "runoff volume match" method [per .1002(43)]. The runoff treatment method is the way most projects are done where you collect the water from all impervious surfaces and treat it in an SCM (and I believe this project is done that way). Runoff volume match is essentially LID- EZ. However, if you use "runoff treatment", the rule says either a primary SCM or a combination of primary and secondary SCMs are needed to provide equal or better treatment. How will the proposed project meet this requirement? 2. 3/28/18, HC: a. Section 6 of the Stormwater Report provides Pre and Post Development Site Runoff Summaries. The 10-year runoff is evaluated to each drainage outfall pre and post development. b. The Post -Development runoff to each Drainage Outfall (existing off -site wet pond, wetlands pocket on Elementary School site, wetlands pocket on Middle School site, etc.) is less than the Pre - Development runoff to each Drainage Outfall. c. SCM 1_ i. Pre -Development Drainage Area `A' Q 10 = 3.92 cfs. ii. Post -Development Drainage Area 'Al' (SCM 1) plus `A2' (sheet flow) Q10 = 2.16 cfs iii. Post < Pre ac ac sf sf sf sr State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drivc Extension I Wilmington, NC 28405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 5 of 13 d. The primary purpose of the dry pond is to collect and manage the peak stormwater runoff from the proposed Elementary School Addition and release the runoff at a non -erosive flow less than pre -development flow conditions. The inflow pipe is buried and terminates at a yard inlet structure which allows the stormwater to rise and waterfall out of the weir into the basin. This dissipates the energy and provides non -erosive velocities into the basin. This structure is to serve as pretreatment for the dry pond. e. An orifice pipe is not required for this design as hydraulic calculations show the pond naturally draws down over 30 minutes through natural infiltration. Please note that an infiltration basin was evaluated and ruled out at this location due to high groundwater conditions. The 10-year discharge from SCM 1 and storm events larger than 10 year enter the perimeter closed conveyance storm system making its way to the existing off -site wet pond for treatment. f. SCM 1 is technically within the drainage area of the existing wet pond, does this not qualify as a treatment train? g. We can revise the `Drainage Area Ex' impervious area to include `future use' as well as remove overall drainage area from `Drainage Area 3' (low density) and reserve it for future use to `Drainage Area Ex' should this allow us to not modify the existing SW8 070333. h. This will not change the proposed drainage arca maps as grading will remain as shown on the plan. i. Correct, see Section 13 of the Stormwater Report. 4/4/18, KJ: a. I have not gone through any of the data or drainage area maps in detail. But, it sounds like you are saying that the dry pond's drainage area is inside the wet pond's drainage area and the dry pond simply mitigates peak flow. If so, then the wet pond will be the primary SCM. If that is the case, then let's label the wet pond as the SCM for the drainage area. The dry pond will be mentioned in the permit, but it will not be the primary treatment mechanism. I recommend that the table in your application have four columns: i. Existing/Offsite ii. Wet Pond (with dry pond for hydrology) iii. Low Density iv. Total (Offsite + Wet Pond + Low Density) b. High &c Low Density in This Permit: i. I recommend that you have three drainage areas on your DA map: 1. Existing/Offsite 2. Wet Pond (with dry pond for hydrology) 3. Low Density ii. When you update the drainage area maps, please make sure that you establish the "natural drainage area boundaries", "variations in land use throughout the project", and/or "construction phasing" per [.1003(1)(d)] as discussed above to establish that the project can have low density areas since it is overall high -density. State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension 1 Wilmington, NC 28405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 6 of 13 c. Also, FYI, I discussed the treatment train question with Annette Lucas in our Central Office, and evidently when they convened the stakeholder group to establish the MDCs the group discontinued the treatment train methodology. Evidently treatment trains are based on diminishing returns on percent removal, and NCSU, EPA, and others have moved to percent concentrations as the basis for pollutant removal as opposed to percent removal. (You will not need credit for the dry pond if it is inside the wet pond's drainage area, but FYI.) 4. 5/18/18 Add Info Response (H. Cook): Three drainage area (DA) sheets were provided on 5/18/18: a. DAM 1: Pre -development drainage (map not inserted) b. DAM2: Post -development drainage _ Ma r J 4� PW O SHEET -_ i- _— — -= DN 2 I a State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 25405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 7 of 13 c. DAM3: Existing Wet Pond drainage area map. • M�iv r� %cr , w..ie •o .,�wc rn:r pu nr..w r 5. 6/20/18 DEMLR (K. Johnson): a. These three maps (DAM I, DAM2, and DAM3) show the same area, but the entire drainage area for the project does not appear to be on a drainage area map. Please show the entire project. b. Please show the following three drainage areas on the drainage area map: i. Three drainage areas: 1. Existing/Offsite: 14.76ac 2. Wet Pond (with dry pond for hydrology): 9.57ac 3. Low Density Area: 36.34ac ii. Other items needed: 1. Please clarify the: a. Location of the drainage area line draining offsite to SW8 070333 prior to this modification. b. Location of the drainage area line draining offsite to SW8 070333 after to this modification. State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. NC 28405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 8 of 13 c. Questions: i. DAM3 shows areas such as "portion of drainage area managed by SCM 1 prior to release into existing wet pond drainage area". Which drainage area is that area now in (offsite, wet pond/SCM2, or low density?) Please ensure that the drainage areas before and after the modification are clear on the plans. ii. DAM2 shows sub -drainage areas totaling to 19.36ac. But, that value isn't the size of any of the drainage areas (offsite, wet pond/SCM2, or low density)? iii. Where is the dry pond in relation to the wet pond? (Before or after?) 2. Please show and label the "natural drainage area boundaries", "variations in land use throughout the project", and/or "construction phasing" per [.1003(1)(d)] as discussed above to establish that the project can have low density areas since it is overall high -density. For clarification, this must be a line on the plan and you have to also provide justification that that line meets the requirements of .1003 (1)(d). 3. Please submit two copies of the drainage area maps. (One copy of each map was submitted on. 5/18/18.) 4. Please provide dimensioned project or project phase boundary with bearings and distances [.1042(2)(g)(ii)]. 5. Please provide the contours and drainage patterns within the drainage areas [.1042(2)(g)(ii), .1002(15), and .1002(38)]. 3. Permittee: a. 2010 Permit Typo: The current (2010) permit is written to "Brunswick County Schools". That was a typo because the application listed "Brunswick County Board of Education" as the intended permittee and as the owner. I will note a correction when the modification is issued. b. Questions: i. The Special Warranty Deed submitted for the portion of the project that will be added shows that "The County of Brunswick" owns the real estate pursuant to a 12/5/16 Agency Agreement with "Brunswick County Board of Education.". It says "It is the intention of both parties to combine this parcel together with the 21.29ac [tract already permitted]." 1. 21.20ac Tract: a. 3/27/18, KJ: I do not see a deed on file for the 21.29ac tract that was permitted in 2010, and so I do not know who owns that tract. Please submit this deed. b. 3/28/18, HC: The old deed is attached. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington NC 28405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 9 of 13 c. 6/20/18: The 21.29ac deed is on file. ii. What is the nature of the relationship between the County and the Board of Education? There are two potential paths forward: 1. Function Like a Lease?: a. 3/27/18, KJ: Does it function like a lease such that we can fill out the application as a lease, and have both parties sign the application? The application essentially says that if the lease/agreement falls through that the property owner will be responsible for the permit. The exact statement to sign is inserted below. If so, please have both parties sign the application in the appropriate areas. There are directions on the application form. (I suspect that this will be what you end up choosing to do....) b. 3/28/18, HC: Discussions are taking place to determine the best way to proceed. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEILR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit I understand that the operation of a stormwater treatrwnt facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. 2. Permit Issue to Both?: a. 3/27/18, KJ: Or, do you want the permit issued to both parties with both parties signing as owners/permit applicants? i. If so, please submit signatures as permit applicants. (You would just have two copies of the applicable pages so that you can have two signatures.) ii. Please also submit O&M agreements from both parties. 1. Permit Information Update Form: Since the permit should already be issued to the Brunswick County Board of Education and we are either going to issue the modified permit to either the Brunswick County Board of Education and the County of Brunswick as either a situation similar to a lease or as co-permittees, we will not require a formal permit transfer. (This will be much simpler and cheaper.) But, we will need to have the Permit Information Update Form for the file to document the official change of ownership. The form is available on our website, https://deq.nc.gov/about/divisions/energy- mineral-land-resources/energy-mineral-land- rules/stormwater-program/post-construction. b. 3/28/18, HC: i. Discussions are taking place to determine the best way to proceed. ii. Acknowledged. 3. 5/18/18 (H. Cook): The application was revised to issue the permit to both: a. The County of Brunswick, and State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 10 of 13 b. Brunswick County Board of Education 4. 6/20/18 DEMLR (K. Johnson): No further action needed on this item. For clarification: a. The Permit Update Form has been submitted. b. Correction to Original SW8 071210 Permit: The permit will reference a correction noting that it was issued to Brunswick County Schools, but it should have been issued to Brunswick County Board of Education. c. Correction to Master SW8 070333 Permit: This is the master permit where 17.46ac of the SW8 071210 project area will drain. I will issue a "correction" to this permit to document the fact that the SW8 070333 drainage area plans were not on file, and that SW8 071210 moved the drainage area line for the SW8 070333 for the area inside SW8 071210. There was no net change in either the drainage area or the impervious area previously permitted as offsite area for SW8 071210 by SW8 070333. 4. 6/20/18: Now that we have established the size and location of the three drainage areas and resolved most of the other big -picture items, I have been able to conduct the standard review for the project as a whole: a. Main Pool Surface Area and Volume, [.1053(1)]: i. Hydraulic Residence Time: It appears that the Design Volume Required was calculated using the difference of the pine and post development values. This is done in SA waters where the design storm is higher, but for non -SA designs the pre -development volume is not removed from the Design Volume [A 019(6)]. The data below is recommended. 5/18/2018 6/20/2018 Drainage Area. 417,028 417,028 impervious area: 235,554 236,554 Volume of Main Poo;, Vmp: 61,002 71,177 Hydraulic Residence Time, HRT: 14 14 Average Time Between Events, Ts: 5 5 Design Volume Required, DV: 25,042 29,219 Rv: 0.5605 0.5605 Design Storm: 1.5 1.5 sf sf cf days days cf ii. Please submit the table showing the elevations, areas, incremental volumes, and accumulated volumes for the main pond/basin, forebay and the total [.1042(2)(f)]: 1. Please ensure that you do not include the minimum six-inch sediment storage in the volumes provided [.1053(3)]. 2. Please also ensure that you size the forebay to 15-20% of only the main pond/basin (as opposed to the basin + forebay) [.1053(5)]. 3. Please ensure that the average depth is sized per the equations in the design manual under MDC 2 for wet ponds [.1053(2)]. Please note that the equations in the manual use "VPP" as the Volume of the permanent pool of the main pond/basin (as opposed to the basin + forebay). 4. Please show the relevant elevations on the plans. For instance, the plans show that the "bottom" of the pond is 17.Omsl, but it is unclear if that is the bottom of the sediment elevation (excavated depth) or the top of the sediment elevation (used for pond design). State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 11 of 13 5. Here is an example from another project. Basin Forebay Tatal Contour Contour Contour El SA lnc Vol Cum Vol El SA Inc Vol Cum Vol El Vol CumVol (ft) (30 (cf) W1 (ft? (sf) (cfi (cf) (ft) (cf) (cf) Excavated Depth, Main Pond 11.5 0 0 Q 11.5 Bottom Poad, Main pond 12.0 14,201 Q Q iSAInc excavated Depth tdeepest point), Farebay 12.5 15,069 7,318 7,318 12.5 Q 0 0 Bottom Road, Forebay 13.0 15,9371 7,752 15,059 13.5 2,912 0 0 13.0 14.0 17,745 16,841 3i,91Q 14.0 4,676 1,897 i,897 14.0 pp 16.5 22.902 11,120 82,316 16.5 7,289 3,441 16451. 16.5 17.0 17.5 TP Volume: 39,954 PP Volume: 98,767 = 82,316 (basin) + 16,451 (forebay) PP Area: 30,191 27.902 fbasin)+ 7,289 (forebey' 2017 Design Manual: Average % Forebay #1: iii. Pond Supplement Form: 1. Please update this form to reflect any revised values (including any drawdown values if they are revised.) 2. The supplement form indicates that there will be 336,554sf of new impervious (which is the total on the application for the new pond/SCM2). But the form also indicates that there will be 6,838sf of existing impervious area? 3. Please email the supplement form to the email address provided below so that it can be preserved electronically per the regulatory requirements [.1042(2)]. b. Low Density Area: Will there be swales in the low density drainage area? If so, please provide the following. If not, please disregard this paragraph. i. Supplement Form: Please provide the low density supplement form. ii. Swale Flow Rate, Non -Erosive for 1Oyr Storm [. 1003 (2)(c)(ii)]: Please provide engineering calculations supporting the information presented in the low density supplement to demonstrate that the conveyances have been designed to not erode during the peak flow from the 10-year storm event. iii. Please email the supplement form to the email address provided below so that it can be preserved electronically per the regulatory requirements [.1042(2)]. c. Setbacks/Buffers [.1003(4)(a)]: The plans identify "Potential Waters of the US/Relatively Permanent Waters". i. Has this been determined not to be a stream? 1. If this is not a stream, please provide justification/documentation. 2. Please provide a 5Oft setback measured from the centerline of the stream (if applicable). The setback shall be measured from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. Please identify the top of bank on the plans and the associated 50-foot setback. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 12 of 13 ii. Swales to Buffers [.1003(4)(e)]: All stormwater discharges into the vegetated setback must be released at the edge of the setback and allowed to flow through as dispersed flow. Please update the plans if necessary. d. Forebay [.1053(5)(b)]: The forebay entrance shall be deeper than the forebay exit. Please update the pond detail. e. Emergency Overflow [.1050(5)]: SCMs shall include an overflow or bypass device for inflow volumes in excess of the treatment volume, or, if applicable, the peak attenuation volume. Please provide an overflow. f. Trash Rack [.1053(10)]: A trash rack or other device shall be provided to prevent large debris from entering the outlet system. Please provide a detail of the device as opposed to a note that the contractor will choose a trash rack. (DEMLR recommends </= 6" openings.) g. Pump for Drawdown [.1050(6)]: SCMs shall have a method to draw down any standing water to facilitate maintenance and inspection. Please include a note on the plans regarding how the pond will be drawn down. h. Fountain [.1053(9)]: If you would like to be able to install a fountain in SCM2, then please select a maximum pump horsepower and provide documentation that it will not cause a resuspension of sediment within the pond, or cause erosion on the side slopes of the pond. i. Berm Velocity [.1053(5)(c)]: Please demonstrate that the water flowing over or through the structure that separates the forebay from the main pool shall flow at a nonerosive velocity. Pond Inlet and Outlet Flowrate, Non -Erosive for IOyr Storm [.1050(4)]: i. Please provide engineering calculations demonstrating that the inlets of the SCMs shall be designed to protect the SCM from erosion resulting from stormwater flow into the SCM during the peak flow from the 10-year storm event. ii. Please provide engineering calculations demonstrating that the outlets of the SCM will not cause erosion downslope of the discharge point during the peak flow from the 10-year storm event. k. E&SC Note [.1050(7)]: Every SCM impacted by sedimentation and erosion control during the construction phase shall be cleaned out and converted to its approved design state. Please provide a note on the plans for this issue. 1. List of Sheet Numbers: Please provide a list of sheet numbers that are relevant to covering all of the intended data for the State Stormwater permit. It appears that some sheet submitted may not be needed. (For instance, the demolition plan.) Please remember to confirm that any revised information is presented consistently throughout the application documents including calculations, supplements, narrative, and plans. Please also remember to provide two hard copies of any updated documents per 15A NCAC 02H.1042(2). The requested information should be received in this Office prior to July 6, 2018, or the application will be returned as incomplete. Please note that only three letters requesting additional information is allowed in the State Stormwater Program. If the information is not satisfactorily provided after the second request, the project will be returned. If the project is returned and you wish to re -submit later, you will need to resubmit all required items at that time, including the application fee. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 State Stormwater Permit No. SW8 071210 Page 13 of 13 If additional time is needed to submit the requested information please e-mail, mail, or fax your extension request, prior to the original due date, to the Division using the contact information available in this letter. The extension request must include a justification and a date of when the requested information will be submitted to the Division. Please remember that extension requests delay the issuance of the final permit. The Division is allowed 90 days from the receipt of a complete application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a v oiatiun of NNCGS 143 215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned application number on all correspondence. If you have any questions concerning this matter, please feel free to call me at (910) 796-7215 or email me at kelly.pjohnson@ncdenr.gov. Sincerely, Kelly Johnson Environmental Engineer GDS/kpj: \\\Stormwater\Permits & Projects\2007\071210 HD\2018 06 addinfo 071210 cc: Ms. Holly Cook, PE, McGill & Associates (via email only) Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Of icc 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 Johnson, Kelly From: Johnson, Kelly Sent: Wednesday, June 20, 2018 2:56 PM To: 'Holly Cook'; 'Craig Eckert' Cc: 'Michael Norton'; 'Lora White' Subject: SW8 071210, Town Creek Elementary School State Stormwater Permit Attachments: 2018 06 addinfo 071210 via email.docx Mr. Eckert & Ms. Cook, Please see the attached request for additional information. Please note that the DEMLR no longer mails hard copies of these letters. This is the only copy you will receive. Also, I have added onto tine summary of the previous discussions we have had. Please note that the relevant/new information is in blue. Thanks, Kelly From: Johnson, Kelly Sent: Thursday, May 17, 2018 3:52 PM To: 'Holly Cook'<holly.cook@mcgillengineers.com> Cc:'Michael Norton'<michael. norton@ mcgi I lengineers.com>; 'Lora White'<Iora.white@mcgiIlenginee rs.com> Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School - FYI Holly, i got your voicemail. I think it would best to just issue an extension so that you all can get the signatures you need rather than submitting the package without the signatures. What date do you need for the revised due date? Thanks, Kelly From: Johnson, Kelly Sent: Wednesday, May 9, 2018 8:55 AM To: 'Holly Cook' <ho ily.cook@mceil!engineers.com> Cc: Michael Norton <inichael.norton@mcgillent ineers.com>; Lora White < ora.white@mceilleneineers.com> Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School - FYI 5/18 it is. Thanks, Kelly From: Holly Cook [mailto;hoily.coo -a -ncgill_e.nvine. rs.com] Sent: Wednesday, May 9, 2018 8:37 AM To: Johnson, Kelly <.kelly.p.ohnson@ncdenr.,-7;ov> Cc: Michael Norton <m chael.norton q c1illeng�neers.com>; Lora White <lora.white a me itlengineers.com> Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School - FYI Kelly, Thank you for the direction. We will proceed with modifying the drainage area and report to ensure an area match. Would Friday, May 18 be an acceptable due date? Sincerely, Holly Cook, PE Project Engineer `McGill 1 t t 11# E 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 holIV.cook@mcgillengineers.com I www.mcgillengineers.com From: Johnson, Kelly j srtsor ncc:e �r._.ov> Sent: Tuesday, May 8, 2018 3:42 PM To: Holly Cook<h:.�Ilv.cc,c'-�r`ic;illengis�eers.cc�^r�> Cc: Michael Norton <mici.ael.r,ortor;c2mc iIlenu ineersocom>; Lora White<iora.wf,iteCmc�:?.Ilengineers.car:i> Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School - FYI Holly, David was unable to find the DA map for the cther permit that Town 'Creek Elementary drains partially offsite to (SW8 070333). Technically, i an, supposed to e.sk SW8 070333 to modify that Permit to show that the: DA line moved. But I can't exactly do that if the SW8 070333 plan is not in the DEIVILR file, and the original design engineer alsc does not have it. So, I talked to GecYgette about it and we are going o have w move on without me U ing SW8 070333 because there really isn't any other choice. I will have to work out the %-?etails on how I document this in t1? files, but we will move forward with modifying the school (SW8 071210) with the drainage area lines "moving" as you have proposed. As we discussed, I created toe drawing below to depict the genera! idea of, how the line will inove and that the square footage of the drainage areas ai?d impervious areas will be maintained. Bur, I understand that the yei ow in this diagram may be larger on the actual plan set. If you have questions or if you need to extend the 5/14 due date, please let me know. Thanks, Kelly Johnson, Kelly From: Johnson, Kelly Sent: Monday, June 18, 2018 3:26 PM To: 'Craig Eckert' Subject: RE: [External] Town Creek Mr. Eckert, I understand that you all need to get this work done before school. (I am a Belville Elementary parent.) I will do what I can to get through this quickly. I can't, however, approve the permit in pieces. I have to approve the whole set of plans at the same time. I will get to this as soon as I can. Thanks, Kelly From: Craig Eckert [mailto:ceckert@bcswan.net] Sent: Friday, June 8, 2018 10:55 AM To: Johnson, Kelly <kelly.p.johnson@ncdenr.gov> Subject: [External] Town Creek Hi Kelly I know that you are probably really really busy hence the email versus a phone call. We secured early funding for the early site work and the elementary school addition. The early site work was a combined subcontractor bid. The early funding was to complete the extensive trucking of unsuitable material/fill prior to buses rolling in August and to support the elementary school addition completion for the 2019 school year. The contractor had scheduled to do the school pad earthwork this summer, extend water and sanitary sewer under the pads, and get out from under the existing/new bus loop with utilities (and repave). I believe that one run of new storm line with a couple of boxes is in that bus loop. McGill will issue construction drawings for selected work (erosion control measures, water, sanitary sewer, but can not issue the bus loop storm sewer drawing without clearance from NCDEQ. Could myself and Mcgill possibly meet early next week to discuss, or could you look at the bus loop area and possible cut that area loose. I really appreciate any additional help above what you have already done for us. I'm on the road today but my cell is 910-398-3815. I'm in constant email contact also. Thank You Craig BRUNSWICK COUNTY SCHOOLS Craig Eckert, Director of Capital Projects & Planning (W) 910-253-1078 (C) 910-398-3815 ceckert0%bcswan.net All e-mail correspondence to and from this address is subject to the North Carolina Public Records Law, which may result in monitoring and disclosure to third parties, including law enforcement. CEI 111;' .`_ E WwaT`.t i Visit the BCS homepager Johnson, Kelly From: Michael Norton <michael.norton@mcgillengineers.com> Sent: Monday, June 4, 2018 4:19 PM To: Johnson, Kelly Cc: Holly Cook Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School - FYI Hi Kelly I wanted to update you on the project status following a meeting by the owners last week. In order to satisfy site construction needs while the children are out for summer break the contractor will need to begin initial site clearing on June 111h (under the approved EC Plan). I've discussed this with Rhonda, and made the contractor aware of the need to follow up with Creighton Brown ahead of time. Obviously, no impervious areas or specifics related to stormwater approval will be authorized until final approvals are received, but I wanted you to be aware of the schedule for site preparation in case you received any calls or correspondence. Thanks again for all your help. Michael Michael A. Norton, PE Shallotte Office Director 'McGfll ,. AKS0VIAl}iS, 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755,5872 1 Cell: 910.367.6869 1 Fax: 910.755.5875 michael.norton@mceillengineers.com I www.mcaillengineers.com From: Johnson, Kelly <kelly.p.johnson@ncdenr.gov> Sent: Tuesday, May 8, 2018 3:42 PM To: Holly Cook <holly.cook@mcgillengineers.com> Cc: Michael Norton <michael.norton@mcgillengineers.com>; Lora White <lora.white@mcgillengineers.com> Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School FYI Holly, David was unable to find the DA map for the other permit that Town Creek Elementary drains partially offsite to (SW8 070333). Technically, I am supposed to ask SW8 070333 to modify that permit to show that the DA line moved. But I can't exactly do that if the SW8 070333 plan is not in the DEMLR file, and the original design engineer also does not have it. So, I talked to Georgette about it and we are going to have to move on without modifying SW8 070333 because there really ihn't any other choice. I will have to work out the details on how I document this in the files, but we will move forward with modifying the school (SW8 071210) with the drainage area lines "moving" as you have proposed. As we discussed, I created the drawing below to depict the general idea of how the line will move and that the square footage of the drainage areas and impervious areas will be maintained. But, I understand that the yellow in this diagram may be larger on the actual plan set. If you have questions or if you need to extend the 5/14 due date, please let me know. Thanks, Kelly Current Offsite DA - Proposed Offsite DA Line } fit imap Aria w Ofsite Purl] NMI 0704331 ru4inagv Area Abased to tifNIP, Porto E) Ui:iartrgv Airft riPrtv6�eci firnrrt){tsiw•�(artLt itre'ved in auhv m-"Ci4 -)Where c Q =6-i? i3oif0 ?r�m+..,,o.iff-..ar.d rent&prfizoi0 ¢nftsivif1/eiFl�_s/ From: Johnson, Kelly Sent: Tuesday, April 10, 2018 9:50 AM To:'Holly Cook'<holly.cook@mcgillengineers.com> Cc: Michael Norton<michael.noi_ton@mcgillengineers.com>; Lora White <lora.white mcgillengineers.com> Subject: RE: [External] RE: Town Creek Elementary School - FYI 4/25 sounds good. I will keep you in the loop in what I hear from David. Thanks, Kelly From: Holly Cook[riiailto:holly.cook@mcgillengineers.com] Sent: Tuesday, April 10, 2018 9:46 AM To: Johnson, Kelly<I(L,-Ily.i:).=hnsni:@ncdenr.gov> Cc: Michael Norton <michael.norton me illengineers_com>; Lora White <lora.white « me ig Ilengineers.com> Subject: [External] RE: Town Creek Elementary School - FYI External email. ❑o not click links or open attachments unless verified. Send ail suspicious email as an attachment to Kelly, Based on the emails below, this is an official request to extend the Wednesday, April 11, 2018 request for information due date two weeks to Wednesday, April 25, 2018. Sincerely, Holly Cook, PE Project Engineer 0 McGifl . 712 Village Road SW, Suite 103 i Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 hollv.cook@mceilleneineers.com I www.mcgilleneineers.com From: Johnson, Kelly <kelly.p.iohnson ncc'nn> Sent: Tuesday, April 10, 2018 8:44 AM To: Holly Cook<holiy.cook@mcpilleneineers.com> Subject: Town Creek Elementary School - FYI Holly, The original engineer is going to try to find the DA map, FYI. Thanks, Kelly From: d bowman [mailto:dbowman atmc.net] Sent: Monday, April 9, 2018 4:05 PM To: Elizabeth Nelson <elizabeth.nelson@capefearengineerir►g.com> Cc: Johnson, Kelly <kellv.p.iohnson@ncdenr.eov> Subject: [External] Re: Rice Creek Plantation -� ternal email. Do not click links or open attachments unless verified. Send al sif picioUs entail as an attarhrnent to Kelly, I'm not exactly sure just what you are looking for, but I do have most of the files and paperwork for both the Rice Creek Development and Town Creek Elementary School. I'll try to look through those files and see what I can find pertaining to drainage areas and the pond for the school. It may take a little time since all of those records are in boxes in storage, but I'll see what I can do. I'll let you know what I find. David B. Bowman, PE From: "Elizabeth Nelson" <eiizabeth.neison@ca efearen_gineerin .com.- To: "d bowman" <dbowmar i;aatmcmet> Cc: "Johnson, Kelly" <kelly.p.iohnson nrdei-lr�.c ov_> 11W Sent: Monday, April 9, 2018 8:08:39 AM Subject: FW: Rice Creek Plantation David — Hope you are doing well! See below from Kelly Johnson — please let her know if this is something you can provide — she is copied on this email. Elizabeth tf nelson, PE CAPE PR ENGI'NE ERi�+C elizabetn :-elson ca efearenaineerin .com PH: 910.30. 1 044 151 Poole Road, Ste. 100 1 Belville, NC ! 28451 From: Johnson, Kelly [mailto:kelly.p.[ohnsnn i-cae�nr_EoL] Sent: Friday, April 06, 2018 11:27 AM To: Elizabeth Nelson<elizab-eth.nelson(a?capeieareii i� iieering.com> Subject: Rice Creek Plantation Elizabeth, This is a long shot. I am missing a piece of paper in a file and I am hoping you may have a copy of it... Avery longtime ago you worked on this project, which is next to Town Creek Elementary. Pond 8 was revised to let the school drain offsite to Rice Creek Plantation. The Drainage area map for Pond 8 was clearly submitted (#7 below), but it is not on file. (Three versions of the permit are also missing...) The school is changing, and they need to move that DA line. I have asked them for a minor modification for Rice Creek to show the DA line's new location. But, that is hard to do since we don't know the old location. (The school at least knows where the line is on *their* property, so they can move forward. But, it is sloppy to not have the DA line for Pond 8 in its file.) I realize that you don't even work there anymore, but I thought I would reach out and check... Thanks, Kelly 13 0 W M AN D k,"S 101 N E N (111 N E E RIN 61 SERVICES, PA 143 1 k4llen I *g4h Awid. Nuot: 3, 14 llliw* !4S, -441.4w, N,Vht i4roVa'a 29459 Mom.. '416�7- k 5165216 fitv 'IM-W f7,Q'7 A I k-.,,fsutt 6, 2010 W CM4 Usimr Uiviston *w W',nvr Quality NC I kp,Wrnvli.t vf i;'Invwmoicni Natur-.6 Rcs;-4mct— V7 Ni It.4% Cvvt-c.l?ij Hick CrVOC - F,144.mo 1 (4 M1 4 01 k 1.14 ix-4411( x..1* Brunswick S I L,' & A,,,,octatc,,. LA, cto li, ed (1,A., Stormwatcr Modification. request fast Ric,-, C.A. A Ph23c I. The rcqul cq,,svocd to rtnt-Ac S p;vtrj,;" #)� 4,4: ;404 Uwe thr 11111t;ff -q 1+'Cw*,M!'1v1, v on .*,�Aolw 1-will ,q�rjll mml rint. rtipy N t4w, Mormmilrr 1%12n2g#.-tTvm Amint A1,11, MV. !01. VI -rim otw k.m mjna< and glin 4:.:A"v ,hv %Noo Imcimte) Basin Scppk"icw --r fl,md )4 SWATH, Rry .1' ; (14m -JOAmai X.)d —14- ((;PY Qf lilt I'll-b 01clo "Y."tm thc 'I ?" �x, v., ighf art arvIlied rAt If sr polid V" ::#1 id rt - k, I ivi I �.v f At oll 60 -t It 14 Ir ! 1: t I 111 f ,l [Yl I f a I u Cht-A, On UMl to 1:4 I'VILir IN rckjllirCtI express Permit modificxf-m I'vC f cop, 'i 'Elf trv-,.rd Y-wo I.J. S)f kh. Paq,. , W AIC', 'M- w 7 Jcamq ow Clk+ f4W (JA: thl AO -41+-'-41C 4 "d PC NJ Hu.4w. colts. -Mr of's. Iffil-t. f rma :mv rift-imiation. Sincerely, Fovlovswr% rt, Pilt-, WYM-02 (Rice Cxvpk. Pfisu7 1) R1'1" 0 6 ZOID 5 ollwsov+, Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. McGill A S S O C I A T E S May 17, 2018 Ms. Kelly .lonnson NC Division of Energy, Mineral & Land Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Dear Kelly: o1�a�o Subject: Stormwater Permit Application Town Creel; Middle School and Elementary School Classroom Addition Lake Park Drive SE Winnabow, North Carolina Please find enclosed the following items for review and approval for the above referenced project: Item Copies Description 1. 1 Original Stormwater Management Permit Application Form — Revised 2. 1 Copy of the Stormwater Management Permit Application Form 3. 1 Original Supplement Forms - Revised 4. 1 Copy of the Supplement Forms 5. 1 Original Operation & Maintenance Agreement - Revised 6. 1 Copy of the Operation & Maintenance Agreement 7. 1 Original Permit Information Update Application Form 8. 1 Copy of the Permit Information Update Application Form 9. 1 Stormwater Design Report - Revised 10. 2 Construction Plan Sealed May 17, 2018 (Partial Plan Set) The plans, applications, and calculations have been updated based on your March 27, 2018 request for information and subsequent correspondence. Please replace the original submittal documents with the enclosed attachments as required. In summary, the built upon area and total drainage area for the existing off -site wet pond have been balanced to equal the numbers shown on the existing Town Creek Elementary School stormwater permit in order to avoid modifying the existing Rice Creek off -site wet pond permit. The detailed calculations can be found in Section 13 of the Stormwater Report. The required updates have been made to the three enclosed Drainage Area Maps which can be found in Section 4 of the Stormwater Report to accommodate the balance in numbers. No major changes have been made to the construction plans. RECEIVE 712 VILLAGE ROAD SW, SUITE 103, SHALLOTTE, NORTH CAROLINA 28470 1 910.755.5872 1riIlIem 0� %Y: I'agtG This project has three main drainage areas. 1. Existing off -site wet pond, including SCM 1 dry pond for stormwater management purposes 2. Proposed on -site wet pond 3. Tow density sheet flow The enclosed application and supplemental documents have been revised as recommended to include both the County and Board of Education as the permittee in order to avoid a Permit Transfer as the original permit was issued in the wrong name. Please contact me at (910) 755-5872 or holly.cook@mcgillengineers.com should you have any questions during your review. We appreciate your help in this process. Sincerely, ,jM/c�/GJI,L�L ASSOJCIATES, P.A. �7u+.c yJ .wJ Holly Cook, PE Shallotte Office Enclosures cc: Kurt Thompson, RA, KSQ Design Craig Eckert, Director of Capital Projects & Planning, Brunswick County Schools Johnson, Kelly From: Johnson, Kelly Sent: Thursday, May 17, 2018 3:52 PM To: 'Holly Cook' Cc: 'Michael Norton'; 'Lora White' Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School FYI t•;olly, i aot your voicemail. I think it would best to just issue an extension so that you all can get the signatures you need ratifier than submitidng the package without the signatures. What date do you need for the revised due date? hanks, Kelly From: Johnson, Kelly Sent: Wednesday, May 9, 2018 8:55 AM To: 'Holly Cook'<holly.cook@mcgillengineers.com> Cc: Michael Norton<michael.norton@mcgillengineers.com>; Lora White<lora.white@mcgillengineers.com> Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School - FYI 5/18 it is. Thanks, Kelly From: Holly Cook [mailto:holly.cookt@mcgillengineers.cc,m] Sent: Wednesday, May 9, 2018 8:37 AM To: Johnson, Kelly <kelly.p.iohnson@ncdenr.gov> Cc: Michael Norton <michael.norton me ill-nyineers.com>; Lora White<lora.white@mcgillengineers.co_m> Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School - FYI Kelly, Thank you for the direction. We will proceed with modifying the drainage area and report to ensure an area match. Would Friday, May 18 be an acceptable due date? Sincerely, Holly Cook, PE Project Engineer . I'cG-M M L—em% ,, ' o # i % J : S 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 holIV.cook@mcgillengineers.com I www.mcgillengineers.com From: Johnson, Kelly <k Ihpiohnson@ncde�.ov> Sent: Tuesday, May 8, 2018 3:42 PM To: Holly Cook <holly.coo_,(^+mr.?iElen.r;ineers.com> Cc: Michael Norton Lora White <lora.white@mcgillengiiie_:rs.com> Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School - FYI Holly, David was unable to find the DA map for the other permit that Town Creek Elementary drains partially offsite to (SW8 070333). Technically, I am supposed to ask SW8 070333 to modify that permit to show that the DA line moved. But I can't exactly do that I the SW8 070333 plan is not in the DEMLR file, and the original design engine _r also does not have it. So, I taiked to Georgette about it and we are going to have to move on without modifying SW8 070333 because there really isn't any other choice. I h.rill have to work out the detaiis on how I document this in the files, but we will move forward with mrmlifying the school (SW8 07 .210) with the drainage area lines "moving" as you have proposed. As we discussed, I -created the drmving below to depict the general idea of. how the: line will move and that the square footage of the drainage areas and impervious areas will be maintained. But, I understand that the yellow in this diagram may be larger on the actual plan set. If you have questions or if you need to extend the 5/14 due date, please let me know. Thanks, Kelly Cur-ert Offstte IAA line rg Ex mrsalp-Arr:t $r tisisltP Ft,ard �S3NH del:}3331 Proposed Offsite DA One Marriage Area "-, 0ftt4G. Pond (5w8070333) 1,r i<r,,.io' Ar• ,,r Atrri•l;ua i t±Ml t�;'Wi0 [3viatna4,»}At(.:.Rear>. N<,r. €Srk hr$K-Xid 04 r.itvd ui new pond) FA:.;i.;.��r!'.16 From: Johnson, Kelly Sent: Tuesday, April 10, 2018 9:50 AM To:'Holly Cook' <holly.! @r�illengineers.cnm> Cc: Michael Norton <michael.norton mcalller jneers.com>; Lora White <lora.white@mc illen; ineers.com> Subject: RE: [External] RE: Town Creek Elementary School - FYI 4,125 sounds good. I will keep you in the loop in what I hear from David. Thanks, :telly From: Holly Cook[mailtoholl��.coc►kmci;.lci.nePrs.com] Sent: Tuesday, April 10, 2018 9:46 AM To: Johnson, Kelly <kelly pJohnson(QncuLnr.gov_> Cc: Michael Norton <micltcel.norton mcgilleneiretr,rs.com>; Lora White<lora.whitegmceillerigineers.com> Subject: [External] RE: Town Creek Elementary School - FYI Extei nal email. Do not click links or open attacie is tiniest' verifle 1. Serw all suspicious email as an attachinert to Kelly, Based on the emails below, this is an official request to extend the Wednesday, April 11, 2018 request for information due date two weeks to Wednesday, April 25, 2018. Sincerely, Holly Cook, PE Project Engineer @McGill i' t ; A t ! n 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 holly.cook(@mcgillengineers.com I www.mcgillengineers.com From: Johnson, Kelly <kelly.p.iohnson@ncdenr.gov> Sent: Tuesday, April 10, 2018 8:44 AM To: Holly Cook <holly.cook mct?illeneineers.com> Subject: Town Creek Elementary School - FYI Holly, The original engineer is going to try to find the DA map, FYI. Thanks, Kelly From: d bowman mailto:dbowman@atmc.riet] Sent: Monday, April 9, 2018 4:05 PM To: Elizabeth Nelson <eliz:abeth. nelson AcapPfearent;inee rine.com> Cc: Johnson, Kelly <keL�r.p.iohnson@ncdenr.gov> Subject: [External] Re: Rice Creek Plantation xternal email. Do not click links or open attachments unless verified. Send ail suspipous email as an attachment to IAgaimt—Sg:n;. Kelly, I'm not exactly sure just what you are looking for, but I do have most of the files and paperwork for both the Rice Creek Development and Town Creek Elementary School. I'll try to look through those files and see what I can find pertaining to drainage areas and the pond for the school. It may take a little time since all of those records are in boxes in storage, but I'll see what I can do. I'll let you know what I find. David B. Bowman, PE From: "Elizabeth Nelson" <P!i7abeth.nelson(a--)capefearen�,iieeri�.a.com> To: "d bowman" net> Cc: "Johnson, Kelly" <kelp{.p..ioi)nson(a).ncdenr.gov> Sent: Monday, April 9, 2018 8:08:39 AM Subject: FW: Rice Creek Plantation David — Hope you ar-2 doing w-2ll! See below from Kelly Johnson —Please let her know if this is something you car. provide — she is copied on this email. Elizabeth M.'NW[ O-11, PE CAFE FEAR ENC I :e:I` �:�ING eli:'7aeth.r;Elc�«c�fearer_,cinri..n. 151 Poole Road, Sto. 1 5 i Belville; l iv 2' =t51 From: Johnson, Kelly [ri ,ilto:!:ell_n. ,_ hr_4.�r Sent: Friday, April 06, 2018 11:27 AM To: Elizabeth Nelson <e!izabeth.nElsnn canEf aPen;in22L nV,.o in> Subject: Rice Creek Plantation Elizabeth, This is a long shot. I am missing a piece of paper in a file and I am hoping you may have a copy of it... A very long time ago you worked on this project, which is next to Town Creek Elementary. Pond 8 was revised to let the school drain offsite to Rice Creek Plantation. The Drainage area map for Pond 8 was clearly submitted (#7 below), but it is not on file. (Three versions of the permit are also missing...) The school is changing, and they need to move that DA line. I have asked them for a minor modification for Rice Creek to show the DA line's new location. But, that is hard to do since we don't know the old location. (The school at least knows where the line is on *their* property, so they can move forward. But, it is sloppy to not have the DA line for Pond 8 in its file.) I realize that you don't even work there anymore, but I thought 1 would reach out and check... Thanks, Kelly 10* HOW MAN OESIGN SLRVICES, PA 143 RDIden jlvtcb 4vjuA..Sjjjtt 3, Yo 11ok anilina 294-3-V Auvoi t 6, 20: it -'l14j 'ILI 4A and Natural Rcsmircri ve 1?xtcnsinn Courttv h.4xhfic,ztj(jn �ri1,whaif f f Brunswick 9YU & -Vm-oot,. IJA, vicloscd jb the Stormwater NfodificAtion request - , .1.1 v 111" a &M V.�U-­t rv.moTc a ;zmi.m o'o-: MV Bill: f4j.p1r;"". .1f3d WIt C ""T)t ;J"v 1Rt.t Dcrvl.tloj lim'v" S-Cn�-Omlcmt V r It 1.4 111"XI.J.'Cru I'm the R, A; hvL i"! S2,kf 41 ttr vo'Vt 141( W It. W`.'.VA S;-.A7x^r V.-, t? t' r'xv. dltv�" -it IjTiWlmrt� 'It" -nap ;CA- flit- Ptv". , MAOINU44'% Vv* #-dv K2S(Xl (12 Oticr Creek- Phxsr 1) 6 2010 6 VO "LLbJohwSOVk' Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Johnson, Kelly From: Johnson, Kelly Sent: Wednesday, May 9, 2018 8:55 AM To: 'Holly Cook' Cc: Michael Norton; Lora White Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School - FYI 5/18 it is. Thanks, Kelly From: Holly Cook[mailto:holly.cook@mcgillengineers.com] Sent: Wednesday, May 9, 2018 8:37 AM To: Johnson, Kelly <kelly.p.johnson@ncdenr.gov> Cc: Michael Norton <michael.norton@mcgillengineers.com>; Lora White <lora.white@mcgillengineers.com> Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School FYI Kelly, Thank you for the direction. We will proceed with modifying the drainage area and report to ensure an area match. Would Friday, May 18 be an acceptable due date? Sincerely, Holly Cook, PE Project Engineeer 1MMcGfl1 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 holly.cook@mcgillengineers.com I www.mcgillengineers.com From: Johnson, Kelly <kelly.p.iohnson@ncdenrnv_> Sent: Tuesday, May 8, 2018 3:42 PM To: Holly Cook<holly.cook@mcgillengineers.com> Cc: Michael Norton<michael.norton@mcgillenginee rs.com>; Lora White<lora.white@mcgiIle ngineers.com> Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School - FYI Holly, David was unable to find the DA map for the other permit that Town Creek Elementary drains partially offsite to (SW8 070333). Technically, I am supposed to ask SW8 070333 to modify that permit to show that the DA line moved. But I can't exactly do that if the SW8 070333 plan is not in the DEiVILR file, and the or:aina: design engineer a'so does not have it. So, I talked to Georgette about it and we are going to have to move on wi-ihout modifyii lg SW8 070333 because there really isn't any other choice. I will have to work out the details on how! document this in the files, but we wi!I move forward with modifying the school (SW8 071210) with the drainage area lines "moving" as you have proposed. As we discussed, I created the drawing below to depict the general idea of how the line will move and that the square footage of the drainage areas and impervious areas will be maintained. But, ! understand that the yellow in this diagram may be larger on the actual plan set. If you have questions or. if ycu reed to extend the 5/14 Vue date, please let me know. Thanks, Kelly Current Offsite DA Lane 'N © (ltaigktgP qrr a tc+OHtit ?tm d {St1�,rf4 Ck7fl.i.�-3� Proposed of"atte DA Line © MainaPAVea to Of4skePond (SW8 070333) Nainae Area Add" to T) fPe Pond Q Drainage Ar ea Removed f rum Of (site Pond (Ireated in rrm pond) 4WN'te +���,Hen;c:�.�,a�r•a�.t!'�(,.3y5•«{,a�w��c,pz,•t�r.f�rr From: Johnson, Kelly Sent: Tuesday, April 10, 2018 9:50 AM To: 'Holly Cook' <holly.cook@mc i� Ilengineers.com> Cc: Michael Norton<michael.nortcn@mceillen==,ineers.com>; Lora White <lora.white@mcgiller in-ers.com> Subject: RE: [External] RE: Town Creek Elementary School - FYI 4/25 sounds good. I will keep you in the loop in what I hear from David. Thanks, Kelly From: Holly Cook [rrtailto;hoily.c(?ak af?mcgriller)rineers cam] Sent: Tuesday, April 10, 2018 9:46 AM To: Johnson, Kelly <kelly p Johnson@ncdenr.gov> Cc: Michael Norton <rr.ichael.rior ;on@mcgillcngineers.coi.i>; Lora White<Iora.whitePmcsillengineers.com> Subject: [External] RE: Town Creek Elementary School - FYI Johnson, Kelly From: Johnson, Kelly Sent: Tuesday, May 8, 2018 3:42 PM To: 'Holly Cook' Cc: 'Michael Norton'; 'Lora White' Subject: RE: [External] RE: SW8 071210, Town Creek Elementary School - FYI Holly, David was unable to find the DA map for the other permit that Town Creek Elementary drains partially offsite to (SW8 070333). Technically, I am supposed to ask SW8 070333 to modify that permit to show that the DA line moved. But I can't exactly do that if the SW8 070333 plan is not in the DEMLR file, and the original design engineer also does not have it. So, I talked to Georgette about it and we are going to have to move on without modifying SW8 070333 because there really isn't any other choice. I will have to work out the details on how I document this in the files, but we will move forward with modifying the school (SW8 071210) with the drainage area lines "moving" as you have proposed. As we discussed, I created the drawing below to depict the general idea of how the line will move and that the square footage of the drainage areas and impervious areas will be maintained. But, I understand that the yellow in this diagram may be larger on the actual plan set. If you have questions or if you need to extend the 5/14 due date, please let me know. Thanks, Kelly Current Offsite DA Line (] Drainage Area to Offsite Pond (SW8070333) Proposed Offsite DA Line j D: I iDrainageArea to Offsne Pond (SW it 0703331 DrainadeArea Addedta {t)ffsite Pond Q Drainage Area Removed from Offsite Pond (treated In new pond) 4Whery = © = 642,736sf of drainage area, and Impervious area sf -- 2346,3959finsidegreen lire (current& proposed offsite DA lines) From: Johnson, Kelly Sent: Tuesday, April 10, 2018 9:50 AM To:'Holly Cook'<holly.cook@mcgillengineers.com> Cc: Michael Norton <michael.norton@mcgillengineers.com>; Lora White <lora.white@mcgillengineers.com> Subject: RE: [External] RE: Town Creek Elementary School - FYI 4/25 sounds good. I will keep you in the loop in what I hear from David. Thanks, Kelly From: Holly Cook[ma ilto:holly.cook@mcgilie neineers.com] Sent: Tuesday, April 10, 2018 9:46 AM To: Johnson, Kelly <kelly.p.iohnson@ncdenr.eov> Cc: Michael Norton <michael.norton mceilleneineers.com>; Lora White<lora.white@mceilleneineers.com> Subject: [External] RE: Town Creek Elementary School - FYI • External email. Do not click links or open attachments unfess Kelly, Based on the emails below, this is an official request to extend the Wednesday, April 11, 2018 request for information due date two weeks to Wednesday, April 25, 2018. Sincerely, Holly Cook, PE Project Engineer MCGH*l A S S 0 C J A T F. S. 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 holly.cook(@mceillensineers.com I www.mcgillengineers.com From: Johnson, Kelly <kelly.p.iohnson@ncdenr.eov> Sent: Tuesday, April 10, 2018 8:44 AM To: Holly Cook<holly.cook@mceilleneineers.com> Subject: Town Creek Elementary School - FYI Holly, The original engineer is going to try to find the DA map, FYI. Thanks, Kelly From: d bowman [mailto:dbowman0atmc.net] Sent: Monday, April 9, 2018 4:05 PM To: Elizabeth Nelson <elizabeth.nelsonCcDcapefeareneineerine.com> Cc: Johnson, Kelly <kellv.p.iohnson(a@ncdenr.eov> Subject: [External] Re: Rice Creek Plantation not click links or opeauspicious email as an attaRto Kelly, I'm not exactly sure just what you are looking for, but I do have most of the files and paperwork for both the Rice Creek Development and Town Creek Elementary School. I'll try to look through those files and see what I can find pertaining to drainage areas and the pond for the school. It may take a little time since all of those records are in boxes in storage, but I'll see what I can do. I'll let you know what I find. David B. Bowman, PE From: "Elizabeth Nelson" <elizabeth.nelson(c)-capefearengineerinci.com> To: "d bowman" <dbowman(&-atmc.net> Cc: "Johnson, Kelly" <kelly.p.johnsonQncdenr.gov> Sent: Monday, April 9, 2018 8:08:39 AM Subject: FW: Rice Creek Plantation David — Hope you are doing welll See below from Kelly Johnson — please let her know if this is something you can provide — she is copied on this email. Elizabeth M. Nelson, PE E APE RAR elizabeth.nelsonCa)_capefearen.gineering.com PH: 910.383.1044 151 Poole Road, Ste. 100 1 Belville, NC 1 28451 From: Johnson, Kelly[mailto:kellv.D.iohnson(@ncdenr.eov] Sent: Friday, April 06, 201811:27 AM To: Elizabeth Nelson <elizabeth.nelson()capefearensineerine.com> Subject: Rice Creek Plantation Elizabeth, This is a long shot. I am missing a piece of paper in a file and I am hoping you may have a copy of it... A very long time ago you worked on this project, which is next to Town Creek Elementary. Pond 8 was revised to let the school drain offsite to Rice Creek Plantation. The Drainage area map for Pond 8 was clearly submitted (#7 below), but it is not on file. (Three versions of the permit are also missing...) The school is changing, and they need to move that DA line. I have asked them for a minor modification for Rice Creek to show the DA line's new location. But, that is hard to do since we don't know the old location. (The school at least knows where the line is on *their* property, so they can move forward. But, it is sloppy to not have the DA line for Pond 8 in its file.) I realize that you don't even work there anymore, but i thought i would reach out and check... Thanks, Kelly '.. BOWMAN DESIGN & ENGINEERING SERVICES, PA 143 Holden Beach Road, Suite 3, PO flex 748, Shallotte, North Carolina 28459 Manz„ 910-75,5.6526 Fax 910-755-6527 August d, 2010 Mr. Christ Baker Division of Watcr (,duality NC Department of Fnwronrnent and Natural Rcsoumes 127 Cardinal Drive I:x erasion Wiknington, North Carr►.ins 28405 Subject: Rick Creek— Phase 1 {# SW8 (1703334MOD) Brunswick County Moxhlicatton Dear Chris: On behalf of Brunswick M l &c Asfodatra, l.ld;. enclm ed is the Swrenuater Modification request for Rice Creek Phasc 1. The requctit is requested to mmovc a portion of the thoroughfare from i'ottd 0, and treat the runoff with a vWtaevc swa c� I. One original grid one copy of the Stormwater Management Permit Applicatim Farrrn ,S\XV -101, Version 07r' it )09). 2. One or4mal and one copy of the Wet Detention BaEin Suppktnent for 11ond 8 ,SW401. Rev 8) 3. (hie eirional and one copy of site Curb Outkt System Suppkmcnt fur the Thoroughfare, 4. Revised mAku: tions for land 9, and revised swal�e calculations fi)r the thoroughfare. 5. A check for $2,0(* to cover the required express permit mmlification for.. G. Two copies of revised Sheet U of the planr-, dated (181(f2lI0. 7. A revit ed drainage area map for the thimoughfare and Pond S. Please- contact our office if you require any udditimial infortnation. Sincerely, Enclosures cc: tile: B2910J)2 (Rice (:reek. Phasr 1) m % 0 6 2010 K.eL Ldiohwsow Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Caw and may be disclosed to third parties. 6 'P Johnson, Kelly ,yR 6701V� — VNt From: Johnson, Kelly '7 mi%(,\) Fzjyn -7tf fi7 1 -ce Sent: Tuesday, May 8, 2018 9:31 AM To: 'd bowman' =� {n45 1U�1��(7 C ,�ao(alo Subject: RE: [External] Re: Rice Creek Plantation r& T MWf- ((tE. 0 VIP Thanks.I appreciate your help. z9571w3070333 CadtKW-C� dO�-51"+ Kelly YiG�° 1� `�+ O\ CL IIJJp1UNA From: d bowman [mailto:dbowman@atmc.net] Sent: Tuesday, May 8, 2018 9:30 AM To: Johnson, Kelly <kelly.p.johnson@ncdenr.gov> Subject: Re: [External] Re: Rice Creek Plantation Kelly, sly 0-74w `%�w So�v� oI,, "O t' 06 s la -� GW $ 0163 �3 m� lUb . 1 have skimmed through the files for the Rice Creek Development and the Town Creek Elementary School, but I have not found what I think you are looking for. Unfortunately, there are several boxes of files pertaining to those projects up in my attic. I won't say that I do not have that particular drainage map, but I will say that I cannot readily put my hands on it. I'm sorry I couldn't be more helpful, but that project has been dormant for years. Hopefully, you can proceed without the map. David From: "Kelly Johnson" <kelly.p.iohnson(ccD-ncdenr.gov> To:- "d bowman" <dbowman(cD-atmc.net> Sent: Tuesday, May 8, 2018 8:56:13 AM Subject: FW: [External] Re: Rice Creek Plantation David, Have you had any luck with this? If you can't find it, or if it is a pain to do so, then we will be OK. I appreciate you offering though. Thanks, Kelly From: Johnson, Kelly Sent: Tuesday, April 10, 2018 8:09 AM To: 'd bowman' <.dbowman@atmc.net>; Elizabeth Belson <elizabeth.nelson@capefearengineerine.com> Subject: RE: [External] Re: Rice Creek Plantation Thanks to both of you. It isn't often that things go missing from the files. But, it is difficult when they do. I am looking for the drainage area map for Pond 8 from -August 2010. It looks like that pond was redesigned at that time to allow 1 the adjacent school to drain offsite to it. If you can't find it, it will be fine. I will find a work -al ound. ! appreci:ate you looking for it though. Thanks, Kelly From: d bowman [,,,ailto:dhowman@atmc.net] Sent: Monday, April 9, 2018 4:05 PM To: Elizabeth Nelson <elizabeth.nelson@capefearenginei-:?.rin¢.com> Cc: Johnson, Kelly <kelI�Lp,lohnson ncdenr.gov> Subject: [External] Re: Rice Creek Plantation •. Fxtnrrt�l err ! neat dick Wks or open attaaGt�rner►ts urdess vMrMed, Send att sums m8d as an astac! t to Kelly, I'm not exactly sure just what you are looking for, but I do have most of the files and paperwork for both the Rice Creek Development and Town Creek Elementary School. I'll try to look through those files and see what I can find pertaining to drainage areas and the pond for the school. It may take a little time since all of those records are in boxes in storage, but I'll see what I can do. I'll let you know what I find. David B. Bowman, PE From: "Elizabeth Nelson" <eiiz beth.nalsun d?canefearero�;IAarina rorr,> To: "d bowman" <dbowrnan(a)atmc.net> Cc: "Johnson, Kelly" <kelly.p.iohnson a_r�cdenr.r ov> Sent: Monday, April 9, 2018 8.08:39 AM Subject: FW: Rice Creek Plantation David — Hope you are doing well! See below from Kelly Johnson —please !et her know if this is somethir3 you can provide —she is copied on this email. Elizabeth M. Nelson, PF elizabeth.nelson(a�cal2efearengineerirri.com. Piny: 910.383.1044 151 Poole Road, Ste. 100 1 Belville, NC i 28451 From: Johnson, Kelly [mailto_;_kelly�.'ohnson ncd,anr.Rov_] Sent: Friday, April 06, 2018 11:27 AM To: Elizabeth Nelson <elizabeth. nelson @capefearenginee ring. com> Subject: Rice Creek Plantation Elizabeth, This is a long shot. I am missing a piece of paper in a file and I am hoping you may have a copy of it... A very long time ago you worked on this project, which is next to Town Creek Elementary. Pond 8 was revised to let the school drain offsite to Rice Creek Plantation. The Drainage area map for Pond 8 was clearly submitted (#7 below), but it is not on file. (Three versions of the permit are also missing...) The school is changing, and they need to move that DA line. I have asked them for a minor modification for Rice Creek to show the DA line's new location. But, that is hard to do since we don't know the old location. (The school at least knows where the line is on *their* property, so they can move forward. But, it is sloppy to not have the DA line for Pond 8 in its file.) I realize that you don't even work there anymore, but I thought I would reach out and check... Thanks, Kelly ,J---'-- .� K-ZL WOhlnsow Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Johnson, Kelly From: Johnson, Kelly Sent: Thursday, April 12, 2018 8:59 AM To: 'Holly Cook' Subject: RE: [External] RE: Town Creek Elementary School - FYI Holly, I don't know how long it will be until I hear from him, but it has only been since Monday that fie offered to help. Your project is really far along in comparison to all of my other projects. It is technically 261 in line overall, and it skipped ahead of 11 projects that haven't even been opened yet. I did the add -info really early on it because I saw the dry pond, and wanted to head off a potential issue later. So, let's extend your project until 5/14 (the Monday after a month from today).. If he hasn't responded by then I will figure out what to do at that point. Thanks, Kelly From: Holly Cook[mailto:holly.cook@mcgillengineers.com] Sent: Thursday, April 12, 2018 8:14 AM To: Johnson, Kelly <kelly.p.johnson@ncdenr.gov> Subject: RE: [External] RE: Town Creek Elementary School FYI External email. Do not click links or open attachments unless verified. Se�J all suspicious email as an attachment to I - Kelly, How much time will you give Mr. Bowman to located his files? With a 4/25 deadline, we will need them early next week to provide enough time to respond. Otherwise, we will need to request another extension. Will this be an issue? Sincerely, Holly Cook, PE Project Engineer UMcGRI A A S 0 C t A.1. C% 712 Village Road SW, Suite 103 i Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 hollv.cook@mcgillengineers.com I www.mcgillengineers.com From: Johnson, Kelly <kelly.p.iohnson@ncdenr.gov> Sent: Tuesday, April 10, 2018 9:50 AM To: Holly Cook<holly.cook@mcgillengineers.com> Cc: Michael Norton<michael.norton@mcgillengineers.com>; Lora White<lora.white@mcgillengineers.com> Subject: RE: [External] RE: Town Creek Elementary School - FYI 4/25 sounds good. I will keep you in the loop in what I hear from David. Thanks, Kcl lv From: Holly Cook[maiIto: holly.cook@mcgiIle ngineers.com] Sent: Tuesday, April 10, 2018 9:46 AM To: Johnson, Kelly <kelly.p.iohnson@ncdenr.l -ovv> Cc: Michael Norton <michael.norton2mcgil1gn ineors..cpm>; Lora White <lora.white. mc, IlenR;ri:-�ers.com> Subject: [External] RE: Town Creek Elementary School - FYI =-- — - External eta 6 ►>i t*16,w open attachrner-&. .%rtd A:Aspicious email as an attachment to Kelly, Based on the emails below, this is an official request to extend the Wednesday, April 11, 2018 request for information due date two weeks to Wednesday, April 25, 2018. Sincerely, Holly Cook, PE Project Engineer �� GH1 �-�i' MV 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 holly.cook@mcgillengineers.com I www.mcgillengineers.com From: Johnson, Kelly <kelly.p.iohnson « ncdenr.gov> Sent: Tuesday, April 10, 2018 8:44 AM To: Holly Cook <hnlly rnnkivmceilleneineers.com> Subject: Town Creek Elementary School - FYI Holly, The original engineer is going to try to find the DA map, FYI. Thanks, Kelly From: d bowman [mailto:dbowman atmc.net] Sent: Monday, April 9, 2018 4:05 PM To: Elizabeth Nelson <elizabeth.nelson@capefearenginee ring.com> Cc: Johnson, Kelly <kelly.p.iohnson@ncdenr.gov> Subject: [External] Re: Rice Creek Plantation External email. Do not click links or open attachments unless verified. Send all suspicious ernaA as an attachment to Kelly, I'm notexactly sure just what you are looking for, but I do have most of the files and paperwork for both the Rice Creek Development and Town Creek Elementary School. I'll try to look through those files and see what I can find pertaining to drainage areas and the pond for the school. It may take a little time since all of those records are in boxes in storage, but I'll see what I can do. I'll let you know what I find. David B. Bowman, PE From: "Elizabeth Nelson" <elizabeth.nelson,@capefearia�igineering.com> To: "d bowman" <dbowman(W-atmc.net> Cc: "Johnson, Kelly" <kelly.p.9ohnsonQncdenr.gov> Sent: Monday, April 9, 2018 8.08.39 AM Subject: FW: Rice Creek Plantation David - Hope you are doing well See below from Kelly Johnson - please let her know if this is something you can provide - she is copied on this email. E izabeth M. Nelson, PE F M, � elizabeth.nelsonCcD-capefearengineering.com PH: 910.383.1044 151 Poole Road, Ste. 100 1 Belville, NC 1 28451 From: Johnson, Kelly [mailto:kellv.p.iohrson ncdenr.eov] Sent: Friday, April 06, 2018 11:27 AM To: Elizabeth Nelson <elizabeth.nelson acapefeareneineerine.com> Subject: Rice Creek Plantation Elizabeth, This is a long shot. I am missing a piece of paper in a file and I am hoping you may have a copy of it... A very long time ago you worked on this project, which is next to Town Creek Elementary. Pond 8 was revised to let the school drain offsite to Rice Creek Plantation. The Drainage area map for Pond 8 was clearly submitted (#7 below), but it is not on file. (Three versions of the permit are also missing...) The school is changing, and they need to move that DA line. I have asked them for a minor modification for Rice Creek to show the DA line's new location. But, that is hard to do since we don't know the old location. (The school at least knows where the line is on *their* property, so they can move forward. But, it is sloppy to not have the DA line for Pond 8 in its file.) I realize that you don't even work there anymore, but I thought I would reach out and check... Thanks, Kelly 04 BOWMAN DESIGN & ENGINEERING SERVICES, PA 143 Holden Reach Road, Suitt 3, PO Rox 74k SI-Alotte, North Carolina 294:- Phone: 910,7�5-6526 1 ak: tJ 1 0,755-6M A':4�w�t 6, 2010 Mr, Clrit 84ker a , atcr Al �e- it, ; vt 1' nv: rI mwc`lt anti N.! ra) Rcsf P,,irw f,ijbiev t. s Kjtk(;rvtk- lk-.w 0.1ris: &A. i%.- f rnm - t, r Nrl e l-'A p.-I u'm P'txmil Ayvl� -"L li- 1'rllfi O:w (it f ql� o' in SW4")f, Ifni, "t, M'14 1;,ej tr.� ri R +r Iv lytl' lu, v id rr-k-j�.t-4; tel t A!!. ttlm!il Iwo A d"i vt q-Aft'd f MI dl--b 2 bAAL f it- t. e g, F. A ftv.'S Qj 41tiatzg. t; tttirj -mip fetht J,VZJ:�4DIM '&fil e; '.fVO ILI i4on't, i Fsa:- Pi- EnckmUres 0 6 2010 ►--6L,�johwsow Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and land Resources Stormwater Permitting 127 Cardina! Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Johnson, Kelly From: Johnson, Kelly Sent: Thursday, April 5, 2018 4:19 PM To: 'Holly Cook' Subject: FW: [Externall RE: SW8 071210, Town Creek Middle and Elementary School - State Stormwater Permit Attachments: 2010 08 permit 070333.docx Holly, Is this roughly what you are proposing? (I have attached the SW8 070333 permit that has the DA and BUA numbers in its Pond 8 that are dedicated to your permit, SW8 071210.) Thanks, Kelly Current Ofsite DA Line � � « • r Drainage Area to Offsite Pond (SW8 070333) From: Johnson, Kelly Sent: Wednesday, April 4, 201811:45 AM To:'Holly Cook' <holly.cook@ mcgillengineers.com> - - Prop, 0 Drainage Area to C Drainage Area Add Drainage Area Ren (treated in new po 4 Where = ® = 642,736sf of drainage area, and Impervious area sf = 246,395sf inside green line (current & proposed offsite DA lines) 1 m rn -m N 2 2 a k \ 0 \/ M. k k (D R _ \ k U k 0 2 § k e 3 § § § « « « c_ |� & & (u � ! c m ■|| 2 � c - | E k � r � E © C � k k o � � % LAt $ $ k N 0 o 4- 16 a g 0 k � 2 � k E � 31�� It 8 Ng �5gts6w� S "w NZ Johnson, Kelly From: o ell Sent: Wednesday, April 4, 2018 11:45 AM p1 To: 'Holly Cook' Cc: ceckert@bcswan.net, Michael Norton Subject: RE: [External] RE: SW8 071210, Town Creek Mid Stormwater Permit Attachments: 2018 03 addinfo 071210 via email.docx L3191\-1Y ` V V V C J Eleme tary School - State Holly, i moved the email below into a Word document because it;;ot a bit long. Please see my responses in Blue in the attached document. Thanks, Kelly From: Holly Cook[mailto:holly.cook@mcgillengineers.com] Sent: Wednesday, March 28, 201811:33 AM To: Johnson, Kelly <kelly.p.johnson@ncdenr.gov> Cc: ceckert@bcswan.net; Michael Norton<michael.norton@mcgillengineers.com> Subject: [External] RE: SW8 071210, Town Creek Middle and Elementary School - State Stormwater Permit External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Kelly, Please see our responses in RED below. Once you have had a chance to review our responses, please give me a call at your convenience to discuss. If the responses below satisfy your request for additional information, we will modify the applicable sections of the Stormwater Report and Application as required. Thank you! Sincerely, Holly Cook, PE Project Engineer VicGM. 4 .y.�0i ; % f I 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 holly.cook@mcgillengineers.com I www.mceillengineers.com 1 From: Johnson, Kelly <kelly.p.iohnson@ncdenr.gov> Sent: Tuesday, March 27, 2018 3:30 PM To: Holly Cook <h lly.cook rn Jgnaireers.com> Cc: ceckert_@_b_cswan.net Subject: FW: SW8 071210, Town Creek Middle and Elementary School - State Stormwater Permit Holly, I was logging this into my project tracking spreadsheet today, and I saw that this will be low density with three pockets of high density (POND). I would like to get clarification of the overall approach since the 2017 rule does not. have POHDs. I have not been throuh the details of the project at all. But, since I noticed some "big picture" questions, I wanted to 0o ahead and get those worked out so that I can work through those details when the tirie comes. I will log, this as a "Request for Additional Information". Please note that we no longer mail hard copies of Add Info letters, and so this email will be the official correspondence. Please respond by 4/11/18. 1, Current Permit: 7Ile current permit (6/16/10) and the prior version (12/13/07) are both for 21.29ac of project area. The 2007 permit was for 290,381sf of impervious and on 6/16/10 it was reduced to 246,395sf of impervious area draining of site for treatment in Pond 8 of SW8 070333 (Rice Creek Plantation Phase 1). Since the impervious reduced between 2007 and 2010, the 2010 ;permit was not triggered into being; covered by the: 2008 rules. It therefore appears that the current permit is si::ill written under the 1995 rules. Yes, thkat is our understandingunders'Ean-ding as well. 2. Proposed Permit: a. Additional Project Area: The current proposal increases the project area from 21.29ac to 60.67ac, and the newly added 39.38ac will be subject to the 2017 rules. But, the application shows ti-i�t theiVe will be three pockets of high density, which isn't in the 2017 rules. The 2017 rules [.1003(1)(d)] has the following similar provision. I suspect that this is what you are doing, but I need a drainage area map showing the layout of all of the drainage areas and how the "natural drainage area boundaries, variations inland use, and/or construction phasing" impact that. I see several stormwater exhibits in the plans, but I do not see a drainage area map? Three Drainage Area Maps are included in the Stormwater Report. Section 4: 1. Pre -Development DAM showing project limits 2. Post -Development DAM showing project limits Section 13: 3. Existing off -site wet pond DAM showing existing permitted drainage area 1,vith pi oposed revisions All "hree maps are attached for your reference. (d) On a case -by -case basis as determined by the Division during application review, projects may be considered to have both high and low density areas based on one or more of the following criteria: (i) natural drainage area boundaries; (ii) variations in land use throughout the project; and (iii) construction phasing. Tables A and B on the Pre and Post DAMs define the drainage areas based on natural drainage boundaries, variations in land use, and construction phasing. b. Data: I have inserted both the table in Section IV(10) of the application (V table below) and a summary table of this data compared to the 2010 permit below (21 d table below). i. Questions: "Ex" Drainage Area: I believe the first column in the application labeled "Ex" 's intended to be the ''existing", already permitted drainage area. Is that correct? Yes 2. Offsite Area: If so, the drainage area draining offsite to SW8 070333 reduced from 14.76ac to 13.09ac and the impervious reduced from 246,395sf to 239,7C4sf. If this modification will impact the configuration permitted for SW8 07033, then SW8 070333 must also be modified. Will this be the case or are corrections needed to the data? The calculations in Section 13 of the Stormwater Report address tho reduction in drainage area and impervious area. Yes, the reduced areas are correct. However, it is no: our intent to inodify the existing SW8 070333 permit for the off -site wet pond. If reducing the impervious area to the pond triggers a permit modification, then we request to rr serve the remaining BUA for future use. Would it also be possible to reserve future drainage area as well? By reserving both of these areas for future use, this would allow us to proceed without modifying SW8 070333. If we do not modify the existing permit, will this simplify the Permit Transfer issue? 3. Dry Pond: The dry pond is treating a high density drainage area (61.3%), but it is not a Primary SCM [per .1002(37)]. The 2017 rule introduced two new terms; "runoff treatment" method [per .1002(43)] and "runoff volume match" method [per .1002(43)]. The runoff treatment method is the way most projects are done where you collect the water from all impervious surfaces and treat it in an SCM (and I believe this project is done that way). Runoff volume match is essentially LID-EZ. However, if you use "runoff treatment", the rule says either a primary SCM or a combination of primary and secondary SCMs are needed to provide equal or better treatment. How will the proposed project meet this requirement? Section 6 of the Stormwater Report provides Pre and Post Development Site Runoff Summaries. The 10 year runoff is evaluated to each drainage outfall pre and post development. The Post -Development runoff to each Drainage Outfall (existing off -site wet pond, wetlands pocket on Elementaryy School site, wetlands pocket on Middle School site, etc.) is less than the Pre -Development runoff to each Drainage Outfall. SCM 1 Pre -Development Drainage Area 'A' Q..10 = 3.92 cfs. Host-Develo ment Drainage Area 'Al' (SCM 1) plus'A2' (sheet flow) Q10 = 2.16 cfs Post ¢ Pre The primary purpose of the dry pond is to collect and manage the peak stormwater runoff from the proposed Elementary Schoo± Addition z nd release the runoff at a non - erosive flow less than pre -development flow conditions. The inflow pipe is buried znd terminates at a yard inlet structure which allows the stormwater to rise and waterfall out of the weir into the basin. This dissipates t1.--2 cnergy and provides ror.-erosive velocities into the basin. This structure is to s ive as pretreatment for the dry pond. ;:n orifice pipe is not required for this desigr> as Hydraulic calculations shc!%, ti c pond naturally draws down over 30 minutes thro.-uOr nz:twral infilzration. Please nova 'uha. ; I-, infiltration basin was evaluated and ruler. ou*: at this location due to high graindW,3ter conditions. The 10 year discharge from SOM I and storm events larger than 3.0 gear er}ter he p,-.-rimeter closed conveyance storm, sys-cern making its way to the existing off- siEe wet �.ond for treatment. SCM 'i. is technically +?`:rithin the drainage; :area of tl-le: existing vvet pond, does this not •quaiify as a. treatment train? it ii.Table in Application: \,t1piiisl(*I.r i11.jtiltg'L!,Af L:d. Ldkjjtn.Ip:':� ItP 34,4MI 11110Flndliuli ili'n/''i. fI fLl It• E:l:• ittrrl'u` #)Il,sa.r r,r;i:.�r.!ar}.?s'i•.te. ,t`- •, }fix �yltlp:ti'? :h##.1C�1 .1R1 •i{c11�,.-fis- • .,.,t'•'� '1i�iii'� ¢,}tt,..%lf:�: tst.4tta�t l:�g e•::. ,..tts•.s }y; a.}Le l4�l`il; R!( tttr' s..(tts t' }:`� }l3.tX •ti {.'a'fii s.y5;, � }�F �, ei� �itr+fe Ify� ��t+d[ikl�a $Rt•.t � �' �c 1t <t _ � is ,1�. �, •r 4 y F 1 4 Ii�4':.r+U4...tLi �' t!(6v lair' G !• t �'- 8 ��la — a r R`1'�tl! t 1rL Y s,itt;tiii(tiillR4q:r• 5,it,.t.{ct- '...;..'jsPrt' r+e' .•_ }� 5ti: M1 _tiL t' -}`fit i4►i1 41:� t� liwi t' - v{s':F. i_ - I rrQ}}dti. i t.t ` ~i �-71`;�\ „•�w,� •+_,..r. Iit,ld,•�iY, A:r.!1L..� I..trv(..4• i }!ltty• L If 1. skit � _ ........ ....� �..y.=.. I : r: x j J.•t #. # � i0.t}1J`r 6. a`�tt�.t �PzEi•t: Ct.6 �.�� r ,,�.. a #;.b}. 1 o (.4 i �t Utz 7 i 1 t k i ! tii#.• 4 r71+ 7t fit` ti}� -•. .. .{ r� Y � t��1 1912 ��1�•rt',� �.a ratt f !! {r j-- i � 6 i. j cititr,•eti«rE y t �� Sit • .`r3.';.`#•, (... .tt--+ .!I'.?I yt f.+1}'.•i l.i.L.H'Y .+, �_ p'F. t, .!:pi �tj=r yr _....-..r J) r ._+•! We can revise the 'Drainage Area Ex' impervious area to include'future use' as well as remove overall drainage area from 'Drainage Area 3' ,low density) and 1=eserv2 it for future use to 'Drainage Area Ex' should this allow us to nut modify the existing SW8 070333. This will not change the proposed drainage area maps as grading `:_rili remain as chown an the plan. iii. 2010 Permit v/s Proposed: 4 6116/2010 ;),ro;)ose-fit Total Total fxis*:ir*.� dAi. �DA2 DA3 Mite? Dry Pondnd Wet Pond l ovy Denslt' FF Area 21.29 60.67 age Area. f C :Drai-,n }.67 �4 , , , -v ' 0.36 9.81: 642,736 2,642,785 570,407 2.5,590 427,336 �37A 1,629,45( imp r j ous Area 246395 509.82 239r rf3�i 9,549 2375765 22,801 % lfn )et Anus 38.3% 19.YA, 4 { Correct, see Section 13 of the Sto, mwater PLourt. c. Permittee: DiFLussions are taking pli ce to Cdeteri-nine i:he kcst l'cc'; to pl-c;ce..H. L 2010 Permit "I'ypu: The current (2010) permit is wriiten to "Brunsti;tick County Scnoo!s". That was a typo because the application I!fted "Brunswick County Board of Education" as the intended permittee and as the owner. I will note a correction when the modification is issued. ii. Questions: The Special Warranty Deed submitted for the portion of the project that will be added shows that "The County of Brunswick" owns the real estate pursuant to a 1.2/5/16 Ag`ncy Agreement with "Brunswick County Board of Education". It says "It is the intention of both parties to combine this parcel together with the 21.29ac [tract already permitted]." 1. 21.20ac Tract: I do not see a d oed on file for the 21.29ac Bract that was permitted in 2010, and so I do not know who owns that tract. Please submit this deed_ The old deed is attached. 2. What is the nature of the relationship between the County and the Board of Education? a. Function Like a Lease?: Does it function like a lease such that we can fill out the. application as a lease, and have both parties sign the application? l he application essentially says that if the lease/agreement falls through that the property owner will be responsible for the permit. The exact statement to sign is inserted below. If so, please have both parties sign the amlication in the appropriate areas. There are directions on the application form. (I suspect that this will be what you end up choosing to do....) As the legal Vzopeertw oxvrwr I acicccowrled, er un&rstand, and agree bN- my siRnaiure below. that agent (enhh, listed in Contw-t InfomiAdom itern 1) dissolves their conVdnv And otcancids or de lease agmvmentr or p tdiig same, responsibilirt - for comphatice %- tb the DENIM Storm -A ater pej to me, the pr°opertV o%iw. As the p€opertv owner, it is mV responsibihhr to notify DENIER inimi submit a completed Narm t mership Change Fenn -*%!thin 30 dawq{ other imi be operattiu treatwent facility without a valid permit. I understand that the operation of a stormwate»< treatn with a valid permit is a violation of NC dal Statue 143- 215.1. and nuv refit in appropm action including- the assessmeat of civil Mies of up to 52-5,000 per day. lnrsuant to NKGS 14: b. Permit Issue to loth?: Or, do you want the permit issued to both parties with both parties signing ads owners/permit applicants? L If so, please submit signatures as permit applicants. (You would just have two copies of the applicable pages so that you can have two signatures.) ii. Please also submit 0&M agreements from both parties. 3. Permit Information Update Form: Since the permit should already be issued to the Brunswick County Board of Education and we are either going to issue the modified 5 permit to either the Brunswick County Board" of Education and the County of Brunswick as either a situation similar to a lease or as co-permlttees, we will not require u formal permit transfer. (This will be much simpler and cheaper.) But, we will need to i iave the Permit Information Update Form for the file to document the official change o; ownership. The form is available on our website, htt 'rc'^.n.nc.gov/about/divisions/energy-m:irier"cn,l-Iz�n[i-r'c?.sC_.'LtrCes,!nile.ic,y-r,-iiirier- I- land-r;_ le,/�tormwater-program/post-constr.a t;or'l. Acknowledged. If you have questions, please let me know-,. Thanks, Kelly From: Johnson, Kelly Sent: Monday, March 26, 2018 2:30 PM To: 'ceckert@bcswa n. net' <ceci:.:_r�::fr .bcsva.n.Ele.t> Cc: Holly Cook <hoI!y cr.; ok, �.:! ! +�iIIELgineerrs_corr> Subject: SW8 071210, Town Creek Middle and Elementary School - State Stormwater Permit The Wilmington Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) accepted the Stormwater Permit Application and $505 fee (check number 369242) on March 26, 2018. The project has been assigned to me and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. Thanks, Kelly K.eLLuiohwsow Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. SW8 071210 — Town Creek Elementary and Middle Schools — State Stormwater Permit ) n� Current Permit: 1. 3/27/18, KJ: The current permit (6/16/10) and the prior version (12113107) are both for 21.29ac of project / Wil area. The 2007 permit was for 290,381sf of impervious and on 6/16/10 it was reduced to 246,395sf of 1. impervious area draining offsite for treatment in Pond 8 of SW8 070333 (Rice Creek Plantation Phase 11. Since the impervious reduced between 2007 and 2010, the 2010 permit was not triggered into being covered by the 2008 rules. It therefore appears that the current permit is still written under the 1995 rules. 2. 3/28/18, HC: Yes, that is our understanding as well. Proposed Permit: I. Additional Project Area: a. 3/27/18, KJ: i. The current proposal increases the project area from 21.29ac to 60.67ac, and the newly added 39.38ac will be subject to the 2017 rules. But, the application shows that there will be three pockets of high density, which isn't in the 2017 rules. The 2017 rules [.1003(1)(d)] has the following similar provision. I suspect that this is what you are doing, but I need a drainage area map showing the layout of all of the drainage areas and how the "natural drainage area boundaries, variations in land use, and/or construction phasing" impact that. I see several stormwater exhibits in the plans, but I do not see a drainage area map? 1. Rule Text: (d) On a case -by -case basis as determined by the Division during application review, projects may be considered to have both high and low density areas based on one or more of the following criteria: (1) natural drainage area boundaries; (ii) variations in land use throughout the project; and (iii) construction phasing. b. 3/28/18, HC: Three Drainage Area Maps are included in the Stormwater Report. All three maps are attached for your reference. Tables A and B on the Pre and Post DAMS define the drainage areas based on natural drainage boundaries, variations in land use, and construction phasing. i. Section 4: 1. Pre -Development DAM showing project limits 2_ Post -Development DAM showing project limits ii. Section 13: Existing off -site wet pond DAM showing existing permitted drainage area with proposed revisions c. 4/4/18, KJ: Please see 2(b)(iii)(3) below. 1 SW8 071210 — Town Creek Elementary and Middle Schools — State Stormwater Permit Data: a. Tables: L 3/27/18, KJ: 1. 1 have inserted both the table in Section IV(10) of the application (111 table below) and a summary table of this data compared to the 2010 permit below (2nl table below). 2. Table in Application: 10. Complete the following information for each dtairwp area identified in 11rojuct information item 9. if them are more than flour drainage areas in the pro <v- , att+ich an additional slut t with the information for each area provided in the same format as below. Basin Information Dmina a Area lix Drain p Area 1 Vraina a Area 2 Vraina a Area 3 Receiving Stream Name Rice Creek Rice Cre k Rice Creek Rice Creek Stream Class • C; SAY C; SW C; SW C; S%V Stream Index Number • 1"1.6 1"1-6 18-81-6 19-81-6 Total Drains Area (sf) 570107 15590 42M$ 1629450 On -site Drainage Area (sf) 57U107 155W 427338 1629150 Off -site Drainage Area (sf) 0 0 0 0 Proposed Impervious Area" sl 239704 9544 W765 22ft06 % Impervious Area" total 42.0 61.3 55.6 1A Im rvious" Surface Area Drains a AwA Fax Drains a Area i Drainage Area 2 Drainage Arno 3 On -site Buildings/lots 90 89656 7607 61t I Cho -site Streets (fj 0 On -site Yarhi sf) 137;187 144257 15777 On-sik'Sidewalki S 12661 Ig12 21790 7029 Other on -site (so 0 Future (s 11 2t124 Uff-!site (sf) 0 Existing BUA••• A 0 Total so: 239704 9549 237765 22M Stmam Class and Index Number can be drtempin .fat: tr+Jliavhd.uuknr.crr�• +rth/uyljju/ >r✓�1++..rfi+struu. 3. 2010 Permit v/s Proposed: 6/16/2010 Proposed Total Total Existing DA1 ;Al on Supplement) DA2 I icy on Sup lement DA3 Offsite? Dry Pond Wet Pond Low Density Project Area 21.29 60.67 Drainage Area 14.76 60.67 13.09 0.36 9.81 37.41 642,736 2,642,785 570,407 15,590 427,338 1,629,450 Impervious Area 246,395 509,824 239,704 9,549 237,765 22,806 % Impervious 1 38.3%1 19.3% 42.0% 61.3% 55.6% 1.4% b. Questions: ac ac s4 sf L "Ex" Drainage Area: 1. 1 believe the first column in the application labeled "Ex" is intended to be the "existing", already permitted drainage area. Is that correct? 2. 3/28/18, HC: Yes ii. Offsite Area: 1. 3/27/18, KJ: If so, the drainage area draining offsite to SW8 070333 reduced from 14.76ac to 13.09ac and the impervious reduced from 246,395sf to 239,704sf. If this modification will impact the configuration permitted for SW8 07033, then SW8 070333 must also be modified. Will this be the case or are corrections needed to the data? SW8 071210 — Town Creek Elementary and Middle Schools — State Stormwater Permit 2. 3/28/18, HC: a. The calculations in Section 13 of the Stormwater Report address the reduction in drainage area and impervious area. Yes, the reduced areas are correct. However, it is not our intent to modify the existing SW8 070333 permit for the off -site wet pond. If reducing the impervious area to the pond triggers a permit modification, then we request to reserve the remaining BUA for future use. b. Would it also be possible to reserve future drainage area as well? c. By reserving both of these areas for future use, this would allow us to proceed without modifying SW8 070333. d. If we do not modify the existing permit, will this simplify the Permit Transfer issue? 3. 4/4/18, KJ: a. "Future impervious": This type of impervious area is essentially a slush fund of impervious that tracks what can "fit" into an SCM that is already designed. It is useful because if one day you want to add a sidewalk or other item, and that sidewalk is within the "future" amount, then you simply obtain a minor modification to reduce the "future impervious" and label it "sidewalk". It makes these types of future modifications easier because you don't have to re -run the pond design calculations. b. "Future Drainage Area": Any time a drainage area changes, it impacts the design of the SCM that it serves, and we have to re -run the pond design calculations which is a major modification. We therefore do not have "future drainage areas". (Even if the drainage area decreases such that the required volume for the pond decreases, that is still a major modification.) Drainage area can only be in one SCM or another. If you will remove drainage area from the SW8 070333 pond, then SW8 070333 will have to be modified to reflect that change. iii. Dry Pond: 1. 3/27/18, KJ: The dry pond is treating a high density drainage area (61.3%), but it is not a Primary SCM [per .1002(37)]. The 2017 rule introduced two new terms; "runoff treatment" method [per .1002(43)] and "runoff volume match" method [per .1002143)]. The runoff treatment method is the way most projects are done where you collect the water from all impervious surfaces and treat it in an SCM (and I believe this project is done that way). Runoff volume match is essentially LID-EZ. However, if you use "runoff treatment", the rule says either a primary SCM or a combination of primary and secondary SCMs are needed to provide equal or better treatment. How will the proposed project meet this requirement? 2. 3/28/18, HC: a. Section 6 of the Stormwater Report provides Pre and Post Development Site Runoff Summaries. The 10-year runoff is evaluated to each drainage outfall pre and post development. b. The Post -Development runoff to each Drainage Outfall (existing off -site wet pond, wetlands pocket on Elementary School site, wetlands pocket on Middle School site, etc.) is less than the Pre -Development runoff to each Drainage Outfall. C. SCM 1 I. Pre -Development Drainage Area 'A' Q10 = 3.92 cfs. ii. Post -Development Drainage Area 'Al' (SCM 1) plus'A2' (sheet flow) Q10 = 2.16 cfs iii. Post < Pre 3 SW8 071210 — Town Creek Elementary and Middle Schools — State Stormwater Permit d. The primary purpose of the dry pond is to collect and manage the peak stormwater runoff from the proposed Elementary School Addition and release the runoff at a non -erosive flow less than pre -development flow conditions. The inflow pipe is buried and terminates at a yard inlet structure which allows the stormwater to rise and waterfall out of the weir into the basin. This dissipates the energy and provides non -erosive velocities into the basin. This structure is to serve as pretreatment for the dry pond. e. An orifice pipe is not required for this design as hydraulic calculations show the pond naturally draws down over 30 minutes through natural infiltration. Please note that an infiltration basin was evaluated and ruled out at this location due to high groundwater conditions. The 10-year discharge from SCM 1 and storm events larger than 10 year enter the perimeter closed conveyance storm system making its way to the existing off -site wet pond for treatment. f. SCM 1 is technically within the drainage area of the existing wet pond, does this not qualify as a treatment train? g. We can revise the 'Drainage Area Ex' impervious area to include 'future use' as well as remove overall drainage area from 'Drainage Area 3' (low density) and reserve it for future use to 'Drainage Area Ex' should this allow us to not modify the existing SW8 070333. h. This will not change the proposed drainage area maps as grading will remain as shown on the plan. i. Correct, see Section 13 of the Stormwater Report. 3. 4/4/18, Q a. I have not gone through any of the data or drainage area maps in detail. But, it sounds like you are saying that the dry pond's drainage area is inside the wet pond's drainage area and the dry pond simply mitigates peak flow. If so, then the wet pond will be the primary SCM. If that is the case, then let's label the wet pond as the SCM for the drainage area. The dry pond will be mentioned in the permit, but it will not be the primary treatment mechanism. I recommend that the table in your application have four columns: I. Existing/Offsite ii. Wet Pond (with dry pond for hydrology) iii. Low Density iv. Total (Offsite + Wet Pond + Low Density) b. High & Low Density in This Permit: i. I recommend that you have three drainage areas on your DA map: 1. Existing/Offsite 2. Wet Pond (with dry pond for hydrology) 3. Low Density ii. When you update the drainage area maps, please make sure that you establish the "natural drainage area boundaries", "variations in land use throughout the project", and/or "construction phasing" per [.1003(1)(d)] as discussed above to establish that the project can have low density areas since it is overall high -density. 4 SW8 071210 — Town Creek Elementary and Middle Schools — State Stormwater Permit c. Also, FYI, I discussed the treatment train question with Annette Lucas in our Central Office, and evidently when they convened the stakeholder group to establish the MDCs the group discontinued the treatment train methodology. Evidently treatment trains are based on diminishing returns on percent removal, and NCSU, EPA, and others have moved to percent concentrations as the basis for pollutant removal as opposed to percent removal. (You will not need credit for the dry pond if it is inside the wet pond's drainage area, but FYI.) 3. Permittee: a. 2010 Permit Typo: The current (2010) permit is written to "Brunswick County Schools". That was a typo because the application listed "Brunswick County Board of Education" as the intended permittee and as the owner. I will note a correction when the modification is issued. b. Questions: L The Special Warranty Deed submitted for the portion of the project that will be added shows that "The County of Brunswick" owns the real estate pursuant to a 12/5/16 Agency Agreement with "Brunswick County Board of Education". It says "It is the intention of both parties to combine this parcel together with the 21.29ac [tract already permitted]." 1. 21.20ac Tract: a. 3/27/18, KJ: I do not see a deed on file for the 21.29ac tract that was permitted in 2010, and so I do not know who owns that tract. Please submit this deed. b. 3/28/18, HC: The old deed is attached. ii. What is the nature of the relationship between the County and the Board of Education? 1. Function Like a Lease?: a. 3/27/18, KJ: Does it function like a lease such that we can fill out the application as a lease, and have both parties sign the application? The application essentially says that if the lease/agreement falls through that the property owner will be responsible for the permit. The exact statement to sign is inserted below. If so, please have both parties sign the application in the appropriate areas. There are directions on the application form. (I suspect that this will be what you end up choosing to do....) b. 3/28/18, HC: Discussions are taking place to determine the best way to proceed. As the legal property, owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity, listed in Contact Information item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DE;VL LR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DENILR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. SW8 071210 — Town Creek Elementary and Middle Schools — State Stormwater Permit 2. Permit Issue to Both?: a. 3/27/18, KJ: Or, do you want the permit issued to both parties with both parties signing as owners/permit applicants? I. If so, please submit signatures as permit applicants. (You would just have two copies of the applicable pages so that you can have two signatures.) ii. Please also submit O&M agreements from both parties. 1. Permit Information Update Form: Since the permit should already be issued to the Brunswick County Board of Education and we are either going to issue the modified permit to either the Brunswick County Board of Education and the County of Brunswick as either a situation similar to a lease or as co- permittees, we will not require a formal permit transfer. (This will be much simpler and cheaper.) But, we will need to have the Permit Information Update Form for the file to document the official change of ownership. The form is available on our website, https:Hdeg.nc.gov/about/divisions/energy-mineral- land-resources/enerev-mineral-land-rules/stormwater- proeram/post-construction. b. 3/28/18, HC: i. 3/28/18, HC: Discussions are taking place to determine the best way to proceed. ii. Acknowledged. 11 Johnson, Kelly From: Johnson, Kelly Sent: Wednesday, March 28, 2018 9AS AM To: 'Craig Eckert'; Holly Cook Subject: RE: [External] Re: FW: SW8 071210, Town Creek Middle and Elementary School - State Stormwater Permit Mr. Eckert, I am really trying to help you avoid having to go through the transfer process to transfer the permit from the Board of Education to the County because it will be expensive and time consuming. Since we have a $505 modification in-house for Town Creek, we would have to formally return that modification (with the $505 forfeited), get a transfer application ($505) that will likely take a few months to process, and then have the modification re -submitted ($505 again) with another few months for that modification review. There must be an easier way forward based on the Agency Agreement to avoid all of this administrative hassle. We can issue permits to 1.) The property owner, 2.) A lessee with the property owner's signature, 3.) A developer with the property owner's signature, or 4.) To two co-permittees. I talked this over with my supervisor and co-workers, and we recommend that you all request that the permit be issued to both the County and the Board of Education, have both entities sign the paperwork as applicants, and reference the 12/5/16 agreement in the permit text. This will circumvent having to formally transfer the permit. I am open to other ideas if you all have them, but I want to make sure you understand that changing the permit's ownership isn't just a matter of me typing in a new name on the document. It is a much more laborious task. If you have further questions, please let me know. Thanks, Kelly From: Craig Eckert [mailto:ceckert@bcswan.net] Sent: Wednesday, March 28, 2018 8:09 AM To: Johnson, Kelly <kelly.p.johnson@ncdenr.gov>; Holly Cook<holly.cook@mcgillengineers.com> Subject: [External] Re: FW: SW8 071210, Town Creek Middle and Elementary School - State Stormwater Permit Brunswick County Schools is an Administrative Unit as defined by the state of NC. Consolidation of the parcels has already occurred. The County of Brunswick now owns both the 20+ acre parcel and the 40+ acre parcel. As the County owns the parcels, permit should be issued in the name of the County. The Agency agreement allows the BOE to act as agent for the County, and also operate the schools. This is not a lease situation Thank you Kelly for taking a quick look at the application. BRUNSWICK COt TNTY SCHOOLS Craig Eckert, Director of Capital Projects & Planning (W) 910-253-1078 (C) 910-398-3815 ceckert(c]beswan. net On Tue, Mar 27, 2018 at 3:30 PM, Johnson, Kelly <kellv.p.iolinson(amcdenngov> wrote: Holly, I was logging this into my project tracking spreadsheet today. and I saw that this will be low density with. three pockets of high density (POHD). I would like to get clarification of the overall approach since the 2017 rule does not have POI IDs. I have not been. through the details of the project at all. But, since I noticed some "big picture" questions, l wanted to go ahead and get those worked out so that I can work through. those details when the time comes. I will log this as a "Request for Additional Information". Please note that we no longer mail hard copies of Add Info letters, and so this email will be the official correspondence. Please respond by 4/11/18. 1. Current Pennit: The current permit (6/16/10) and the prior version (1.2/13/07) are both for 21.29ac of project area. The 2007 pennii was for 290,381sf of impervious and. on 6,116/10 it was reduced to 246,395sf of impervious area draining offsite for treatment in Pond 8 of SW8 070333 (Rice Creek Plantation Phase 1). Since the impervious reduced between 2007 and 2010. the 2010 permit was not triggered into being covered by the 2008 rules. it therefore appears that the current permit is still written under the 1995 rules. 2. Proposed Permit: a. Additional Project Area: The current proposal increases the project area from 21 29ac to 60.67ac, and the newly added 39.38ac will be subject to the 2017 rules. But, the application shows that there will. be three pockets of high. density, which isn't in the 2017 rules. The 2017 rules [.1.003(1)(d)] has the following similar provision. I suspect that this is what you are doing, but I need a drainage area map showing the layout of all of the drainage areas and how the "natural. drainage area boundaries, variations in ].and use, and/or construction phasing'" impact that. I see several storniwater exhibits in the plans, but I do not see a drainage area map? (d) On a case -by -case basis as determined by the Division during application review, projects may be considered to have both high and low density areas based on one or more of the following criteria: (i) natural drainage area boundaries; (ii) variations in land use throughout the project; and (iii) construction phasing. b. Data: I have inserted both the table in Section IV(10) of the application (I` table below) and a summary table of this data compared to the 2010 permit below (2nd table below). i. Questions: 1. "Ex" Drainage Area: I believe the first column in the application labeled "Ex" is intended to be the "existing", already permitted drainage area. Is that correct? 2. Offsite Area: If so, the drainage area draining offsite to SW8 070333 reduced from 14.76ac to 13.09ac and the impervious reduced from 246,395sf to 239,704sf.. If this modification will impact the configuration permitted for SW8 07033, then SW8 070333 must also be modified. Will this be the case or are corrections needed to the data? 3. Dry Pond: The dry pond is treating a high density drainage area (61.3%), but it is not a Primary SCM [per .1002(37)]. The 2017 rule introduced two new terms; "runoff treatment" method [per .1002(43)] and "runoff volume match" method [per .1.002(43)]. The runoff treatment method is the way most projects are done where you collect the water from all impervious surfaces and treat it in an SCM (and I believe this project is done that way). Runoff volume match. is essentially LID-E7. However, if you use "runoff treatment'', the rule says either a primary SCM or a combination of primary and secondary SCMs are needed to provide equal or better treatment. How will the proposed project meet this requirement? ii. Table in Application: Ill. Cc+�,�l•���ts� ttw; hs���ia� ie�ur�ati 1f�r;;�h dt::sxca id��sti�hx! is i't4+�+•t ��►tarer�d+��r �• n, +� N d�.x;� sir+' RlOie &w I;nz r .ir�srea araii iri t1a prays t, atia& ao axiditior ai dwt wt* ttn+ trsh+tatt*m for each MVA pr'cW4WJ in OW 5jee frwm4t ax glow. Rwinlntorammct kv 1hMiM eAieaFx Vraina .Atft2 17 a Mxit:`i R�tciv S1riv l auv� R".CM-A RkV(-t0Bk Rk-vC.'omt: Rif,-CftV1, Lim C: sw C-SW C.;w F, tkwam Indo N r ` 1"1-b lib "A of 41-6 ISIM b x';� Amass 5704(t7' 15"0 -- �rgry7'13R 2t,2"50 �y Vu,-*t! t�FAflt# Area 09 5700 Zsw 1127y* 104M L)T Sfd tm ` ^ia", Zf/tit-4 7-"* 'S.1 ntre Alms`" cater. 420 81:4 L4 I+a inrra+°SurfaceArW 1. . 1�ixrat. t_ Oratna .Areal !IA!1! •Ales {kai AreAl 'on. sire Rultd hoes (. S'Jta56 76N 63M tOR-61k AAft" b L�q tl f_h"4WiktV%Ak* .: l +l l.. ?.d 0 AAA -- Tutrrm Tntaf +��: �94ii14F '9549 .'..�:'7b5 .3�R0u' �ittr.'a►tf:4ic.iz�rsarNter�•,rab;�„mrf�n�i+r� Iilena:��ti�.r%i:,ut«.'�a:a"•i�r't±:l�'.�w:.t!'�'*x�':a•d:���it,+fit•, iii. 201.0 Permit v/s Proposed: 6/16/2010 Proposed Total Total Existing DA1 (Al on Supplement) DA2 tU ors S jFp:rrsettl DA3 Offsite? Dry Pond Wet Paid Low Density Project Area 21.29 60.67 14.76 60.67 13.09 0.36 9.81 37.41 Drainage Area 642,736 2,642,785 570,407 15,590 427,338 1,629,450 Impervious Area 246,395 509,824 239,704 9,549 237,765 22,806 % Impervious 38.3%1 19.3% 42.0% 61.3% 55.6% 1.4% c. Permittee: ac ac sf sf i. 2010 Permit Typo: The current (2010) permit is written to "Brunswick County Schools". That was a typo because the application listed "Brtuzswick County Board of Education" as the intended permittee and as the owner. I will note a correction when the .m.odificatio.n is issued. ii. Questions: The Special Warranty Deed submitted for the portion of the project that will be added shows that "The County of Brunswick" owns the real estate pursuant to a 12/5/16 Agency Agreement with "Brunswick County Board of Education". It says "It is the intention of both parties to combine this parcel together with the 21.29ac [tract already permitted]." i . 21.20ac Tract: I do not see a deed on file for the 21.29ac tract that was permitted in 2010, and so I do not know who owns that tract. Please submit this deed. 2. What is the nature of the relationship between the County and the Board of Education? a. Function Like a Lease?: Does it firnction like a lease such that we can fill out the application as a lease, and have both parties sign the application'? The application essentially says that if the lease/agreement falls through that the property owner will be responsible for the permit. The exact statement to sign is inserted below. If so, please have both parties sign the application in the appropriate areas. There are directions on the application form. (I suspect that this will be what you. end up choosing to do....) As the legal property owner I acknowledge, understand, and agree by my signatnre below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibditq for compliance with the DBMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my resporisibdity to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I wM be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143 215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. b. Permit Issue to Both?: Or, do you want the permit issued to both parties with both parties signing as owners/permit applicants? 4 �. If so, please submit signatures as pen -nit applicants. (You would just have two copies of the applicable pages so that you can. have two signatures.) ii. Please also submit O&M agreements from both parties. 3. Permit Information Update Form: Since the permit should already be issued to the Brunswick County Board of Education and we are either going to issue the modified permit to either the Brunswick County Board of Education and the County of Brunswick as either a situation similar to a lease or as co-permittees, we will not require a formal permit transfer. (This will be much simpler and cheaper.) But, we will need to have the Permit Information Update form for the .file to document the official change of ownership. The form is available on our website, https://deg.n.c.gov/about/divisions/energy-mineral-land- resources/energyy-mineral-land-rules/stormwater-program/post-construction. If you have questions, please let me know. Thanks, Kelly From: Johnson, Kelly Sent: Monday, March 26, 2018 2:30 PM To: 'ceckertnubcswan.net' <ceckert@bcswan.net> Cc: Holly Cook <holly.cookna,mcgillengineers.com> Subject: SW8 071210, Town Creek Middle and Elementary School - State Stormwater Permit The Wilmington Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) accepted the Stormwater Permit Application and $505 fee (check number 369242) on March 26, 2018. The project has been assigned to me and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. Thanks, Kelly 1. et ,gJohVUSOVU Kelly Johnson I+:nvironmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. All e-mail correspondence to and from this address is subject to the North Carolina Public Records Law, which may result in monitoring and disclosure to third parties, including law enforcement. wuWVI.4� i� t�l Visit the BCS homepage! Johnson, Kelly � IA>�, l From: Johnson, Kelly Sent: Tuesday, March 27, 2018 3:30 PM To: Holly Cook Cc: 'ceckert@ bcswan.net' Subject: FW: SW8 071210, Town Creek Middle and Elementary School - State Stormwater Permit Holly, I was logging this into my project tracking spreadsheet today, and I saw that this will be low density with three pockets of high density (POHD). I would like to get clarification of the overall approach since the 2017 rule does not have POHDs. I have not been through the details of the project at all. But, since I noticed some "big picture" questions, I wanted to go ahead and get those worked out so that I can work through those details when the time comes. I will log this as a "Request for Additional Information". Please note that we no longer mail hard copies of Add Info letters, and so this email will be the official correspondence. Please respond by 4/11/18. 1. Current Permit: The current permit (6/16/10) and the prior version (12/13/07) are both for 21.29ac of project area. The 2007 permit was for 290,381sf of impervious and on 6/16/10 it was reduced to 246,395sf of impervious area draining offsite for treatment in Pond 8 of SW8 070333 (Rice Creek Plantation Phase 1). Since the impervious reduced between 2007 and 2010, the 2010 permit was not triggered into being covered by the 2008 rules. It therefore appears that the current permit is still written under the 1995 rules. 2. Proposed Permit: a. Additional Project Area: The current proposal increases the project area from 21.29ac to 60.67ac, and the newly added 39.38ac will be subject to the 2017 rules. But, the application shows that there will be three pockets of high density, which isn't in the 2017 rules. The 2017 rules [.1003(1)(d)] has the following similar provision. I suspect that this is what you are doing, but I need a drainage area map showing the layout of all of the drainage areas and how the "natural drainage area boundaries, variations inland use, and/or construction phasing" impact that. I see several stormwater exhibits in the plans, but I do not see a drainage area map? (d) On a case -by -case basis as determined by the Division during application review, projects may be considered to have both high and low density areas based on one or more of the following criteria: (i) natural drainage area boundaries; (ii) variations in land use throughout the project; and (iii) construction phasing. b. Data: I have inserted both the table in Section IV(10) of the application (V table below) and a summary table of this data compared to the 2010 permit below (2"d table below). L Questions: 1. "Ex" Drainage Area: I believe the first column in the application labeled "Ex" is intended to be the "existing", already permitted drainage area. Is that correct? 2. Offsite Area: If so, the drainage area draining offsite to SW8 070333 reduced from 14.76ac to 13.09ac and the impervious reduced from 246,395sf to 239,704sf. If this modification will impact the configuration permitted for SW8 07033, then SW8 070333 must also be modified. Will this be the case or are corrections needed to the data? 3. Dry Pond: The dry pond is treating a high density drainage area (61.3%), but it is not a Primary SCM [per .1002(37)]. The 2017 rule introduced two new terms; "runoff treatment" method [per .1002(43)] and "runoff volume match' method [per .1002(43)]. The runoff treatment method is the way most projects are done where you collect the water from all impervious surfaces and treat it in an SCM (and I believe this project is done that way). Runoff volume match is essentially LID-EZ. However, if you use "runoff treatment", the rule says either a primary SCM or a combination of primary and secondary SCMs are needed to provide equal or better treatment. How will the proposed project meet this requirement? ii. Table in Application: IQ. Contpkt.- th%. koWlW10.4 information for cath drainage errs identified ua 1'r•-<., t Infurenati.on it --in 9. 11 there arc more dmin f.m r Aminage areas in the project, attach an additional stie t with the infornwtion for each area pro."Itlea ili Ill. 2'.41pl' wriflat a5 t7tAvw. liasinlofF�mki 9 m lAaina . Area Fx UmLm Anm 1 ! Drains � Area 2 Draina a Area ;3 j Receiving; Rnmm Nam... Smam C lao * Rice Creek Rice crtvk Ric a CreA Rite Creek j C; Sw C ; IYs' C; SW C; SW 'llream ineirx -ZiM , IMI-6 Iit$i =x_ 16-81 6 `4z 18-81.6 �s Total i Ir s;n x; s Ara 5713�90 15340 'ks 1Fa2fd45[t ---. i►+t ails tsr,?lna ;e `.re.°.e g i; 570,107 1554 �'f`�%, oEi 16214511 i Oft-sib.1 hi1G Asir {54j 11 _ _ ., 0 4544 61.3 is F PropowAlin wxn,� 4n=sy "� lgtt �rcy�+tc :4rs!d" 1}c+ri"y _.�..vr= 239704 42.0 22" 1.4 i Im art nnia' udacc Avot Diain Ares Px Ara1n s+a.:p 1 tlinusd s Arrri ? Drein r Arra { Chrsilc lhtylelin, �:`l;oC ftif{ 6.9656 7ti(i7 63i1ti?l Cka.,nh 5tre b f� I U f'TL 11 g i f} i;'?kr: 1•�4Z5; ISM ._ _1 trxgt6t51it �v;t1• { fs .�_ ., I;.l�f't Citkt.�retrs-9a1r {+11 U .,....M.:I.t" _.._ Y"r.:'i . 71129: _ _�� '1'v:.11 f5 ' 7"_•17t1.1 't53V 3'r'fr`i :?fit)5 + �tg•('rtMl E.if^: a:�grif 3:tUfa`A �"u'ie!r7�ae'I CR�E � ;?i•1>.,�.l±lw�At. ��� .,* i i �_ _,.} � , `.. a--� � :kf� �,: , JL= iii. 2010 Permit v/s Proposed: .............. 6/16/2010 Proposed Total Total Existing DA1 M! cm SUP ierr.>_ra; DA2 (C' ca SurwemenO DA3 Dffsite? Dry Pond Wet Pond Low Density Project Area 21.29 60.67 t . �76 60.67 13.0✓' 0.36 9.81 37.41 Drainage Area 642,736 2,642,785 570,407 15,590 427,338 1,629,450 Impervious Area 246,395 509,824 239,704 9,549 237,765 22,806 % Impervious 38.3%1 19.3% 42.0% 61.3% 55.6% 1.4% c. Permittee: ac ac sf sf L 2010 Permit Typo: The current (2010) permit is written to "Brunswick County Schools". That was a typo because the application listed "Brunswick County Board of Education" as the intended permittee and as the owner. I will note a correction when the modification is issued. ii. Questions: The Special Warranty Deed submitted for the portion of the project that will be added shows that "The County of Brunswick" owns the real estate pursuant to a 12/5/16 Agency Agreement with "Brunswick County Board of Education". It says "It is the intention of both parties to combine this parcel together with the 21.29ac [tract already permitted]." 1. 21.20ac Tract: I do not see a deed on file for the 21.29ac tract that was permitted in 2010, and so I do not know who owns that tract. Please submit this deed. 2. What is the nature of the relationship between the County and the Board of Education? a.. Function Like a Lease?: Does it function like a lease such that we can fill out the application as a lease, and have both parties sign the application? The application essentially says that if the lease/agreement falls through that the property owner will be responsible for the permit. The exact statement to sign is inserted below. If so, please have both parties sign the application in the appropriate areas. There are directions on the application form. (I suspect that this will be what you end up choosing to do....) As the legal property o%mer I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement; or pending sale, responsr-bdity for compliance with ttie DES Stormwater permit reverts back to me, the property owner. As the propefty owner, it is my responsi mlity to notify ➢7EMML.. t imrruediately armi submit a completed Name/Ownership Change Form within 30 days; otherw-ise I will be operating a stormwater treatment facility without a valid permit_ I understand that the operation of a sto±�r_water trp t facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. b. Permit Issue to Both?: Or, do you want the permit issued to both parties with both parties signing as owners/permit applicants? i. If so, please submit signatures as permit applicants. (You would just have two copies of the applicable pages so that you can have two signatures.) ii. Please also submit O&M agreements from both parties. 3. Permit Information Update Form: Since the permit should already be issued to the Brunswick County Board of Education and we are either going to issue the modified permit to either the Brunswick County Board of Education and the County of Brunswick as either a situation similar to a lease or as co-permittees, we will not require a formal permit transfer. (This will be much simpler and cheaper.) But, we will need to have the Permit Information Update Form for the file to document the official change of ownership. The form is available on our website, https:Hdeg.nc.gov/about/divisions/energy-mines I-land-resources/energy-mineral- land-rules/stormwater-program/post-construction. If you have questions, please let me know. Thanks, Kelly From: Johnson, Kelly Sent: Monday, March 26, 2018 2:30 PM To: 'ceckert@bcswan.net' <ceckert@bcswan.net> Cc: Holly Cook<holly.cook@mcgillengineers.com> Subject: SW8 071210, Town Creek Middle and Elementary School - State Stormwater Permit The Wilmington Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) accepted the Stormwater Permit Application and $505 fee (check number 369242) on March 26, 2018. The project has been assigned. to me and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. Thanks, Kelly f-etUdiDkn'sDvV Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Johnson, Kelly From: Johnson, Kelly Sent: Monday, March 26, 2018 2:30 PM To: 'ceckert@ bcswan.net' Cc: Holly Cook Subject: SW8 071210, Town Creek Middle and Elementary School - State Stormwater Permit The Wilmington Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) accepted the Stormwater. Permit Application and $505 fee. (check number 369242) on March 26, 2018. The project has been assigned to me and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. Thanks, Kelly F�.l°��I�ohwsow Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 0 McGill A S S O C I A T E S March 15, 2018 Ms. Georgette Scott, Regional Engineer NC Division of Energy, Mineral & Land Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Dear Ms. Scott: E _ Zm101� // Subject: Stormwater Permit Application Town Creek Middle School and Elementary School Classroom Addition Lake Park Drive SE Winnabow, North Carolina Please find enclosed the following items for review and approval for the above referenced project: Item Copies Description 1. 1 Original Stormwater Management Permit Application Form 2. 1 Copy of the Stormwater Management Permit Application Form 3. 1 Application Fee Check in the Amount of $505.00 4. 1 Original Supplement Forms 5. 1 Copy of the Supplement Forms 6. 1 Original Operation & Maintenance Agreement 7. 1 Copy of the Operation & Maintenance Agreement 8. 1 Copy of the Property Deed 0 's rl`= 9. 1 Stormwater Design Report, Including: E C E IV E • Narrative MA', Z S 2018 • Aerial Depicting Site Conditions • USGS Map BY, • Soils Report 10. 2 Construction Plan Sealed March 15, 2018 11. 1 Topographic Survey 12. 1 Brunswick County/Brunswick County Schools Agency Agreement 13. 1 Signature Authority Letter 712 VILLAGE ROAD SW, SUITE 103, SHALLOTTE, NORTH CAROLINA 28470 1 910.755.5872 1 www.mcgillengineers.com The purpose of this project is for the construction of the new Town Creek Middle School and expansion of the existing Town Creek Elementary School off of Lake Park Drive SE on approximately 60.66 acres of which 21.28 acres is the current Town Creek Elementary School site and 39.38 acres is the current Town Creek Middle School site. The project is to be phased as shown on the plans. A High Density Stormwater Permit, SW8 071210, was issued by the North Carolina Department of Environment and Natural Resources Division of Water Quality (NCDENR DWQ) for the Town Creek Elementary School project in 2007 and modified on June 16, 2010. This project falls under Section 15A NCAC 02H .1019 Coastal Counties of the North Carolina Administrative Code Current Stormwater Rules. Vacating the shared property line between schools and combining the parcels should allow this project to apply for a Permit Modification for a Low Density Stormwater Permit with Pockets of Hi g Density as t e com med lmpervious aTeaS for—tFils br0lect are The 39.38 acre Middle School portion of this project is a new review for state stormwater. No modifications to the existing Town Creek Elementary School off -site stormwater wet pond are proposed as part of this work. The stormwater runoff from the existing Town Creek Elementary School is conveyed by open channel and closed conveyance systems to an existing off -site stormwater wet pond. No net increase in impervious areas or stormwater runoff to the existing stormwater wet pond are proposed as part of this work. Outside of the limits of construction shown on this plan, no changes to the previously approved and permitted Town Creek Elementary School stormwater plan are proposed as part of this work. The existing off -site stormwater wet pond was designed and approved to handle 246,395 sf of impervious area with no additional capacity. The existing pond was previously certified and is assumed compliant. All stormwater runoff from the Town Creek Elementary School Expansion and the Town Creek Middle School site will be directed to new stormwater control measures (SCM) or sheet flow as project calculations allow. The proposed 7,607 sf Town Creek Elementary School building expansion is to be located along the southern wing of the existing school building. The expansion consists of six (6) classrooms, vestibule, girl's restroom facility, and boy's restroom facility. The proposed 2-story 91,280 sf gfa Town Creek Middle School building, roadways, parking lots, sidewalks, athletic fields and associated facilities are to be located off of Lake Park Drive SE northeast of the existing Town Creek Elementary School building with shared access roadways, bus parking, and walkways between the schools. The proposed building straddles the existing school property line. The shared property line shall be vacated and the parcels combined. Less than 20.0 acres will be disturbed as part of this work. Please contact me at (910) 755-5872 or holly.cook@mcgillengineers.com should you have any questions during your review. 3 We appreciate your help in this process. Sincerely, McGILL ASSOCIATES, P.A. 4V 461 ./ Holly Cook, PE Shallotte Office Enclosures cc: David Cherry, AIA, KSQ Design Craig Eckert, Director of Capital Projects & Planning, Brunswick County Schools ECIE- MAl 2 6 I'll BY: AGENCY AGREEMENT by and between BRUNSWICK COUNTY BOARD OF EDUCATION and BRUNSWICK COUNTY, NORTH CAROLINA Dated as of December 5, 2016 PPAB 3501226v I AGENCY AGREEMENT THIS AGENCY AGREEHENT, dated as of December 5, 2016- and entered into by and between RICUNSWICK COUNTY BOARD OF EDtrCATION, which has general control and supervision of all matters pertaining to the public schools in the Brunswick County School Administrative Unit, its school administrative unit, and is duly organized and existing under the laws of the State of North Carolina (the "Board of'Education"), and the COUNTY OF BRi Nswl( K. NoRT'n C"kROLINA, a political subdivision of the State of North Carolina (the "C'uunry"), WITAESSETH.- WHEREAS, the County and the Board ot'[:ducation have previously agreed to cooperate in a plan to finance the coat of certain prgiects. which each has found to he necessary and desirable to provide primary and secondary education in the County; and WHEREAS, such projects consist of constructing. improving. and renovating school facilities. specifically including. among other things, the construction and renovation of classroom facilities, and district -wide improvements for security. technology and building infrastructure, the acquisition and installation of furnishings and equipment, and the acquisition of land or rights -in -land required therefor (coil ec:tively, the: -Facilities"). all as approved by the voters of the County in a referendum voted on November 8. 2016; and WHEREAS, in furtherance of such plan, the County is authorized to construct and equip real and personal property constituting the facilities and to enter into contracts related thereto: and ff HIEREAS. in furtherance of such plan. the (otintN desires Io ticsign:tte the• Knord of l thiLatton ;is it-, ageonl with respect to the-owwruction. renovatlotl and aquippmg, of the Facilities and the Board of Education is willing to accept such an appointment; and WHEREAS, the Board of Education and the County have determined to enter into an agreement in order to executa such plan and this agreement t,thir. ";tKrne l ;lgretynrertt' j constitutus such an agreement: and WHEREAS, all acts, conditions and things required by law to exist. to have happened and to have been performed precedent to and in connection with the execution and entering into of this Agency Agreement do exist. have happened and have been performed in regular and due time. form and manner as required by law. and the parties hereto are novv duly authorized to execute and enter into this Agency Agreement; NOW, THEREFORE, in consideration of the promises and of the mutual agreement-, and cos,enant, contained herein and for other valuable: consideration, the: parties hereto do hereby agree az, follows: Section 1. Construction and Other Accomplishment of School Facilities. file County. in furtherance of such plan, will contract for the construction and other aveomplishme;nt tit the Facilities. 1'he County will tnance the cost of the Facilities with the: proceeds of general obligation bonds to be issued pursuant to a bond order adapted by the Board of Commissioners of the County (the "Board") on August 1 2016 and approved by a majority of voters who voted thereon on November 8, 2016. Section 2. Soard r f Edueation to - I rt ac .-Igew r f the C`oven-. iIIIA13 350122HvI (a) The County hereby irrevocably 4f points the: Board ofLducatirm as its agent in c onnectiOn with all phases of the dcsign. cons-tructicm, supervision and other- accomplishment of the racilities l he tic►aril of Education is hereh% delegated re%ponsihility for the dar to day management of the c:.cnstiucticon of the Faelhtte., and the pavment of invoices. in accordance with the terms herein. 'rile Board of Education, as the agent of the County for the foregoing purposes. shall cause the Facilities to he completed in accotdan%:c with tht description prow idcd herein that was approved b% the voters. in accordance with the respective construction documents, any subsequent bond resolutions approved by the County and any applicable requirement; of governmental authorities and law. (b) ilte Board of 1AULation agrees that (i) it will cause- all construction contract,; anal other related documents for the: Facilities to be in the nantc of the County,. (h) other than as de%cribed in subsection (c) herein.. it will ensure that all construction contracts will be signed by an authori7ed County representative identified by the Board and acknowledged by an authorized Board of Education representative identified by the Guard of [education and iiiil it <<. ill present all such documents for approval of or, in the cast of:sub.. tiion (e) herein, ratification by the. Board. The Board of l.duc:ation shall cause the construction agreements to be rewiewed and appro vet] as to legal fines in atc:oordanc:e with the County -s policies and practices for legal rev iew ofcontracts pricer to submittal to the: Board for award. The County agrees to cause all documents to be approved in a timely manner. (c) I he County hereby delegates authority to the Board of I.duc:ation to approve and the Bound of Fducation"s finance Director to pre -audit contraeK. purchase orders and changer carder% concerning amount.% up to $3007000 with sub..,equcnt repeorting to the County Such approval authority is limited to amounts specified in the Board of Education budget for the Facilities and only for projects specifically authorized by the: voters on November 8. 2016 and the County shall not ratify expenditures outside such parameter~. (d) rho• Board of lducation shall suhnait all contracts and an} amendments thereto, except those auth orrted tinder suhscction (c) hereinf6t pre -audit by the C aunty%. Director of Fiscal Operations in accordance with G.S. 159-28: (e) The County and Hoard or Education agree that all amount-, received by the County as refunds of State of North Carolina sale.a tax with respect to expenditures made in connection with the Facilities will he held by the County may be requested by the Board of Education to finance education -related expenses. 1fie sales tat refunds may only be used for the benefit of Bruns%Wk County Schools-. Tile Board of Education is herehy directed to include the following language in all construction contracts: 1. Pursuant to N.C'.G.S. § 1 q5-164,14, the Owner is eligible tier sales and use tax refunds on all materials which become a permanent part of the construction. The Contractor agrees to provide the Owner documentation which meets the requirements of Sales and Use Tax Regulation 42 regarding requests for refund of sales and use taxes. Those requirements are outlined below: 2. All refund claims must be substantiated by proper documentary proof and only those taxes actually paid by the claimant during the fiscal year covered by the refund claim may be included in the claim. i. Any local sales or use taxes included in the claim must be,eparately stated PP kB 15012260 ., This rafts that there are no deli„yuwr: ad valorem taxes, fees, assessments or other liens which the Brunswick Courity Tax Collector Is charged with Wig, that are a lien on: Parcel Number 094 OM 62�_ as notated by the Brunswick County Assessor's Office. This is not a certification that the parcel number matches the deed MA@_"11�}'aArtu (Aril) Tax Col. / Del. Tax Spec, IIIIII�I�II'I�IICIIIIIIIIIIIII'IIIIII Brenta 1IW1m1I50.54:05.0 p Brunswick Caun y, NC Register of Deeds page 1 of 2 Return �vp �c.� 1 t TYP Rav TovIfi#: k $ . Ok-- Refunki Gosh___.__yinanee -,. 4 Portions of document are illegible due to condition of original. O Document contains seals verified by original instrument that cannot be reproduced or copied. Prepared by Bryan W. Batton, P. O. Box 249, Bolivia, NC 29422 Parcel Nwnber: 0840006202 Without Opinion on Title NORTH CAROLINA NORTH CAROLINA SPECIAL BRUNSWICK COUNTY WARRANTY DEED THIS DEED, made this & *` day of March, 2018, by and between BRUNSWICK COUNTY BOARD OF EDUCATION, party of the first part, a school administrative unit duly organized and existing under the laws of the State of North Carolina (hereinafter called "Grantor''), and THE COUNTY OF BRUNSWICK, (hereinafter called "Grantee"), whose mailing address is: P.O. Box 249, Bolivia, NC 28422; WITNESSETH The parties hereto have entered an Agency Agreement dated December 5, 2016 to facilitate construction and financing of school improvements. Said agreement requires that the County own the real estate to seek sales and use tax refunds on the project. That the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in Brunswick County, North Carolina, and more particularly described as follows: Being all of that 50.00 acre tract and non-exclusive 60' Ingress/Egress Easement of 3.25 acres as depicted on plat entitled "Survey of 50.00 Acres for Brunswick County School System" and to be found of record in Plat Book 45, Page 30, in the Brunswick County Registry. LESS AND EXCEPT that certain 10.62 acre parcel previously conveyed to the County of Brunswick in Deed Book 3234, Page 343. It is the intention of both parties to combine this parcel together with the 21.29 acres shown upon Plat Book 44, Page 52 in the Brunswick County Registry and EIVE MAR 2 6 2016 idY: IIIII IIIIIIII I�IIIIIII IIIII III IIIIIII Ba0z5 P1031 � Brunswick ounty, NC Register of Deeds page 2 of5s2 PROP previously conveyed to Grantee in Book 2744, Page 1282 of the same and having a tax parcel identification number of 0840006803. TO HAVE AND TO HOLD the aforesaid lots or parcels of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor has done nothing to impair such title as Grantor received, and Grantor will warrant and defend title against the lawful claims of all persons claiming by, under or through Grantor, except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: The provisions of all applicable zoning and land use ordinances, statutes and regulations; ad valorem taxes for 2018 and subsequent years; and all easements of record. IN WITNESS WHEREOF, the Grantor has c .s in Wd*exec the day and year first above written) Charles W. Miller, Chairman Brunswick County Board of Education ATTES Leslie K. up ten ent STATE OF NORTH CAROLINA COUNTY QOF BRUNSWICK I, rl r 4&--.Q F. Grow, a Notary Public in and for said the County and State aforesaid, do hereby certify that Charles W. Miller and Leslie K. Tubb, both either personally known to me or proven by satisfactory evidence, personally appeared before me this day and acknowledged that they are the Chairman and Secretary, respectively, of the Brunswick County Board of Education, and that by authority duly given and as the act of the Board of Education, the foregoing instrument was signed in its name by its Chairman, sealed with its corporate seal, and attested by himself as its Secretary. Witness my hand and official seal this the /o ' h day of March, 2018. Notary Public My Commission expires: 1 - 8 ' ZO 20 il6lsliMlan i. tM 6b�to�3 II �III�I II III) III I IfllI IIIIIII�!I IIIEM 12 21 59. P1282,z:�-5g.00m Brunswick County, NC Register ofDe Deeds page i of 7 Presenter � vim$ �Rat�� Total Rev �` ��Iftt. Ck$_.Ck# Cash$ Refund; Cast' S Finance ❑ Portions of document are i{legib a due to condition of original. IJ Document contains seals verified by original instrument that cannot be reproduced or copied. Excise Tax: $0.00 Without Opinion on Title Parcel Number: part of part of 008400068 Prepared by: The CauseyLaw Firm, P.A. P.O. Box 189, Shallotte, NC 28459 Brief Description: Town Creek Elementary School Site . STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK NORTH CAROLINA SPECIAL ECEIVE PEAR 2 6 2018 WARRANTYSEM THIS DEED, Made this the 5th day of February, 2008, by the BRUNSWICK COUNTY BOARD OF EDUCATION, a school administrative unit duly organized and existing under the laws of the State of North Carolina with an office and place of business in Brunswick County, North Carolina ("Grantor"); having address of: 35 Referendum Drive NE, Bolivia, NC 28422 to the COUNTY OF BRUNSWICK, a political subdivision of the State of North Carolina and a body politic and corporate ("Grantee") having an address of: 45 Courthouse Drive, NE, Building E, Bolivia, NC 28422 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns,'and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH: That the Grantor acquired the property herein conveyed in that Deed recorded in deed book 2686 at Page 417 of the Brunswick County Register of Deeds on October 9, 2007. III II IIII Jill :59IIIII11111 11111111111111 B2744 P128306 i3O Brunswick County, NC Register of Deeds page 2 of 7 WHEREAS, the parties hereto have entered an Agency Agreement dated August 1, 2007 to facilitate construction and financing of school improvements which require that the County own the real estate to seek sales and use tax refunds on the project. THAT the said Grantor, for valuable consideration paid by the Grantee, receipt of which is hereby acknowledged, has and by these presents do grant, bargain and convey unto the said Grantee in fee simple, all that certain parcels of land situated in Town Creek Township, Brunswick County, North Carolina and more particularly described as follows: See Attached Exhibit "A" attached hereto and incorporated herein by reference. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with Grantee, that Grantor has done nothing to impair such title as Grantor received, and the Grantor will warrant and defend the title against the lawful claims of all persons claiming by, under or through Grantor, other than as set out on Exhibit `B" and Exhibit "C" exceptions. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. Brunswick County Board of Education i BY: Shirley Babson, diairman fIIIIIIII IIIIII IIIIIIiII IIIfIIIllllll B2144 PRM nsan 59 000 Robert 3. Robinson Brunswick County, NC Register of Deeds page 8 of 7 STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK 1, 6 U 14. T �)6 i v_' , a Notary Public of the County and State aforesaid, do hereby certify that Shirley Babson and Dr. Katie McGee, both either being personally known to me or proven by satisfactory evidence (said evidence being ),personally appeared before me this day and acknowledged that they are the Chairman and Secretary, respectively, of the Brunswick County Board of Education, and that by authority duly given and as the act of the Board of Education, the foregoing instrument was signed in its name by its Chairman, sealed with its corporate seal and attested by himself as its Secretary. WITNESS my hand and notarial seal, this �i kday of b1 - 2008. Notary Public My Commission Expires: 1l-- �ZZ, �1. H. 40 aQ NOTARY 1 �j Gi PUBLIC z 'y f s f� �CK cov 02-21-2008 1111I 11111111111111 Jill 1 P1285 iso06:59.000 Brunswick County, NC Regiser of Deeds page 4 of 7 EXHIBIT "A" Located in Town Creek Township, Brunswick County, North Carolina: BEING that certain 21.29 acres as shown on a real property survey for Brunswick County School System prepared June 27, 2007 by Martin R. Stoughton, PLS (L-3727) of McKim & Creed and being recorded in Plat Cabinet 44, Page 52 of the Brunswick County Registry, reference to which map is hereby made for a more particular description. TOGETHER WITH a certain perpetual, non-exclusive right of way and easement as an appurtenance to the above described tract, for purposes of ingress, egress, regress and the extension of utility services out to U.S. Highway 17, said right of way and easement being more particularly described as follows: Beginning at a point on the eastern right of way of U.S. Highway 17 (Public right of way), said point is located S 41-14-13 E 4760.07 ft. from N.C. Grid Monument Winnabow Az. Mk. 2: Proceed from said point of beginning and leaving said right of way and with the northern lines of the above described Section K and with a curve to the right having a radius of 25.00 ft. a chord N 62-50-25 E 34.38 ft., thence S 73-43-09 E 107.95 ft., thence with a curve to the left having a radius of 950.00 ft. a chord S 85-39-21 E 392.97 ft., thence N 82-24-28 E 463.79 ft., thence with a curve to the left having a radius of 950.00 ft. a chord N 71-20-32 E 364.66 ft., thence N 60-16-37 E 107.22 ft., thence leaving said northern line of Section K N 60-16-32 E 76.17 ft., thence with a curve to the left having a radius of 60.00 ft. a chord N 15-16-37 E 84.85 ft., thence N 29-43-23 W 112.62 ft., thence with a curve to the right having a radius of 820.00 ft. a chord N 03-11-48 W 732.44 ft. to the southwestern corner of the proposed School Tract (taken from a survey by McKim & Creed dated June 27, 2007), thence with the western line of said School tract and with a curve to the right having a radius of 820.00 ft. a chord N 28-43-24 E 154.16 ft., thence N 34-07-02 E 829.94 ft. to a point in the northern line of the Brunswick - Stu tract, thence with said northern line N 59-58-44 W 60.15 ft., thence leaving said northern line and with the lines of the above described Section J S 34-07-02 W 825.64.ft. thence with a curve to the left having a radius of 880.00 ft. a chord S 02-11-49 W 930.58 ft., thence S 29-43-23 E 4.83 ft., thence with a curve to the right having a radius of 25.00 ft. a chord S 02-45-45 W 26.85 ft., thence with a curve to the left having a radius of 105.00 ft. a chord S 20-22-47 W 53.89 ft., thence with a curve to the right having a radius of 25.00 ft. a chord S 32-53-39 W 23.00 ft., thence S 60-16-37 W 107.22 ft., thence with a curve to the right having a radius of 850.00 ft. a chord S 71-20-32 W 326.28 ft., thence S 82-24-28 W 463.79 ft., thence with a curve to the right having a radius of 850.00 ft. a chord N 85-39- 21 W 351.61 ft., thence N 73-43-09 W 100.15 ft., thence with a curve to the right having a radius of 25.00 ft. a chord N 28-40-52 W 35.38 ft. to a point on the eastern right of way of U.S. Highway 17, thence with said right of way S 16-21-26 W 6.31 ft., thence S 19-24-00 W 142.58 ft. to the point of beginning according to a survey by Hanover Design Services, P.A. (All bearings are N.C. Grid relative to Map Cabinet 24, Page 235). Said easement being further shown on the above referenced recorded survey for Brunswick County School System prepared by Martin R. Stoughton, PLS (L-3727) of McKim & Creed. illllllllllll Illllllilll II1I11111 III lobes Plz o i son:s9o00m Brunswick County, NC Register of Deeds page 5 of 7 It is intended, agreed and understood that this is a non-exclusive right of way and easement for the joint use and enjoyment of the parties hereto, their respective successors and assigns. In the event such easement, or portion thereof, is relocated by agreement of Grantor and Grantee with an easement of substantially equal duality and design, then Grantor, its successors and assigns, agrees to convey to Grantee, its successors and assigns, such relocated easement in substitution and in place of the above described easement or portion thereof; and Grantee, by acceptance of this deed, agrees to release and re -convey to Grantor such easement or portion thereof so abandoned. And in the event Grantor, its successors and assigns ever desires to dedicate said right of way and easement, or any agreed relocation thereof, to the public for inclusion into the North Carolina Department of Transportation road system, then Grantee, its successors and assigns, by acceptance of this deed, agrees to join and consent to such public dedication. fIIIlIIIIIIII IIIIlI IIIIIIIlIllliLkjtj!;370z 0 59.0 ,2 06:59.000 Brunswiek.County, NC Register of Deeds Robinson page 6 of 7 EXHIBIT "B" RIGHT OF REPURCHASE: Grantor reserves that it has taken the property subject to that right of Brunswick -Stu and Associates, LLC to exercise a right and option to repurchase the property described herein from Grantor, its successors and assigns, for the sum of $638,700.00, but such right and option shall not arise and become effective until the day which follows the fifth year from the recording date shown on Grantor's deed; however this right of repurchase shall terminate and Grantor shall have no such. obligation to re -convey the said property in the event it has significantly completed construction of a school thereon within the five year period specified above. In the event any portion of the proposed school is destroyed or damaged by fire or other casualty prior to significant completion, Brunswick -Stu and Associates, LLC agrees to extend the five year period by two years in order to allow Grantor to rebuild or repair the school. Brunswick -Stu - and Associates, LLC agrees to affirmatively remove such right of repurchase by execution of a recordable release upon significant completion of construction of a school on the said property. If construction of a school has not so significantly been completed within the five year period, then Grantor for itself, its succcssors and assigns, agrees upon written notice and tender of said sum by Brunswick - Stu and Associates, LLC, to re -convey said property to Brunswick -Stu and Associates, LLC, by General Warranty deed free and clear of monetary liens and encumbrances and restrictions, except as hereinafter stated. Brunswick -Stu and Associates, LLC agrees to subordinate and by this instrument does hereby subordinate its right and option of repurchase to any applicable financing security interests or conveyances by Grantor of the property described herein as required to facilitate Certificate of Participation financing. In any event, this right and option to repurchase, if not sooner exercised as may be made to appear on the Brunswick County public Registry, shall automatically expire and terminate on the day which. follows the seventh year from the recording date shown on this deed. 1IIIIIIIIIIIIIIIIIIIIIIIIIJIIIIIIIIII M�kk0i�z-ms-69G00mBruCounty,NC Re aster . insonS page 7 of 7 EXHIBIT "C" 1. Subject to utility easements of record; 2. Subject to street or road rights of way of record; 3. Subject to matters of zoning and subdivision ordinances for Brunswick County; 4. Subject to rights of others in and to the use of the right of way and easement described in this deed; and 5. Passive royalty rights in gas and associated hydrocarbons and minerals in favor of International Paper Realty Corporation as reserved in a deed recorded in Book 1644, Page 559, Brunswick County Registry. BRUNSWICK COUNTY SCHOOLS 35 Referendum X- o ivie, North Carolina 28422 one: 9 253-28 0Fax- 910-253-2827 Date: March 2, 2108 To: Authorities Having Jurisdiction From: Colonel Les Tubb, Superintendent of Brunswick County Schools Subject: Signatory Authority Craig Eckert is authorized to sign North Carolina Department of Environmental Quality (NCDEQ, NCDENR. DEMLR) Application forms related to Erosion Control and Storm Water Management This authorization covers state and county forms. Current jobs in design include: Lincoln Elementary School Addition 1664 Lincoln Rd, Leland NC 28451 Town Creek Middle School (new)/Town Creek Elementary School (addition) 6330 Lake Park Drive, Winnabow NC28479 High School Field House Additions. 550 Whiteville Rd, nw Shallotte NC 28470 280 Cougar Rd, BSL Southport NC 28461 114 Scorpion Dr, Leland NC 28451 If you have questions regarding this correspondence please contact me at 910-253-2900. Thank You. Sincerely BRU I TY SCHOOLS Col el es Tub (Ret) Board Members: Chairman Ed Lemon - Vice -Chairman - John Thompson - Charles Miller • Catherine Cooke • Ellen Milligan Leslie K. Tubb, Superintendent 4 Application Completeness Review Checklist Project Name: �� Date Delivered to WIRO: G- .e� l� •T`- �1 [�.�r ,,g ,r� BIMS Received/Accepted Date 2Ac Project County/Location: �` *BIMS Acknowledged Date: Rule(s): _!017 Coastai—,! ❑2008 Coastal 1995 Coastal ,,.Phase IIUniversalJ1988 Coastal Permit Action: Ne Major Mod Minor Mod / Renewal / Transfer **New Permit M _ Permit Type: HD / L era / HD &LD Combo xisting Permit tt: cj '7 Savo General Permit / Offsite tempt / Rescission UPE Cert on File? SCM Type(s): : ' ; �' 70ffsite to SW8: Development Type: Commercial / Residentiai%h 5i__? - Master PE Cert on File? Subdivided?: Subdivision or Single Lot For New or Transferred Permits Permittee is: Stream Class: Property Owner(s) DDeveloper, Lessee EtPurchaser EISA Map 1:10RW Map Paperwork Emailed Engineer on: upplement(sj (1 original per BMP) ®CY'iM with correct/original signatures }1 ongina! per BMP except LS/VFS and swafesj DA10lication with correct/original signatures Corp or LLC: Sig. Auth. per So5 or Si nature Authorization letter or re art $505 (wit in Smo) No Fee soils Report: w/SHWT or Genera! Report calculations (signed/sealed) Deed Restrictions, if subdivided: E**Signed & Notarized Template Correct Template JCommJRes & Hp LD or Dec, Covenants & Recorded Covenants Recorded Plats °i0% or more lots Sold List mail Address: Design Engineer DE-Krail Address: Property Owner eed Email Address: Lessee 01-ease Agreement Email Address: Purchaser Purchase Agreement Email Address: Developer Email Address: HOA Representative lgpaject Narrative SG5 Mapd Plans-- 02 Sets [Detlands: Delineate*, _Q_ rNo Wetlands dir �c�nity Map E irr'oject Boundaries kregend F��'out (proposed BUA dimensions) DYA Maps r, 7_10etails (roads, cul-de-sacs. curbs. sidewalks, BMPs, Buildings, etc) :26sting Conditions andscape Plan ( grading la- Seal REVIEWER NAME: NOTES TO REVIEWER: *Enter BIMS Acknowledged Date on this Sheet l *FOR NEW Projects -Enter New Permit # on Supplements & Deed Restiction Templates. A"T G:WQ\\\Reference Lihran\ProceduresiCheckiists\Complezeness Review Checklist 2018 03 13 Weaver, Cameron From: Lora White<lora.white@mcgillengineers.com> Sent: Monday, August 28, 2017 10:50 AM To: Weaver, Cameron Subject: RE: Town Creek Elementary School Cameron, When you can, if you would get the entire stormwater file to Allways Graphics we would appreciate it. Thanks, Lo ra Lora White Administrative Assistant -:%McGill 712 Village Road SW, Suite 103 Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 lora.white@mcgillengineers.com I www.mcgillengineers.com From: Weaver, Cameron[mailto:cameron.weaver@ncdenr.gov] Sent: Munday, August 28, 2017 10:33 AM To: Lora White<lora.white@mcgillengineers.com> Subject: RE: Town Creek Elementary School Hi Lora I can make the Town Creek Elementary School file available for your review by appointment during business hours. Copies no larger than 11x17 can be made here during the review for $.05/copy and large plans can be taken over to Allways Graphics when my time allows to get you copies of those. Just let me know what you need. Cameron Cameron Weaver Environmental Assistance Coordinator -Wilmington Regional Office NCDEQ-Division of Environmental Assistance and Customer Service 127 Cardinal Drive Ext. Wilmington, NC 28405 91.0-796-7303 NCDEQ NEW WEBSITE: http://deg.nc.gov/ DEACS NEW WEBSITE: http://deg.nc.soy/about/divisions/environmental-assistance-customer-service E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Lora White [mailto:lora.white mcgilleneineers.com] Sent: Monday, August 28, 2017 9:43 AM To: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: Town Creek Elementary School Cameron, We would like to request a review of the file for Town Creek Elementary School in Brunswick County. Is there a form or can you give me some guidance on how to get copies of the documents? We will be working on the expansion of the school and the new middle school adjacent to the elementary school. Thanks, Lora Lora White Administrative Assistant M. cGin 712 Village Road SW, Suite 103 1 Shallotte, NC 28470 Phone: 910.755.5872 1 Fax: 910.755.5875 lora.white@mcgillengineers.com I www.mcgillengineers.com