Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8070333_Historical File_20071212
State Stormwater Management Systems Permit No. SW8 070333MOD December 12, 2007 John Baker, Managing Member Brunswick STU and Associates, LLC PO Box 19808 Raleigh, NC 27619 Subject: Stormwater Permit No. SW8 070333MOD Rice Creek Plantation — Phase I High Density Subdivision Project Brunswick County Dear Mr. Baker: o' z6mcd 6 M\ss+tAy The Wilmington Regional Office received a complete Stormwater Management Permit Application for Rice Creek Plantation — Phase I on December 12, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 070333MOD, dated December 12, 2007, for the construction of the project, Rice Creek Plantation — Phase I. This permit shall be effective from the date of issuance until April 26, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you, have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at (910) 796-7215. Sincerely, Edward Beck Regional Supervisor Surface Water Protection Section ENB/csb: S:\WQS\STORMWATER\PERMIT\070333MOD.dec07 cc: David Bowman, P.E., Bowman Design and Engineering Services, P.A. Brunswick County Inspections Chris Baker Wilmington Regional Office Central Files Page 1 of 10 State Stormwater Management Systems , Permit No. SW8 070333MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO John Baker and Brunswick STU and Associates, LLC Rice Creek Plantation — Phase I US 17, Brunswick County FOR THE construction, operation and maintenance of eleven (11) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 26, 2017 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater controls have been designed to handle the runoff from (See tables Section 1.6) square feet of impervious area. This basin must be operated with a 30' vegetated filter. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 10 State Stormwater Management Systems Permit No. SW8 O7O333MOD The following design elements have been permitted for these wet detention ponds stormwater facility, and must be provided in the system at all times. Design Criteria I Pond #1 Pond #2 Pond #3 Pond #4 Pond #5 Pond #6 a. Drainage Area, 8.69 7.33 12.73 11.17 4.55 2.79 acres: Onsite, ftZ 378,444 319,410 554,482 486,629 198,391 121,564 Offsite, ftZ None None None None None None b. Total Impervious 187,943 236,419 178,739 242,219 92,613 50,094 Surfaces, ft2 (1) Buildings 140,116 195,764 113,476 184,336 68,190 31,538 (2) Streets 45,512 37,654 63,523 55,012 23,335 18,077 (3) Sidewalks 2,306 3,001 1,740 2,871 1,088 479 (4) Offsite None None None None None None c. Design Storm, 1 1 1 1 1 1 inches d. Pond Depth, feet 6 6.5 6 6.5 6 4 e. TSS removal 85 85 85 85 85 85 efficiency f. Permanent Pool 23 23 23 20 19 24 Elev., FMSL g. Perm. Pool Surface 8,413 8,716 10,408 12,288 7,154 5,502 Area, W h. Permitted Storage 19,560 20,251 23,893 27,917 16,863 6,096 Volume, fte i. Temporary Storage 25 25 25 22 21 25 Elev., FMSL j. Controlling Orifice, 1.5 2 1.5 2 1 1 "0 pipe k. Permitted Forebay 4,942 4,780 6,110 7,913 3,482 1,946 Volume, W I. Receiving Rice Creek / Cape Fear Stream/River Basin m. Stream Index 18-81-6 Number n. Classification of C;Sw Water Body o. Max. fountain 1/8 1/8 1/8 1/8 1/8 1/8 horsepower Page 3 of 10 State Stormwater Management Systems Permit No. SW8 070333MOD Design Criteria Pond #7 1 Pond_#8 i Pond #9 Pond #10 10.40 5.52 a. Drainage Area, 16.57 1 3.35 acres: Onsite, W 452,857 1447,072 146,113 240,645 Offsite, ft2 None j 244,667 None None b. Total Impervious 235,591 290,381 62,982 89,462 Surfaces, ft2 (1) Buildings 174,148 30,072 i 65,652 (2) Streets 58,703 45,714 32,431 ! 22,810 (3) Sidewalks 2,740 479 1,000 (4) Offsite None 244,667 None None c. Design Storm, 1 1.5 1 1 inches d. Pond Depth, feet 1 6 12 6 6 e. TSS removal 85 85 85 85 efficiency f. Permanent Pool 23 23 24 20.5 Elev., FMSL g. Perm. Pool Surface 10,534 17,987 10,792 6,975 Area, ft2 h. Permitted Storage 24,200 44,635 24,835 16,502 Volume, ft3 i. Temporary Storage 25 25 26 22.5 Elev., FMSL j. Controlling Orifice, 2 3 1.5 1.5 T pipe k. Permitted Forebay 6,280 15,737 6,214 3,362 Volume, ft3 I. Receiving Rice Creek / Cape Fear Stream/River Basin m. Stream Index 18-81-6 Number n. Classification of C;Sw Water Body o. Max. fountain 1/8 1/4 1/8 1/8 horsepower SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. Page 4 of 10 State Stormwater Management Systems Permit No. SW8 070333MOD 4 The permittee shall at all times provide the operation -and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 8. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 9. The Director may determine that other revisions to the project should require a modification to the permit. 10. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 5 of 10 State Stormwater Management Systems Permit No. SW8 070333MOD 12. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 13. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 14. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 15. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 16. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 17. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 18. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 19. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 20. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 070333MOD, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. Page 6 of 10 State Stormwater Management Systems Permit No. SW8 070333MOD e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is 3,000 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. h. Built -upon area in excess of the permitted amount will require a permit modification. 21. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 22. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 23. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. 'The maximum pump power for a fountain in these ponds are (See tables Section 1.6). 24. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. IiI. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. Page 7 of 10 State Stormwater Management Systems Permit No. SW8 070333MOD 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 12th day of December, 2007. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 070333MOD Page 8 of 10 State Stormwater Management Systems Permit No. SW8 070333MOD Rice Creek Plantation — Phase I Stormwater Permit No. SW8 070333MOD Brunswick County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 9 of 10 State Stormwater Management Systems Permit No. SW8 070333MOD Certification Requirements. Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. _12. Required drawdown devices are correctly sized per the approved plans. _13. All required design depths are provided. _14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. M. NCDENR-DWQ Regional Office Brunswick County Building Inspections Page 10 of 10 P. 01 Ic Ic TRANSACTION REPORT is DEC-14-2007 FRI 12:08 PM Ic Ic � is FOR: NCDENR 9103502004 � Ic >K t SEND � Xt �c DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP DEC-14 12:06 PM 97556527 1'43" 10 FAX TX OK 363 Ic TOTAL 1M 43S PAGES; 10 1{ State of North CaroUss Department of Environment and Natural Resources Wilmington Regional ORiee Michael F. Easley, Governor William a Roar, ,Tr., Secretary FAX COVER SHEET Date. 12-11, el, No. Pages .(exeL cover): To: _�l/♦ o� �DGt�Qi?% . From: _ G1y�' /%?�•�- r Co: �Gy Gam!% �� Phone: � _ _ . Fax: Fax: (910) 350-2004 Loa e Xd- e;, /. 1,4/ eo 'e�� 127 Cardinal Drive ExtensUm, Wilmington, NC 2W5 • (910) 79&7215 • An Equal QppoMmity Affi motive Action Employer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor FAX COVER SHEET Date: �'0 To:/�� Co: Fax: William G. Ross, Jr., Secretary No. Pages (exc/l.ccover): From: Phone: Fax: Re: 1-%OUJ/7 e�/EE4 EGE/f1E.J (910)350-2004 G D'e Z- 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer 7 BOWMAN DESIGN 8s ENGINEERING SERVICES, PA 143 Holden Beach Road, Suite 3, PO Box 748, Shallotte, North Carolina 28459 Phone:910-755-6526 Fax:910-755-6527 Hand Delivery December 10, 2007 Mr. Chris Baker Division of Water Quality NC Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: Rice Creek Plantation — Phase I Brunswick County Express Modifiation; High Density Dear Mr. Baker: On behalf of Brunswick BTU & Associates, LLC, enclosed for your review and approval are the following documents: 1. One (1) original and one (1) copy of the Stormwater Management Permit Application. 2. One (1) original and one (1) copy of the Wet Detention Basin Supplement for Pond 8. 3. One (1) original and one (1) copy of the Wet Detention Basin Maintenance Agreement for Pond 8. 4. Two (2) copies of the Design Calculations (Pages 1-54). 5. Two (2) copies of the Project Narrative. 6. Two (2) copies of the Design Plans (Cover, Sheets Cl-C11). 7. A check in the amount of $ 4000.00 to cover the required application fee. Please contact me if you have any questions or require any additional information. Sincerely, 54e_ Brian S. Hall, EI Enclosures cc: Mr. John Baker, Brunswick STU & Associates, LLC File: 2500.02 (Rice Creek Plantation — Phase I) RICE CREEK PLANTATION — PHASE 1 RIJNSWICK COUNTY, NC REVISED STORMWATER CALCULATIONS December 2007 Prepared by: BOWMAN DESIGN & ENGINEERING SERVICES, PA 143 Holden Beach Road, Suite 3 PO Bnx 748 Shallotte, North Carolina 28459 Phone: 910-755-6526 Fax: 910-755-6527 RICE CREEK PLANTATION - PHASE 1 REVISED IMPERVIOUS AREA TOTALS /§ co M K 7 00 e 2 CD CD 0 k R- U. ©§ § K 2 o t 2 9§§ - i o r o 0 0 to 0 % ■ k k § k k \ k © ° � § o $ § c §$ _ ^ 2 Cot� - o R v C122 ° g o o o G ■ §§� k§ Q a c§ § R o � 0 0 a & C aR OR ■ § _ a � ¥ 2 # C.)n K P. 2 k E Q cri § cd CM « � r- � # K - g§ 0 o §_ CD o 0 § V) c - � § §In z § 2 ■ § 2 k MOM § § S § E $ § § @ ■ o k a M 0 ■ IL | or 574- k 0 to m 0) 2 c � q- C e K — 9 © 8§ ® § 8 G 2 _ m « k § k K f I W 2 o o 0 40 CD o C2 $ w f § q @ o � - § ■ 2 co 2 co a C2 o o� CDk a§ r- § f o 0 0 0 0 0 e _� cc K§ w Cl) § k k ■ N - CM Q ca Q§§ - r ■ a 2 § § 0 © 0 CD Q CD 0 o o 0 @ q C%L s C%L �CD © 7 R _ a o CD2 gCD K 2 8 2 @ Go § E o 0 0 co§ 2 2 v°Lq k \ / k\ § 8 wt N 0 0 0 Q coN v° § CY @ 14 2— ofr,54 13 z a W W z C9 W 0 a m z W 0 Q fir c7 F� R R a V W A N o °N° O N o O 0 0 G O 0 O N p N y`LLdo •CR c') N r Go waa vi r tt W O O N O C O O O O O O ao O cq N W N W W n q P. m n fO C o O 0 O 0 G 0 O N 0 f � 3 FKs pppp I� ? ' coo O � O C O O � Vi M V V co pej O v fqMt yy N N � ^ A N O O 0 N O O O O O O O C W M Cl) N f m Y p O N n N m O N G O m O O O O O O W W pp N a m 0 M V O 0 O O O O p ym LL m 40 a O W i 3 OF SI O F' MMp {7 T cmY N O G m N N W U. ^� U. O 0 me w m R N o 0 O 0 O 0 O 0 O 0 O 0 O N m w to O 2 f N W U � � C O O C C C � W O C W H di QO m Of p OD W O O O O p O O O O O p O C O O O O O O N Ol m N W m p p C W J V CV ^ N � � O 0 O p 0 C tN► '07 0 0 C6 Cp N Y a cm R Nv o p CD c 0 C 0 o 0 C 0 C W o � N o O p CD O C o O 0 O 0 O m M m C f O O O CD O O '? P a0 O f� O O O O Y C.)m P1 �C14N a f. � O O O N 0i C4 O CD C Q P9 + 0 F S$ w q LL LU x 0 � 19 0 � % � ;E a � � z � � � � w 2 z IL ■ U. w � q 0 2 w & k le CD $ R § k § � § A a k § 0 LU � z § K$0 co o o 0 o 0 7co k k�$� C 3 of k wi § k k § P. 2 0/§ § ® U� lx « � Q ■ § k j.J j _ k w S k a� ■ 0 & §§ § & § k « Q / o E■ ® ■ ■ 67 OP 54 w § kk 0 z� )< wk u2 rx2 � LUL. § k k C � Cq d w _ - C m G � � � x � % § § o § 7 7 o § d @ d § ' 8 ■ § a § to ¥ � � ) ¢ \ E � / § _ 00 cc m o o _ 't C-4 w 2IL § LL § _ E O k k k k � k ■ k � § § ■ O « « § f � � z k ® § § § 2 _ @ § § Li § § § ■ ƒ o e 0 & ■ � ■ ■ ag [ ) � & w .G'+ RICE CREEK PLANTATION - PHASE 1 REVISED SWALE CALCULATIONS (FOR TRACT A & PORTIONS OF THOROUGHFARE) RICE CREEK PLANTATION - PHASE 1 SWALE DRAINAGE FLOW CALCULATIONS FOR TRACT A AND THE THOROUGHFARE BOWMAN DESIGN and ENGINEERING BSH Iefir4uEl1;' Drainage Area = Drainage Area - Design Storm = Surface GRASSY IMPERVIOUS Total 'A' Weighted C' Intensity'i ' r'r QI = CIA ftnr , :Drainage Area = Drainage Area = Design Storrs = Swface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'1 ' (3) Qr = CIA 23,423 SF 054 Acres 10 -YR storm Acres C-Value n7 0:30 1 0.2 0.24 0.95 .54 0.5 5 7.1 ....._SCI's 64.110 SF 1.47 Acres 10 -YR storm Ades C-value rn Oleo 0.2 0.67 0.95 1.47 0.541 71 6; cis DA-5 REMOVED (IMP. AREA ADDED TO POND 8 DA) 44M. 'r 0*7. -Drainage Area = Drainage Area _ Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted C' Intensity 'I ' �r Qr - CIA 3.9.39.8 SF 0.90 Acres 10 -YR storm Q trtlln Dh 2 <: Drainage Area = 1 67,296 SF Drainage Area = 1 1.54 Acres J-YR Design Storm = 1 10 storm Surface Acres C-value (l) GRASSY 0.85 02 IMPERVIOUS 0$9 D95 Total A' .54 Weighted 'C' 0. Intensity '1 '(3) 7.1 a = CIA s'a - cfs 1f1r11 _<; Drainage Area = 1 24198 SF Drainage Area = 0.56 E] Acres Design Storm = I t0 -YR storm Swtace Ades C-valuer'? GRASSY 0.31 0-2 IMPERVIOUS 025 0.95 Total 'A' 0.56 Weighted C' 0.5 Intensity'i Qr - CIA _ :=:.$,9. Cfa DA-6 REMOVED (IMP. AREA ADDED TO POND 8 DA) DA-8 REMOVED (IMP. AREA ADDED TO.POND 8 DA) 4i[r' m.DA --; Drainage Area = 18 571 SF Drainage Area = . 0.43 Acres Design Storm = 10 YR storm DA-9 REMOVED Surface Ades C-valuenl (IMP. AREA ADDED GRASSY 0.22 02 TO POND 8 DA) IMPERVIOUS 0.21 0.9,5 Total 'A' 0.43 Weighted C' 0.56 Intensity'/ ' 0r 7.1 QI = CIA ; ?'i, CIS 4 from DA-1114 Drainage Area = 4B 466 SF 1 I3¢.g ,;Drainage Area = 30,406 SF Drainage Area = 107 1 Acres Drainage Area = . 0.70 1 Acres Design Storm = 10 -YR storm Design Storm = 10 -YR storm Surface Acres C-VaNre lt' Surface Acres C-value 1 sl GRASSY 0.57 1 02GRASSY 0.38 0.2 IMPERVIOUS 0.50 0.85 IMPERVIOUS 0.34 095 Total A' 1.07 Total A' 0.70 Weighted C' O. Weighted C' 0. 5 Intensigr'i ' m 7.1 Intensity'] ' m 7.1 QI = CIA =:. . cis QI = CIA " CIS (1) Table 8.03s; (2) Figure 8.03a; (3) Figure 8.03b or the NCDENR Erosion and Sediment Control Planning and Design Manual. ReNsion Date: 121712007 7 or S4 RICE CREEK PLANTATION - PHASE 1 SWALE DRAINAGE FLOW CALCULATIONS FOR TRACT A AND THE THOROUGHFARE BOYIIAIiAN DESIGN and ENGINEERING BSH 0*0 *#*It, Drainage Area = 45,626 SF :a Qn`13 _Drainage Area = 41,70$ SF Drainage Area = 1.05 Acres Drainage. Area =1 0,96 . Acres Design Storm = 1'0 -YR storm Design Storm =I 1.0 -YR storm Surface Acres C-Value rn Surface Acres C-Value ru GRASSY 0..53 0,2 GRASSY 0.01 0.2 IMPERVIOUS 0.52 095 IMPERVIOUS 045 095 Total A' 1.05 Total 'A' 0.96 Weighted'C' g 0.572 Weighted'C' 0.553 Intensity'1 ' (3) 71 Intensity 'I QI = CIA - _ _ _ cis QI = CIA .-. •3. 9rFla f,1 itpg( pi!Ist ' : Drainage Area - 59,693 SF Q from DA-46 Drainage Area = I 4$ 820 SF Drainage Area = 1,37 Acres Drainage Area = 1 112 Acres Design Storm = 10 -YR storm Design Storm = 1 10 -YR storm Surface Acres C-Valuer+7 Surface Acres C-Valuer+7 GRASSY 0.70 0 2 GRASSY 047 02 IMPERVIOUS 0.07 0 95 IMPERVIOUS 055 095 Total A' 1.37 To18/'A' .1.12 Weighted'C' 0. Weighted'C' 0.568 Intensity's ' ta) T.1 Intensity'i ' (3) 7.1 QI = CIA 6.It1 Cis QI = CIA" CIS 1 �1 •: Drainage Area = 1 15 719 SF 01 gni UA.0 Drainage Area = 20,081 SF Drainage Area I 36 Acres Drainage Area m 1 0,40 Acres Design Storm = 10 1-YR storm Design Storm = 1 10 -YR storm Surface Acres C-Value rn Surface Acres C-Value n7 GRASSY 0.19 0.2 GRASSY �gt� 0.2 IMPERVIOUS 017 0.95 IMPERVIOUS 0.95 Total'A' 0. Total A' Weighted C' 0.553 Weighted'C' 0.525 Intensity's ' r3l 7.1 Intensity'i ' r3r 7.1 QI = CIA 1,-'i41cfs QI = CIA '&73 Cis Drainage Area = 1 33.789 SF 1ti UA-1 f : Drainage Area = 1 42.942 SF Drainage Area = 1 078 Acres Drainage Area = 1 099 Acres Design Storm = 10 -YR storm Design Storm = I 1. -YR storm Surface Acres C-Valuer+7 Surface Acres C-Value rl GRASSY 0.43 Q.2 GRASSY 0.50 0.2 IMPERVIOUS 0.35 0:95 IMPERVIOUS 0.49 0.95 Total A' 0.78 Total A' 0.99 Weighted'C' 0.538 Weighted 'C' 0.573 Intensity'i,� 7.1 Intensity'/'(') 7.1 QI = CIA [` cis = CIA 44t cis 41 ttAni 1p.; Drainage Area = 1 37,299 SF Drainage Area = 41,201 SF Drains Area Drainage _ 0.86 Acres Drainage Area = 1 095 Acres Design Stare = 10 J-YR storm Design Storm = 1,0 -YR storm Surface Acres C-Value (1) Surface Acres C-Valuer+I GRASSY 0.4:8 02 1 GRASSY �JE� 02 IMPERVIOUS 0 38 0 b IMPERVIOUS 0 9b Total A' 0.86 Total A' Weighted 'C' S33 Weighted'C' 0,557 Intensity's ' (3) 7.1 Intensity'/ ' (3) 7 1 Q, = CIA r Cis Qi = CIA de Wrenn. . Drainage Area = 58,109 SF Wrprrf DA.23. Drainage Area = . 37 22 SF Drainage Area = 1 33 Acres Drainage. Area = 0.86 Ares Design Storm 1 10 J-YR storm Design Storm = 10 -YR storm Surface Acres C-Value r'l Surface Acres C-Value I+7 GRASSY 0:6$ 0.2 GRASSY 0,45 0.2 IMPERVIOUS F- 0.64 0.95 IMPERVIOUS 0.41 0.9b Total'A' 1.33 Total A' 0.86 Weighted'Cl 0.560 Weighted 'C' 0.558 Intensity's '(3) 7 1 Intensity 'I 'r3r 7,1 Qi = CIA CIS QI = CIA , .; .:; Cie (1) Table 9.03a; (2) Figure e.03a; (3) Figure a.03b or the NCDENR Erosion and Sediment Control Planning and Design Manuel. R"alon Date:12f7r2007 8 ofr 51 RICE CREEK PLANTATION - PHASE 1 SWALE DRAINAGE FLOW CALCULATIONS FOR TRACT A AND THE THOROUGHFARE BOWMAN DESIGN and ENGINEERING BSH 11i1�[il - Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted C' Intensity'i ' Or Q = CIA -0*01094T6 , Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total 'A' Weighted C' Intensity 'I ' c1 Q = CIA *411(1.0,A26 Drainage Area = Drainage, Area = Design Storm = Surface GRASSY IMPERVIOUS Tota! A' Weighted 'C' Intensity'i ' csl QI = CIA 4,1V"TP k40; Drainage Area - Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted C' Intensity's ' t'i ($ = CIA Q-( 00i lam_ _ ",-Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total 'A' Weighted C' Intensity'1 ' i'r Qr = CIA Q.1kQ ;k'I ' Drainage Area a Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Tote! A' Weighted 'C' Intensity's ' QI = CIA 34,375 SF 0.79 Acres 10 -YR storm Acres C-Value (') 0.39. 0.2 0.4'0 095 0.79 0.580 7.1 F7- Cf$ 14.765 SF 0.34 Acres 10 -YR storm Acres C-Value (11 0.14 0.2 0.20 0.95 0.34 0.643. 7,1 _.vim 17,227 SF 040 Acres 1-YR 10 storm Apses C-Value Mr 0..32 1 0.2 0.08 0. 5 0.40 0.352 7.1 cis 33,369 SF Acres 1-YR storm C-Value (lr 0.77 10 Apes 0.65 1 0.2 012 p.95 0.77 IT 0.31 7.1 55 248 SF 1.27 Acres 1p -YR storm Apes C-Value('i 113 1 02 0.14 0798 1.27 . 83 71 cfs t8.348 SF 0,42 Acres 1-YR 10 storm Apes C-Value(1) 04.2 0.2 0 00 0.95 0.4 0.a 7,1 cfs O,t3D (1) Table 8.03a; (2) Figure 8.03s; (3) Figure 8.03b of the NCDENR Erosion and Sediment Control Planning and Design Manual. Q[lDA,7 Drainage Area = Drainage Area Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'/ ' (31 Q=CIA QV*4 DA-27, . Dminage Area = Drainage Area = Design Store = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' t� QI=CIA Q from DA-29 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted C' Intensity's ' QI = CIA Q firpnt t>Fq 1 : Drainage Area - Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total 'A' Weighted C' Intensity'1 ' (3) Q-CIA ".Q.ftOFA DA-43.. Drainage Area Drainage Area = Design Storm = 13,982 SF 1 Acres -YR storm C-Value 0.32 10 Acres 0.16 02 0.17 O.SiS 0.32 0.598 7.1 ;cfs 33,643 SF 0.77 Acres 10 -YR storin Acres C-value ('r 0 37 0.2 0.40 0 95 0.77 0.588 7.1 25 81F-I SF 1 Acres -YR storm C-Value (1J 0.2 0.59 10 Apes 0.3.8 0.21 0.95 0.5 0.48 7.1 43,795 SF 101 Acres 10 -YR storm Acres C-Value f11 0.87 0.2 0.14 095 .01 7.1 0.304 y 5 e SF Apes R storm Surface Acres C-Value f'j GRASSY 0.80. 0.2 IMPERVIOUS 1 0.28 0.95 Total A' 1 1.08 Weighted C' 0-94 Intensity'1 ' r'r 7.1 Qr = CIA {1 OFS 1 f4* "46 : Drainage Area = 1 2124.0 1 SF Drainage Area = j__LLj:j0=j Acres Design Storm =1 10 -YR storm Surface Apes C-Value GRASSY 0.42 0.2 IMPERVIOUS 0.07 0.95 Total A' 0.49 Weighted C' 0.30 Intensity'1 ' is) 7.1 QI = CIA :fl:#I cfs Revision Date: 12f712007 I ag. 51 RICE CREEK PLANTATION - PHASE 1 SWALE DRAINAGE FLOW CALCULATIONS FOR TRACT A AND THE THOROUGHFARE BOWMAN DESIGN and ENGINEERING BSH Q iro[tlb -38,, Drainage Area = 1 14.591 SF Drainage Area = 1 03.3 Acres Design Storm 1 10 -YR storm Surface Acres C-Value c1J GRASSY 1 0.33 0.7 IMPERVIOUS 0.00 0.05 Total A' 0.33 Weighted Intensity's Lb=CIA cfs Q rom l')A4# :Drainage Area = SF Drainage Area =PRIP-YRstorm Acres Design Storm = Surface Acres C-Valuetll GRASSY 0.68 02 IMPERVIOUS 0.35 0.95 Total'A' 1.03 Weighted 'C' 0.456 Intensity'i ' 7,1 QI = CIA ..; oft ;Q from t�AO Drainage Area = 1 84,879 SF Drainage Area = 195 Acres Design Storm = 10 -YR storm Surface Acres C-Value m GRASSY 1.76 0.2 IMPERVIOUS 0.19 0.95 Total A' 1. Weighted 'C' 0.27 Intensity's Q = CIA a; cis Q fro1w0A42 ` Drainage Area = 1 43.571 SF Drainage Area = 1 1.00 J-YR Acres Design Storm = 1 10 storm Surface Acres C-ValueflJ GRASSY 1.0.0 . 0.2 IMPERVIOUS 0.00 0:95 Total A' 1.U0 Weighted'C' 0.200 Intensity'i ' t'm 7.1 Q = CIA CIS 0-from Drainage Area = 14328 SF Drainage Area = 1 013 J-YR Acres Design Storm = 10 storm Surface Acres C-Vaw (1) GRASSY 0.33 02 IMPERVIOUS 0 00 0 95 Total A' 0.33 Weighted 'C' 0.200 Intensity's ' t3l 7.1 QI = CIA 47licts G #rajah ;1A-46 „Drainage Area = 1 14.933 SF Drainage Area = 1 034 1-YR Acres Design Storm = 10 storm Surface Acres C-Value n� BRASSY 0.34 0.2 IMPERVIOUS 000 0.95 Tots/"A' 0.34 Weighted 'C' 0.200 Intensity's f�=C:IA cis (1) Table 8.03a; (2) Figure 8.03a; (3) Figure 8.03b of the NCDENR Erosion and Sediment Control Planning and Design Manual. •frOM-1 ,+3'1' ..,,Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total 'A' Weighted 'C' Intensity's ' 13) QI - CIA d 1rArrrAA_ 8 Drainage Area = Drainage Area = Design Storm = Sudare GRASSY IMPERVIOUS Total 'A' Weighted 'C' Intensity'i ' 0t QI = CIA QfMM,t441._. `Drainage Area = Dreinage.Area = Design Storrs = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'/ ' (a) QI = CIA 47122 SF 108 Acres 10 -YR storm Acres C-Value(,) 0.921 02 016 0.85 1.08 0.311 cre 7.1 8 189 SF 019 Acres 10 -YR storm Acres C-Value r1i 0,10 0.2 0.00 095 .19 .Z00 7.1 1} . Cis 31,175 SF 0.72 Acres 10 -YR storm Acres C-Value 11J 0.64 10.2 0.08 1 0.95 0.72 0.2 7.1 . rui i4+ Drainage Area = 1 86,249 SF Drainage Area = 1 1.98 Acres Design Storm = 10 -YR storm Surface Acres C-Value /9 GRASSY 1.72 0,2 IMPERVIOUS 0.28 0.95 Total A' 98 Weighted 'C' 0.298 Intensity Y ' t9m 7.1 CIA _ 9i 5"6; '._ Drainage Area = 1. 38.8;92 SF Drainage Area = 0 82 Acres Design Storm = .10 -YR storm Surface Acres C-Value l") GRASSY 0.2 IMPERVIOUS Qi�; 095 Total A' Weighted 'C' Intensity's ' n1 7.1 QI - CIA cts `Drainage Area = 73,290 SF Drainage Area =1 168 Acres Design Storm - 1 10 -YR storm Surface Acres C-Value /1J GRASSY 1,4.6 1 0 2 IMPERVIOUS 0.�2-2 0.95 Total A' Weighted 'C' 0.298 Intensity's ' tam 7,1 (� = CIAF-7-3it£ cfs R"don Date: 1217=07 to of 9+ RICE CREEK PLANTATION - PHASE 1 SWALE DRAINAGE FLOW CALCULATIONS FOR TRACT A AND THE THOROUGHFARE BOWMAN DESIGN and ENGINEERING BSH tl.frpltt Drainage Area ■ Drainage Area = Design Storm Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i '(3) QI = CIA 8 685 SF Acres -YR storm C-Value r�) 0.2 015 10 Acres oil 0.04 095 0.15 7.1 0.395 cis px9 Drainage Area _ Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted C' Intensity'i ' j) QI = CIA 7.1 SF Acres R storm w.1-if). 0 fronlr PAW Drainage Area = 1 12,044 SF Q firomij*41' Drainage Area = 1 71..413 SF Drainage Area = 1 0.28 Acres Drainage Area = 1 1.,64 Acres Design Storm = 1:0 -YR storm Design Storm =1 10 -YR stor Surface Acres C-Value rn Surface Acres C-Velue GRASSY 0.28 0.2 GRASSY 1129 �-0,2 IMPERVIOUS Goo 0.95 IMPERVIOUS 0.35 0.95 Tota!'A' 8 Tots! A' .64 Weighted C' 0-3-00--nj Weighted C' 0.360 Intensity's ' ce) 71 Intensity 'i ' (3) 71 QI = CIA QI = CIA s,.• -44�;� cis Q fr0ilrfp-Q ' Drainage Area = 1 16.0 103 SF Drainage Area = 1 3.68 Acres Design Storm = 10 -YR storm Surface Acres C-valuer') DA-53 REMOVED GRASSY 3.48 0.2 (IMP. AREA ADDED IMPERVIOUS 0.420 0.95 TO DA-51) Total 'A' Weighted'C' D.241 Intensity'i ' (3) 7.1 Q1 = CIA . 6.: CfS DA-54 REMOVED (IMP. AREA ADDED TO DA-51) ' Q *6111 l DA4 Drainage Area = Drainage Area = Daslgn Storm Surface GRASSY IMPERVIOUS Total 'A' Weighted C' Intensity'i 0 - CIA 'Oham..1 -59; : Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensigr'i a=CIA 100,535 j SF 1 Acres -YR storm C-valueru 3,82 10 Acres 3.:40 0,2 0,42 0 95 3.82 0.282 71 X cis 23 0,95 SF 053 Acres 1D -YR storm Acres G-Value r�) 0-40 0.2 0.13 0.95 .53 0.384 7.1 Cis (1) Table 8.03a; (2) Figure 8.03a; (3) Figure 8.03b of the NCDENR Emelon and Sediment Contml Planning and Dealgn Manuel, 111" IM44; ` Drainage Area = 1 30,536 SF Drainage Area = 1 0.70 Acres Design Storm = I 10 -YR storm Surface Acres C-value a' GRASSY 0.40 02 IMPERVIOUS Total A' Weighted C' Intensity's ' c" Qi = CIA a lfoi$)lli,: Drainage Area = 1 55,474 SF Drainage Area = 1.27 Acres Design Storm = I 10 -YR storm Surface Acres C-Value (1) GRASSY 1.09 0 2 IMPERVIOUS 0.18 0.95 Tota/'A'. 1.27 Weighted C' 0.306 Intensity's ' Q1 = CIA . •...;.Y.•.,:,..°.'i 77' Cis from DA-W Drainage Area = 133,496 SF Drainage Area = 1 3 08 Acres Design Storm = 10 -YR storm Surface Acres C-Value rf) GRASSY 02 IMPERVIOUS 9t;; 0.95 Total 'A' Weighted C' 0.24 Intensity'I ' (3) 71 QI=CiA -`�; cis Revision Date: 12r712007 11 a F 54 a� I I S o$$$$$$z:°$::°Z$3�$$'$$ LU K y� 7Yi i�YY iT i'i'iY'i h�hYiT7+YT }U C pp yyi�pp niwovw yv y1 op o t��y wYf V!A80 pyy�� n'1 yyi�pp qq pp q N YI Y7q r f M4 N rPi r'�T �.-: P'iR Oi DPI Mi Pi Rl.—.- vi a r C SSri w� ea�� r• pr +�N � LL V 33 F (� - N - - - - - - - an ul u� W K1 ri fn n �t1 ❑�p N4YNf 4N['1 [�]YM�[�MMeh nI�LV t^f [V Nn7 O O O O p p 0 d p 0 0 0 0 0 Q 0 0 0 0[ I O O q 86;N r W `f -Ol l4 �`N NIQ PI •'CNN 17�-:N �'N'�O'N sav ssssgs8ssssS 8 assssgs go° wovp.vpp000vppv.vpv�a'paov 9 T pp 'r�}pp 8 O 0 v p p d v v p v p v Q. v n@ •3a1-1-1- p v o m ww 9p �n v��n van wu�v�ua ul u�ux �n u�w u�ina win vim rr z^ ~ Q 4 N 0 $� fi O � 9 r p p r p 0 — p r N N O n p [� Z, I H m �.Q �NIhRM r I+Rr Rj� I i i s z��NrRr�mN.vrrrwr �p r�&I��I�I�i]IT s cZ I 12 OF' 54 I 5= IL g W a 12 1 I s ul w 0g Nth 4;.�. !-q it iG'NO�1G 'f K+"!{�..W�Ol'R' N ca e� (O' V A PI ' .Pl- G O:: ,q 88 S�7S1D888p:3A�dm��: r, .. LLLL5 LL. V •y ib d!0'[3n ip O SIR. (� P t0A '. N 0.+�'v-�>•N�M�a-N:��Ni-tV �N �00fJ� N.�N�-N M ` i T pld s 12.1 .Gnr � O 90 OOcoo 0 a ci01 - 00 6O0 d OCNiD pOOO W m C r — CM .-. Y �' Y' O♦ ru%. a N N O o a m - V" W. — I- N G O I` PI 6— co. f f rl i F 8888 wdwo 8,$1 do 88.88888$ g w 0 .. w0 O aY a a �; Iu w lu ioV3 14 w'toa is W o� lx J MAN 21 F111A W i 21' %IerdSSW-'`�is.g''e'Kait6:di•Io�.� �ti � i� g wpd I I i e) 1 .J ewp Q NgRPIRFl�AR�O�O.p3.��3�9C9�8�88868$ pp ��yyeFFee p I� IT � i 13 of SS4 ■ a Z C wl Z Q J 6 W J I !A S Q N �f7 �e7- N Y7 �f N O a3 TIT v r N em W ad pi .+ co J e9NN N49 N W.A N NN.� nl l+�N 00440 C °I LC W [UUJ QQ iBbO 1 aod'g c 6Q0a >o.000009000oobboobbdoo.o LU W� NAF 61 N NN _ A[N{V W tN Nfil NN NRY C4, 914 •. h pp2 Q °D d b b b O O O O b O Q O d O 0 0 G Gf Q O O. b .—ION W O T �1GNONN V f7. LL Oi DL S S p p O b' p pp O 8 pp b 0 p O p 0 pp o O pp O H ppp C G$ ppp O O. 8. p. O D O d Ow 81 o ao ooaav 0000b ovv oo n.vv vq ww a 00 �1n Nv�v�Nnu]u'x in u��n n+n u�innnnn u�inw w w i^ Td� 2 r {dd9 ' m'lr44 O_l �t Ygy!g@y.'lgS�,. �gv TORLI ICI ISM! 4! G F a�Nfl��� m.NMr10r1�00 �YNNN W NN N t s c cd O Z� J a Q F-' w 7 ❑ ❑LI 7 w Ix W .@a m W. z !¢ ®F S4 Z LLsb W 2 s in 0'A NN O�'OO NO3 Win. iV mC4 OYR �N C41R �!G RVri IV N'�fO ao NOJ i0. pi pi 'OO, N. lV'N! N'Ol Rxl�.. a7 �F PJ.N m.Y7 N v 4�. O420OWOI�. iYCx iR' G147+C. d1 U a`AtAJ aaffiAS�'5��nC`�y3S�`m�iS3mid �000popgoogoo;000ggopd'pooaodd000. t Y cq y h 0 ' NA OO O ONIT EO W O 0 0 0 0 0 0 0 0 O'O O O O O CO Id O Q O O.O O O d O G 0 K a�n .101. OO IQ�eNv{- ry: m��f. qr,m��.� Np� MamrrTN. WI a�•M Q GpN Sp�J 1pV. V3 a pppp. 80G.SOGSgS$$8.$$�S.88g$$880000000- pp=ppO pN p�.pn p�pd pO p po pOip9pO pr pO pN pN O G 001r1 O^O.� O �� 1r1 O U7 q� 0' 0001q O'.wpq O sQ0711E i • W O uj 3 O _ W W m GI w• . pJ '.. Yi n id I M A a imp oC, J I I I I I E Z pT¢`'•bjT' 8 {I�tcjypl ,� Ii I i i p O�T+1 g lto '%$1 Npe tl1� Q g�S:�A {� T.114 Nye f�9 ew+,'. ��gg� K 0 $$ i i RO`NArM�rl o�. iidwrf�tle a NNRRINI pp pp Fl� h ptl ^ A �bp R R�l�����f ��MrO pp ��yy ry ��yy W iY1�O. rr�� ae yp� C 3' z 0 Ix g a 0 W 7 O W IY LU w W) W Q w 0 z tl m !S 0 F 5-4 RICE CREEK PLANTATION - PHASE 1 REVISED CULVERT CALCULATIONS (FOR TRACT A & PORTIONS OF THOROUGHFARE) 0 x _Z co w W Z z W O C z a U) w G O m T w a z 0 a F a X gig Z C� w 0 a a U co O H w J m 9 a 2 0 U W O _Z O _Z 0 w U z w ac w LL w N U O co Z_ LO r 16 or S19 RICE CREEK PLANTATION - PHASE 1 REVISED POND CALCULATIONS (FOR PONDS 7-10) RICE CREEK PLANTATION - PHASE 1 POND DRAINAGE AREAS POND 1 SF POND 1 AC TRACT AREA 378,444 8.69 ROADS BUA 45,521 1.05 M/F BUILDINGS BUA 107,800 2.47 M/F DRIVEWAYS BUA 32,316 0.74 M/F SIDEWALKS BUA 2,306 0.05 TOTAL BUA 187,943 4.31 % IMPERVIOUS 49.68% 49.66% POND 2 SF POND 2 AC TRACT AREA 319,410 7.33 ROADS BUA 37,654 0.86 M/F BUILDINGS BUA 156,200 3.59 M/F DRIVEWAYS BUA 39,564 0.91 M/F SIDEWALKS BUA 3,001 0.07 TOTAL BUA 236,419 5.43 % IMPERVIOUS 74.02% 74.02% POND 3 SF PONDS AC TRACT AREA 554,482 12.73 ROADS BUA 63,523 1.46 M/F BUILDINGS BUA 90,200 2.07 M/F DRIVEWAYS BUA 23,276 0.53 M/F SIDEWALKS BUA 1,740 0.04 TOTAL BUA 178,739 4.10 % IMPERVIOUS 32.24% 32.24% POND 4 SF POND 4 AC TRACT AREA 486,629 11.17 ROADS BUA 55,012 1.26 M/F BUILDINGS BUA 147,400 3.38 M/F DRIVEWAYS BUA 1 36;936 0.85 M/F SIDEWALKS BUA 2,871 0.07 TOTAL BUA 242,219 5.56 % IMPERVIOUS 49.77% 49.77% POND 5 SF POND 5 AC TRACT AREA 198,391 4.55 ROADS BUA 23,335 0.54 M/F BUILDINGS BUA 55,000 1.26 M/F DRIVEWAYS BUA 13,190 0.30 M/F SIDEWALKS BUA 1,088 0.02 TOTAL BUA 92,613 2.13 % IMPERVIOUS 46.68% 46.68% BOWMAN DESIGN and ENGINEERING BSH 17 air 5-,+ Revision Date: 12l7/2007 RICE CREEK PLANTATION - PHASE 1 POND DRAINAGE AREAS POND 6 SF POND 6 AC TRACT AREA 121,564 2.79 ROADS BUA 18,077 0.41 M/F BUILDINGS BUA 24,200 0.56 M/F DRIVEWAYS BUA 7,338 0.17 M/F SIDEWALKS BUA 479 0.01 TOTAL BUA 50,094 1.15 % IMPERVIOUS 41.21 % 41.21 % POND 7 SF POND 7 AC TRACT AREA 452,857 10.40 ROADS BUA 55,156 1.27 M/F BUILDINGS BUA 138,600 3.18 M/F DRIVEWAYS BUA 35,548 0.82 M/F SIDEWALKS BUA 2,740 0.06 TOTAL BUA 232,044 5.33 % IMPERVIOUS 51.24% 51.24% POND 8 SF POND 8 AC TRACT AREA 721,739 16.57 ROADS BUA 45,714 1.05 - 0 0.00 - 0 0.00 OFFSITE (SCHOOL) 244,667 5.62 TOTAL BUA 290,381 6.67 % IMPERVIOUS 40.23% 40.23% POND 9 SF POND 9 AC TRACT AREA 146,113 3.35 ROADS BUA 32,431 0.74 M/F BUILDINGS BUA 23,800 0.55 M/F DRIVEWAYS BUA 6,272 0.14 M/F SIDEWALKS BUA 479 0.01 TOTAL BUA 62,982 1.45 % IMPERVIOUS 43.10% 43.10% POND 10 SF POND 10 AC TRACT AREA 240,645 5.52 ROADS BUA 22,810 0.52 M/F BUILDINGS BUA 51,000 1.17 M/F DRIVEWAYS BUA 14,652 0.34 M/F SIDEWALKS BUA 1,000 0.02 TOTAL BUA 89,462 2.05 % IMPERVIOUS 37.18% 37.18% BOWMAN DESIGN and ENGINEERING BSH l8 of gj Revision Date: 12/7/2007 RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations Pond 7 BOWMAN DESIGN and ENGINEERING BSH Drainage Area (DA) F.Jamisf or .1.0.40 ac Impervious Area (IA )= �' .' � sf 5.33 ac Percent Impervious 1 IA/DA 0.512 or 51.2% SAIDA, 85% TSS Pond Depth = 6 or 2.16% (vegetative filter req'd Min. re 'd SA @ PP SA/DA x DA 9,791 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.511 Volume. = 1 in x 1 ft / 12 in x Rv x DA 19,290.20 cf SA provided @ PP Oval Pond Elev = 23 7 is sf Enough SAprovided? YES Min. storage depth re 'd Min. storage volume / SA provided Q PP 1.83 ft Storage depth set at —T"—--51ft Elevation of temporaq pool 25 ft SA @ TemRoratypool sf Storage volume provided Average of SA @ temp. pool & PP x storage depth ,' cf OK Outlet Sizina Q - 2 da drawdown time Min. re 'd storage volume x 1 In. / 2 days) 0.112 cfs Q - 5 day drawdown time Min. re 'd storage volume x 1 In. / 5 days) 0.045 cfs Height h 1/2 Min. Storage De 1.00 it CD Constant 0.6 Required Area for Q-2 A = Q/ C x 2 h 3.34 in Required Area for Q-5 A = Q/ C x 2 h 1.34 in Orrice Chooser CHECK Area Provided by Orifice Choosen A = 7cr2 3.14 in Area Provided b Orifice Choosen 0.022 ftz The Average head h = 1/2(Temporary Pool depth - 1/2 orifice diameter 11.5 in The Average head 0.958 ft Q provided Q = Ca 2 h 0.103 cis OK Revision Date: 1217t2007 l9 0 F S�F RICE CREEK PLANTATION - PHASE 1 POND 7 VS. FOREBAY TOTAL POND VOLUME at TEMPORARY POOL BOWMAN DESIGN and ENGINEERING BSH ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME(CF 17 1696 2148 2148 18 2600 3103 5251 19 3606 4160 9411 20 4713 5317 14728 21 5921 6924 21651 22 7926 9230 30881 23 10534 11333 42214 24 12131 12868 65081 25 13604 STORAGE VOLUME BETWEEN PP & TP = 24200 18% OF PERMANENT POOL VOLUME = 5659 22% OF PERMANENT POOL VOLUME = 6794 6280 CF = 20.3% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 17 324 422 422 18 520 633 1055 19 746 874 1929 20 1001 1143 3072 21 1285 1441 4513 22 1597 1767 6280 23 1937 PERM. POOL VOL. TEMP. POOL VOL. ZO o F 54 RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations Pond 8 BOWMAN DESIGN and ENGINEERING BSH Drainage Area (DA) = 12 Isf or 16.57 ac Impervious Area lA = �,���1;° sf 6.67 ac Percent Impervious 1 I=IAIDA 0.40e or 40.296 SAIDA; 85% TSS Avg. Pond Depth = +, ;-: '. or 2.45% (vegetative filter re 'd (Avg. Pond Depth = Vol. @ PP / SA. PP Min. Re 'd SA @ PP Re 'd SA @ PP = SA/DA @ 85% TSS x DA 17,657 sf Min. Req'd Storage Vol. Rv = 0.05 + (0.009 x i) = 0.412 Re 'd Storage Vol. = 1.5 in x 1 ft / 12 in x Rv x DA 37,179 cf Provided SA Q PP Pond Elev @ PP = 23_ sf OK Min. R 'd Storage Depth Re 'd Storage Depth = Re 'd Storage Vol. I SA @ PP 2.07 ft Storage Depth set at ;:° , _ :. , .,° + ft Pond Elev Q TP 25 ft Provided SA TP ,-'ijl sf Provided Storage Volume See Attached Calculations) 44l cf OK Outlet Slzino Q - 2 day Drawdown Time Q = Re 'd Storage Vol. x 1.5 In. / 2 days)) 0.323 cfs Q - 5 day Drawdown Time Q = Re 'd Storage Vol. x 1.5 in. / 5 days)) .0.129 cis Height h h = 1/3 Re 'd Storage Depth) 0.667 ft Co Constant 0.6 Required Area for Q-2 A = Q/ C x 2 h 11.82 In Required Area for Q-5 A = Q/ C x 2 h 4.73 in Orifice Choosen 4,00-1 in CHECK Area Provided by Office A = 702 7.07 in Area Provided by Orifice 0.049 le Avg Head h h = 1/3 Stora a Depth)) 8.00 in Avg Head h 0.667 ft Q Provided by Orifice Q = Ca 2 h' 0.193 cfs OK Drawdown Time t = ProVd Storage Volume x 1.5 in. / Q Provided) 4.02 days OK SAtiDA Valua Average Pond Depth Percent 4 4.5 4.42 0.400 :' Z40 2.43 0.500 3.05 0.402 2.62 2.41 aiuestaken from Toble'f{ 2.of tlig {GD 1i .Sivr�7�lrat�r.$MF M�nu�1 1t 1i-2 i Revision Date: 12/7/2007 z/ a� 5`4 RICE CREEK PLANTATION - PHASE 1 POND 8 VS. FOREBAY TOTAL POND VOLUME at TEMPORARY POOL BOWMAN DESIGN and ENGINEERING BSH ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 13 1,990 2,382 2,382 14 2,773 3,235 5,616 15 3,696 4,227 9,843 16 4,757 5,357 15,199 17 5,956 6,623 21,822 18 7,290 8,024 29,846 19 8,758 9,575 39,421 20 10,392 11,298 50,719 21 12,203 13,164 63,882 22 14,124 7,311 71,193 22.5 15,120 8,277 79,470 F 23 17,987 9,892 89,362 23.5 21,580 11,051 100,413 24 22,625 _ 23,692 124,104 T 25 24,758 AVERAGE DEPTH OF POND = 4.42 STORAGE VOLUME BETWEEN PP & TP = 44,635 18% OF PERMANENT POOL VOLUME = 14,305 22% OF PERMANENT POOL VOLUME = 17,483 'ERM. POOL VOL. EMP. POOL VOL. Z'i 0 F 574 RICE CREEK PLANTATION - PHASE 1 POND 8 VS. FOREBAY FOREBAY VOLUME at PERMANENT POOL BOWMAN DESIGN and ENGINEERING BSH ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 13 193 271 271 14 349 449 720 15 549 671 1,391 16 793 938 2,329 17 1,083 1,250 3,579 18 1,416 1,601 5,179 19 1,785 1,985 7,164 20 2,185 2,401 9,565 21 2,616 2,848 12,412 22 3,079 1,601 14,013 22.5 3,323 1,724 15,737 23 3,574 15,737 CF = 19.8% OF PERM. POOL VOLUME 2.3 o F 54 c W m O —m w� m¢a a ,Q Zc O g Q w a� wt LU U ' v9 a: r - 71 m it e 3 it O !A rt c S o I 0 N 0 w- cm v m LL c C s 7P) cc N t: C9 l9 iV+ W M w Lu s. W o0�Sa12 H H E c a c � tp rn � oon ` O O: G G G NO n n U If ? if if if II Z if O m v U m � v .1p. Q 0 � v o v a q � a o �& E E E V 3 r N HEM Y UQ II n u n n u O vq .112 �12 m .71 C Z+ OF 5.+ a§ $ � CO ID w § � § m � E�RG'tC%!Ci Eodddd000 e :clC4 � E - §Rcm- dCaui cm 14'RF.:q�A��_ �Go�P-wP-0; w � > � -0 to Lo � * 0�_mN__a E s E � w � ■ k I § 25 ofr 64 RICE CREEK PLANTATION - PHASE 1 1 year - 24 hour storm routing for Pond 8 Bowman Design Engineering Services, PA BSH Stage -Storage Elevation (ft MSL) Water Level (ft) Surface Area (at) Incremental Volume (cf) Accumulative Volume (cf) 23 0.00 17,987 0 4,732 23.25 0.25 19,069 4,732 5,181 23.5 0.50 21,580 9,913 11,051 24 1.00 22,625 20,964 11,578 24.5 1.50 23,685 32,542 12,111 25 2.00 24,768 44,653 12,651 25.5 2.60 25,846 57,304 13,199 26 3.00 26,948 70,502 13,753 26.5 3.50 28 064 84,255 I 4.00 1 - 3.50 I 3.00 2.50 2.00 1.50 1.00 Stage -Storage Curve 0 20,000 40,000 50,000 80.000 100,000 Storage (cu ft) Outlet Structure Stage -Discharge Curve Stage -Discharge H -Water Level (ft) Q I'l Orifice () 2l Stirc21 QrOutlet Weir (cfs) al Emergency Weir (cfs) 0.00 0.00 0.00 0.00 0.25. 0.12 0.00 0.00 0.50 0.17 0.00 0.00 1.00 0.24 0..00 0.00 0.29 0.00 0:00 E 0.33 0.00 0.00 0.37 189.74 0.00 3.00 0.41 249A2 0.00 3.50 0.44 314.30 1 432.16 C = 1 0.60 Cw = 3.00 A = 1 0.049 Ls = 16.00 LW = 22.00 Orifice Stage -Discharge Curve 4.001 -- ---- - 3.50 € 8.00 , I 2.50 -1 �r 2.00-. J 0' 0.0 0.0. 0.00 0.10 0.20 0.30 0.40 0.50 Discharge (ch) 4.00------- _ - -----� 3.80 r 3.50 3.50 3.00 2.50 jr 3.40 2.00 3.30. .J 1.50 3.20 1.00 3.i0 0.50. 3.00 0.00 I 2.90 0.00 50.00 100.00 150.00.200.00 250.00 300.00 350.00 0.00 Discharge left) Emergency Weir Stage -Discharge Curve 100.00 200.00 300:00 400.00 500.00 Discharge (cis) (1) Q = CA(2gH)'"2 ; (2) Q = CWLH"'9, where C. - 3.0 for Broad -crested Weir ?,& 01r 54 Revision Date 12l1/2007 Q 2 a co C6m W Q = CC) a C 0 Z� O Q� § C Z � 2 Q' c w a uU UIT W N Z Q 1 w 3 0 c w co (SRO) mou ... p.LaMr� M r 0 CA CA 0 ci r-i c. p s c p� o M ... w CV t, ,,- n � �po oop 0 O Q r. tin N M C E m v O ti t, 7 -air S'`f W = 00 Q c i p Z IL O Q� r � Z JQ o D, 'a c LLI a LU L- M W N U N N N 'N N N N N N N N N N N N � r r r r v- r V- r r r V- V- !- r r Q o 6 ci 0 0 0 0 0 0 0 0 0 0 0 0 7 CO 0 ..i V CAON00Or1,IT0.n 00 N CD It CO N CD OD CACDNO N .m O OD OD OD 00 COI�~C- 00 OD CO CDCDCDOOeItl Op CD O � 00 0p 00co M U Cad �'d st CO) C � CA C �QCDCDCO M M M gM gM q M CD M CD M COCD M M m M Cp Co 9"9999CCOOOC�COOC 00 �`� 0000000000OOOOQ N C O M O V O La O O O r, O 00 0 0 0 I—'E NNNNNNNNNNNNNNN R C CDIl- ITvIV ODCAOrNM ITOCC)0O I[I�CpDI�OD00 OIC�0000 F- C .-. NNNcocMNNNNNNN.NN(N O C,ci0a100C]6O0,6cici66 COv 7 CD v00NcO�tgONCQrtrgDNtD m ram- ! r C0 I� M O CO M c MrC4M04CVCVr�rOOCC7i0 � 0 CD 0) CD Cn O CA � CD C) CD 00. co r. C � � � C CO N( U�McMMMCQCMMC'9MOM C7� CA CD CD CD CD CD CO CD CD M C C-i egra999 9999 99 U o �.� 000cO'000'0000Oao C c .o CD c OOOO�O rOrCCrI��OD�p1NONrN O O O CnN N N C rNM MMM�MMMMMerer�ttst� OCO1-000)0rNM�O 2-$ a Fr 54 RICE CREEK PLANTATION - PHASE I Wet Detention Basin Calculations Pond 9 BOWMAN DESIGN and ENGINEERING BSH Drainage Area (DA) = J-1,1 I sf or 3.3 ac 5 Impervious Area (1A) = 0 sf 1.45 ac Percent Impervious (1) lA/DA 0.431 or 43.1 SAIDA, 90% TSS Pond Depth = 6 or 2.29% NO vegetative filter req'd) Min. req'd SA @ PP (SA/DA)x(DA) 3,341 sf Min. reqd storage volume Rv = 0.05 + (0.009 x 1) = 0.438 Volume = I in x (1 ft / 12 in). x Rv x DA 5,332.45 of SA pwovided a PP Oval Pond Eley = 23.5 42 sf A r V Enough SA provided? YES Min. storage.de th req'd Min. storage volume./ SA provided 0 PP 0.49 ft Storage depth set at ft Elevation of temporary pool 25.5 ft SA a? Twipormy pool ',,°,-,JOA Isf Storage volume provided Average of SA do temp. pool & PP x storage depth jcf OK Outlet Sizina Q - 2 day drawdown time Min. req'd storage volume x (1 in. / 2 days) 0.031 c1s; Q - 5 day drawdown time Min. req'd storage volume x (1 in. / 5 days) U12 cis Height h (1/2 Min. Storage Depth) 1.00 ft CD Constant 0.6 Required Area for Q-2 A = Q/(C x2 h 0.92 in 2 Required Area for Q-5 A = Q/(C x (2gh)"2) 0.37 in-, Office Choosen in CHECK Area Provided by Orifice Choosen A = 0.79 in 2 Area Provided by Orifice Choosen 0.005 ft2 The Average head h = 1/2(Tempore ry Pool depth - 1/2(orifice diameter)) 11.75 in The Average head 0.979 ft Q provided Q = Ca(2gh)"2 0.026 efs OK Revision Date: 1217/2007 RICE CREEK PLANTATION - PHASE 1 POND 9 VS. FOREBAY TOTAL POND VOLUME at TEMPORARY POOL BOWMAN DESIGN and ENGINEERING BSH ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 17.5 1190 1726 1726 18.5 2261 2 807 4532 19.5 3352 3958 8490 20.5 4563 5221 13710 21.5 5878 6949 20659 22.5 8019 9406 30064 I 23.5 10792 11630 41694 24.5 12468 13205 54899 l 25.5 1 1 STORAGE VOLUME BETWEEN PP & TP = 24835 18% OF PERMANENT POOL VOLUME = 5412 22% OF PERMANENT POOL VOLUME = 6614 6214 CF = 20.7% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 18.5 415 563 563 19.5 710 874 1436 20.5 1037 1215 2651 21.5 1392 1 584 4234 22.5 1775 1980 6214 23.5 2185 3ERM. POOL VOL. f EMP. POOL VOL. 30 o4:* 5,1 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING Wet Detention Basin Calculations BSH Pond 10 Drainage Area DA = :,. $1 sf or 5.52 ac Impervious Area (IA)= sf 2.05 ac Percent Impervious l IA/DA 0.372 or 37.2% SAIDA; 90% TSS Pond Depth = 6 NO vegetative filter re 'd Min. re 'd SA @ PP SA/DA x DA 4,714 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.385 Volume.= 1 in x 1 ft / 12 in x Rv x DA 7,712.34 cf SA provided @ PP Oval Pond Elev = 20.5, Enough SAprovided? YES Min. storage depth re 'd Min. storage volume / SA provided el PP 1.1.1 ft Storage depth set at ft Elevation of temporary ool 22.5 ft SA @ Temporary pool ; :-::. ? sf Storage volume provided Average of SA @ temp. pool & PP x storage depth 1 50 cf OK Outlet Sizina Q - 2 day drawdown time Min. re 'd storage volume x 1 in. / 2 days) 0.045 cis Q - 5 day drawdown time Min. re 'd storage volume x 1 in. / 5 days) 0.018 cfs Height h 1/2 Min. Storage Depth) 1.00 ft Co Constant 0.6 Required Area for Q-2 A = Q/ C x 2 h 1.33 in Required Area for Q-5 A = Q/ C x 2 h 0.53 in Orifice Choosen CHECK Area Provided by Orifice Choosen A = arz 1.23 in Area Provided by Orifice Choosen 0.009 fe The Average head h = 1/2(Temporary Pool depth - 1/2 orifice diameter 11.6875 in The Average head 0.974 ft Q provided Q = Ca 2 h' 0.040 cis OK Revision Date: 12f7/2007 3r 0f 54 RICE CREEK PLANTATION - PHASE 1 POND 10 VS. FOREBAY TOTAL POND VOLUME at TEMPORARY POOL BOWMAN DESIGN and ENGINEERING BSH ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMUL PIT; VE VOLUME CF 14.5 146 490 490 15.5 833 1198 1687 16.5 1562 1 976 3663 17.5 2389 2 849 6511 18.5 3308 4091 10602 19.5 4873 5924 16526 20.5 6975 7626 24151 21.5 8276 8876 33027 22.5 9476 STORAGE VOLUME BETWEEN PP & TP = 16502 18% OF PERMANENT POOL VOLUME = 2975 22% OF PERMANENT POOL VOLUME = 3636 3362 CF = 20.3% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 15.5 187 267 267 16.5 346 441 708 17.5 536 645 1352 18.5 753 8 76 2228 19.5 998 1135 3362 20.5 1271 "ERM. POOL VOL. f EMP. POOL VOL. -32 0 F 5t F4 O CA c .0 N c tm c LU c rn W c CD m r y Lu c Q 27 O. U i U Z O � � c CO g� CL 'n Yy U°f w m U E R w 9 N W W 3 QQF- q Ink o O Q O U Z a d a m E E c ` m 4 o � C U y 0 O v � _ IZ co J 2 p p co ° rrrrr0rrrr IO�CO�COD� mmOCO d�IQ rN01MCe=r Cri LpN rlL]�rr �W NCQ4V itOLONrCq �� cV NNCDCO co 0�N cv ...V �C) 01CflCOrI�N co CO ti OR OR tp N C NCONCOr NrMCm N 0q cmr O 't N O CO�L,IOrw0C4 � Iq ui l0 U 6660000000 d 0000000000 N N N N N N N N N N V 0 0 0 0 0 00000 C1 � t� CL O O O •� cnet r1(�rrC7tt) er0 I,— COL 'i�Cl�CnCV r1000rcV ama E G — m � o0 000o0 0. Z.Or OOOOOOC;O00 E v m cov cQ gcgC4 LO0` O r, IcciuNi GDl,rr`�tCV 0�C91L9 G g Q a� y c c c ° a a°aa°O�aa00caa E O C7 d 0 r ° .a3 C E a O s N y a � a � U a 11 c v c +� W �3 aD � 42 u E a c .2 m �o C MoLL o a z w 3 a 33 F .54 Precipitation Frequency Data Server Pagel of 4 POINT PRECIPITATION , i° FREQUENCY ESTIMATES FROM NOAA ATLAS 14 North Carolina 34.133 N 78.083 W 26 feet from "Precipitation -Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D, Martin, B. Lin, T. Pazzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Fri Dec 7 2007 Confidence Limits Seasonality Location Maps Other Info: GIS data Maps Help ' D Precipitation Frequency Estimates (inches) ARP* 5 10 15 N3? 60 120 3 6 12 24 4$ 4 7 10 20 30 45 60years) min min min min miss hr hr hr hr hr :.day day da day day day day 0.53 0.84 1.05 1.44 1.80 .14 2.29 2.84 3.32 3.90 4.54 5.06 5.78 6.51 8.73 10.78 13.39 16.07 = 0.63 1.00 1.26 .1.74 2.18 2.61 2.79 3.46 4.05 4.73 5.49 6.10 6. 77 7.79 10.40 12.81 15.83 18.93 0.73 .1.17 1.48 2.10. 2.69 3.31 3.55 4.41 5.21 6.12 7.04 7.73 8.76 9.65 12.67 15.37 18.76 22.14 10 0.81 1.30 1.65 2.38 3.10 3.89 4.21 5.25 6.22 7.34 8.40 9.12 10.26 11.21 14.55 17.45 21.13 24.69 25 0.92 .1.46 1.85 2.74 3.65 4.72 5.18 6.48 7.73 9.22 10.45. 11.19 12.45 13.46 17.22 20.32 24.40 28.11 50 1.60 1.59 2.01 3.03 4.10 6.4.3 6.03 7,55 9.08 10.89 12.2fi 12.97 14.29 15.35 19.41 22.63 27.00 30.76 100 1.08 1.71 2.16 3.31 4.57 6,20 6.:96 . 8.75. 10.58 12.79 14.30 14:95 16.30 17.39 21.74. 25.00 29.66 33.42 200 JEE 1.83 2.31 3.60 5.05 7.04 7.99 10.09 12.2.8 14.96 16.62 .17.15 18.50 19.60 24.21 7.46 32.38 36.07 500 1.26 2.00 .51 .00 5.74 8.26 9:55 12.12 14.88 18.32 20.16 20.55 21.71 22.81 F7.72 30.87 36.12 39.61 1000 1.35 2.13 2.67 4.33 6.31 9.32 10.91. 13.92 17.2.1 21.30 23.27 23.50 24.42 25.48 30.60 33;56 39.05 42.31 Text version of table ' Them Pred0tatlon frequency estimates are based on a oadal duration sedes. ARI Is the Average Recurrence Interval. Please refer to the documentation for more Information. NOTE: Formatting forces estimates near zero to appear as zero. * Upper bound of the 90% confidence interval Preci itation Fre uen Estimates inches ARI*j ears 5 10 in min 15 30 60 .120 3 6 min min min min hr 1 hr jEhr 1[24 48 hr hr 4 day 7 10 day 20 30 45 60 ® .510.91 1.14 1.56 1.94 2.33 .51 3.13 3.70 4.31 5.00 5.54 day 6.26 7:02 da 9:36 day 1.1.50. day 14.23 Jdayl 17.00 0.68 1.08 1.36 1:88 2.36 2.85 3.06 3.82 7.55 8:41 4.50 5.23 6.05 6.68 11.16 13.67 16.83 0.04 5.78 5 0.79 1.26 1.59 2.27 2.90 3.61 3.89 4.86 6.77 7.76 8..46 9.50 10.44 13.60 16.40 T9.95 23.44 10 0.88 1.40 1.77 2.57 3.35 4.24 4.62 5.71 6.90 8.11 9.25 9.99 11.13 12.12 15.60 18.61 22.48 6.12 25 0.90 1.57 1.99 2.95 3.93 5.14 5.67 7.10 8.56 10.17 11.53 12.26 13.51 14.55 18.47 1.69 5.98 29.77 50 100 1.07 1.71 1.16 1.84 2.16 3.26 4A EE 6.59 8.28 2.33 3.57 4:91 6.75 7.61 9.58 10.03 11.68 12.01 13.56 14.13 15.86 14.24 16.45 15.52 16.63 7.751 8.88 20.87 23.45 24.20 28.77 32.64 200 1.25 1.98 2.50 3.88 5AS 7.65 8.72 11.05 13.54 16.56 18.50 18.96 20.20 21.36 26.25 26.81 29.56 31.67 35.53 34.72 38.48 500 1.36 2.16 2.72 4.32 6.20 9.00 10.43 13.28 16.43 20.40 22.58 22.88 23.91 25.01 30.30 33.46 138.971142.49 1000 The uPPr 1.46 2.3-0 bound dthe n 2.89 4.68 6.84 10.19 11.95 15.28 18.98 23:88 26.25 26:39 27.09 28.22 33.67 36.59 42.41 45.65 " e Co tidenoe interval at 9096 cortiderane level is the value which 5% of the simulated quandle values far a given frequency are greater titan. These precipbuon frequency estlauft are based on a RadjaLdureton see ies, ARi Is the Average Recurrence interval. Please refertc the dw-umentation for more information. NOTE: Formatting prevents estimates near zero to appear as zero. * Lower bound of the 90% confidence interval Preci itation Frequency Estimates inches ARI 5 10 15 30 60 120 3 6 12 24 48 4 7 10 20 30 ZZ min min min min min min hr hr hr hr hr da da da da da r� http://hdse.nws.noaa.gov/cgi-bin/hdsc/buildout.perl?type=pf&units=us&series=pd&statena... 12/7/2007 Precipitation Frequency Data Server Page 2 of 4 1 1 10 49110.78 0.98 1.34 1.67 1.97 2.11 I 3:02 3.56 4.17 4.66 5.37 6.06 118.17 10.15 12.64 15.2.1 0 0.58 0:93 L 17 1.62 2.03 2.41 2.57 3.18 3:i68 4.33 5.05 5.62 6.47 7.26 9.74 12:05 14:94 17.92 0 0.68 1:08 1.37 1.95 2.5- 3:04 3.26 .04 4.72 5.59 6.46 7:11 8.12 8.96 11.85 14.46 17.68 20:94 10 0.75 1.20 1.52 2,Z0 2.87 3.57 3.85 4.79 5.62 6.68 7.66 8.35 9.47 10:38 1356 16:37 19.87 23:31 25 0.84 1.34 1.71 2,52 3.36 4.31 4.71 S.R6 6.92 8.31 9.43 10.16 11.42 12:40 �5.96 18:99 22.86 26.46 5Q 0.9 i 1.45 1.84 1.56 1.97 2.77 3.02 3.76 4.16 4:94 5.44 5.60 6.24 6.79 7.81 8.07 9.72 10.97 11.68 13. 22 14.04 17.89 21.03 25.18 28.86 100 0.98 9.32 11.27 12.64 13.32 14.71 15.77 19:88 23.10 27.50 31.20 200 1.05 1.13 1.66 2.16 E2 2 2- 3.26 3.58 4.58 5.14 6.30 7.10 7.32 8.37 8.90 10.55 10,70 12.78 12.99 14.49 15.57 17.20 15.10 17.75 16.49 19.03 17.59 20.16 21.95 24.77 25.18 27.97 29.83 32.91 33.48 36.46 500 1000 1.20 1.89 2.37 3.84 5.6I 8:20 9.46 11:98 I4.56 17.76 19.51 I9.97 21:T1 22:21 27.OI 30.13 35.28 38.70 w.o, w r:o - w..w: -: u-111-1 eau 4-luia vaiuem rur a unerl aeguency are rest Alan. These predpitadon frequency esdmates are based on a nard8l duration maxima seder AM Is the Average Recurrence Interval. Please refer to the documentation for more information. NOTE: Formafng prevents estimates near zero to appear as zero. Partial duration based Point Precipitation Frequency Estimates Version, 3 34.133 N 78.083 W 26 ft 49 45 49 3E 36 34 32 30 28 26 24 22 20 18 16 14 12 18 8 6 4 2 0 + c s 9 0 b 7 0 910 20 30 4050 80100 140 200 300 500 700 1080 Fri Boo 07 15:07:20 2007 peerage Recurrence Interval (years) Duration -min 10-min 120-m 3-hr -- 4 - r --m- 30-day 1-+- 5-min 6-hr a 4-day -+- 7-da -e- y �45-day -�-- 60-day -xF 30-min -a 12-hr -I-- 10-day -+- 60-min � 24-hr �- 20-da --w- 35' d F -6-'q http://hdsc.nws.noaa.gov/cgi-bin/hdsc/buildout.perl?type=pf&units=us&series=pd&statena... 12/7/2007 Precipitation Frequency Data Server Page 3 of 4 Partial duration based Point Precipitation Frequency Estimates Version: 3 34.133 N 7$.083 W 26 ft 44 42 40 3$ 36 £ 34 32 30 2$ a 26 a 24 £ 22 0 20 M i$ Q 16 .+ 14 a 12 a 10 $ 6 4 2 0 r W. � r r r r� .� - ���rrr+rrrrrriii�ri�■i r� ash �il.�J► .. �r � r�r £ £ C £ £ £ a L L L L L L L L L a e $ a r W ££ s r s £ C i r r £ s m m M N M m m m M m VJ r r N r r OD i l'7 V• w oD N , V• ji o m a a a I r- r a r s 1 a r .0a r 1 a s r 1 m Vl ~ '~ m A 11 10 m T .y .� .. NM Duraon ti * CO V• 0 N W V) OD CD V) G) Fri Dec 07 l5j07!2O 2007 +� .+ N CV) V 1p Maps - Average Recurrence Interval ears! 1 - - 50 2 100 — 5 t 200-- te —a— 500 + 25 - 1000 �- 178-W 118-W 100,-W 90 W Rth 70'-W These maps were produced using a direct map Mquest from the U .a.. -Census BureanMgppingand Cartographic Bgsources Tjer. Map Server. 36 o F g4 http://hdsc.nws.noaa. gov/cgi-bin/hdsc/buildout.perl?type--pf&units=us&series=pd&statena... 12/7/2007 Precipitation Frequency Data Server Page 4 of 4 Please read dfsclaimerfor more tnjormaffmL LEGEND — State Connector — County Stream 0 Indian Resv M1litary Area Lake/Pond/Ocean �b. National Park Street Other Park --- Expressway [ City Highway 0 County s 8 mi Scale 1: 228583 2 q 6' a 1O km *average --true scale depends on monitor resolution Other Maps/Photographs - View. USGS., digital orthophoto quadran_gIe_DO�) covering this location from TerraServer USGS Aerial Photograph may also be available ' from this site. A DOQ is a computer -generated image of an aerial photograph in which image displacement caused by terrain relief and camera tilts has been removed. It combines the image. characteristics of a photograph with the geometric qualities of a map. Visit the USGS for more information. Watershed/Stream Flow Information - Find.the. Watershed for this location using the U.S. Environmental Protection Agency's site. Climate Data Sources - P recipitation frequency results are based on data from a variety of sources, but largely NCDC. The following links provide general information about observing sites in the area regardless of if their data was used in this study. For detailed information about the stations used in this study, please refer to our documentation.. Using the National Climatic Data Center's j CDCa station search engine, locate other climate stations within: +A30 minutes ... OR... L +/-1 degree of this location (34.133/-78.083). Digital ASCII data can be obtained directly from NCDC. Hydrameteorohrgical Deslga Studio Center DOC/NOAAMational weather Service 1325 East -west Highway haver Spring, MD 20910 (301) 713-1669 Qnesdons?: YDSC_QugstionsQnoea.gov Disclaimer 37 vF g-4 http://hdsc.nws.noaa.gov/cgi-bin/hdsc/buildout-perl?type=pf&units=us&series=pd&statena... 12/7/2007 Precipitation Frequency Data Server Page 1 of 4 POINT PRECIPITATION IN. FREQUENCY ESTIMATES FROM NOAA ATLAS 14 " North Carolina 34.133 N 78.083 W 26 feet from "Precipitation -Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonin, D. ivia:uy,, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Fri Dec 7 2007 I ext verslon Elf table. I - l nese Prec'pl'ason rrequencY estimates are based on a bartlal duration series ARI Is the Average Recurrence interval. Please refer to the documentation for more Information. NOTE: Fornaldng forces estimates near zero to appear as zero. • --- ----- - --••-r---•••-.......w ..�.. uu a imL= wuow sane& AEU ai ale Average Recurrence Interval. Please refer to the dQcumerlta6on for mare Information. NOTE: Formidng prevents estimates near zero to appear as zero. * Lower bound of the 90% confidence interval Pre ci itation Intensity Estimates (in/hr. Alit 5 10 15 30 60 120 3 6 12 24 48 4 7 10 20 30 45 60 (years) min min min min min min hr hr hr hr hr I day f1 day I al A� I of ;p., I do-lIlao..11A—1 3g ofv ,4 http://hdsc.nws.noaa.gov/cgi-bin/hdsc/buildout.perl?type=idf&units=us&series=pd&staten... 12/7/2007 Precipitation Frequency Data Server Page 2 of 4 L 1 J 5.88 4.70 3.92 2.69 1.67 0.99 0.70 0.44 0.25 0.15 0.09 0.05 0.03 0.03 0.02 0.01 0.01 0.01 0 0 7.00 8.12 9.02 10.13 10.96 11.78 12.58 5.5E 4.6g 3.24 6.50 5.48 3.90 7.22 6.0$ 4.41 8.076.82 5:05 8.72 7.3t5 5.55 9.36 Eg 6.04 9.97 8.38 6:52 i0.74 9.01 7.17 i 1.33 9.48 7.68 2.03 2.50 gfl 1.20 1.52 1.79. 0.85 1.08 1.28 0.53 0.31 0:18 0.67 0.39 0.23 0.11 0.13 0:06 0.07 0.04 0.05 0.03 0.04 0.02 0.02 0:02 0:02 0.01 0.02 001 0:01 10 0.80 0.47 0.28 Fo 161 0.09 0.06 0.04 0.03 0:02 0:02 0.02 25 50 3,6 3.76 4.16 4.58 2_.1(, 1.57 0:9R 0.57 0.35 0.20 0.11 0,07 0.05 0.03 0:03 0:02 0:02 2.47. 2,80 3.15 1.81 1.13 0.67 040 023 0:12 0.08 0.06: 0.04 0:03 0.02 0.02 100 2.08 2.36 1.30 0.77 1.49 0.89 0.47 0.54 0.26 0.30 0.14 0:16 0.09 0.10 0.07 0.04 0.07 - 003 0:03 0.03 0.03 U.02 0.02 200 500 1000 13.57 14.40 5.14 5.61 3.66 4. I0 2.79 3. I5 1.76 1.06 2.00 1.21 0:65 0.74 0.36 0:41 0:18 0.21 0.11 0..13 0.08 0.09 0.05. 0.06 0.04 0.04 0:03 0.03 03 0tEOOj33:] _ --- _--.._ -...- �..-�••w ...w.-- o. o�........ �o..� a.o� W u�a re�uo wiow� �� u� we suumatea quanme values for a given m3quency are lea man. These precipitation frequency estllnates are based on a oartial duretlon maxima series. ARI Is the Average Recurrence Interval. Please refer to the documentation for more Information. NOTE: Formatting prevents estimatas near zero to appear as zero. 7 s 3 * 2 £ 1 a 0.7 � 0.3 c * 0.2 i v .83 .83 .02 .01 O W L 4 Partial duration based Point IDF Curves Version. 3 34.133 M 78.083 W 26 ft r i w_ MEME .001 £ £ £ £ £ C 2 L L L L L L L L L 7r M 7r 7` m M T 71 MN? s are ch I I I I 1 1 I M* " W N e6 * I 1 1d Qi V'a 'a 'a 'a 1 I I a 'a .0 .0 W Y7 tlS ~ '~ M ODn .-. .� ++ N 0 Duration M* I I M 7 In h I9 1 I0 1 e, I eJ 1 in 1 eI Fri Dec 07 1511071147 2007 N M It %0 Average Recurrence Interval (years) :-tear --- 0-year o^ 2-year -+- lee -year 5-year - 200-year 10-dear -B- 500-year -1- 25-year - 1000 wear -a Maps - 3'q o F 54T http://hdsc.nws.noaa.gov/cgi-bin/hdsc/buildout.perl?type=idf&units=us&series=pd&staten... 12/7/2007 Precipitation Frequency Data Server Page 3 of 4 120-W 11 a^'w 100, "w 90t'w RaL ia^'w Z These maps woo produced using a dired map request hom the ,k V.8, Census_BureacMopping-and Carty whic Ftesauree$ Tiger Map Sarver. Pkase read ite aimerfor more information. LEGEND --State Connector — County Stream C� Indian Resv A'. Military Area Lake/Pencil Ocean National Park — Street = Other Park -- Expressway = City Highway Cunt y�1 Sca 1 e 1: 228583 ip 2 6$ QB 0 km �8 mi *average --true depends scale on monitor resolution Other Maps/Photographs - View..US GS digital orthophoto_quadrangle_(DOQ) covering thislocation from TerraServer; USGS Aerial Photograph may also be available from this site. A DOQ is a computer -generated image of an aerial photograph in which image displacement caused by terrain relief and camera tilts has been removed. It combines the image characteristics of a photographwith the geometric qualities of a map. Visit the USGS for more information. Watershed/Stream Flow Information - Find the_Watershed for this location using the U.S. Environmental Protection Agency's site. Climate Data Souree; - Precipitation frequency results are based on data from a variety of sources, but largely NCDC. The following links provide general information about observing sites in the area, regardless of if their data was used in this study. For detailed information about the stations used in this study, 44 a1= S4- http://hdsc.nws.noaa.gov/cgi-bin/hdsc/buildout.perl?type--idf&units=us&series=pd&staten... 12/7/2007 RICE CREEK PLANTATION - PHASE 1 REVISED STORMBRAIN CALCULATIONS (FOR PONDS 7 -10) RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 7 BSH Q to 1 7,1,., „-;,,"Drainage Area = 54,015 SF Drainage Area = 1.24 1 Acres Design Storm 1 10 -YR storm Surface Acres GValue (, AsphaIVRooftop 0.55 0,95 Greac 0.81i 0.2 Total A' 1.24 weighted'C' 0.53 Intensity's ' (3) 7.1 Qi = CIA 4.0 cis 'Q IV DA-7 s^' Drainage Area = 34,043 SF Drainage Area = 0.78 Acres Design Storm 1 10 -YR storm Surface Acres FVahre r+1 AspheiVRooftop 0.46 0 95 Grass 0.32 5 2 Total A' 0.78 Weighted'C' 0.64 Intensity'/ ' (3) 1 Qi = CIA � 4!610., cis 4 to qA 7,S- Drainage Area = ZOA54 I SF Drainage AreaI Acres Design Storm = 10 -YR storm Suttee Acres C-Value r'I Aspheit/Rooftop 0.88 1 0.95 Grass 0.31 0.2 Total A' 0.69 Weigghted 'C' Intensity 11 ' 43) 7.1 Q = CIA . 7w. cis Drainage Area = 3e.41.8 SF Drainage Area = 0.84 Acres Design Storm 1 1;0 -YR storm Surface Acres C-Vahre r11 AsphaWRooftop 0.35. 1 0.95 Grass 0.49 1 112 Tate/'A' 0.84 Weighted V 0.51 Intensity'! ' (3) 7.1 Qi = CIA ., a .. Cis Drainage Area = 0.303 SF Drainage Area 1.16 1 Acres Design Storm 1 10 -YR storm Surface Acres C-Value(, Asphalt/Rooftop 0.74 1 0.85 Grass 0.44 12 Total A' 1.18 We/ghhrd 'C' 0 87 Intensity '/'13) 71 Qi = CIA B.Eo de 41 dF S4- Revision Date: 14g2007 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 7 SSH ;,Clig7.'Y Drainage Area = 44181 SF Drainage Area = 1.01 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r11 Asphalt/Rooftop 0„85 0 95 Grass Q 38 1 Q-2 Total A' 1.01 Weighted 'C' 0.68 Intensity'! ' P) Q, =CIA . k cfs Q_wOA-7.7 Drainage Area = 1 17,358 SF Drainage Area = 0.40 Acres Design Storm I 10 -YR storm Surface Acres C-Value nr AsphaWRooftop Q.11 0.05 Grass 0.29 0.2 Total A' 0.40 Weighted 'C' 0.41 Intensity'i'(3) 7.1 Qi.= C/A .1S cis Drainage Area = 39.770 SF Drainage Area = 0.91 Acres Design Storm = 10 -YR storm Surface Apes C-Va/ue(rl AsphalNRootlap 0.52 0.95 Grass 0.39 0.2 Total A' 0.91 Welghted'C' 0.83 Intensity'/' j31 71 ft i k9 BA4.9 • Drainage Area = 10,049 SF Drainage Area = 0.23 1 Acres Design Storm = 10 -YR storm Surface Apes C=value nl AsphalNRoottop 0.21 1 0.95 Grass 0.02 1 0.2 Total A' 0.23 Weighted 'C' 0.88 Intensity '1'i3) 7.1 Qi = C/A • :.46 ': ; cis Revision DOw 12rrr2007 t-2 OF E4 RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 7 BOWMAN DESIGN and ENGINEERING BSH Q fi'[7.1 p; ":r Drainage Area = Drainage Area = Design Storm = Surface AsphalNRooftop Gress Tote! W Weighted 'C' Intensity'I Q = CIA (}tm0A?-tt :Drainage Area= Drainage Area = Design Storm = Surface Asphalt/Rooftop Grass Total A' Weighted 'C' Intensity'i ' ia) Qr= CIA ", 14q 12. . Drainage Area = Drainage Area = Design Storm = Surface Asphalt/Rooftop Grass Total w Weighted 'C' Intsnsity'I ' 181 Qi = CIA Q: to DM7 44 . Drainage Area = Drainage Area = Design Storm = Surface Asphalf/Rooltop Grass Total A' We/ghted'C' Intensity 7 ' (31 Q = CIA 33,088 SF 0.76 Acres 10 -YR storm Aaas FVahm nl 0.45 0.95 0.33 1 0.2 0.76 0.62 7.1 SF Acres storm 7.1 10.541 1 SF 0.24 1 Acres 10 -YR storm Acres C-Value (') 004. 0.05 0.20 02 0.24 0.32 k7.1 - •Pc4a 45.504 SF 104 Acres 110 -YR storm Acres C-Valuelll 7.1 -4.W., 43 Rcvlalan DaW. 12172007 n C Z O P A I IX O LL d N Z O© L F q 16 a_Z W O v0 Re N Y W Y Y he Y be beY be heSL Y Y Y Y = 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 t� F _ � V t9 PD l7 HOC W l7 1C Nf {9 M M lD L O C C O C G C O C G G C O O O FW COD n W N W 00 N CR {� W n P N a 01 Y OJ O Ol 0 m 07 0 0 6 Y Y m W 'mod,, D� � N N N N N N N N ^ ^ N '�' P Qo7 Of n h Oj LL lu 0. o p Mf p o pP� W N p N yet D. O ON G O O g O O O O O i5 O c5 O O O O a OLU C C C C O O O C C C C O O O O O O O O O O O O O O O O O C e O O O O O O O O O O O O O O O O G I C O C C G C 0 G C C C 0 C W W W W W W W W W W W W W W W m m m m m a a. a m m a n. m m a O O C O C O G 0 O O O O O O C 2 x x 2 x x x x x x 2 x x 2 2 W d. b P P b a P P N •' r cc P P P r W log aa 2� k •= �: aS � n ri ns�' ti o o � O o m w to IS N f aN d ma imii o' PLU M m N rD a �D m n m m IL d aoodaanadd����� y W fq VJ VJ VJ H fA fA VdS fdlJ fdlJ to !�/_ 44 o: 54- RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 8 BOWMAN DESIGN and ENGINEERING 8SH «Drainage Area = 1 73182 1SF Drainage Area = 1.88 Acres Design Storm 1 1`0 -YR storm Surface Ames C-Value (') Grass 1.25 0.2 AsphaWRooftop 0.43 0.95 Total A' 1.88 Wa/ghtad V 0.38 Intensity'i ' (') 7.1 Qi=CIA Cis 0 t@ AA -2. Drainage Area = 67 3? SF Drainage Area = 1 55 Acres Design Storm = 1,0 -YR storm Surface Acres C-Vafue(') Grass 118 02 AsphalVRooftop 037 0.95 Total A' 1.55 Weighted 'C' 0.38 Intensity -1 ' IaI 71 Q = CIA EA.4f cts "Drainage Area = 1 45.278 SF Drainage Area = 1 1-04 Acres Design Storm = 10 -YR storm Surface Acres C-Va/ue(') Grass 0,84 0.2 AsphalVRooftop 0 20 0.95 Total A' 1.04 Weighted 'C' p.34 Intensity'/ ' (a) 7.1 -3a1}t-4' Drainage Area 58114 SF Drainage Area = 1.33 Acres Design Storm = 1°0 -YR storm Surface Acres C-value(') Grass 1." 0.2 AsphalVRooflop 0.29 0.95 Total A' 1.33 Weighted 'C' Intensity '/'(3) 7.1 Q, = CIA ;. , •. 44 cis , Drainage Area = 25 823 SF Drainage Area = 0.50 Acre Design Storm 1 10 -YR storm Su face Acres C-Valug (') Grass 0.31 0 2 AsphaWRooftop 024 1 096 Total A' 0.59 Weloted 'C' 0.55 Intensity '1'(a) 7.1 Qi = CIA 7 72 ,32°"`.. cts to A4-4t . ! Drainage Area = 22.802 SF Drainage Area = 0.52 Acres Design Storm 1 10 -YR storm Surface Acres C-value(') Grass 0.50 i 0,2 AsphalVRooftop 002 1 0.95 Total A' Weighted 'C' 0.52 0.23 Intensity'! ' Ia) 71 Qi = CIA 0.so cfs _ Revlaion Date: S UNN J ter .5 RICE CREEK PLANTATION - PHASE 1 BOVWAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 8 BSH qJ6 OW. Drainage Area = 40,496 SF Drainage Area = 1.11 Acres Design Storm = 1:0 -YR storm Surface Acres C-4814enl Grass 0.39 0.2 AsphaltiRooftop 0.72 0.95 iota/ * 1.11 Weighted 'C' 0.69 Intensity -1 ' I3I 7.1 Qi = CIA 0.41 ... cis , • Q/ 8 :,• Drainage Area = 30 8.39 SF Drainage Area = 0.71 Acres Design Storrs = 0 -YR storm Surface Acres C-Value ro Grass 0.33 0.2 Asphalt/Rooftop 038 0.95 Tote/'A' 0.71 Weighted 'C' 0.80 Intensity's ' r'1 7.1 Qi =CIA hlt 0 ` . CIS A Ip QA-I.; Drainage Area = 27.231 1 SF Drainage Area = 0:63 1 Acres Design Storm 1 10 -YR storm Surface Acres C-Velum) Grass 0:43 0.2 AsphaitiRooftop 0.20. 0.95 Total A' 0.63 Weighted 'C' 0.44 Intensity '/ 7.1 Qi = CIA 1.4s : cfe Q tffpl 40� •� Drainage Area = 10192 SF Drainage Area = 0.23 Acres Design Storm 1 10 -YR storm Surface Acres FValue nl Grass 0.11 1 0,2 Asphalt/Rooftop 0.12 0.95 Total'A' 0.23 Weighted 'C' 0.58 Intensity'/' 13) 7.1 Qt = CIA #r . cfs Q tv:Wwf 1. Drainage Area = 13,209 SF Drainage Area = 0,30 Acres Design Storrs = 10 -YR storm Surface Acres C-Value rrr Gress 0:10 1 0.2 Asphalf/Rooftop 0.20 0.95 Total A' 0.30 Weighted C' D.89 Intensity -1 ' l,1 7.1 Qi - CIA t.i9 CIS � F � T RWalon NO: 17172007 RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 8 BOWMAN DESIGN and ENGINEERING BSH :, IlkWw `_ L Drainage Area = Drainage Area = Design Storm = Surface Grass AsphaWRooftop Tofa/'A' Weighted 'C' Intensity 11 ' 13) Q, = CIA Q,t0 QX.13: .'Drainage Area = Drainage Area = Design Storm = Surface Gress AsphaltlRooftop Total A' Weighted 'C' Intensity'! - (3) QI = CIA -Drainage Area = Drainage Area = Design Storm = Surface Grass AsphaiVRooftop Total A' Weighted 'C' Intensity'/ Qi = CIA W�itA-!S." Drainage Area = Drainage Area = Design Storm = Surface Grass AspheiVRooftop Total A' Weighted 'C' Intensity 'i Qi = CIA Drainage Area= Drainage Area = Design Storm = Surface Grass Asphalt/Rooftop Total A' Weighted 1C' Intensity Y ' (a) Qi = CIA 20.0.87 SF 0.60 Acres 0 -YR storm Acres C-Value 11I 0,170 02 0.50. 0.95 0.60 0.83 7.1. 8.it. • : cts 11,.3.51 SF 020 Acres 10 -YR storm Acres GValue n1 0.13 02 0.13 0.05 0.26 0.67 7,1 cra 10.940 SF 0.25 1 Acres 10 -YR storm Acres C-value nI 0-0.2 1 02 0.23 0.95 0.25. 0.89 7.1 i n - • cfs 16.703 1 SF 038 1 Acres 10 -YR storm Acres C-Valuer9) 0-09 10.2 0.27 0.05 0.36 0.76 7.1 11 533 SF 0.26 Acres 10 -YR storm Acres C-Value r'r 0,13 1 0.2 0.13 0.00 0.28 0.57 7.1 rcf, 1.07 .� ReviWon Date: 12r7r W 0F S9' RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 8 BOWMAN DESIGN and ENGINEERING BSH a tDA 1 .: Drainage Area = Drainage Area = Design Storm = Surface Grass Asphalt/Rooftop Total A' Weighted 'C' Intensily'i ' (a) Qi = CIA Q:to flA-18 Drainage Area = Drainage Area = Design Storm = Surface Grass Asphalt/Rooftop Total A' Weighted 'C' Intensity'/ 4 = CIA Drainage Area - Drainage Area = Design Storm = Surface Grass Asphalt/Rooftop Total A' Weighted C' Intenally'1 ' iai Qi = CiA kI40 :. _ Drainage Area Drainage Area = Design Storm = Surface Grass Asphalt/Rooftop Total 'A' Weighted C' Intensity'/ ' r'r Qi = CiA 4i-t-ZS Drainage Area = Drainage Area = Design Storm = Surface Grass Asphalt/Rooftop Total A' Weighted 'C' Intensity'I 'cal Qi = CiA 19,929 1 SF 0.25 1 Acres 1:0 -YR storm Acres C- mm 0.02 1 0.2 0.2.,3 0.95 0,26 0.89 7.1. , Cfs 27,815 1 SF 0.83 Acres 10 -YR storm Ades C-Value ro 0.1'2 0.2 0:51 0.95 0.63 0.81 71 . 341 cfs 14,881 1 SF .034 1 Alas 10 -YR storm Ades C-Valuenr 0.17 0.2 0.17 Q:95 0.34 0.57 7.1 b' cfs 18 91>2 SF 0.43 1 Ades 10 -YR storm Ades C-Valuenr 0,18 1 0.2 025 0.95 0.43 0.63 7.1 CIS 54.384 SF 1.25 f Acres 10 -YR storm Ades C-Value ni 0.89 1 0.2 0.36 10.95 1.25 0.42 7.1 .7 see cfe TU OF 5 �' Revision Dsh: 1477=07 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 8 eSH t p.$pi Drainage Area - 0,482 SF Drainage Area = 015 Acres Design Stone = 1 10 -YR storm Surface Acres C-Value rtl Grass 0.05 0,2 AsphaWRoottop 0.00 0.95 Total A' 0.15 Weighted V 0.65 Intensity l ' (3) 71 Qm = CIA il.m .: . ds 4 tu:l5ti Drainage Area = 19,20,4 SF Drainage Area = 1 0,44 1 Acres Design Storm 1 10 -YR storm Surface Acres C-Value (, Grass 0.2.3 0.2 Asphalt/Roottop 0.21 095 Total A' 0.44 Weighted 'C' 0.58 Intensity'/ ' tam 7.1 04 = C/A 1.T4": `.: Cis 4t01�24` . Drainage Area = 1 14.295 SF Drainage Area = 0 ... Acres Design Storm 1 10 -YR storm Surface Acres C-Value (, Grass 0.14 0.2 Asphalt/Rooftop 019 0.95 Total A' 0.33 We/ghted 'C' 0.63 Intensity'/'(8) 7.1 Qm = CIA 1.4#: ". cis Q tsi 17uA-2G Drainage Area = 31,984 SF Drainage Area = 0.73 Acres Design Storrs I to -YR storm Surface Acres C-Value(, Grass 0.54 0.2 Asphait/Rooftop 019 0.95 Total A' 0.73 Weighted 'C' 0.39 Intensity 'I ' r'r 7.1. Qi = CIA 05 :'. ors Q. tp.DA=21k ' Drainage Area = 24.748 SF Drainage Area = 0.57 Acres Design Storrs = 10 -YR storm Surface Acres C-Value n) Grass 0.57 0.2 Asphalt/Rooftop 000 0.95 Total A' 0.57 Weighted V 0.20 Intensity '/ ' (3) 7.1 Qm = CIA O Ft.: ors RevWan We: 12r72OD7 oe lu z a z LU z w 0 LU 0 0 0 0 0 0 0 0 CO In co OD 10 co ci 6 6 Q 6 6 0 0 ci Q Q 0 0 0 o c o 0 0 0 0 r. lu V3 co en Q) en W) OR W) CR ww 49 0) cl) 1. 4 (4 C4 N C4 CY 11 ' P' •i. LU IL 42 a 0 C, C, a W 12 01. CD 0 4D a 0 0 40 40 w c cm 4w CD cc 0-6 w lu CL CL m U, ui IL ca till [*I, I LU w 0 -R uj 2: IL :. H 5.05 RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 9 BOWMAN DESIGN and ENGINEERING BSH 4 011A.4�1 , ,; Drainage Area = Drainage Area = Design Storm = Surface Asphalt/Rooftop Grass Total 'A' Weighted 'C' Intensity's ' tal Qi =CIA Drainage Area = Drainage Area Design Storm = Surface Asphalt/Roottop Grass Total A' Weighted 'C' Intensity'/ Qi = CIA R !MA-k3 ,.- • Drainage Area = Drainage Area = Design Storrs = Surface AsphawRooftop Grass Tola/ A' Weighted 'C' Intansity'i ' (3) Q = CIA %.,:1b1-&.4.�, Drainage Area= Drainage Area = Design Storm = Surface Asphalt/Rooftop Grass Total A' Weighted 'C' Intensity 'i ' iai Qi = CiA 26.390 1 SF 0.50 Acres 10 -YR storm Acres C-Valua nl 0.30 095 0.20 0.2 0.58 0.89 7.1 40,540 SF 0.93 Acres 10 -YR storm Acres FValue 0,53 0.95 0 40 0.2 0.93 0.69 7.1 4.14 cfs 3. B 4fl8 SF 0.64 Acme 10 -YR storm Acres C-Value ni 0.38 1 0.95 0.46 10.2 0.84 .54 7.1 .1S.21 cfs 19.880 SF 0.48 Acres 10 -YR storm Acres C-Valueni o.f's 1 0.95 0.31 1 0.2 0.46 0.45 7.1 t cis Revision Deb:1217l1007 a z a W W z a z W z a cc W 0 Gl 0 T. O T n ujO LL 6 z O Og hV 16 Q. _Z W LU 0 ,u 2W OF 2 N Y W O O O O O x 2 V S S M MI OI GO T T fV T YO r_ lot m 7 0 ri W N W mol 0 0 0 � ri v v ai v W 03 N U. n n lu IL 9 o S O O y o 0 0 0 0 � 0 0 0 0 0 a` ` 0 0 0 0 0 c o 0 0 0 IL a a a a II x x x x x lu w a ca -0101 I N N V N F N Ih IA Mj � T W N Ol tr N M fq lq fA VJ S' - OF •�+ RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 10 BOWMAN DESIGN and ENGINEERING BSH b.'.; Drainage Area = Drainage Area = Design Stone = Sumacs AsphaWRoottop Grass Total A' Weighted V Intensity's 103 Q=CiA iQ2 ":• •Drainage Area= Drainage Area = Design Storrs = Surface Asphalt/Rooftop Gress Total A' Weighted 'C' Intensity'/ Q,=C/A ;. Q•taQ%4 G: _. ; Dreinage Area - Drainage Area = Design Storm = Surface Asphait(Rooflop Grass Total A' WalghtW V Intensity'! ' ral Q, = CIA "A.3Sti lam= PQ4"Y Drainage Area = Drainage Area = Design Stone = Surface Asphalt/Roottop Gress Total A' Weighted 'C' Intensity 'I Qi = CiA w o,i2A-!4b.6 Drainage Area = Drainage Area = Design Storm = Surface Asphalf/Rooftop Grass Total A' Weighted'C' Intensity 7 �l Qi = CIA . ' Drainage Area = Drainage Area = Design Storm = Surface AsphalURooftop Gress Tonal' Weighted Intensity's ' (3) Q = CIA SF Acres storm ,,mob-") 53195 SF 1.29 Acres 10 -YR storm Acres C-Value(, 0.47 D.95 075 0.2 1.22 0.49 71 • • 4.2'4 cf, 42.371 1 SF 0.97 Acres 10 -YR storm Acres C-Valus0) 0.36 0.95 0.81 0. 0.97 1. 0.48 Efi:rxe 4i 044 SF 1 0.94 1'0 Acres -YR storm Ades C-Vahre nJ 0.39 1 06 055 . 0.2 0.94 0.61 7.1 8.4 cis 40.730 SF 0.94 Acres 10 -YR storm Acres C-Va/ue nJ 0,55 1 0.95 0.30 10.2 0.94 0.84 7.1 4. 7 CIS 17.073 1 SF 0.38 Ads 10-YR.storm Acres C-Value(l) 0"02 095 0 37 0.2 0.39. 0.24 74 ti 66 ets 4 ' �� RWslon Daft: 17J72007 moo z I � 2 § � ) § § § § § § § � � ■ - � � � � ' � � _ ■ ■ � ©E 22 § § § ) § § o§ £ § ■ 2 ■ m 4 § w w IL ) I § § § § W3 V3 ■ 2 a ■ ■ ■ 0 8CD- W ° o o IL m■ m m m 2 2 2 2 2 g w w - ■ ® ® ■ a l� C4 © 2 m zK z40 § k ° � � q ® ■ � 2 g 3 R q FL k § k § k § ,54 OF�