Loading...
HomeMy WebLinkAboutSW8070333_Historical File_20070426State Stormwater Management Systems Permit No. SW8 070333 April 26, 2007 John Baker, Managing Member Brunswick STU and Associates, LLC PO Box 19808 Raleigh, NC 27619 Subject: Stormwater Permit No. SW8 070333 Rice Creek Plantation — Phase I High Density Subdivision Project Brunswick County Dear Mr. Baker: o�L.'\tJqv\Ck1 r 5 The Wilmington Regional Office received a complete Stormwater Management Permit Application for Rice Creek Plantation — Phase I on April 25, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 070333, dated April 26, 2007, for the construction. of the project, Rice Creek Plantation — Phase I. This permit shall be effective from the date of issuance until April 26, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at (910) 796-7215. Sincerely, Edward Beck Regional Supervisor Surface Water Protection Section ENB/csb: S:IWQSISTORMWATERIPERMIT1070333.apr07 cc: Elizabeth Nelson, P.E., Bowman Design and Engineering Services, P.A. Brunswick County Inspections Chris Baker Wilmington Regional Office Central Files Page 1 of 10 State Stormwater Management Systems Permit No. SW8 070333, STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO John Baker and Brunswick STU and Associates, LLC Rice Creek Plantation — Phase l US 17, Brunswick County FOR THE construction, operation and maintenance of eleven (11) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 26, 2017 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater controls have been designed to handle the runoff from (See tables Section 1.6) square feet of impervious area. This basin must be operated with a 30' vegetated filter. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 10 State Stormwater Management Systems Permit No. SW8 070333 6. The following design elements have been permitted for these wet detention ponds stormwater facility, and must be provided in the system at all times. Design Criteria Pond #1 Pond #2 Pond #3 Pond #4 Pond #5 Pond #6 a. Drainage Area, 8.69 7.33 12.73 11.17 4.55 2.79 acres: Onsite, ft2 378,444 319,410 554,482 486,629 198,391 121,564 Offsite, ftZ None None None None None None b. Total Impervious 187,943 236,419 178,739 242,219 92,613 50,094 Surfaces, It' (1) Buildings 140,116 195,764 113,476 184,336 68,190 31,538 (2) Streets 45,512 37,654 63,523 55,012 23,335 18,077 (3) Sidewalks 2,306 3,001 1,740 2,871 1,088 479 (4) Offsite None None None None None None c. Design Storm, 1 1 1 1 1 1 inches d. Pond Depth, feet 6 6.5 6 6.5 6 4 e. TSS removal 85 85 85 85 85 85 efficiency f. Permanent Pool 23 23 23 20 19 24 Elev., FMSL g. Perm. Pool Surface 8,413 8,716 10,408 12,288 7,154 5,502 Area, ft2 h. Permitted Storage 19,560 20,251 23,893 27,917 16,863 6,096 Volume, fte I. Temporary Storage 25 25 25 22 21 25 Elev., FMSL j. Controlling Orifice, 1.5 2 1.5 2 1 1 V pipe k. Permitted Forebay 4,942 4,780 6,110 7,913 3,482 1,946 Volume, fta I. Receiving Rice Creek / Cape Fear Stream/River Basin m. Stream Index 18-81-6 Number n. Classification of C;Sw Water Body o. Max, fountain 1/8 1/8 1/8 1/8 1/8 1/8 horsepower Page 3 of 10 State Stormwater Management Systems Permit No. SW8 070333 Design Criteria Pond #7 Pond #8_1 Pond #9 Pond #10_ ; Pond #11 I a. Drainage Area, 10.40 7.44 18.34 7.46 17.69 acres: Onsite, ft2 452,857 324,110 359,755 332,430 326,829 Offsite, ft2 None None None j None j None b. Total Impervious 235,591 160,546 157,355 i j 160,080 166,943 Surfaces, ft2 (1) Buildings 174,148 ! 119,581 106,818 123,727 106,885 (2) Streets 58,703 39,094 48,841 34,482 58,318 (3) Sidewalks 2,740 1,871 1,696 1,871 1,740 (4) Offsite None None None None None c. Design Storm, 1 1 i 1 1 1 inches d. Pond Depth, feet 6 6 6 6 6.5 e. TSS removal 85 185 85 85 85 efficiency f. Permanent Pool 23 123 24 20.5 20.5 Elev., FMSL g. Perm. Pool Surface 10,534 7,258 10,792 6,975 7,511 Area, ft2 h. Permitted Storage 24,200 17,123 24,835 16,502 17,593 Volume, ft3 i. Temporary Storage 25 25 26 22.5 22.5 Elev., FMSL j. Controlling Orifice, 2 .1.5 1.5 1.5 1.5 "O pipe k. Permitted Forebay 6,280 3,538 6,214 3,362 4,402 Volume, ft3 Rice Creek / Cape Fear I. Receiving Stream/River Basin 18-81-6 m. Stream Index Number n. Classification of C;Sw Water Body o. Max. fountain 1/8 1/8 1/8 1/8 1/8 horsepower II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. Page 4 of 10 State Stormwater Management Systems Permit No. SW8 070333 4. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspectiuris revery 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 8. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 9. The Director may determine that other revisions to the project should require a modification to the permit. 10. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 5 of 10 State Stormwater Management Systems Permit No. SW8 070333 12. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 13. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 14. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 15. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 16. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 17. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 18. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 19. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 20. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 070333, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. Page 6 of 10 State Stormwater Management Systems Permit No. SW8 070333 e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is 3,000 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. h. Built -upon area in excess of the permitted amount will require a permit modification. 21. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 22. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 23. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in this pond is (See tables Section 1.6). 24. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. Page 7 of 10 State Stormwater Management Systems Permit No. SW8 070333 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee fora minimum of ten years from the date of the completion of construction. Permit issued this the 26th day of April, 2007. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 070333 Page 8 of 10 State Stormwater Management Systems Permit No. SW8 070333 Rice Creek Plantation — Phase I Stormwater Permit No. SW8 070333 Brunswick County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 9of10 State Stormwater Management Systems Permit No. SW8 070333 . Certification Requirements. Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. _14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections Page 10 of 10 BOWMAN DESIGN /7 & ENGINEERING SERVICES, PA 143 Holden Beach Road, Suite 3, PO Box 748, Shallotte, North Carolina 28459 Phone:910-755-6526 Fax:910-755-6527 Hand Delivery April 24, 2007 Mr. Chris Baker Division of Water Quality NC Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: Rice Creek Plantation Brunswick County Express Submittal Comments Dear Mr. Baker: Per your request, enclosed for your review are: 1.) Two (2) copies of the revised Master Stormwater Plan (sheet C1). 2.) Two (2) copies of the revised drainage area maps (scale: 1" = 150�. In addition to the items listed above, enclosed are two (2) copies of the revised Stormwater Management Permit Application for Phase 1 (page 3 attachments only). The Application enclosed with our letter dated April 5, 2007 listed incorrect drainage area data for stormwater ponds 9, 10 & 11. Please contact me if you have any questions or require any additional information. Sincerely, BrianS. Hall, EI Enclosures cc: Mr. John Baker, Brunswick STU & Associates, LLC File: 2500.02 (Rice Creek Plantation — Phase I) Preceived 4 /3.5 /0-7 .A LA 0 V w 0 0 U O tv y � y � d o� �O 00 o rn Cyyr f•" l7l cn II O W 0 0 V1 O ° N ° A ° a a W W A a a �w A N ° a A I a ° A a N A A ° A w 00 V 44, �� l_J E N I w 0 I a a n 00 0 LA yv G Ll aLl A v a a LV °a A v v a v A w 0 d a O a a d a N d a W a a /a A b a d a d w a v a J b d a d a N d a � v � `' O lid a N a a a 0 a a 0 r a W � d cn It 00 0 m b a a b a d a a a O � N b 0 a A d a V a 0 0 a W 0 v N 0 v a C a a 00 A v a 0 C a a w v b 0 a N Ga 7d W�'d�d Q (,pZr O 1% 00, 0 d a C a 0 A A a a O O I oy M Pd 0 a e a 0 u N W O O A O a � a a tA 0 a o a a 0 a 0 ad E O a w 0 lA a o o BOWMAN DESIGN oj 78s ENGINEERING SERVICES, PA 143 Holden Beach Road, Suite 3, PO Box 748, Shallotte, North Carolina 28459 Phone:910-755-6526 Pax:910-755-6527 Hand Delivery April 9, 2007 Mr. Chris Baker Division of Water Quality NC Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: Rice Creek Plantation Brunswick County Express Submittal Comments Dear Mr. Baker: Per your request on April 5, 2007, enclosed for your review are: APR I M17 1.) Two (2) copies of the revised Stormwater Management Permit Application (page 3 attachment). 2.) Two (2) copies of the revised Phase 1 Design Plans (sheets C1 & C11). 3.) Two (2) copies of the revised Master Stormwater Plan (sheet Cl). 4.) Two (2) copies of the drainage area maps for Ponds 1-11. 5.) Two (2) copies of the notorized document granting John Baker authority to sign as a managing member of Brunswick STU & Associates, LLC. Please contact me if you have any questions or require any additional information. Sincerely, Brian S. Hall, EI Enclosures cc: Mr. John Baker, Brunswick STU & Associates, LLC File: 2500.02 (Rice Creek Plantation Phase I) BOWMAN DESIGN /7 & ENGINEERING SERVICES, PA 143 Holden Beach Road, Suite 3, PO Box 748, Shallotte, North Carolina 28459 Phone:910-755-6526 Fax:910-755-6527 Hand Delivery March 29, 2007 Mr. Chris Baker Division of Water Quality NC Department of Environment and Natural Resources 127 Cardinal Drive Extension WArnington, North Carolina 28405 Subject: Bice Creek Plantation - Phase I Brunswick County Express Submittal, Low Density with Pockets of High Dear Mr. Baker. On behalf of Brunswick BTU & Associates, LLC, enclosed for your review and approval are the following documents: 1. One (1) original and one (1) copy of the Stormwater Management Permit Application. 2. One (1) original and one (1) copy of the Low Density Supplement for Tract A. 3. One (1) original and one (1) copy of the Curb Outlet System Supplement for Tract A. 4. One (1) original and one (1) copy of the Curb Outlet System Supplement for the Thoroughfare. 5. One (1) original and one (1) copy of the Wet Detention Basin Supplement for Ponds 1 thru 11. 6. One (1) original and one (1) copy of the Proposed Deed Restrictions for Tract A 7. Two (2) copies of the Design Calculations (Pages 1-75). 8. Two (2) copies of the Project Narrative. 9. Two (2) copies of the Design Plans (Cover, Sheets CI- C11). 10. A check in the amount of $ 4000.00 to cover the required application fee. Please contact me if you have any questions or require any additional information. Sincerely, Brian S. Hall, EI received 0 3�A9 07 Enclosures cc: Mr. John Baker, Brunswick STU & Associates, LLC File: 2500.02 (Rice Creek Plantation —Phase I) BOWMAN DESIGN & ENGINEERING SERVICES, PA 143 Holden Beach Road, Suite 3, PO Box 748, Shallotte, North Carolina 28459 Phone:910-755-6526 Fax:910-755-6527 RICE CREEK PLANTATION - Phase I PROJECT NARRATIVE Rice Creek Plantation consists of a 1,306.37 acre tract located on US Hwy 17 (Ocean Highway) in Brunswick County, NC. The developer proposes to construct roads, and install sewer and water utilities to serve commercial office buildings, 361 multi -family units and 1,656 single-family homes. This project was previously approved as a 1,328 acre project with 1,656 single family homes and 492 multi -family units (see permit # SW8 070334 as approved on April 26, 2007). A portion of the project was sold to Brunswick County Schools in order to build Town Creek Elementary School. Phase 1 of Rice Creek Plantation consists of multi -family Tracts H, I, L, single-family Tract A and a portion of the Thoroughfare (as shown on the Rice Creek Plantation - Master Plan), totaling 175.35 acres. The developer will disturb approximately 122.56 acres during construction of Phase 1, which includes 361 multi -family units and 175 single-family homes. The erosion control permit for Rice Creek Plantation- Phase 1 (Bruns 2007-396) includes both Phase 1 and Town Creek Elementary School (21.21 acres of disturbance) for a total of 143.77 acres of disturbance. Stormwater runoff from Tracts H, I and L will be directed to ten (10) on -site wet detention basins. Originally, prior to selling a portion of the project to Brunswick County Schools, the project included eleven (11) on -site stormwater ponds (see permit # SW8 070333 as approved on April 26, 2007). Pond 11 was eventually eliminated, and the drainage areas for Ponds 7-10 were altered. Ponds 7, 9 & 10 were not redesigned using Phase II stormwater rules because of reductions in drainage areas, impervious area totals and impervious percentages for these ponds (approved by C. Baker of the NCDENR Wilmington Regional Office on October 25, 2007). A comparison of the data for Ponds 7, 9 & 10 is attached. Pond 8 was redesigned to treat all of the off -site run-off produced by Town Creek Elementary School. The developer proposes to install asphalt roads throughout the subdivision with 30" standard or 24" roll curb and gutter, which will direct runoff to the stormwater collection systems (Tracts H, I & L) or 100' vegetated swales (Tract A). As established on the Stormwater Master Plan, limits will be established for all single-family lots, multi -family residential areas and commercial areas to the extent that the project as'a whole meets low density criteria at the 30% (non -SA waters) level. The single-family lots within Tract A are limited to 3,000 SF of impervious surface. A Temporary construction entrance will be installed along US 17 to prevent significant amounts of sediment from entering the adjacent highway. Temporary silt fencing will be installed adjacent to wetlands. Check dams will be built at existing ditch outlets prior to the filling and relocation of existing ditches. Temporary diversions will be constructed to direct stormwater runoff to Ponds 1-10, which will serve as temporary sediment basins, and to other temporary sediment basins and sediment traps. Block and gravel inlet protection will be installed to protect the curb and yard inlets within Tracts H, I and L. These measures BOWMAN DESIGN & ENGINEERING ERVICES, PA 143 Holden Beach Road, Suite 3, PO Box 748, Shallotte, North Carolina 28459 Phone:910-755-6526 Fax:910-755-6527 RICE CREEK PLANTATION - Phase 1 shall be inspected regularly, and the accumulated sediment removed to prevent the conveyance of sediment to any off -site areas. Upon stabilization of the disturbed areas, sediment will be removed from the pond to return it to original design depth. Within the thoroughfare right -of way and Tract A, the 100' vegetated swales are to be installed after the asphalt roadways and the curb and gutter are installed. Level spreaders will be constructed at the swale outlets for erosion control purposes. The primary permanent erosion control measures that will remain after the temporary measures axe removed will be permanent grassing and asphalt. BOWMAN DESIGN 8a ENGINEERING SERVICES,PA 143 Holden Beach Road, Suite 3, PO Box 748, Shallotte, North Carolina 28459 Phone:910-755-6526 Fax:910-755-6527 RICE CREEK PLANTATION - Phase 1 POND 7 ORIGINAL DESIGN CURRENT DESIGN I DRAINAGE AREA (SF) 452,857 452,857 IMPERVIOUS AREA (SF) 235,591 232,044 IMPERVIOUS 52.02% 51.24% POND 9 ORIGINAL DESIGN I CURRENT DESIGN DRAINAGE AREA (SF) 359,775 146,133 IMPERVIOUS AREA (SF) 157,355 62,982 % IMPERVIOUS 43.74% 43.10% POND 10 ORIGINAL DESIGN CURRENT DESIGN DRAINAGE AREA (SF) 332,430 240,645 IMPERVIOUS AREA (SF) 160,080 89,462 % IMPERVIOUS 48.15% 37.18% 7 BOWMAN DESIGN 8s ENGINEERING SERVICES, PA 143 Holden Beach Road, Suite 3, PO Box 748, Shallotte, North Carolina 28459 Phone:910-755-6526 Fax:910-755-6527 RICE CREEK PLANTATION — PHASE 1 PROJECT NARRATIVE This project consists of a 1,328-acre tract located on US Hwy 17 (Ocean Highway) in Brunswick County, NC. The developer proposes to construct roads, and install sewer and water utilities to serve commercial office buildings, 492 multi -family units and 1,656 single- family homes. Phase 1 consists of Tracts A, H, I, L and a portion of the Thoroughfare (as shown on the Stormwater Master Plan), .totaling 196.56-acres. 175 single-family homes and 492 multi -family units will be completed during this first phase of construction. Stormwater runoff from multi -family Tracts H, I and L will be directed to eleven (11) on -site stormwater ponds via stormwater collection systems. The developer proposes to install asphalt roads throughout the subdivision with curb and gutter, which will direct stormwater runoff to curb inlets or 100' vegetated swales. As established on the Stormwater Master Plan, limits will be established for all single-family lots, multi -family residential areas and commercial areas to the extent that the project as a whole meets low density criteria at the 30% (non -SA waters) level. The single-family lots within Tract A are limited to 3,000 SF of impervious surface. Initially, the roads and utilities will be installed in the right-of-way. Temporary construction entrances will be installed to protect adjacent roads. Temporary silt fencing, temporary diversions, and temporary sediment basins will be used to prevent significant amounts of sediment from leaving the site. These measures shall be inspected regularly, and the accumulated sediment removed to prevent the conveyance of sediment to any off -site areas. The primary permanent erosion control measures that will remain after the temporary measures are removed will be permanent grassing and asphalt. Rice Creek Plantation Hydrologic and Hydraulic Calculations Maori 2007 Prepared by: BOWMAN DESIGN & ENGINEERING ee- SERVICES, PA 143 Holden Beach Road, Suite 3, PO Box 748, Shallotte, North Carolina 28459 Phonez 910-755-6526 F= 910-755-6527 § x � 0 k § M be LU Lli 0 rz § � CO 0 ƒ LU (L LL � � 0 K � w IL w ■ « e � 0 19 w a § 2 Or.- It k 2 k- n M LO m(I 0 Cl) k c 0) o 0 0 0$ k CIL o mLL co i w CD i 0 ku 0 CD le 0) r o o LO N U)) § / C 2'o q 0 M k � k/ fCl) o § § W� 2 Cl) R\& o - o 0 0 0° 2 C ® p § o k$ \ a V ~ 2 2 0 0 0 0 f OD f k § u� § ¥ Cl) V n co 9 r � o Cl) § © K � o o o o S @ 8 N " / R« n k 2 k to 0 o w 0 0 G 0 0 0 0 2 K OD m k k C.)0 LL PA e k cck § k j k ■ z k � ■ > k W k � ■ � k L LU § _ ± cc & ■ ■ ■ LU ■ § k ) c 0 ) 19,15 � 0 ■ ui � IL 0 k0 abe CD 0 §a �■ LN k ' / k ] @ « R © :- $ § c k/ \¥ k j 6/ k\ LO _ ( .© ui ■ « k k k k k K 0 0L6 o 0 0 0 0 0 0 O -r / co k CO Im 0 � _ § K K o 0 o o 0 o o k k § k LU k k k k o 0 0 0 Cl 0 o 0 ) § k k k LU ■ A o (0 C-4 o Lf) R o � F Go @ r-� o 0 Co o@ § K L§ k a© 2 § c cc a 2� 0 0 0 0 0 0 0 7$ to co 8 § § t - ci 00 a 04 §$� o 0 0 0 0 0 o f f K k � 2 q - o $ \\� o 0 0/ co2 0/\ § $Go a ) m I § K$ 0 g B A@ u In inR o 0 0-� R o© q K C\ \ 7/ k m k d � c B � A O-P -15 2m z 8 w � a � K ■ w a w ■ « ■ � 0 � w IL ■ la o o o 8¥ 2 q§ B B B o� d d e d m d ® � U. Co �$ w Cl) 7 o a o 8 o 0@§ d� d d d a 00 - d � � LU v k k§$$$$ 8 k � e o co � E A o R$ 8@§ 2 p m E k LO K 00 0 0 o o a 2 2 2 2 2 © §§- CM CM § d § q§ @ aR 0 0 8 0 � § d@ d d a a §� q• 04 O-§ o q[% g o o o o� 2 B 0- o 6 6 6 d a a k ¢ � E ■ E _j o o b 2 2 2§ 2§\§ « ■ _ & ■ § « LU n b § m � § 2 � � � § � ■ LL � � § § � � ■ ,� o-f 15 0 f 0 z 5Q Lu V O W W va a� O0O0 � O LL x 0 � e v N O O � dp O 0 N lu yU W � U o p o o 0 0 0-- 8 ^ co M cc M 0 o p O o 0 0 o W CD pp � W Of Of O O C C C C CO fp 0 ^ J F co m Q m M O o o M000 OD N O O � 0 � Y v H o o$ 0 p o o 0 0 0 0 0 0 0 0 0 0 0 o o M M o p o ^ °r° 'n o 0 p o 0 0 0 0 0 0 0 o 0 v W v of o 0 F ^ 'o° cCOo o p o 0 o 0 n M rn 0 o 0 0 0 0 cc m ^ F M x UNNN F M M N O O O O o G ^ A P) N O O O O N N' Om M N 64 -15 Z� z § w � � � 0 � § ■ c 2 ■ � x � � @ 0 � � % k :E CL � � _ � � 0 A w 2 x a ■ 0 g « ■ � 0 � ■ IL ■ CD Im n @ k E � ¥ co% R _ G R m& R cn ad C Q cn LU « s® cm - - a k 2 2 o 0 0 0 0 0ƒ k coE x � k—§ k k/ LO 0 E§ z A% U 6 R k$ $ m _ C k 4 C k c E k k e k § k k e a § ® 2 « w ■ -J LLI 2 § ) 5 9 0 § ■ o ■ LL. | ■ LL & LU ■ k k I _ k ix 5 o4 -15 W I x IL �y o� �o H FF LL] I Q W V0 d' LLi W V a. 2 _ V Q v W LL x a D 0 w O 2 F O W c O .E7 Q. o!f J 5C Q H F V r W ao a x IL w LL a U) 0 a 2 J q CRv F Cp ap v, o 0 OO CD N N CC O O r COO M W Q LL x � O o r' o 0 o d o o� co cc Lc) Lc) O x F J LO N W O CO p CIO 61 O x O ti COO r N O O O L Q r a a i m m m a e a � } Y a m O m Z Q J W m W o IL m a o 0 0 � LL F �1 W I - CD 0 N M N W C O N RICE CREEK PLANTATION - PHASE 1 SWALE DRAINAGE FLOW CALCULATIONS FOR TRACT A AND THE THOROUGHFARE BOWMAN DESIGN and ENGINEERING BSH Q from DA-1 Q from IaA-3 Q from DA-5 Q from DA-7 Q from DA-9 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' t3) QI = CiA Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' (') QI = CiA Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighied'C' Intensity'i 4 = CiA Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'!' (3) QI = CiA Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Tota! A' Weighted 'C' Intensity 'i Qi = C!A Q from DA-11A Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i QI = CiA 56,436 SF Acres -YR storm GValueff) 0.2 1.30 10 Acres 0.72 0.58 0.95 1.30 7.1 0.536 4.93 cfs 38,157 SF Acres -YR storm GValue ��� 0.2 0.88 10 Acres 0.48 0.40 0.95 0.88 0.542 7.1 3.37 efs 7,843 SF 0.18 Acres 10 -YR storm 19,548 SF Acres -YR storm GValue f', 0.2 0.45 10 Acres 0.26 0.19 0.95 0.46 1 7.1 0.518 cis 1.65 20,201 SF Acres -YR storm GValue rf, 0.2 0.46 10 Acres 0.24 0.22 0.95 0.46 7.1 0.556 cfs 1.63 46,466 SF Acres -YR storm C- value 0.2 1.07 10 Acres 0.57 0.50 0.95 1.07 7.1 0.552 CIS 4,18 (1) Table 8.03a; (2) Figure 8.03a; (3) Figure 8.03b of the NCDENR Erosion and Sediment Control Planning and Design Manual. Q from DA-2 Drainage Area = 39,109 SF Drainage Area = 0.90 Acres Design Storm = 10 -YR storm Surface Acres C-Va/uef4) GRASSY 0.49 0.2 IMPERVIOUS 0.41 0.95 Total A' 0.90 Weighted 'C' 0.5w2 Intensity'i ' c') 7.1 QI = CiA 3.4i: efs Q from DA-4 Drainage Area = 54.740 SF Drainage Area := 1.26 Acres Design Storm = 10 -YR storm Surface Acres GValue(l) GRASSY 0.69 0.2 IMPERVIOUS 0.57 0.95 Total A' 1.26 Weighted 'C' 0.540 Intensity 7 7.1 QI = CiA 4.82 cfs Q from DA4 Drainage Area = 19,138 SF Drainage Area = 0.44 Acres Design Storm = 10 -YR storm Surface Acres GValue fry GRASSY 0.26 0.2 IMPERVIOUS 0.18 0.95 Total'A' 0.44 Weighted 'C' 0.507 Intensity'i ' t'') 7.1 QI = CiA 1.58 cis Q from D" Drainage Area = 8,669 SF Drainage Area = 1 0.20 1-YR Acres Design Storm = 10 storm Surface Acres GValueff) GRASSY 0.09 0.2 IMPERVIOUS 0.11 0.95 Total A' 0.20 Weighted 'C' 0.615 Intensity'i ' r') 1 7.1 QI= CiA 0. efs Q from DA-10 :Drainage Area = 42,283 SF Drainage Area = 0.97 1-YR Acres Design Storm = 10 storm Surface Acres GValue ('J GRASSY 0.51 0.2 IMPERVIOUS 0.46 0.95 Total A' 0.97 Weighted 'C' 0.555 Intensity'i ' 0) 7.1 QI = CiA 3.83 cis Q from DA-11 B Drainage Area = 1 30,406 SF Drainage Area = 0.70 Acres Design Storm = 10 -YR storm Surface Acres C- value GRASSY 0.36 0.2 IMPERVIOUS 0.34 0.95 Total A' 0.70 Weighted 'C' 0.565 Intensity '! ' t3) 7.1 QI = CiA 2.901cis Revision Date: 3/21/2007 . I J 15 RICE CREEK PLANTATION - PHASE 1 SWALE DRAINAGE FLOW CALCULATIONS FOR TRACT A AND THE THOROUGHFARE BOWMAN DESIGN and ENGINEERING BSH Q from DA-12 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted Intensity'i ' 0) QI = CIA Q from DA-14 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' 0r QI=CiA Q from DA46 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' t6r QI = CiA Q from DA•18 Drainage Area Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity 7 ' ter QI=CiA 48,626 SF Acres -YR storm C-Value ff, 0.2 1.05 10 Acres 0.53 0.52 0.95 1.05 7.1 0.572 CFS a.2s 59,693 SF Acres -YR storm C-Value r" 0.2 1.37 10 Acres 0.70 0.67 0.95 1.37 7.1 0.567 cfs 5.51 15,719 SF Acres -YR storm C-Valuer" 0.2 0.36 10 Acres 0.19 0.17 0.95 0.36 7.1 0.553 cfs 1.42 33,789 SF 0.78 Acres 10 -YR storm Q from DA,20 Drainage Area = 1 37,299 SF Drainage Area = 1 0.86 Acres Design Storm = 10 -YR storm Surface Acres C-Value f11 GRASSY 0.48 0.2 IMPERVIOUS 0.38 0.95 Total A' 0.86 Weighted 'C' 0.533 Intensity'i 7.1 QI = CiA 3.24 cfs Q from DA-22 Drainage Area = 58,109 SF Drainage Area = 1.33 Acres Design Storm = 10 -YR storm Surface Acres C- Value r1J GRASSY 0.69 0.2 IMPERVIOUS 0.64 0.95 Total A' 1.33 Weighted 'C' 0.560 Intensity'i ' t°' 7.1 Qi = CiA 6.30 cfs (1) Table 8.03a; (2) Figure 8.03a; (3) Figure 8.03b of the NCDENR Erosion and Sediment Control Planning and Design Manual Q from DA-13 Drainage Area = 41,706 SF Drainage Area = 0.96 Acres Design Storm = 10 -YR storm Surface Acres C-Value fv GRASSY 0.51 0.2 IMPERVIOUS 0.45 0.95 Total A' 0.96 Weighted 'C' 0.553 Intensity'i ' tit 7.1 QI = CiA 3.78 CIS Q from DA-16 Q from DA-17 Drainage Area = 1 48,825 SF Drainage Area = 1 1.12 Acres Design Storm = 1 10 -YR storm Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity 'i ' t'r QI = CiA Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total 'A' Weighted 'C' IntensitO ' t'r QI = CiA 20,081 SF Acres -YR storm C-Value rf) 0.2 0.46 10 Acres 0.26 0.20 0.95 0.46 0.525 I Icts Q from DA-19 Drainage Area = 42,942 SF Drainage Area = 0.99 1-YR Acres Design Stone = 10 storm Surface Acres C-Value GRASSY 0.50 0.2 IMPERVIOUS 0.49 0.95 Total A' 0.99 Weighted 'C' 0.573 Intensity 'i ' O) I 7.1 QI = CiA 4.01 Cfs Q from OA-21 Drainage Area = 1 41,201 SF Drainage Area = 0.95 Acres Design Storm = 10 -YR storm Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' t''r QI = CiA Q from DA-23 Drainage Area = 1 37,42 SF Drainage Area = 0.86 Acres Design Storm = 10 -YR storm Surface Acres C-ValuerV GRASSY 0.45 0.2 IMPERVIOUS 0.41 0.95 Total A' 0.86 Weighted 'C' 0.558 Intensity 7 ' t'r 7,1 QI = CiA 8.40 cfs Revision Date: 3012007 RICE CREEK PLANTATION - PHASE 1 SWALE DRAINAGE FLOW CALCULATIONS FOR TRACT A AND THE THOROUGHFARE BOWMAN DESIGN and ENGINEERING BSH Q from DA-24 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'!, Q,=CIA Q from DA-26 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity 'i ' tar Q,=CIA Q from DA-28 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total 'A' Weighted 'C' Intensity 7' t'') Q,=CIA Q from DA30 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' t''r Q,=CiA Q from DA-32 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity 7 Q,=CIA Q from DA-34 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' I.3r Q,=CiA 33,087 SF Acres -YR storm C-Value r11 0.2 0.76 10 Acres 0.38 0.38 0.95 0.76 7.1 0.575 Cfs $.1C 16,051 SF 0.37 Acres 10 -YR storm 17,227 SF Acres -YR storm C-Value 11J 0.2 0.40 10 Acres 0.32 0.08 0.95 0.40 7.1 0.352 0.99 Cfs 33,369 SF Acres -YR storm C-Value r11 0.2 0.77 10 Acres 0.65 0.12 0.95 0.77 I 7.1 0.317 cfs 1.73 (1) Table 8.03a; (2) Figure 8.03a; (3) Figure 8.03b of the NCDENR Erosion and Sediment Control Planning and Design Manual. 55,248 SF 1.27 Acres 10 -YR storm 18.346 SF 0.42 Acres 10 -YR storm Q from DA-25 Drainage Area = 1 15,247 SF Drainage Area = 1 0.35 Acres Design Storm = 10 -YR storm Surface Acres C-Value 1r) GRASSY 0.16 0.2 IMPERVIOUS 0.19 0.95 Total A' 0.35 Weighted 'C' 0.607 Intensity'i ' ter 7.1 Q, = CIA i.51 !cis Q from DA-27 Drainage Area = 32,358 SF Drainage Area = 0.74 Acres Design Storm = 10 -YR storm Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' t') Q,=CiA Q from DA-29 Drainage Area = 25,816 SF Drainage Area = 0.59 Acres Design Storm = 10 -YR storm Surface Acres C-Value r11 GRASSY 0.38 0.2 IMPERVIOUS 0.21 0.95 Total A' 0.59 Weighted 'C' 0.466 Intensity'i ' c°) 7.1 Q, = CIA 1.96 cfs Q from DA31 Drainage Area = 43,795 SF Drainage Area = 1.01 Acres Design Storm = 10 -YR storm Surface Acres C- Value GRASSY 0.87 0.2 IMPERVIOUS 0.14 0.95 Total A' 1.01 Weighted 'C' 0.304 Intensity'! ' t'') I 7,% '. Q, = CIA 2.17 CIS Q from DA33 Drainage Area = 47,217 SF Drainage Area = 1.08 1-YR Acres Design Storm = 10 storm Surface Aces C- Value GRASSY 0.80 0.2 IMPERVIOUS 0.28 0.95 Total A' 1.08 Weighted 'C' 0.394 Intensity'i ' c°) 7.1 Q, = CIA 3.03 cis Q from DA-35 Drainage Area = 21,240 SF Drainage Area = 1 0.49 Acres Design Storm = 10 -YR storm Surface Acres C-Valuer�) GRASSY 0.42 0.2 IMPERVIOUS 0.07 0.95 Total A' 0.49 Weighted 'C' 0.308 Intensity'! ' c) 7_1 Q, = CiA 1.07 cfs Revision Date: 3/21/2007 C(&PC-15 RICE CREEK PLANTATION - PHASE 1 SWALE DRAINAGE FLOW CALCULATIONS FOR TRACT A AND THE THOROUGHFARE BOWMAN DESIGN and ENGINEERING BSH Q from DA-36 Q from DA-38 Q from DA-40 Q from DA-42 Q from DA44 Q from DA-46 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total'A' Weighted Intensity 'i ' t"r Q;=CiA Drainage Area = Drainage Area = Design Storm Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity 7 Qi = CiA Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total 'A' Weighted 'C' Intensity 'i ' ter Qi=CIA Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total 'A' Weighted 'C' Intensity 'I ' O) Q=CIA Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity 7 ' t''r Qi = CiA Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity 'I ' csr Qi = CiA 14,591 SF Acres -YR storm C-Value ", 0.2 0.33 10 Acres 0.33 0.00 0.95 0.33 7.1 0.200 cis 0'.43 44,661 SF Acres -YR storm C- Value 0.2 1.03 10 Acres 0.68 0.35 0.95 1.03 0.456 7.1 3.32 cfs 84,879 SF 1.95 Acres 10 -YR storm 43.571 SF Acres -YR storm C-Value ", 0.2 1.00 10 Acres 1.00 0.00 0.95 1.00 I 7.1 0.200 cfs 1.42 14,328 SF Acres 1-YR storm C- value 0.2 0.33 10 Acres 0.33 0.00 0.95 0.33 7.1 0.200 cfs (1.47 (1) Table 8.03a; (2) Figure 8.03a; (3) Figure 8.03b of the NCDENR Erosion and Sediment Control Planning and Design Manual. 14,933 SF 0.34 Acres 10 -YR storm Q from DA-37 Drainage Area = 47,122 SF Drainage Area =1 1.08 Acres Design Storm = 10 -YR storm Surface Acres C-Value ") GRASSY 0.92 0.2 IMPERVIOUS 0.16 0.95 Total A' 1.08 Weighted 'C' 0.311 Intensity 'i 7.1 QI = CiA 2.30 cfs Q from DA49 Drainage Area = 1 8,189 SF Drainage Area = 0.19 Acres Design Storm = 10 -YR storm Surface Acres C-Value GRASSY 0.19 0.2 IMPERVIOUS 0.00 0.95 Total A' 0.19 Weighted 'C' 0.200 Intensity'i 7.1 Qi = VA 0.27 ds Q from DA-41 Drainage Area = 31,175 SF Drainage Area = 0.72 Acres Design Storm = 10 -YR storm Surface Acres C-Value ") GRASSY 0.64 0.2 IMPERVIOUS 0.08 0.95 Total A' 0.72 Weighted 'C' 0.284 Intensity'i ' cyr 7.1 Qi = CiA 1.44 cfs Q from DA-43 Drainage Area = 1 86,249 SF Drainage Area = 1 1.98 Acres Design Storm = 10 -YR storm Surface Acres C- value GRASSY 1.72 0.2 IMPERVIOUS 0.26 0.95 Total A' 1.98 Weighted 'C' 0.298 Intensity'i ' 01 i 7. i i- Qi = CIA Q from DA45 Drainage Area = 36,892 SF Drainage Area = 0.82 1-YR Acres Design Storm = 10 storm Surface Acres C-Value (" GRASSY 0.64 0.2 IMPERVIOUS 0.18 0.95 Total 'A' 0.82 Weighted 'C' 0.364 Intensiiy'i ' I3) 7.1 Q. = CiA 2.13 Cfs Q from DA-47 Drainage Area = 73,290 SF Drainage Area = 1 1.68 Acres Design Stone = 10 -YR storm Surface Acres C-Value (l, GRASSY 1 1.46 0.2 IMPERVIOUS 1 0.22 0.95 Total A' 1.68 Weighted 'C' 0.298 Intensity 'i "0) 7.1 Qi = CiA 3.56 cfs Revision Date: 3/21/2007 4 -15 RICE CREEK PLANTATION - PHASE 1 SWALE DRAINAGE FLOW CALCULATIONS FOR TRACT A AND THE THOROUGHFARE BOWMAN DESIGN and ENGINEERING BSH Q from DA48 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity's ' t') Q=CiA Q from OA-50 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity 'i ' t'') QI=CiA Q from DA-52 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' (') Q, = CiA Q from DA-64 Q from DA-88 Q from DA-58 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total 'A' Weighted 'C' Intensity's Q = CiA Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' (') QI = CiA Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total 'A' Weighted 'C' Intensity's"') Q,=CiA 6,685 SF Acres -YR storm C-Valuef" 0.2 0.15 10 Acres 0.11 0.04 0.95 0.15 7.1 0.395 cfs 0.43 12,044 SF Acres -YR stone C-Value ", 0.2 0.28 10 Acres 0.28 0.00 0.95 0.28 7.1 0.200 cfs 0.39 160103 SF Acres -YR storm C-Value ", 0.2 3.68 10 Acres 3.48 0.20 0.95 3.68 7.1 0.241 CfS 8.28 31,960 SF Acres -YR storm C-Value (" 0.2 0.73 10 Acres 0.55 0.18 0.95 0.73 I 7.1 0.384 cis 2.00 166,535 SF Acres -YR storm C-Value ", 0.2 3.82 10 Acres 3.40 0.42 0.95 3.82 7.1 0.282 cfs 7.67 23,095 SF Acres -YR storm C- value 0.53 10 Acres 0.40 0.2 0.13 0.95 0.53 0.384 7.1 1.45 cfs (1) Table 8.03a; (2) Figure 8.03a; (3) Figure 8.03b of the NCDENR Erosion and Sediment Control Planning and Design Manual. Q from DA49 Drainage Area = Drainage Area = Design Storm = Surface GRASSY IMPERVIOUS Total A' Weighted Intensity'i ' t') Q,=CiA Q from DA-51 13.939 SF 0.32 Acres 10 -YR storm Acres C- value «� 0.27 0.2 0.05 0.95 0.32 0.317 7.1 0,721 Cfs Drainage Area = 44,701 SF Drainage Area = 1.03 Acres Design Storm = 10 1 -YR storm Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity 'i Qi = CiA Q from DA-53 Drainage Area = 53,869 SF Drainage Area = 1.24 Acres Design Storm = 10 -YR storm Surface Acres C- value GRASSY 1.18 0.2 IMPERVIOUS 0.06 0.95 Total 'A' 1.24 Weighted 'C' 0.236 Intensity'i ' r'1 7.1 QI = CiA 2.08 CIS Q from DA-0 Drainage Area = 1 30,536 SF Drainage Area = 1 0.70 Acres Design Storm = 10 -YR storm_ Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' t') Q;=CiA Q tram DA47_ Drainage Area = Drainage Area = Design Storrs = Surface GRASSY IMPERVIOUS Total A' Weighted 'C' Intensity'i ' (') QI = CiA 55,474 SF Acres -YR stone C- value 0.2 1.27 1 I Acres 1.09 0.18 0.95 1.27 7.1 0.306 efs 2.77 Q from DA-59 Drainage Area = 133,496 SF Drainage Area = 3.06 Acres Design Storm = 10 -YR stone Surface Acres C- value rf� GRASSY 2.86 0.2 IMPERVIOUS 0.20 0.95 Total A' 3.06 Weighted 'C' 0.249 Intensity'i ' t') 7.1 QI = CiA 5.42 CIS Revision Date: 3/21/2007 11 o -C 75 aW ohm W Z z w Q 3 wW �zzzzzzzzzzzzzzzzzzzzzzzzzzzz a w o- (�1q1 �y1! {1�1 (�6�1 (1�1 (µqI yW i1m1 �y{1 yW (�t�1 �p1�1 �y11 �(I�J F �ry{�1 ilyJ (�/1�1 (1�1 �({�1 �(1�1 (�1�7r i i r 7 ri t r T T T Tr 7 rT T T 71; T F Q N1i7Q MOoolq MO NO mmWn1`�, cm�I�$ONn If7pmin mt7Q��n� {� LL V l9 W YO Ne00lJm V N V a7NYe=r IO V Lh co NIO t+J rt's F_ uu�� Nt7 �fn1, NED pp�yAA O W AA O� ��f001 QppW� C� ��pp W W W O aDA�r�I��,N poip WJ y r cmr r G r r O r N r r r r r C r r r r r r r r r r C LL. LL W O U JA a, $nmYmO t� n mt� $h000f IOr V rN �tOVmM'Qt� Nm�4��mmO 1t> h 0 mmul j Pl NrrNdrrr��tVrrrra=r��a=����r mr m fD h—ram--N N�mu� W NOIr Q 7Nl?�N W N a7RNMNl q t'7 Nl"l ai M l9 to a"�t9 ttfl N l Q O O O O d O d O d d d 0 d o O d d O d d o d o d o 0 do mmnty m 7 r NOlO d mrnmt�aoty O h m m$nreim vvmm �p 00mrO eh w u�u� ppppppN YO11n Q a7—M (t6 fH �� N tV MMrNNM dr r N Ndr N NNE d N $$$$$$$$$$$$$$$$$$$$$$$$$$$$$ dddddddoddddd000000000ddddddd r rrr r � a �rc �tioic3'ci - -.drit} .. 'tlo . aF ci dd Fl-l* +H+1- 6Y p O y� 1F7 ty5 l*H- +l-l* -.Yl Z � O Ay o of �V OO J z n o oQ, rmN�mvworlmrm NNN NNNmN UIxooQ�oQcoo��o������������ a�rnii,mmt�eamCq�%`n°w����wm�q�nwe�wn��lemo V II Y! OiC 111 N�pi V OON NIp�tV tC��� llb APl��O! t•Np7 H-rid- g`ml rV V wmn mONN NNt�tlmn yII I OfO p1 u Q J W z O W 0 W !K00000000000000000000000000000000 Qzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzz W C- } V RWR >- R Gog,noo,ffo,�n$$'a O It N CO N AQM WQfON M N-: fO f-: 6 NMMOO W �fONNNAc46W F grand M" ,2 K;�M; J W r r O r N r r -----d r r r O r r r r N r r r c LL w . 1 ... - U y q�cgWt mCRry nCRCiq mmnfNo,��Qf,vi,oi, OD O r r r r r N r ,iQ., N r r N r r N r N r N r O O N r N r r r N r ,c`�y N N l 7!j! jJ],ti'l •�fW 49 u+ viflanl.� = •k�un,:n�_n -,:�i s,.,ns..�.L laiu: �flaa fa:::c�s.� f, -0 U � � U) Q �NNNO�, P] V N V �t9 I�QN V (Q ,[1 Nf0 l���ffISY�N� V NR V q K 000coc0000000000000cooc000coodoc Wa sf= :4 pp Q ,. C4 ppS C4at, pppp ��yy4 ®�p � G � � N � f V t i f c� MmNNNaa w Q LLO _f. SSSSSSSSSS C C C C Iq O If1 C If1 G S SSS C 10 I[1 O S S WC w S 1p H C w S C S S G C 10 S S O� S S 0 S SB 0 0 0 0w 1f7 w O LL LL O= r- - oH* + 1+ + +H-lo - -1 -HI 9 w 1, yN �UA yyyy. O� A. 'A z z OIarNMgln '4"7'4'�'�i�'4 A f@p W g�g gF C a wmf^.�o"�i.A-orN.nmm-.:seaaa4v-r eaP!aaaaa4 lz 4q (� CrrNNMtO�A{V 01 �t9 �fp��NOJCC Oi�mIV lV Pf IA {V ram oe N Nsi p fn nan9 a�nom71A9 am/sWfOOCf p qt� Q tp V V �OisQw,D N,MO a W N2t; �p Nb N W {+; w a a W c�0}m w z�a ❑ t]U yNN m is 0- — 15 I 0 a z 30 d W LLJ ulC' 0 YY>Y fWp yI ZZIZ»YYlIYYY=»>i!>}YY! W K yyY�1!000 RHEUM* F 100F RM* M U4 V Y Y (,) Q 6r� 1gOppuialf7OO10�OpploOO2.02C, MIOQm47N voov GNMONtG W.r. Ol)O V'N m1010QAOONAl7Q <l7OQ��MCl7 Yfu>mVu>w r10Ar (UqJ o [O Qm ANA O Qlq W Q 1q If1O CD, NNl9 OrOrr NAO�lOm000 �y A(p (pO 0 r IS m OAAOED M l+JrrQ 07 WJ 7 N Y +9 N 1: 6 N'i N aS 6 6 N N N r N M N 6 6 M N N 6 N C LL LL w O 1 {i, U it My f0 Q cu�u�i���a� 5� �lu�ic�Nm +3v �� �g � �j C O C C ON C G C C O C C C G O G G G G C G G G G G G O G iN{ ❑ W W ♦ '?M NfO ID C-OOtgNp UD N tom.-((ppNNA�y r N N N N N O��yy N fV ((pp O/fO N lq N Q RK OOGOOGGOGCO�Cpp CC{O��Gddd dydddd OO ��OYr 010 WOOD pG {d W O W �l0 ��Om� V A�Ci Q N r G r G r r O r r r r O O r r r r r r r C O r ppG S O p ppN O O p O S p O S p S O O O p p O O p O O p O O p O O p O O O O S O 0 0 g rrrrrrrrrrrrrrrrrrrrrrrrrrr ogi$i8[Sforggilgg��igf$ oLU j " �• 1•'�,-� �r gas r r 8 $ . ��r�s� g,g��s�g� r;r L11 1ij[pn� ��11�+{ i7 it' 1 `1{r}. f i -1 LL Ow 1Is�5ru1 7T `f1 1! m 'Qlic:Q }f oT ewr•k��o�tn`r�i;,'.�t�fono✓T +11;1 v ©'OC•tfoai.� !o'[? , �QMa�i1MobIsu1Mti' o, 1+H* ON* wa g p my ' W W m tlf vt m u;N .-. Z RW a `" $ - oe J Z A O LQQ� rma�Q�¢�Qb fQO OQf OrNO1 QIq f�A OOOOOOOOD�N Q�CQD �¢❑❑O❑❑40¢❑Q ❑O ❑O ❑ O IOmANa7r QI� mmh m i O C Ab N(C B O d' NMI N A NN �AOS N4 �AI!$P�D m q Oj dj.4CN4 .YR r r PI ".A A tO�r Vi W rNP9Q NfOAaOw��m�plQ gittA CDO NgNN�NNN y a z a w ca >' z Z 5 IL O Z 02 LE LL a � � o a Cr ryw^ J W 2 2 w � jN mF Z 0 m13 Z ❑ F �a w a W Q' me G a m Lo) J J V Q d J I Li a� 15 M 19 0 yy W W WW ((pp W W ym� W W yy yy W W Wy1 0 �mpLU W W�yy� �p yy W W W W y W W yy W W W O (m� W W W W W Wy� VM. yy W W tr Y! TZY>oYY!!Y>a>YV VVVV w a MINIM A2,. a Wmrn mm s>a' wrnmm sivs IMIF 8r nr �ngN gW 8a) M8084a a Ua} N r N Nda)Rm r M rR m Q CNam 1,01 r csd 0; Nm NNcm P- m168�Rs m aa 0 0 N r M ((pp m N N m N N m 8 m a f 0 W A a 3� N 0 Q� p c9i a n O J CN NCN a)CN ai N eN cd N v N N N 66 N M N N CN N� 6 CN CNM�MNCN LL W 0 fopipp �WCWyy � CC0 o W x Imr--Q 000A.000000000000000000 .0 o. oo oO opa . oo J!`. {ip1 iWN N..^'h.i ; Ci7n fIc C', I M, 11 i!III ' �' 1 lit W ❑0 r�VM; CO,v aM7 9A11W mN mn+Nn rR QN5?aNWOwOXN1 Q G G G O G G O G G G G G O G O C G G O G G G G G G G G G C G C G W ba,ONfp a)mm�NWNVNm m mmm W n W p ;;mm DR r Nm V pI mA mmnMrr � C did C C N C c4 O � Ord ai _: C C ai C C C C7 N N O 88888888888888888888888888888888 O O C] O W 6 wi G d wi 6 C b G w7 C wi G 6 6 6 G h did 0 G C wi Y] -F O oeafaft# & do�di�'' IA O O N co ,A Vb NI'i IC4 4t.'C! m An MOo J � O o o� J 2 V W N tt1 N m G a�Da�❑❑ar00�0$❑$00❑v❑❑❑❑000�� a O pfCgp W W Cf �rCN W AIfIRA^NAN�9D A�YtOr9Ad1 Nalm�lA N ee�� ai�a;s A� ONN ��Q rPlr N01 �'A OOO W a; ptN00 W �mNIV ppppmOO/ W NANC7 A m� C9N W R wA � u�i g pp N a o 2 n R 10, Mal m x s;Ix pp MJ p V V {� p� Q Q �p S O m Q� Cp p, is o 3 b N p a N m W b N b 1-1 d ¢ a O S z Z 5 a z 0 z Q g y4 a' LL Z F a w Z z R FJ_ !+ 5 W vw X 0 WSW q0Q F�y �fN n } � Z W m S Z ❑ w � a W Q N o � � n w f] 0 m y J J V ja> N7 0 = zm Rm w W z_ 0 z w M c z a N w G a 3 O 00 r W V a Y U = 00 U O U m O- ufi LO vv w U� J� Q� 0] CMC9 Go 00 }gip 2� w 3w IL Ow y r-ti LL Q v T T w O O d O O i O O (q G C w N N > T o0 T co c w as d UU s w N U ao 00 w r r a CL a m u� W 0� LOo ❑ In QU 0 ❑ N 40 O Ld tG H w d UU mm d co O H w ..J co O U U) (D z Q Q' z_ w U z w w w LL w H w J U X 0 m z �n T 0 a) 0 0 W a� 16 14 -115 RICE CREEK PLANTATION - PHASE 1 POND DRAINAGE AREAS BOWMAN DESIGN and ENGINEERING BSH POND 1 SF POND 1 AC TRACT AREA 378,444 8.69 ROADS BUA 45,521 1.05 M/F BUILDINGS BUA 107,800 2.47 M/F M/F DRIVEWAYS BUA 32,316 0.74 M/F SIDEWALKS BUA 2,306 0.05 TOTAL BUA 187,943 4.31 49.66% 49.66% POND 2 SF POND 2 AC TRACT AREA 319,410 7.33 ROADS BUA 37,654 0.86 M/F BUILDINGS BUA 156,200 3.59 M/F DRIVEWAYS BUA 39,564 0.91 M/F SIDEWALKS BUA 3,001 0.07 TOTAL BUA 236,419 5.43 % IMPERVIOUS 74.02% 74.02% POND 3 SF POND 3 AC TRACT AREA 554,482 12.73 ROADS BUA 63,523 1.46 M/F BUILDINGS BUA 90,200 2.07 M/F DRIVEWAYS BUA 23,276 0.53 M/F SIDEWALKS BUA 1,740 0.04 TOTAL BUA 178,739 4.10 % IMPERVIOUS 32.24% 32.24% POND 4 SF POND 4 AC TRACT AREA 486,629 11.17 ROADS BUA 55,012 1.26 M/F BUILDINGS BUA 147,400 3.38 M/F DRIVEWAYS BUA 36,936 0.85 M/F SIDEWALKS BUA 2,871 0.07 TOTAL BUA 242,219 5.56 % IMPERVIOUS 49.77% 49.77% POND 5 SF POND 5 AC TRACT AREA 198,391 4.55 ROADS BUA 23,335 0.54 M/F BUILDINGS BUA 55,000 1.26 M/F DRIVEWAYS BUA 13,190 0.30 M/F SIDEWALKS BUA 1,088 0.02 TOTAL BUA 92,613 2.13 % IMPERVIOUS 46.68% 46.68% Revision Date: 3/21/2007 i-1 0-c- -15 RICE CREEK PLANTATION - PHASE 1 POND DRAINAGE AREAS BOWMAN DESIGN and ENGINEERING BSH POND 6 SF POND 6 AC TRACT AREA 121,564 2.79 ROADS BUA 18,077 0.41 M/F BUILDINGS BUA 24,200 0.56 M/F DRIVEWAYS BUA 7,338 0.17 M/F SIDEWALKS BUA 479 0.01 TOTAL BUA 50,094 1.15 % IMPERVIOUS 41.21 % 41.21 % POND 7 SF POND 7 AC TRACT AREA 452,857 10.40 ROADS BUA 58,703 1.35 M/F BUILDINGS BUA 138,600 3.18 M/F DRIVEWAYS BUA 35,548 0.82 M/F SIDEWALKS BUA 2,740 0.06 TOTAL BUA 235,591 5.41 % IMPERVIOUS 52.02% 52.02% POND 8 SF POND 8 AC TRACT AREA 324,110 7.44 ROADS BUA 39,094 0.90 M/F BUILDINGS BUA 94,600 2.17 M/F DRIVEWAYS BUA 24,981 0.57 M/F SIDEWALKS BUA 1,871 0.04 TOTAL BUA 160,546 3.69 % IMPERVIOUS 49.53% 49.53% POND 9 SF POND 9 AC TRACT AREA 359,755 8.26 ROADS BUA 48,841 1.12 M/F BUILDINGS BUA 85,600 1.97 M/F DRIVEWAYS BUA 21,218 0.49 M/F SIDEWALKS BUA 1,696 0.04 TOTAL BUA 157,355 3.61 % IMPERVIOUS 43.74% 43.74% POND 10 SF POND 10 AC TRACT AREA 332,430 7.63 ROADS BUA 34,482 0.79 M/F BUILDINGS BUA 99,400 2.28 M/F DRIVEWAYS BUA 24,327 0.56 M/F SIDEWALKS BUA 1,871 0.04 TOTAL BUA 160,080 3.67 % IMPERVIOUS 48.15% 48.15% POND 11 SF POND 11 AC TRACT AREA 326,829 7.50 ROADS BUA 58,318 1.34 M/F BUILDINGS BUA 83,400 1.91 M/F DRIVEWAYS BUA 23,485 0.54 M/F SIDEWALKS BUA 1,740 0.04 TOTAL BUA 166,943 3.83 % IMPERVIOUS 51.08% 51.08% Revision Date: 3/25/2007 RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations BOWMAN DESIGN and ENGINEERING BSH Pond 1 Drainage Area (DA) = I 378,444 sf or 8.69 ac Impervious Area (IA )= I 187,943 sf 4.31 ac Percent Impervious I IA/DA 0.497 or 49.7% SAiDA,- 85% TSS Pond Depth = 0 0.0208 or 2.08% (vegetative filter re 'd Min. re 'd SA PP SA/DA x DA 7,883 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.497 `Volume = 1 in x 1 ft! 12 in` x Rv x DA 15,672.58 cf SA provided @ PP Oval Pond Elev = 23 1 8,413 sf Enough SAprovided? YES Min. storage depth re 'd Min. storage volume I SA provided @ PP 1.86 ft Storage depth set at 2 ft Elevation of temporary ool 25 ft SA @ Temporary ool 11,107 sf Storage volume provided Average of SA @ temp. pool & PP x storage depth I 19,560 cf OK Outlet Sizina Q - 2 day drawdown time Min. re 'd storage volume x 1 in. / 2 days) 0.091 cfs Q - 5 day drawdown time Min. re 'd storage volume x 1 in. / 5 days) 0.036 cfs Height h 1/2 Min. Storage Depth) 1.00 ft CD Constant 0.6 Required Area for Q-2 A = Q/(C x (2gh) ) 2.71 in Required Area for Q-5 A = Q/(C x (2gh) ) 1.08 in Orifice Choosen 1.50 in CHECK Area Provided by Orifice Choosen A = x 1.77 in Area Provided by Orifice Choosen 0.012 ft The Average head h = 1/2(Temporary Pool depth -1/2 orifice diameter 11.625 in The Average head 0.969 ft Q provided Q = Ca(2gh) 0.058 cfs OK Revision Date: 3/21/2007 l r o-P '15 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING POND 1 VS. FOREBAY BSH TOTAL POND VOLUME at TEMPORARY POOL ELEVATION FT MSL I SURFACE I AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 17 1145 1493 1493 18 1841 2240 3733 19 2639 3089 6822 20 3538 4034 10856 21 4530 5366 16221 22 6201 7307 23528 23 8413 9107 32635 24 9800 10454 43088 25 11107 STORAGE VOLUME BETWEEN PP & TP =19560 18% OF PERMANENT POOL VOLUME = 4236 22% OF PERMANENT POOL VOLUME = 5176 4942 CF = 21.0% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION (FT MSL SURFACE AREA (SF) INCREMENTAL VOLUME (CF) ACCUMULATIVE VOLUME CF 17 263 334 334 18 405 491 825 19 576 677 1501 20 777 892 2393 21 1007 1137 3530 22 1267 1412 4942 23 1556 PERM. POOL VOL. TEMP. POOL VOL. ,An 4 -1J RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations BOWMAN DESIGN and ENGINEERING BSH Pond 2 Drainage Area (DA) = 1 319,410 sf or 7.33 ac Impervious Area (IA )= 1 236,419 sf 5.43 ac Percent Impervious I IA/DA 0.740 or 74.0% SAIDA, 85% T SS Pond Depth = 6.5 0.0258 or 2.58% (vegetative filter re 'd Min. re 'd SA @ PP SA/DA x DA 8,242 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.716 Volume = 1 in x 1 ft / 12 in x Rv x DA 19,062.30 cf SA provided @ PP Oval Pond Elev = 23 8,716 sf Enough SAprovided? YES Min. storage depth re 'd Min. storage volume / SA provided @ PP 2.19 ft Storage depth set at 2 ft Elevation of temporary ool 25 ft SA Q Temporary ool 11,480 sf Storage volume provided Average of SA @ temp. pool & PP x storage depth 20,251 cf OK Outlet Sizin Q - 2 day drawdown time Min. re 'd storage volume x 1 in. / 2 days) 0.110 cfs Q - 5 day drawdown time Min. re 'd storage volume x 1 in. / 5 days). 0.044 ofs Height h 1/2 Min. Storage Depth) 1.00 ft CD Constant 0.6 Required Area for Q-2 A = Q/(C x (2 h) ) 3.30 in Required Area for Q-5 A = Q/(C x (2gh) ) 1.32 in Orifice Choosen 2.00 in CHECK Area Provided by Orifice Choosen A = 7cr2 3.14 in Area Provided by Orifice Choosen 0.022 ft The Average head h = 1/2(Temporary Pool depth - 1/2 orifice diameter 11.5 in The Average head 0.958 ft Q pwided Q = Ca(2gh) 0.103 cfs OK Revision Date: 3/23/2007 RICE CREEK PLANTATION - PHASE 1 POND 2 VS. FOREBAY BOWMAN DESIGN and ENGINEERING BSH TOTAL POND VOLUME at TEMPORARY POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF' ACCUMULATIVE VOLUUME CqEL 16.5 612 392 392 17 956 1338 1730 18 1719 2151 3881 19 2583 3065 6946 20 3547 4076 11022 21 4605 5492 16513 22 6378 7547 24060 23 8716 9435 33495 24 10153 10817 44311 25 i 1480 STORAGE VOLUME BETWEEN PP & TP = 20251 18% OF PERMANENT POOL VOLUME = 4331 22% OF PERMANENT POOL VOLUME = 6293 4780 CF =19.9% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF JACCUMULATIVE VOLUME CF 16.5 114 74 74 17 182 261 335 18 339 432 767 19 525 632 1399 20 739 861 2259 21 982 1118 3377 22 1 1263 1403 I 4780 23 1 1553 PERM. POOL VOL. TEMP. POOL VOL. as "�- -15 RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations BOWMAN DESIGN and ENGINEERING BSH Pond 3 Drainage Area (DA) = 554,482 sf or 12.73 ac Impervious Area (IA )= 178,739 sf 4.10 ac Percent Impervious I IA/DA 0.322 or 32.2% Sk'DA; 85%6 T SS Pond Depth = 8 i 0.01371' or 1.37% (vegetative filter re 'd Min. re'd SA Q PP SA/DA x DA 7,580 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.340 Volume = 1 in x 1 ft / 12 in x Rv x DA 15,715.77 cf. SA provided @ PP Oval Pond Elev = 23 10,408 1 sf Enough SAprovided? YES Min. storage depth re 'd Min. storage volume / SA provided @ PP 1.51 ft Storage depth set at 2 ft Elevation of temporary ool 25 ft SA @ Temporary ool 13,423 sf Storage volume provided Average of SA @ temp. pool & PP x storage de I 23,893 cf OK Outlet Sizina Q - 2 day drawdown time Min. re 'd storage volume x 1 in. / 2 days) 0.091 cfs Q - 5 day drawdown time Min. re 'd storage volume x 1 in. / 5 days) 0.036 cfs Height h 1/2 Min. Storage Depth) 1.00 ft CD Constant 0.6 Required Area for Q-2 A = Q/(C x (2gh) ) 2.72 in Required Area for Q-5 A= Q/ C x 2 h 1.09 in Orifice Choosen I 1.50 in CHECK Area Provided by Orifice Choosen A = nr2 1.77 in Area Provided by Orifice Choosen 0.012 ft The Average head h = 1/2(remporary Pool depth - 1/2 orifice diameter 11.625 in The Average head 0.969 ft Q provided Q = Ca 2 h 0.058 cfs OK Revision Date: 3/27/2007 �3 0� '15 RICE CREEK PLANTATION - PHASE 1 POND 3 VS. FOREBAY BOWMAN DESIGN and ENGINEERING BSH TOTAL POND VOLUME at TEMPORARY POOL ELEVATION FT IviSL SURFACE AREA SF' INCREMENTAL VOLUME(CD ACCUMULATIVE VOLUME CF 17 1683 2132 2132 18 2580 3079 5210 19 3577 4126 9336 20 4674 5270 14605 21 5865 6851 21456 22 7837 9123 30579 23 10408 11193 41771 24 11977 12700 54471 25 13423 STORAGE VOLUME BETWEEN PP & TP = 23893 18% OF PERMANENT POOL VOLUME = 5504 22% OF PERMANENT POOL VOLUME = 6727 6110 CF = 20.0% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION FT _Ms SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 17 320 415 415 .18 509 618 1033 19 727 850 1883 20 973 1111 2993 21 1248 1400 4393 22 1551 1717 6110 23 1883 1 - PERM. POOL VOL. TEMP. POOL VOL. 'Aq 0-c— 15 RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations BOWMAN DESIGN and ENGINEERING BSH Pond 4 Drainage Area DA = I 486,629 sf or 11.17 ac Impervious Area (IA )= I 242,219 sf 5.56 ac Percent Impervious / IA/DA 0.498 or 49.8% SAIDA; 85% TSS Pond Depth = 6.5 0.01791 or 1.79% (vegetative filter re 'd Min. re'd SA @ PP SA/DA x DA 8,716 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.498 Volume = 1 in x 1 ft / 12 in x Rv x DA 20,194.05 cf SA provided 9, PP Oval Pond Elev = 20 1 12,288 sf Enough SA rovided? YES Min. storage de th reV Min. storage volume / SA provided @ PP 1.64 ft Storage depth set at 2 ft Elevation of temporaty pool 22 ft SA @ Temporary ool 15,560 sf Storage volume provided Average of SA @ temp. pool & PP x storage depth I 27,917 cf OK Outlet Sizin Q - 2 day drawdown time Min. re 'd storage volume x 1 in. / 2 days) 0.117 cfs Q - 5 day drawdown time Min. re 'd storage volume x 1 in. / 5 days) 0.047 cfs Height h 1/2 Min. Storage Depth) 1.00 ft CD Constant 0.6 Required Area for Q-2 A = Q/(C x (2gh) ) 3.50 in Required Area for Q-5 A= Q/ C x 2 h 1.40 in Orifice Choosen 2.001 in CHECK Area Provided by Orifice Choosen A = 7tr2 3.14 in Area Provided by Orifice Choosen 0.022 ft The Average head h = 1/2(Temporary Pool depth - 1/2 orifice diameter 11.5 in The Average head 0.958 ft Q provided Q = Ca(2gh) 0.103 cfs OK Revision Date: 3/24/2007 A5 J- -1,5 RICE CREEK PLANTATION - PHASE 1 POND 4 VS. FOREBAY BOWMAN DESIGN and ENGINEERING BSH TOTAL POND VOLUME at TEMPORARY POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME C:F JACCUMULATIVE VOLUME CF 13.5 2100 1170 1170 14 2578 3094 4263 15 3609 4175 8438 16 4741 5357 13795 17 5973 6636 20431 18 7299 8388 28819 19 9476 10882 39701 20 12288 13141 52841 21 13993 14777 67618 22 15560 STORAGE VOLUME BETWEEN PP & TP = 27917 18% OF PERMANENT POOL VOLUME = 7146 22% OF PERMANENT POOL VOLUME = 8734 7913 CF = 19.9% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 13.5 388 219 219 14 488 599 818 15 709 834 1652 16 959 1098 2750 17 1237 1391 4140 18 1544 1712 5852 19 1879 2062 7913 20 2244 PERM. POOL VOL. TEMP. POOL VOL. A 6 0-f- -)5 RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations BOWMAN DESIGN and ENGINEERING BSH Pond 5 Drainage Area (DA) = 1 198,391 Isf or 4.55 ac Impervious Area (IA )= I 92,613 sf 2.13 ac Percent Impervious I IA/DA 0.467 or 46.7% SAIDA; 85% TSS Pond Depth = 6 0.0193 or 1.93% (vegetative filter re 'd Min. re 'd SA @ PP SA/DA x DA 3,837 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.470 Volume = I in x 1 ft / ! 2 in x Rv x DA 7,772.60 cf SA provided @ PP Oval Pond Elev = 19 1 7,154 sf Enough SAprovided? YES Min. storage depth re'd Min. storage volume / SA provided @ PP 1.09 ft Storage depth set at 1 2 ft Elevation of temporary ool 21 ft SA M Temporary ool I 9,662 sf Storage volume provided Average of SA @ temp. pool & PP x storage de h I 16,863 cf OK Outlet Sizinsa Q - 2 day drawdown time Min. re 'd storage volume x 1 in. / 2 days) 0.045 cfs Q - 5 day drawdown time Min. re 'd storage volume x 1 in. / 5 days) 0.018 cfs Height h 1/2 Min. Storage Depth) 1.00 ft CD Constant 0.6 Required Area for Q-2 A = Q/(C x 2 h) ) 1.35 in Required Area for Q-5 A = Q/(C x (2gh) ) 0.54 in Orifice Chooser I 1.00 in CHECK Area Provided by Orifice Choosen A = 7Er2 0.79 in Area Provided by Orifice Choosen 0.005 The Average head h = 112(Temporary Pool depth - 1/2 orifice diameter 11.75 in The Average head 0.979 ft Q provided Q = Ca(2gh) 0.026 cfs OK Revision Date: 3/21/2007 �1 o-F -15 RICE CREEK PLANTATION - PHASE 1 POND 5 VS. FOREBAY BOWMAN DESIGN and ENGINEERING BSH TOTAL POND VOLUME at TEMPORARY POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF JACCUMULATIVE VOLUME CF 13 370 684 684 14 998 1363 2047 15 1728 2143 4190 16 2557 3020 7209 17 3482 4267 11476 18 5052 6103 17679 19 7154 7805 25384 20 8455 9059 34442 21 9662 STORAGE VOLUME BETWEEN PP & TP = 16863 18% OF PERMANENT POOL VOLUME = 3164 22% OF PERMANENT POOL VOLUME = 3867 3482 CF = 19.8% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF JACCUMULATIVE VOLUME LCFI 13 74 137 137 14 199 276 413 15 353 444 857 16 535 641 1497 17 746 866 2363 18 985 1119 3482 19 1253 PERM. POOL VOL. TEMP. POOL VOL. A o-p -6 RICE CREEL( PLANTATION - PHASE 1 Wet Detention Basin Calculations BOWMAN DESIGN and ENGINEERING BSH Pond 6 Drainage Area (DA) = I 121,564 sf or 2.79 ac Impervious Area (IA )= I 50,094 sf 1.15 ac Percent Impervious I IA/DA 0.412 or 41.2% SAIE)A, 86% TSS Pond Depth = 4 1 0.02681 or 2.68% (vegetative filter re 'd Min. re'd SA @ PP SA/DA x DA 3,263 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.421 Volume = 1 in x i it i 12 in) x Rv x DA 4,263.57 cf SA provided @ PP Oval Pond Elev = 24 1 5,502 sf Enough SAprovided? YES Min. storage depth re'd Min. storage volume / SA provided @ PP 0.77 ft Storage depth set at I lift Elevation of temporary ool 25 ft SA @ Temporaty pool I 6,690 sf Storage volume provided Average of SA Q temp. pool & PP x storage depth 1 6,096 1 cf OK Outlet Sizina Q - 2 day drawdown time Min. re 'd storage volume x 1 in. 12 days) 0.025 cfs Q - 5 day drawdown time Min. re 'd storage volume x 1 in. / 5 days) 0.010 cfs Height h 1/2 Min. Storage Depth) 0.50 ft CD Constant 0.6 Required Area for Q-2 A = Q/(C x (2 h 1.04 in Required Area for Q-5 A = Q/(C x 2 h) ) 0.42 in Orifice Choosen I 1.00 in CHECK Area Provided by Onfice Choosen A = 7cr2 0.79 in Area Provided by Orifice Choosen 0.005 ft The Average head h = 1/2 em ore Pool depth - 1/2 orifice diameter 5.75 in The Average head 0.479 ft Q provided Q = Ca(2 h) 0.018 cfs OK Revision Date: 3/21/2007 A� 0-- -15 RICE CREEK PLANTATION - PHASE 1 POND 6 VS. FOREBAY BOWMAN DESIGN and ENGINEERING BSH TOTAL POND VOLUME at TEMPORARY POOL ELEVATION FT MSL I SURFACE AREA SF JINCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 20 664 1019 1019 21 1374 1778 2797 22 2182 2886 6683 23 3589 4546 10228 24 5502 6096 16324 25 6690 7240 23564 26 7790 STORAGE VOLUME BETWEEN PP & TP = 6096 18% OF PERMANENT POOL VOLUME = 1841 22% OF PERMANENT POOL VOLUME = 2250 1946 CF = 19.0% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME JgFL 20 118 198 198 21 278 372 570 22 465 573 1143 23 681 803 1946 24 925 PERM. POOL VOL. TEMP. POOL VOL. 3o of- 1J` RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations BOWMAN DESIGN and ENGINEERING BSH Pond 7 Drainage Area (DA) = I 452,857 sf or 10.40 ac Impervious Area (IA )= 235,6911 sf 5.41 ac Percent Impervious 1 IA/DA 0.520 or 52.0% SAIDA; 85% TSS Pond 'Depth = 6 I 0.02201 or 2.20% (vegetative filter re 'd Min. reV SA @ PP SA/DA x DA 9,968 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.518 Volume = i in x 1 it / i2 it-1) x Rv x DA 19,556.23 cf SA provided @ PP Oval Pond Elev = 23 1 10,534 sf Enough SAprovided? YES Min. storage depth re'd Min. storage volume / SA provided @ PP 1.86 It Storage depth set at 2 ft Elevation of temporary ool 25 ft SA @ Temporary ool 13,604 sf Storage volume provided Average of SA @ temp. pool & PP x storage de t I 24,200 cf OK Outlet Sizina Q - 2 day drawdown time Min. re 'd storage volume x 1 in. / 2 days) 0.113 cis Q - 5 day drawdown time Min. re 'd storage volume x 1 in. / 5 days) 0.045 cis Height h 1/2 Min. Storage Depth) 1.00 ft CD Constant 0.6 Required Area for Q-2 A = Q/ C x 2 h ' 3.38 in Required Area for Q-5 A = Q/(C x (2 h) ) 1.35 in Orifice Choosen I 2.00 in CHECK Area Provided by Orifice Choosen A = 7cr2 3.14 in Area Provided by Orifice Choosen 0.022 ft The Average head h = 1/2(Temporary Pool depth -1/2 orifice diameter 11.5 in The Average head 0.958 ft Q provided Q = Ca 2 h 0.103 cfs OK Revision Date: 3/21/2007 31 04 -15 RICE CREEK PLANTATION - PHASE 1 POND 7 VS. FOREBAY BOWMAN DESIGN and ENGINEERING BSH TOTAL POND VOLUME at TEMPORARY POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 17 1696 2148 2148 18 2600 3103 5251 19 3606 4160 9411 20 4713 5317 14728 21 5921 6924 21651 22 7926 9230 30881 23 10534 11333 42214 24 12131 12868 65081 25 13604 STORAGE VOLUME BETWEEN PP & TP = 24200 18% OF PERMANENT POOL VOLUME = 5569 22% OF PERMANENT POOL VOLUME = 6794 6280 CF = 20.3% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION FT MSL SURFACE AREA (SF) INCREMENTAL VOLUME GF ACCUMULATIVE VOLUME CF 17 324 422 422 18 520 633 1055 19 746 874 1929 20 1001 1143 3072 21 1285 1441 4513 22 1597 1767 6280 23 1937 PERM. POOL VOL. TEMP. POOL VOL. 3 a O-F -15 RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations BOWMAN DESIGN and ENGINEERING BSH Pond 8 Drainage Area (DA) = I 324,110 sf or 7.44 ac Impervious Area (IA )= I 160,546 sf 3.69 ac Percent Impervious l IA/DA 0.495 or 49.5% SAeDA; 85% TSS Pond Depth = 6 0.0208 or 2.U8% (vegetative filter re 'd Min. re 'd SA @ PP SA/DA x DA 6,731 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.496 `v'oiurne = i in x '1 ft 112 in x Rv x DA 13,391.41 cfr SA provided @ PP Oval Pond Elev = 23 1 7,258 sf Enough SAprovided? YES Min. storage depth re'd Min. storage volume / SA provided Q PP 1.85 ft Storage depth set at 2 ft Elevation of temporary ool 25 ft SA @ Temporary pool 9,817 sf Storage volume provided Average of SA @ temp. pool & PP x storage depth I 17,123 cf OK Outlet Sizine Q - 2 day drawdown time Min. re 'd storage volume x 1 in. / 2 days) 0.077 cis Q - 5 day drawdown time Min. re 'd storage volume x 1 in. / 5 days) 0.031 cis Height h 1/2 Min. Storage Depth) 1.00 ft CD Constant 0.6 Required Area for Q-2 A = Q/(C x (2gh) ) 2.32 in Required Area for Q-5 A = Q/(C x 2gh) ) 0.93 in Orifice Choosen 1.50 in CHECK Area Provided by Orifice Choosen A = itr2 1.77 in Area Provided by Orifice Choosen 0.012 fF- The Average head h = 1/2(Temporary Pool depth -1/2 orifice diameter 11.625 in The Average head 0.969 ft Q provided Q = Ca(2 h) 0.058 cfs OK Revision Date: 3/21/2007 330-c--15 RICE CREEK PLANTATION - PHASE 1 POND 8 VS. FOREBAY BOWMAN DESIGN and ENGINEERING BSH TOTAL POND VOLUME at TEMPORARY POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF JACCUMULATIVE VOLUME CF 17 363 681 681 18 999 1368 2049 19 1737 2157 4206 20 2577 3047 7253 21 3517 4319 11572 22 5120 6189 17761 23 7258 7922 25682 24 8585 9201 34883 25 9817 STORAGE VOLUME BETWEEN PP & TP = 17123 18% OF PERMANENT POOL VOLUME = 3197 22% OF PERMANENT POOL VOLUME = 3907 3638 CF = 19.9% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME (CD ACCUMULATIVE VOLUME CF 17 65 130 130 18 195 275 405 19 355 450 855 20 544 653 1508 21 762 885 2393 22 1008 1145 3538 23 1282 PERM. POOL VOL. TEMP. POOL VOL. s4 0-c- -15 RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations BOWMAN DESIGN and ENGINEERING BSH Pond 9 Drainage Area (DA) = I 359,755 sf or 8.26 ac Impervious Area (IA )= I 157,355 sf 3.61 ac Percent Impervious / IA/DA 0.437 or 43.7% SAIDA; 85% T SS Pond Depth = 6 1 0.0179 or 1.79% (vegetative filter re 'd Min. 'd SA @ PP SA/DA x DA 6,429 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.444 Volume = 1 in x '1 ft / 12 in x Rv x DA 13,300.60 Gi SA provided @ PP Oval Pond Elev = 24 1 10,792 sf Enough SAprovided? YES Min. storage depth re 'd Min. storage volume / SA provided @ PP 1.23 ft Storage depth set at 2 ft Elevation of temporary ool 26 ft SA @ Temporary ool 13,9411 sf Storage volume provided Average of SA @ temp. pool & PP x storage depth I 24,835 cf OK Outlet Sizina Q - 2 day drawdown time Min. re 'd storage volume x 1 in. / 2 days) 0.077 cfs Q - 5 p4y drawdown time Min. re 'd storage volume x 1 in. / 5 days) 0.031 cfs Height h (1/2 Min. Storage Depth) 1.00 ft CD Constant 0.6 Required Area for Q-2 A = Q/(C x (2gh) ) 2.30 in Required Area for Q-5 A = Q/(C x 2gh) ) 0.92 in Orifice Choosen 1.501 in CHECK Area Provided by Orifice Choosen A = 7rr2 1.77 in Area Provided by Orifice Choosen 0.012 The Average head h = 112(Temporary Pool depth - 1/2 orifice diameter 11.625 in The Average head 0.969 ft Q provided Q = Ca(2 h) 0.058 cfs OK Revision Date: 3/25/2007 3 5 o-� "15 RICE CREEK PLANTATION - PHASE 1 POND 9 VS. FOREBAY BOWMAN DESIGN and ENGINEERING BSH TOTAL POND VOLUME at TEMPORARY POOL ELEVATION FT MSL SURFACE I AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 18 1190 1726 1726 19 2261 2807 4532 20 3352 3958 8490 21 4563 5221 13710 22 5878 6949 20659 23 8019 9406 30064 24 10792 11630 41694 25 12468 13205 64899 26 13941 STORAGE VOLUME BETWEEN PP & TP = 24836 18% OF PERMANENT POOL VOLUME = 6412 22% OF PERMANENT POOL VOLUME = 6614 6214 CF = 20.7% OF PERMANENT POOL VOLUME FOREBAY VOLUME at PERMANENT POOL ELEVATION FT MSL SURFACE AREA (SF) INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 19 415 563 563 20 710 874 1436 21 1037 1215 2651 22 1392 1584 4234 23 1775 1980 6214 24 2185 PERM, POOL VOL. TEMP. POOL VOL. 36 cX- —15 RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations Pond 10 BOWMAN DESIGN and ENGINEERING BSH Draina a Area (DA) = 1 332,430 sf or 7.63 ac Impervious Area (IA )= I 160 080 sf 3.67 ac Percent Irn .n"is 1 [A/DA 0.482 or 48.2% SAIDA; 85% TSS Pond Depth = 6 0.0201 or 2.01 % (vegetative filter re 'd Min. re 'd SA 0 PP SA/DA x DA 6,674 sf Min. req'd storage volume Rv = 0.05 + (0.009 x 1) = 0.483 Volume = 1 in x 1 ft / 12 in x Rv x DA 13,391.13 cf SA provided @ PP Oval Pond Elev = 20.5 1 6 975 sf Enough SAprovided? YES Min. storage depth r 'd Min. storage volume / SA provided @ PP 1.92 ft Storage depth set at 2 ft Elevation of temporafy pool 22.5 ft SA @ Temporaty pool I 9 476 sf Storage volume provided Average of SA @ temp. pool & PP x storage depth I 16,502 cf OK Outlet Sizina Q - 2 dav drawdown time Min. re 'd storage volume x 1 in. / 2 days) 0.077 ofs Q - 5 day draw -down time Min. re 'd storage volume x 1 in. / 5 days) 0.031 cfs Height h 1/2 Min. Storage Depth) 1.00 ft CD Constant 0.6 Required Area for Q 2 A = Q/ C x 2 h 12 2.32 in Required Area for 0-5 A = Q/ C x 2 h '2 0.93 in Orifice Choosen 1.50 in CHECK Area Provided by Orifice Choosen A = wx2 1.77 in2 Area Provided by Orifice Choosen 0.012 fe The Average head h = 1/2(Temporary Pool depth -1/2 orifice diameter 11.625 in The Average head 0.969 ft Q provided Q = Ca 2 h V2 0.058 cfs OK Revision Date: 3/28/2007 RICE CREEK PLANTATION - PHASE 1 POND 10 VS. FOREBAY BOWMAN DESIGN and ENGINEERING BSH ELEVATION FT MSL SURFACE AREA (SF) INCREMENTAL VOLUME CF ACCUMULAT!VE VOLUME CF 14.5 146 490 490 15.5 833 1198 1687 16.5 1562 1976 3663 17.5 2389 2849 6511 18.5 3308 4091 10602 19.5 4873 5924 16526 20.5 6975 7626 24151 21.5 8276 8876 33027 22.5 9476 STORAGE VOLUME BETWEEN PP & TP =16502 18% OF PERMANENT POOL VOLUME = 2975 22% OF PERMANENT POOL VOLUME = 3636 3362 CF = 20.3% OF PERMANENT POOL VOLUME ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF ACCUMULATIVE VOLUME CF 15.5 187 267 267 16.5 346 441 708 17.5 536 645 1352 18.5 753 876 2228 19.5 998 1135 3362 20.5 1271 PERM. POOL VOL. TEMP. POOL VOL. 3S &�- '15 RICE CREEK PLANTATION - PHASE 1 Wet Detention Basin Calculations Pond 11 BOWMAN DESIGN and ENGINEERING BSH Drainage Area (DA) = I 326,829 sf or 7.50 ac Impervious Area IA = I 166 943 sf 3.83 ac Percent Impervious (1) IA/DA 0.511 or 51.1 % SAIDA; 85% TSS Pond Depth = 6.5 1 0.01851 or 1.85% (vegetative filter re 'd Min. re 'd SA 0 PP SA/DA x DA 6,059 sf Min. req'd storage volume RV = 0.05 + (0.009 x 1) = 0.510 Volume = 1 in x 1 ft / 12 in x Rv x DA 13,882.51 cf SA proidded @ PP Oval Pond Elev = 20.5 7,5111 sf Enough SAprovided? YES Min. storage depth re'd Min. storage volume / SA provided @ PP 1.85 ft .Storage depth set at 2 ft Elevation of temporary ool 22.5 ft SA @ Temporaty pool I 10,037 sf .Storage volume provided Average of SA 0 temp. pool & PP x storage depth 17 593 cf OK Outlet Sizina Q - 2 day drawdown time Min. re 'd storage volume x 1 in. / 2 days) 0.080 cfs Q - 5 day drawdown time Min. re 'd storage volume x 1 in. / 5 days) 0.032 cfs Height h 1/2 Min. Storage Depth) 1.00 ft CD Constant 0.6 Required Area for 0-2 A = Q/ C x 2 h ' 2.40 in Required Area for 0-5 A = Q/ C x 2 h '"2 0.96 in Orifice Choosen 1.50 1n CHECK Area Provided by Orifice Choosen A = m2 1.77 in Area Provided by Orifice Choosen 0.012 ft2 The Average head h = 1/2(Temporary Pool depth -1/2 orifice diameter 11.625 in The Average head 0.969 ft Q provided 0 = Ca 2 h 1/2 0.058 cfs OK Revision Date: 3/28/2007 BOWMAN DESIGN and ENGINEERING BSH RICE CREEK PLANTATION - PHASE 1 POND 11 VS. FOREBAY ELEVATION FT MSL I SURFACE AREA SF INCREMENTAL VOLUME CF IACCUMULATIVE VOLUME CF 14 442 1358 1358 15.5 1369 1733 3091 16.5 2097 2513 5604 17.5 2928 3391 8994 18.5 3853 4636 13630 19.5 5419 6465 20095 20.5 7511 8165 28260 21.5 8819 9428 37688 22.5 10037 STORAGE VOLUME BETWEEN PP & TP =17593 18% OF PERMANENT POOL VOLUME = 3617 22% OF PERMANENT POOL VOLUME = 4421 4402 CF = 21.9% OF PERMANENT POOL VOLUME ELEVATION FT MSL SURFACE AREA SF INCREMENTAL VOLUME CF JACCUMULATIVE VOLUME CqEL 14 140 355 355 15.5 333 408 762 16.5 482 576 1338 17.5 670 779 2117 18.5 888 1012 3129 19.5 1135 1273 4402 20.5 1411 PERM. POOL VOL. TEMP. POOL VOL. 41 D O�-' 15 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 1 BSH Q to DA-1 1 Drainage Area = 16,661 SF Drainage Area = 0.38 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r'I Grass 0.07 0.2 Asphalt/Rooftop 0.31 0.95 Total A 0.38 Weighted 'C' 0.81 Intensity'i ' tag 7.1 Q; = CIA 219tcfs Q to DA-1 2 Drainage Area = 1 16,382 SF Drainage Area = 0.38 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r'I Grass 0.13 0.2 AsphaiVRooftop 0.25 0.85 Total A' 0.38 Weighted C' 0.698565499 Intensity's ' (') 7.1 Qi = CIA i .87 CIS Q to DA-1 3 Drainage Area = 40,043 SF Drainage Area = 0.92 Acres Design Storm 1 10 -YR storm Surface Acres C-Value fy1 Grass 0.43 0.2 Asphalt/Rooftop 0.49 0.95 Total'A' 0.92 Weighted C' 0.60 Intensity's ' ('1 7.1 Qi = CIA 3.91 Cis Q to DA-14 Drainage Area = 43,440 SF Drainage Area = 1.00 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuel+l Grass 0.66 1 0.2 Asphalt(Rooftop 0.34 0.95 Total A' 1.00 Weighted C' 0.45570442 Intensity'i ' (31 7.1 Qi = CIA 323 cis .:.,r w w w.r � u Drainage Area = 54,036 SF Drainage Area = 1.24 Acres Design Storm 1 10 -YR storm Surface Acres C-Value I+1 Grass 0.59 0.2 AsphalURooftop 0.65 0.95 Total A' 1.24 Weighted C' 0.59 Intensity'i ' ('1 7.1 Q, = CIA 522 cis Q to DA-1.6 Drainage Area = 25,394 SF Drainage Area = 0.58 Acres Design Storm = 10 -YR storm Surface Acres C-Value "1 Grass 0.19 0.2 Asphalt/Rooftop 0.39 0.95 Tote! A' 0.58 Weighted 'C' 0,701744507 Intensity'i ' (s) 7.1 q = CIA 2.40 cis Revision Date: 3/=3QO07 y RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 1 BOWMAN DESIGN and ENGINEERING BSH Q to DA-1 7 Drainage Area = 37,107 SF Drainage Area = 0.85 Acres Design Storm 1 10 -YR storm Surface Acres C-valuelrl Grass 0.47 0.2 Asphalt/Rooftop 0.38 0.95 Total A' 0.85 Weighted 'C' 0.55 Intensity '1 ' rat 7.1 Q; = CiA 3.23 cis Q to DA-1 s Drainage Area = 20,285 SF Drainage Area = 0.47 1 Acres Design Storm 1 10 -YR storm Surface Acres c-Value t'1 Grass 0.16 0.2 Asphalt/Rooftop 0.31 0.95 Total A' 0.47 Weighted 'C' 0.699270397 Intensity'i ' r'r 7.1 Qi = CiA 2.31 cfs w to DA-1 9 Drainage Area = 1 41,099 SF Drainage Area = 0.94 Acres Design Storm 1 10 -YR storm Surface Acres C-Value nl Grass 0.47 0.2 Asphalt/Rooftop 0.47 0.95 Total A' 0.94 Weighted 'C' 0.57 Intensity'/ ' (sl 7.1 Qi = CiA 3 64 cfs Q to DA4 10 Drainage Area = 38181 SF Drainage Area = 0.83 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r+1 Grass 0.33 0.2 Asphalt/Rooftop 0.50 0.95 Total A' 0.83 Weighted 'C' 0.661729764 Intensity'i ' r'r 7.1 Q; = CiA 3.84 cfs tom ' 11 Drainage Area = 31,008 SF Drainage Area = 0.71 Acres Design Storm 1 10 -YR storm Surface Acres C-Valueltl Grass 0.49 0.2 AsphaltiRooftop 0.22 0.95 Total'A' 0.71 Weighted 'C' 0.43 Intensity'i 7.1 Q; = CiA 2.18 cfs Revision Date: 3232007 It A 0-� -15 O x zm 2 W W z a z W a e z c9 W W Q0 g 3 0 m 0 z �a Lu a° am z O0 z 56 az_ W w W 0 G' fn Y 0 W Y Y Y m m Y Y Y Y Y Y Y Y x 0 0 0 0 0 0 0 0 0 0 0 0 0 V m CR m b N N 6 N W aD r p�p N r N Ci a m ro w 04 w N OR ODD OCD N fN0 m M W -v V m P-: -4 L6 m m W a 0 .� J f7 07 f0 W fW7 M OW9 R7 l7 1L M N V� C O C C O O 0101010 OOO 0101 H 110 C W F 2 M M M M M M M W OD N M W W N OD N v W —a, M M CO ri v Co v M Vi m ai ro to W IL � MN M M M h M M OJQ NM 11�� -j LL� M CO CO C -0 O O O O pN O OQNOO O O O O O O O O O O O O O W 0 0 0 0 0 0 0 0 0 0 0 O 0 e Q o 0 0 0 0 0 0 0 0 0 0 0 0 W W W W W W W W W W W W W W a a a a a a a a a a a a a a o a o o a o o c o 0 0 0 x x x x x x x x x x x x x W2 N b N N ao 0 a0 Y! w 10 O a! ar G. W N N N W N N M m OR 00LU O r O. O a a QCl 0 p p C G a Q Q G Q O O W N N N N OD aaD M aV 4 4 A vp ao ri ui n ai N n F N C7 -t O q fD W O N Li O'� -15 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 2 BSH Q to DA-21 Drainage Area = 1 50,275 SF Drainage Area = 1.15 Acres Design Storm 1 10 -YR storm Surface Acres C-Value (l) AsphalVRooftop 0.61 0.95 Grap.a 0.54 0.2 Total A' 1.15 Weighted 'C' 0.60 Intensity 'i ' tat 7.1 Qc = CiA 4.89 cis Q to DA-2.2 Drainage Area = 43180 SF Drainage Area = 0.99 Acres Design Storm = 10 -YR storm Surface Acres C-Value rfl AsphalVRooftop 0.63 0.95 Grass 0.38 0.2 Total A' 0.99 Weighted 'C' 0.676658175 Intensity 'i ' cat 7.1 Qi = CiA 4.78 cis Q to DA-2 3 Drainage Area = 38,678 1 SF Drainage Area = 0.89 Acres Design Storm 1 10 -YR storm Surface Acres C-Value rfi AsphalVRoottop 0.49 0.95 Grass 0.40 0.2 Total A' 0.89 Weighted 'C' 0.61 Intensity's ' c3) 7.1 Q; = CiA 387 cts Q to DA-2 4 Drainage Area = 19,989 SF Drainage Area = 0.46 Acres Design Storm = 10 -YR storm Surface Acres C-Valuerf! AsphalVRooftop 0.32 0.95 Grass 0.14 0.2 Total A' 0.46 Weighted 'C' 0.723007854 Intensity's ' c3t 7.1 Qi = CiA F 2.38 cis Drainage Area = 32,532 SF Drainage Area = 0.75 Acres Design Storm 1 10 -YR storm Surface Acres C-Value rfl AsphalVRooitop 0.28 1 0.95 Grass 0.49 0.2 Total A' 0.75 Weighted 'C' 0.48 Intensity's ' c3t 7.1 Qi = CiA 2.45 cis Revision Date: 3/232007 yy o� �5 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 2 BSH Q to DA-2.6 Drainage Area = 66,856 SF Drainage Area = 1.31 Acres Design Storm = 10 -YR storm Surface Acres C-Value r'i AsphaltlRooftop 0.58 0.95 Grass 0.73 0.2 Total A' 1.31 Weighted 'C' 0.53 Intensity'i ' i:ii 7.1 Q; = CiA 4 94 cfs Q to DA-2 7 Drainage Area = 13,546 SF Drainage Area = 0.31 Acres Design Storm 1 10 -YR storm Surface Acres C-Value() Asphalt/Rooftop 0.28 0.95 Grass 0.03 0.2 Total A' 0.31 Weighted C' 0.88 Intensity'i ' i'i 7.1 Qi = CiA 1.93 cfs Q to DA-2 8 Drainage Area = 20,051 1 SF Drainage Area = 0.46 Acres Design Storm 1 10 -YR storm Surface Acres C-Value ra Asphalt/Rooftop 0.17 0.95 Grass 0.29 0.2 Total A' 0.46 Weighted 'C' 0.476988679 Intensity's ' i'1 7.1 Q; = CiA 1 56 ofs Q to DA-2 9 Drainage Area = 26,073 SF Drainage Area = 0.60 Acres Design Storm = 10 -YR storm Surface Acres C-Valuer" Asphaftfflw op 0.17 0.95 Grass 0.43 0.2 Total A 0.60 Weighted 'C' 0.41 Intensity'i ' i'i 7.1 Qi = CiA 1 78 cis Revision Date: 31=007 C9 x zm oc W W Z 0 Z W c a Z W 0 Z Im N Z O �a a0 2 y a Z OO F Fes- U J U IL Z W a ❑ 02 VO 2ti Y W 2 0 0 0 0 0 0 0 0 0 0 U a3 a; yQ F 0 w CO M OD O O CO W a 0 CO 0 v ui m 6 v d 6 h Ih v J.. W M O O M M q Q M M Oil O+! �Of M M UI m OR as 2 0 aCl) n � W N Cl) CO CO Cp OR � "r m tT m m m m m m n n W a y T M M M { v N N N N W T .4 LL Q (9 P7 a 00 M N O 0 O 4 0 0 O' 0 0 0 0 0 0 0 0 0 y 0 0 0 o c a 0 0 0 0 W o o •o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 I o o o o o 0 0 0 W W a. W W W W W W W W W f ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ F�J S 2 2 S 2 S S S 2 �S} W N v 0 m 0 0 Qg H N OV �rj N OV N m N N Z a Q N O N Pl C G N N OV OOD Oy0 m N � W � Q A N F a CV OV CV CV N q q N OV N a u❑i vOi u0i vOi vOi h y y RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 3 BSH Q to DA-31 Drainage Area = 30,751 1 SF Drainage Area = 0.71 Acres Design Storm = 10 -YR storm Surface Acres C-Value m Asphalt/Rooftop 0.27 1 0.95 Grass 0.44 1 0.2 Total A' 0.71 Weighted 'C' 0.49 Intensity'i 7.1 Qi = CiA 244 cis Q to DA-3.2 Drainage Area = 31,393 SF Drainage Area = o. i1 Acres Design Storm = 10 -YR storm Surface Acres C-Value r'r Asphalt/Rooftop 0.30 0.95 Grass 0.42 0.2 Total A' 0.72 Weighted 'C' 0.512203357 Intensity'i 7.1 Q, = CiA 2.62 cis Q W DA-3.3 Drainage Area = 30,574 SF Drainage Area = 0.70 Acres Design Storm 1 10 -YR storm Surface Acres C-Value rr) AsphaltlRooftop 0.38 1 0.95 Grass 0.32 1 0.2 Total A' 0.70 Weighted'C' 0.61 Intensity'i'r'i 7.1 [CIS Qi = CiA 302 Q to DA-3A Drainage Area = 32,048 SF Drainage Area = 0.74 Acres Design Storm 1 10 -YR storm Surface Acres C-Valued! Asphalt/Rooftop 0.29 0.95 Grass 0.45 0.2 Total A' 0.74 Weighted 'C' 0.495628432 Intensity'i ' i'i 7.1 Q; = CiA 2.59 cis Q `« D" if Drainage Area = 39.584 SF Drainage Area = 0.91 Acres Design Storm 1 10 -YR storm Surface Acres C-Value() Asphalt/Rooftop 0.58 0.95 Grass 0.33 0.2 Total A' 0.91 Weighted 'C' 0.68 Intensity'i 7.1 Q; = CiA 4.38 cis Q to DA-3.6 Drainage Area = 44 888 SF Drainage Area = 1.03 Acres Design Storm = 10 -YR storm Surface Acres C-Value rr) Asphalt/Rooftop 0.57 0.05 Grass 0.46 0.2 Total A' 1.03 Weighted 'C' 0.B14852522 Intensity'i ' 1'i 7.1 Q, = CiA 4.50 cfs Revision Data: 312320( 7 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 3 BSH Q to DA-3 7 Drainage Area = 17,130 SF Drainage Area = 0.39 Acres Design Storm = 10 -YR storm Surface Acres C-Value "1 Asphalt/Rooftop 0.26 0.95 Grass 0.13 0.2 Total A' 0.39 1 Weighted 'C' 0.70 Intensi y'i ' r3i 7.1 Q; = CIA b °4 cfs Q to DA-3 B Drainage Area = 10,986 SF Drainage Area = 0.25 Acres Design Storm = 10 -YR storm Surface Acres C-Value t+l AsphalURooftop 0.16 0.95 Grass 0.09 0.2 Total A' 0.26 Weighted 'C' 0.675805571 Intensity 'i ' r'r 7.7 Q; = CIA 1.21 cis Q t3 DA-3-2 Drainage Area = 34,912 SF Drainage Area = 0.80 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuelri AsphalURooftop 0.38 0.95 Grass 0.42 0.2 Total A' 0.80 Weighted C' 0.56 Intensity's ' 131 7.1 Q; = CIA 3.16 cis Q to DA-3 i c Drainage Area = 40,737 SF Drainage Area = 0.94 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuelrl AsphalURooftop 0.38 0.95 Grass 0.56 0.2 Total A' 0.94 Weighted 'C' 0.504749982 Intensity's ' r3r 7.1 Q; = CiA 3.35 cfs 3 Q '^ DA 4' �e w vm. Drainage Area = 33,001 SF Drainage Area = 0.77 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuet'l Asphalt/Rooftop 0.45 1 0.95 Grass 0.32 1 0.2 Total A' 0.77 Weighted C' 0.64 Intensity'i ' 131 7.1 Q; = CIA 349 cis Q to OA4.12 Drainage Area = 18,660 SF Drainage Area = 0.43 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r'l AsphalURooftop 0.30 1 0.95 Grass 0.13 0.2 Total A' 0.43 Weighted 'C' 0.72524 1158 intensity'i 7.1 Q; = CIA 2.21 ,cis RWafon Date: 3/23/2007 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 3 BSH 0 to DA-313 Drainage Area = F--37-,8-9e--j SF Drainage Area = 1 0.87 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuelfl Asphalt/Rooftop 0.31 0.95 Grass 0.56 0.2 Total A' 0.87 Weighted'C' 0.41 Intensity'i ' c3) 7.1 Oi = CIA 2 89 cis 0 to DA-314 Drainage Area = 21,391 SF Drainage Area = 0.49 Acres Design Storm 1 10 -YR storm Surface Acres C-Valued Asphalt/Rooftop 0.17 0.95 Grass 0.32 0.2 Total A' 0.49 Weighted 'C' 0.459837231 Intensity'i ' 131 7.1 4 = CiA 140 cfs 0 to wA 315 Drainage Area = 17,650 SF Drainage Area = 0.41 Acres Design Storm = 10 -YR storm Surface Acres C-Value l" Asphalt/Rooftop 0.32 0.95 Grass 0.09 0.2 Total A' 0.41 Weighted 'C' 0.79 Intensity's ' i''i 7.1 Qi = CiA 2 28 cfs 0 to DA-318 Drainage Area = 23,749 SF Drainage Area = 0.55 Acres Design Storm = 10 -YR storm Surface Acres C-Valuelll Asphalt/Rooftop 0.18 0.95 Grass 0.39 0.2 Total A' 0.66 Weighted 'C' 0.420101699 Intensity'i ' 131 7.1 Qi = CiA 1.83 cis ,7 Drainage P.wa = 33,792 SF Drainage Area = 0.78 Acres Deslgn Storm 1 10 -YR storm Surface Acres C-Value 1'l Asphalt/Rooftop 0.44 0.95 Grass 0.34 0.2 Total A' 0.78 Weighted 'C' 0.B3 Intensity'i ' 131 7.1 Qi = CiA 3.44 cfs 0 to DA-3.18 Drainage Area = 30,243 SF Drainage Area = 0.69 Acres Design Storm 1 10 -YR storm Surface Acres C-Value(') Asphalt/Rooftop 0.30 0.95 Grass 0.39 0.2 Total A' 0.69 Weighted C' 0.524074993 Intensity'i iai 7.1 Qi = CiA 2.58 cfs u Revision Date: 3/23/2007 i cl� 0-C C7 x zm r W W z co Z Wp C z a ro W p 3 O m Y V W Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y x 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C1 OR A W m A CD CLt CO m N W W N CD OD CD tq �Np yd F ci a O W m O N f0 t CD w O is 47 A co Co m Co m Co m O CND W 0) m 0) v (o v to co m v r- r-: ao r-� of o is ad v v w m 0 r: id 9 gg tli 2 M cq co M M O C7 l+l C9 O W O W M CD M M M m M m M M M CO M CO M CO M 0 O O O O O Q O 0 a a O O O O C O O G O G O p W WW W co W W co M OR M Rf� w O M M M A .. . 3 W IL W E N N N ti N N N : W N N O O N N N n n n U. Q pi l+l M W a-ao I O O w w A A M Ow O Yi O O w M O N O e0 O N O Y> w A w A w A O O J O O O O O O O r O O O O O r O O O O O O O N O N O O O O O O O O O O O O O O O O y 0 0 0 O o o ei o 0 0 0 0 0 0 0 0 0 0 O 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 zaW b S c S c c c S c c S c S o S b c S c c S 0 0 0 0 0 0 0 0 0 0 0 o 0 o 0 o o 0 0 0 0 W W W W W W W W W W W W W W W W W W W W W W a. a p a c a p❑❑❑ a a a a p a p❑ a a p a p a c a p❑❑❑ a a a a o❑❑ a a a p❑ a m w r w r w r w r w r a fV w w a a o w w o 2 w w w CA Co �+ g N N M I,r r r r r W N m CD ao W r m r co M m o co A m m m _ ai ri ai of ai c� ri O ai r of vs ai � ai r r r M a V G °T ❑ ai O of 0 ai ❑ ai C ri of O t� 0 �i 0 ai 0 Q p ai a Q aa C ❑ O 6 0 C O o o'AIN o n m ry a as o0o m a°Do N o w N w 6 O V � r M N N N M H fa9 en r M Yi m CO r H N M 0: w m t` W W _ r r r a7 O O d d Ni CC C7 M y Ol 0 y m y m y 47 y pj d CO d Pi d M d M d❑ f"j M o C9 d l+i d N7 d CO d d1 d 0 y y N to� y W W W CO 0 5 0 o-F "15 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 4 BSH Q to DA-41 Drainage Area = I 36,856 SF Drainage Area = 0.84 Acres Design Storm 1 10 -YR storm Surface Acres C-Value AsphaltlRooftop 0.35 0.95 Grass 0.49 0.2 Total A' 0.84 Weighted 'C' 0.51 Intensity'i ' 131 7.1 Q; = CIA 3.08 Cis Q to DA-4.2 Drainage Area = 39,322 SF Drainage Area = 0.90 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuer'/ AsphalURooftop 0.51 0.95 Grass 0.39 0.2 Total A' 0.90 Weighted 'C' 0.623724833 Intensity'i 7.1 Qi = CIA 4.00 CIS -toDAA. Drainage Area = 24,297 SF Drainage Area = 0.56 Acres Design Storm 1 10 -YR storm Surface Acres C-Value rn AsphaiVRoottop 0.32 0.95 Grass 0.24 0.2 Total A' 0.56 Weighted 'C' 0.63 Intensity'i ' r') 71 Q; = CIA 2.50 cis Q to DA A Drainage Area = 1 33,866 1 SF Drainage Area = 0.78 Acres Design Storm 1 10 -YR storm Surface Acres C-valuer�l Asphalt/Rooftop 0.43 0.95 Grass 0.35 0.2 Total A' 0.78 Weighted C' 0.614814288 Intensity's ' (a) 7.1 Qi = CIA 3.39 cis :; ...w.r Q 10 un u Drainage Area = 98,729 SF Drainage Area = 0.38 Acres Design Storm 1 10 -YR storm Surface Apes C-Valued/ Asphalt/Rooftop 0.29 0.95 Grass 0.09 0.2 Total A' 0.38 Weighted 'C' 0.77 Intensity's ' 13) 7.1 Revision Date: 3)24l2007 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 4 BSH Q; = CiA 2.09 cis Q to DA-4.6 Drainage Area = 12,231 SF Drainage Area = 0.28 Acres Design Storm = 10 -YR storm Surface Acres C-Valuerli Asphalt/Rooftop 0.25 0.95 Gress 0.03 0.2 Total A' 0.28 Weighed C' 0.887770419 Intensity 'i ' i'i 7.1 Q = CiA 1.73 cis Q to DA-4.7 Drainage Area = 52.724 SF Drainage Area = 1.21 Acres Design Storm = 10 -YR storm Surface Acres C-Value 1'1 Asphalt/Rooftop 0.58 0.95 Grass 0.63 0.2 Total A' 1.21 Weighted C' 0.56 Intensity 'i ' la) 7.1 Q, = CfA e.01 cis Q to DA-4 S Drainage Area = 40,570 SF Drainage Area = 0.93 Acres Design Storm = 10 -YR storm Surface Acres C-Value fr1 Asphalt/Rooftop 0.38 0.95 Grass 0.55 0.2 Total A' 0.93 Weighted C' 0.508004437 Intensity 'i ' 131 7.1 Qi = CiA 3.35 cis Q to OA-4 9 Drainage Area = 15,941 SF Drainage Area = 0.37 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuel�1 AsphalVRooftop 0.16 0.95 Grass 0.21 0.2 Total A' 0.37 Weighted 'C' 0.53 Intensity's ' iai 7.1 4 = CiA I 101 Icis Q to 0A-410 Drainage Area = 34,056 SF Drainage Area = 0.78 Acres Design Storm 1 10 -YR storm Surface Acres C-Value i'1 Asphalt/Rooftop 0.43 0.95 Grass 0.35 0.2 Total A' 0.78 Weighted C' 0.6125 Intensity's ' �'i 7.1 Q; = CiA 3.40 cis Revision Date: 3/2412007 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 4 BSH Q to DA-411 Drainage Area = 1 35.114 SF Drainage Area = 0.81 Acres Design Storrs 1 10 -YR storm Surface Acres C-Valuel'l AsphaIVRooftop 0.46 0.95 Grass 0.35 0.2 Total A' 0.81 Weighted 'C' 0.B3 Intensity'i ' m'm 7.1 Qm = CIA 4 rw.a cis Q to DA-4 12 Drainage Area = 21,707 SF Drainage Area = 0.50 Acres Design Storm 1 10 -YR storm Surface Acres C-Value m Asphalt/Rooftop 0.31 0.95 Grass 0.19 0.2 Total A' 0.50 Weighted 'C' 0.666563781 Intensity'i ' I3m 7.1 Qi = CIA 135 cis Q to DA4.13 Drainage Area = 35,822 SF Drainage Area = 0.82 Acres Design Storm 1 10 -YR storm Surface Acres C-Value (') AsphalURooftop 0.38 0.95 Grass 0.44 0.2 Total A' 0.82 Weighted C' 0.55 Intensity's ' m'm 7.1 Qm = CIA 3.19 cis Q to OA-414 Drainage Area = 34.530 SF Drainage Area = 0.79 Acres Design Storrs 1 10 -YR storm Surface Acres C-Value r'l AsphalURooftop 0.33 0.95 Grass 0.46 0.2 Total A' 0.79 Weighted C' 0.512224153 Intensity'i ' m'm 7.1 Q; = CIA 2.88 cis yr DA4 Drainage A. ea = 20,530 SF Urainage Area = 0.68 Acres Design Storm = 10 -YR storm Surface Acres C-Valuel'l AsphalVRooftop 0.39 0.95 Grass 0.27 0.2 Total A' 0.66 Weighted C' 0.65 Intensity'i ' m'm 7.1 Qi = CIA 3A7 ofs Revision Date: MM007 53 o4 15 Z CO re W W Z O Z W a e Z 0 W W O 3 0 Y W Y Y Y Y Y Y Y Y Y Y I�e� Y Y Y Y S O O O O O O O O O O O O O O O V � m � w m Q A OD lal 1c; N N O g g N R 0 OD N h m O Vm 400. W ID m M O V m OD d' J v � O` m ti V Id 1� ri 0) o 6 W C1 2 M pf c0 ccl �0 10 M M m m M M m m q 0 O O O O O O O O O C O O O O O LU 0 LU pJ � M Ol M m eM O � m N m N M Ol n m m m OR M m M O) R M O) m m W n Q N Cl) N � N n � O W N N N O) LL aLLI dcc a W O �Oq h Yf N O O O O t00 O A Q O O O O O O O O O O O O O O C O O G G O O G G G C CO O O O W o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O G o 0 o 0 o o 0 6 0 o 0 0 0 W W W W W W W W W W W W W W W a a a a a a a a a a a a a a a aco WLU a M a a a A a 2� ❑ �❑ Q Q Q�¢ Q Q ❑ Q Q ❑ Q C v O O p Cc! O A m N tOD. N c" OR G A OV r V cd N N M H e+mf N F N M V i0 m h m � qm q 0.❑ 0) ❑ y ❑ ❑ y ❑ W ❑ N ❑ N O N ❑ fn G ❑ ❑ ❑ ❑ ❑ In N c7 fn I h w 5y a 15 RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 5 BOWMAN DESIGN and ENGINEERING BSH Q to DA-5.1 Drainage Area = 1 57.682 SF Drainage Area = 1.32 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuelll AsphaIVRooftop 0.52 0.95 Grass 0.80 0.2 Total 'A' 1.32 Weightea 'C' U.49 Intensity 7 ' i'1 7.1 Q, = CIA 4.85 ds Q to DA-5.2 Drainage Area = 19,581 SF Drainage Area = 0.45 Acres Design Storm = 10 -YR storm Surface Acres C-ValueVl AsphaWRooftop 0.27 0.95 Grass 0.18 0.2 Total A' 0.45 Weighted 'C' O.BS0943203 Intensity'i ' 181 7.1 Q = CIA Z.08 cis Q to DA-5 3 Drainage Area = 19,785 SF Drainage Area = 0.45 Acres Design Storm 1 10 -YR storm Surface Acres C-Value tr! AsphaIVRooftop 0.25 0.96 Grass 0.20 0.2 Total A' 0.45 Weighted 'C' 0.61 Intensty'i ' i'1 7.1 Qi = CiA 1 98 cis 0 to DA-5 4 Drainage Area = 7,923 SF Drainage Area = 0.18 Acres Design Storm 1 10 -YR storm Surface Acres C-Value tol AsphaiVRooftop 0.11 0.95 Grass 0.07 0.2 Total A' 0.18 Weighted C' 0.65357819 Intensity 'i ' (al 7.1 Q; = CIA 0.84 cis 4 iw a 5.5 Drainage Area = 33,544 1 SF Drainage Area = 0.77 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuelrl AsphaiVRooftop 0.45 0.95 Grass 0.32 0.2 Total A' 0.77 Weighted 'C' 0.64 Intensity 7 ' i'i 7.1 Qi = CIA 3.49 cis 55 o�f, -15 Revision Date: 3124=07 RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 5 BOVMAN DESIGN and ENGINEERING BSH Q to DA-5 6 Drainage Area = 1 10,300 SF Drainage Area = 0.24 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuelrl Asphalt/Rooftop 0.13 0.95 Grass 1 0.11 0.2 Total Al 0.24 Weighted C' 0.612339606 Intensity 'i ' tsi 7.1 Qi = CiA 1.03 cis Q to DAS ? Drainage Area = 31,316 SF Drainage Area = 0.72 Acres Design Storm 1 10 -YR storm Surface Acres C-Value f�1 Asphalt/Rooftop 0.39 0.95 Grass 0.33 0.2 Total A' 0.72 Weighted C' 0.61 Intensity'/ Qi = CiA 3.10 cis Revision Date: 3242007 § 0 _n LL CLz z0 z� 56 IL � � u� uj = 0 0 0 0 0 0 0 0 u � - 2 ■ G ■ � k § § § � � q « q a # to k § � §E § §B B§_� f M k§ 2 Q a en§ co§ § § § \ 2 a §� B k B B k k k lu `J § > 2 2 2 2 2 2 2 w w w w w w w w w CL k ( ( ) � § _ _ ■ - _ © © a _ _ _ _ _ _ Q w § § 48, 7 6 c 8u, § k � §) � � 2 § k lid° § 2 § ° § k § 5-1 O-f- -1-5 RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 6 BOWMAN DESIGN and ENGINEERING BSH Q to DA-6.1 Drainage Area = 64,008 SF Drainage Area = 1.47 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuelfi AsphaWRooftop 0.78 0.95 Grass 0.69 0.2 Total A' 1.47 Weighted C' D.60 Intensity'i ' i'i 7.1 Qi = CIA 6.24 cis Q to DA-6.2 Drainage Area = 28,912 SF Drainage Area = 0.66 Acres Design Star 1 10 -YR storm Surface Acres C-Value r'l AsphaiVRooftop 0.37 0.95 Grass 0.29 0.2 Total A' 0.66 Weighfed'C' 0.6180928_3.3__ Intensity 'i ' 131 7.1 Qi = CIA 2.91 ds Revision Date: 324/2007 51 o-F -) 5 � _2 ■§ 7z z° lqM ) § l� w§ lzU) ui § § K § 2CR g rZ ab ab � u $ « n 2 $ Q w LO �§ •a S $� a §§_m & ■ coQ Q �a a § § § 2 2 o 0 �2 > i� 8 6 _ LLI w w ) � IL § _ _ cc �- N Q LLI / z §u 1 0 kcc cccp a) _ LLI § § a RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 7 BOWMAN DESIGN and ENGINEERING BSH Q to DA-7 1 Drainage Area = 54,015 SF Drainage Area = 1.24 Acres Design Storrs 1 10 -YR storm Surface Acres C-Value rrl AsphaIVRooftop 1 0.55 1 0.95 Grass 0.69 0.2 Total'A' 1.24 Weighted C' 0.53 Intensity 'i ' t') 7.1 Qi = CiA 4.89 cfs Q to DA-7 2 Drainage Area = 34,043 SF Drainage Area = 0.78 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r+l Asphalt/Rooftop 0.46 0.95 Grass 0.32 0.2 Total A' 0.78 Weighted C' 0.641447581 Intensity's"') 7,1 Q; = CiA 3.58 cfs Q to DA.,7-3 Drainage Area = 29,854 SF Drainage Area = 0.69 Acres Design Storrs 1 10 -YR storm Surface Acres C-Value rrl AsphalURooftop 0.38 0.95 Grass 0.31 0.2 Total A' 0.69 Weighted 'C' 0.62 Intensity'i Q; = CiA 3 00 ofs Q to DA 7.4 Drainage Area = 36,418 SF Drainage Area = 0.84 Acres Design Storm 1 10 -YR storm Surface Acres C-Value m Asphalt/Rooftop 0.35 1 0.95 Grass 0.49 0.2 Total A' 0.84 Weighted C' 0.513979351 Intensity'! ' t'1 71 Q; = CiA 3.06 cfs 7.5 Drainage Area =I - ,1PQ ISF v V Drainage Area = 1 1.18 Acres Design Storm = 10 -YR storm Surface Awes C-Valuer�1 Asphalt/Rooftop 0.74 0.95 Grass 0.44 0.2 Total A' 1.18 Weighted 'C' 0.67 Intensity'1' i'i 7.1 a=CiA 562 ds 6o o�- -)5 Revision Date: 3262007 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 7 BSH Q to DA-7.6 Drainage Any = 1 44161 SF Drainage Area = 1.01 Acres Design Storm 1 10 -YR storm Surface Acres C-Value i'i Asphal (Rooftop 0.65 0.95 Grass 0.38 0.2 Total A' 1.01 Welghted 'C' 0.B8086547 Intensity'i ' 131 7.1 Q=CiA 4S cfs Q to DA 7.7 Drainage Area = 17.358 SF Drainage Area = 0.40 Acres Design Storrs 1 10 -YR storm Surface Acres C-Value Asphalt/Rooftop 0.11 0.95 Grass 0.29 0.2 Total A' 0.40 Weighted 'C' 0.41 Intensity'! ' i31 Q=CiA L±81s; Q to DA-7 a Drainage Area = 1 14,543 SF Drainage Area = 0.33 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r'i Asphalt/Rooftop 0.24 0.95 Grass 0.09 0.2 Total A' 0.33 Weighted C' 0.739145981 Intensity'/ ' (3) 7.1 Q, = CiA ; ; 5 cis Q t0 DA-7 9 Drainage Area = 25,228 SF Drainage Area = 0.58 Acres Design Storm = 10 -YR storm Surface Acres C-Value(" Asphalt/Rooftop 0.36 0.95 Grass 0.22 0.2 Total A' 0.58 Weighted C' 0.67 Intensity'i ' 131 7.1 Qr = CiA 2.74 cis Drainage Area = 10,049 SF Drainage Area = 0.23 Acres Design Storm = 10 -YR storm Surface Acres C-Value Asphalt/Rooftop 0.21 0.95 Grass 0.02 0.2 Total A' 0.23 Weighted 'C' 0.882724849 Intensity'i ' (3) 7.1 Q; = CiA 1.45 cfs Revision Date: 3125=07 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 7 BSH Q to DA-7 11 Drainage Area = 1 33,088 SF Drainage Area = 0.76 Acres Design Storm 1 10 -YR storm Surface Acres C-Value nr AsphaltlRooftop 0.43 0.95 Grass 0.33 0.2 Total'A' 0.76 Weighted 'C' Intensity'i 7.1 Qi = CIA 3.37 c1s Q to DA-712 Drainage Area = 24,648 SF Drainage Area = 0.57 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r'r Asphalt/Rooftop 0.39 0.95 Grass 0.18 0.2 Total A' 0.57 Weighted C' 0.71693038 Intensity'i ' ('') 7.1 Q; = CIA 2.68 cfs Q to %A47 13 Drainage Area 10,547 SF Drainage Area = 0.24 Acres Design Storm = 10 -YR storm Surface Acres C-Value r+r Asphalt/Rooftop 0.04 0.95 Grass 0.20 0.2 Total A' 0.24 Weighted 'a 0.32 Intensity's ' 1'r 7.1 Qi = CIA 056 cfs Q to 6A-7 14 Drainage Area = 45,504 SF Drainage Area = 1.04 Acres Design Storm = 10 -YR storm Surface Acres C-Valuer'r Asphalt/Rooftop 0.50 0.95 Grass 0.54 0.2 Total A' 1.04 Weighted 'C' 0.55897943 Intensity l ' 1a) 7.1 Qi = CIA 4.15 ofs ReMaion Date: 3r26@007 Z Co 2 W W Z_ r7 Z W C W Z c� w W 0 Z 0 m Y W Y Y Y Y Y. Y. Y Y Y Y Y. Y Y Y Y Y = O O O O O O O O O O O O O O O O t� W m A ray CO N W N M IR If! OI Ifl 1� N H � � �O 1► � Ifj I. Oi � �Np N v f0 v N v w v O v m 0m h 0 m v q u� ao v cn m m ro m v m of a m v v, co c w v w ui v, u� r r� m co W C1 �J .. 4 M m m m m m o �7 ch cv7 0 w m l7 m m m 0o m m m o 10 O O O CD O O O O O O O C G x w p W `W ru Cl) m m m m m w m m m m m O 1"' � W n W W N W W N W W q W W n N l•J v "' mn fG l7 p7 (C l9 f�1 C7 F7 ri a m W a h Cl) m v Cl) co r m m m m m N r N N N N N N N h LLQ" r r r r m r r (O r r r r r r r pj o m O a o a o 0 0 O O o a N a a$ uai o 0 J O O O O O O O O O O O (q O O O O O O O O O O O O O O O O W O O O O O O O O O O O O O O O O C QO O O O O O O O O O O O O O O O > O O O O O O O O O O O O O O O O W W W W W W W W W W W W W W W W W a a a a a a a a a a a a a a a a a ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ p ❑ W W w M w w V w w w w w w w 0® aD v N Nv m n O a r za C7 ❑ ❑ p O p G p ❑ O� C � m go O O Q N A M N y W N q C w � N N tOD m It W� q 1, m Cl LLIN .�- a y w y y y y y v❑i v❑i u❑i co CO co y v❑i 63a�- -1,,5 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 8 BSH Q to MA-81 Drainage Area = 1 35.351 SF Drainage Area = 0.81 Acres Design Storm 1 10 -YR storm Surface Acres C-Value (') Asphalt/Rooftop 0.46 0.95 Grass 0.35 0.2 Total A' 0.81 Weighted 'C' 0.63 Intensity'i ' �'� 7.1 Q, = CIA 3.60 cfs Q to DA-8.2 Drainage Area = 33,668 SF Drainage Area = 0.77 Acres Design Storm = 10 -YR storm Surface Acres C-Value I'I AsphaR/Rooftop 0.38 0.95 Grass 0.39 0.2 Total A' 0.77 Weighted 'C' 0.568735892 Intensity'i ' i''i 7.1 Qi = CIA 3.12 cfs Q to DA-8 3 Drainage Area = 45,443 SF Drainage Area = 1.04 Acres Design Storm 1 10 -YR storm Surface Acres C-Value m AsphaiVRooftop 0.53 0.95 Grass 0.51 0.2 Total A' 1.04 Weighted 'C' 0.58 Intensity'i ' �'� 7.1 Qi = CIA 430 cfs O to DA-f14 Drainage Area = 20,378 SF Drainage Area = 0.47 Acres Design Storrs 1 10 -YR storm Surface Acres C-Value(') Asphalt/Rooftop 0.39 0.95 Grass 0.08 0.2 Total A' 0.47 Weighted 'C' 0.82524781 B Intensity'i ' (3) 7.1 Qi = CIA 2.74 cis Drainage Area = 17,575 SF Drainage Area = 0.40 Acres Design Storm = 10 -YR storm Surface Acres C-Value I'I AsphalVRooftop 0.24 0.95 Grass 0.16 0.2 Total A' 0.40 Weighted 'C' 0.65 Intensity'i ' i't 7.1 Q = CIA 1.85 crs Revision Date: 3/25/2007 6w o-F �5 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 8 BSH Q to DA-8.6 Drainage Area = 21 678 SF Drainage Area = 0.50 Acres Design Storm = 10 -YR storm Surface Acres C-Valuel}i AsphatVRooftop 0.21 0.95 Grass 0.29 0.2 Total A' 0.50 Weighted 'C' - 0.518482148 Intensity'i ' i'1 7.1 Q = CiA 1 S2 CIS Q to DA-8 7 Drainage Area = 47,984 SF Drainage Area = 1.10 Acres Design Storm 1 10 -YR storm Surface Acres C-Value() Aspha[VRooftop 0.58 0.95 Grass 0.52 0.2 Total A 1.10 Weighted C' 0.59 Intensity 'i ' tsi 7.1 Q; = CiA 4.65 cfs C to DA-8 a Drainage Area = 41,515 SF Drainage Area = 0.95 Acres Design Storm 1 10 -YR storm Surface Acres C-Value (l) Asphalt/Rooftop 0.47 0.95 Grass 0.48 0.2 Total A' 0.95 Weighted 'C' 0.569863905 Intensity'i ' (') 7.1 Qi = CiA 3 86 cfs Q to DA-8.9 Drainage Area = 34.178 SF Drainage Area = 0.78 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r�) Asphalt(Rooftop 0.42 0.95 Grass 0.36 0.2 Total A' 0.78 Weighted C' 0.60 Intensity 'i ' t'i 7.1 Qi = CiA 3 35 cfs Revision Date: 3252007 6 5 o-F '15 § _2 §o �2 0 z� 56 k§ 20 w§ rxt; 0�� Ne Y. he he ���� = 0 0 0 0 0 0 0 0 0 0 � 2 a% a N N g q 'i ° i ■ ■ m 0 2 s a It G g 2 w§ e CO 2 > )i R§ Q _9 ce UJ n � w � � � � 6 w K ■ § n, j q§ G q CoG G S �a ¥ 7 S e a e e 8 8 e S© § § CD,§ § § § § § k ■ ` ) 2 2 G 2 2 2 2 2 2 2 >� w w w w w w w w w� U, a a IL 0. IL 0. IL a a a a 2 § a - © - © A - © m m _ _ _ _ _ _ klui _co } } } \ cd go a? � � c a � � m [ ■ a � ■ ■ 2 _ 44 LU k k k j j j / k 0 m I& o-� -15 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 9 BSH Q to DA-91 Drainage Area = 1 19147 SF Drainage Area = 0.44 Acres Design Storm 1 10 -YR storm Surface Acres C-Value i'i Asphalt/Rooftop 0.22 0.95 Grass 0.22 0.2 Total A' 0.44 Weighted 'C' 0.58 Intensity'i ' fii 7.1 Qi = CIA i LC cfs Q to DA-9 2 Drainage Area = F-2-5-,6-37--1 SF Drainage Area = 0.59 Acres Design Storm 1 10 -YR storm Surface Acres C-Value() Asphalt/Rooftop 0.32 0.95 Grass 0.27 0.2 Total A' 0.59 Weighted 'C' 0.807785622 Intensity'i ' i'i 7.1 Q; = CIA 2.64 cis Q to DA-9 3 Drainage Area = 32.621 SF Drainage Area = 0.75 Acres Design Storm = 10 -YR storm Surface Acres C-Value (+l Asphalt/Rooftop 0.38 0.95 Grass 0.37 0.2 Total A' 0.76 Weighted C' 0.58 Intensity'i ' iyi 7.1 Qi = CIA 3 Q9 cis Q to bA-9 4 Drainage Area = 8,674 SF Drainage Area = 0.20 Acres Design Storm 1 10 -YR storm Surface Acres C-Value i'i Asphalt/Rooftop 0.09 0.95 Grass 0.11 0.2 Total A' 0.20 Weighted 'C' 0,54293212 Intensity'i ' �'� 7.1 Qi = CIA 076 efs Q w 0".5 Drainage Area = 30,203 SF Drainage Area = 0.69 Acres Design Storm = 10 -YR storm Surface Acres C-Value(T) AsphaiVRooftop 0.01 0.95 Grass 0.68 0.2 Total A' 0.69 Weighted 'C' 0.21 Intensity'i ' ��� 7.1 a = CIA 104 cfs Q to D/-9 Q Drainage Area = 12.953 SF Drainage Area = 0.30 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r'i Asphalt/Rooftop 0.22 0.95 Grass 0.08 0.2 Total A' 0.30 Weighted 'C' 0.754883039 Intensity 'i ' r3) 7.1 Q; = CIA 1.59 cts Revision Data: 325QGD7 6'1 0� 15 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 9 BSH Q to DA-9.7 Drainage Area = 1 66,518 1 SF Drainage Area = 1.50 Acres Design Storm 1 10 -YR storm Surface Acres C-Value (l) Asphalt/Rooftop 0.75 0.95 Grass 0.75 0.2 Total A' 1.50 Weighted 'C' 0.57 Intensity '/ ' 131 7.1 Q; = CiA u.13 cis Q to DA-9.8 Drainage Area = 30121 SF Drainage Area = 0.69 Acres Design Storm 1 10 -YR storm Surface Acres C-Value l') Asphalt/Rooftop 0.31 0.95 Grass 0.38 0.2 Total A' 0.69 Weighted C' 0.538233857 Intensity'! ' 131 7.1 Q; = CiA 2.63 Cis Q to DA-9 9 Drainage Area = 46,102 SF Drainage Area = 1.06 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuelll Asphalt/Rooftop 0.50 0.95 Grass 0.56 0.2 Total A' 1.06 Weighted 'C' 0.55 Intensity'i ' ��� 7.1 Qi = CiA 417 cis O to C1A-91D Drainage Area = 53,051 SF Drainage Area = 1.22 Acres Design Storm 1 10 -YR storm Surface Acres C-Value rn AsphalURooftop 0.51 0.95 Grass 0.71 0.2 Total A' 1.22 Weighted 'C' 0.51406948 Intensity'! ' i3) 7.1 Qi = CiA 446 cis Q 0 6A.V Drainage Area = 16,818 SF Drainage Area = 0.39 Acres Design Storm 1 10 -YR storm Surface Acres C-Valuefll Asphalt/Rooftop 0.31 0.95 Grass 0.08 0.2 Total A' 0.39 Weighted C' 0.80 Intensity 'i ' 131 7.1 Q; = C!A 2 20 cfs Revision Date: W5Q007 6 S o-C- -6 Y W Y Y Y Y Y Y Y Y Y Y Y Y Y x 0 0 0 0 0 0 0 0 0 0 0 0 0 t� Oo1 N W 100 100 �- N O e0 f�D F W i V pf lD M M M M M t7 M M N1 c9 C9 LU OW H F W tea, � co corn �: W W n n W n n �- ai ui ri a v v ai ai � v ao v v Sir+ W IL v N N N nn A nn A hh A N N N n LLa a a ROD a N a ROD A r1O. o o 2 m O J o O 0 O 0 O 0 O 0 O 0 O 0 O o O w O O 0 O 0 O 0 O (A O C G O O C C O O O O O O W o 0 0 0 0 0 0 0 0 0 0 0 0 W W W W W W W W W W W W W W a ❑ a ❑ a ❑ a ❑ a ❑ a ❑ a ❑ a ❑ a ❑ a ❑ a ❑ a ❑ a ❑ x x x x x x x x x x x x x W ®. N N N a0 a0 a0 N ap a0 ao a O a0 T T T T T T T T W N v of of �n of ao of ao 0 W j — rA M m . a w ❑ � m m o❑ o o c❑❑ c o❑ o c c a0 O r T N W r M M r 10 T M Ra a0 ai T m 0 0 00 F d W Cp T 9 all T T T 9 M a � N f� f� y y y W f❑A � y y y RICE CREEK PLANTATION - PHASE 1 STORM DRAIN CALCULATIONS FOR POND 10 BOWMAN DESIGN and ENGINEERING BSH Q to DA-10.1 Drainage Area = 1 25,586 SF Drainage Area = 0.59 Acres Design Storm 1 10 -YR storm Surface Acres C-Value() Asphalt/Rooftop 0.38 0.95 Grass 0.21 0.2 Total A' 0.59 Weighted 'C 0.69 Intensity's ' cs) 7.1 Q. = CIA 2 86 cfa Q to DA-10 2 Drainage Area = 32,737 SF Drainage Area = 0.75 Acres Design Storm = 10 -YR storm Surface Acres C-Value t'I Asphalt/Rooftop 0.38 0.95 Grass 0.39 0.2 Total A' 0.75 Weighted 'C' 0.559283219 Intensity'i 7.1 Qi = CIA 2.98 ofs Q to DA i0 3 Drainage Area = 40,120 SF Drainage Area = 0.92 Acres Design Storm = 10 -YR storm Surface Acres C-Value t'l Asphalt/Rooftop 0.46 0.95 Grass 0.46 0.2 Total'A' 0.92 Weighted'C' 0.57 Intensity'i ' i''i 7.1 Q; = CIA 3.76 ofs Q to [b4-1104 Drainage Area = 34,893 SF Drainage Area = 0.80 Acres Design Storm 1 10 -YR storm Surface Awes C-Value t'1 Asphalt/Rooftop 0.49 0.95 Grass 0.31 0.2 Total A' 0.80 Weighted 'C' 0.658782584 Intensity'/ ' i31 7.1 Q, = CIA 3.75 cis Q iu QA-10.6 Drainage Area = 29,298 SF Drainage Area = 0.67 Acres Design Storm 1 10 -YR storm Surface Awes C-Value t'I Asphah/Rooftop 0.31 0.95 Grass 0.36 0.2 Total A' 0.67 Weighted 'C' 0.55 Intensity'i 7.1 Qi = CIA 2.61 cis Revision Date: 3/25/2007 "1 D o-F 15 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 10 BSH Q to DA-10 6 Drainage Area = 1 26,255 SF Drainage Area = 0.60 Acres Design Storm 1 10 -YR storm Surface Acres C-Value l'l Asphalt/Rooftop 0.17 0.95 Grass 0.43 0.2 Total 'A' 0.60 _ Weighted 'C' 0.41153685 Intensity'i ' (s) 7.1 1:11s; Q, = CiA 1.73 Q to DA-10 y Drainage Area = 17,970 SF Drainage Area 1 0.41 Acres Design Storm 1 10 -YR storm Surface Acres C-Value l'l AsphaIVRooftop 0.27 0.95 Grass 0.14 0.2 Total A' 0.41 Weighted 'C' 0.69 Intensity'i "a) 7.1 Q; = CiA 2.02 cfs Q to DA 10.8 Drainage Area = 11.571 SF Drainage Area = 0.27 Acres Design Storm 1 10 -YR storm Surface Acres C-Value i'i Asphalt/Rooftop 0.25 0.95 Grass 0.02 0.2 Total A' 0.27 Weighted 'C' 0.905859476 Intensity'/ ' ia! 7.1 Q; = CiA 1 71 cis 0 to DA-10.9 Drainage Area = 14,930 SF Drainage Area = 0.34 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r'I AsphaiVRooftop 0.26 0.95 Grass 0.08 0.2 Total A' 0.34 Weighted 'C' 0.77 Intensity'i ' jai 7.1 1fs Qi = CiA 187 Q w wit-i0. iii Drainage Area = 72,458 SF Drainage Area = 1.66 Acres Design Storm = 10 -YR storm Surface Acres C-Value Asphalt/Rooftop 0.73 0.95 Grass 0.93 0.2 Total A' 1.66 Weighted 'C' 0,52914378 Intensity'i ' i'1 7.1 Q = CiA 6.25 oft Revision Date: 31=007 c3 x am W W Z a Z W 'O C b Z On cc W O 3 O m Y U Y Y. Y Y Y Y Y Y. Y Y Y Y. 0 0 0 0 0 0 0 0 0 0 0 0 U 4 T m A A A W f00. fD tw0 U CD CD v m m m m .Q: m m m U � Oi pf Ci M S S S m m Q q2 O O O O O O O O O O O O WW H W W co Ol cCl)m Of. O1 . m N ao N m N to Of th R N m m m a m � � m tG t0 3 W a W N N N N N O LL Q V A l+l CM p7 Q a Q Y Q Y W O t+f o 0 0 0 0 0 0 o O O J S O S O O O O O O O S S H O O G o 0 o C C o C C C W o 0 0 0 0 0 0 0 0 0 0 0 o 0 o o 0 o o 0 0 o W W U, W W W W W W W W W W a a a a a a a a a a a a 0 0 0 o c o c a o 0 0 0 x x x x x x x x x x x xp I N a w N a'0 N N w S M M oM a to N V' ? N m pp m W W G pf G O C C p O C C W o Z Q Q o o 0 0 o Q o 0 0 0 a 0 Wd o 0 0 0 o c o 0 0 0 o c � y y RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 11 BSH Q to DA-11.1 Drainage Area = 1 23,180 SF Drainage Area = 0.53 Acres Design Storm 1 10 -YR storm Surface Acres C-Veluelll Asphalt/Rooftop 0.22 0.95 Grass 0.31 0.2 Total A' 0.53 Weighted 'C' 0.51 Intensity'i ' i'i 7.1 Qi = CiA 193 crs Q to DA-11.2 Drainage Area = 25,742 SF Drainage Area = 0.59 Acres Design Storm = 10 -YR storm Surface Acres C-Value l" Asphalt/Rooftop 0.28 0.95 Grass 0.31 0.2 Total A' 0.59 Weighted 'C' 0.555357004 Intensity 'i ' iyi 7.1 Qi = CiA 2.33 afs Q t3 DA•1 1.3 Drainage Area = 20,221 SF Drainage Area = 0.46 Acres Design Storm 1 10 -YR storm Surface Acres C-Value rtl AsphalURooftop 0.29 1 0.95 Grass 0.17 0.2 Total A' 0.46 Weighted 'C' 0.67 Intensity's ' i'i 7.1 Qi = CiA ?.20 cfs Q to DAB-11.4 Drainage Area = 12,683 SF Drainage Area = 0.29 Acres Design Storrs = 10 -YR storm Surface Acres C-Value ifs Asphalt/Rooftop 0.23 0.95 Grass 0.06 0.2 Total A' 0.29 Weighted 'C' 0.792454487 Intensity 'I ' 131 7.1 Qi = CiA 1.64 Cis 4 Drainage Area _ 12,739 SF Drainage Area = 0.29 Acres Design Storm = 10 -YR storm Surface Acres C-Value l" Asphalt/Rooftop 0.12 0.95 Grass 0.17 0.2 Total A' 0.29 Weighted 'C' 0.51 Intensity's ' ta) 7.1 Qi = CiA 1.05 CIS //�� Revision Date: 325=7 0-C 1j5 RICE CREEK PLANTATION - PHASE 1 BOWMAN DESIGN and ENGINEERING STORM DRAIN CALCULATIONS FOR POND 11 BSH Q to DA-11 6 Drainage Area = r-4-6,-92-6-1 SF Drainage Area = 1 1.08 1 Acres Design Storm = 10 -YR storm Surface Acres C-Value (9 AsphaltlRooftop 0.64 0.95 Grass 0.44 0.2 Total'A' 1.08 Weighted C' 6.64556962 Intensity's ' �'� 7.1 Q; = CiA 4.94 cfs Q to DA-11 Drainage Area = 26,849 SF Drainage Area = 0.62 Ades Design Storm 1 10 -YR storm Surface Acres C-Value() Asphalt/Rooftop 0.24 0.95 Grass 0.38 0.2 Total A' 0.62 Weighted 'C' 0.49 Intensity 'i ' i'') 7.1 Qi = CiA 2.15 cfs G to DA-11 8 Drainage Area = F-2-1,13-5--1 SF Drainage Area = 0.49 Acres Design Storm = 1 10 -YR storm Surface Acres C-Value rrl Asphalt/Rooftop 0.33 0.95 Grass 0.16 0.2 Total A' 0.49 Weighted 'C' 0.710106458 Intensity's ' i''i 7.1 Qi = CiA 245 cis Q to DA-11.$ Drainage Area = 64,511 SF Drainage Area = 1.48 Acres Design Storm = 10 -YR storm Surface Acres C-Value l" Asphalt/Rooftop 0.68 0.95 Grass 0.80 0.2 Total A' 1.48 Weighted C' 0.54 Intensity'i ' r'i 7.1 Qi = CiA 5.72 cis Q 0 w-A- i i to Drainage Area = 23,967 SF Drainage Area = 0.55 Acres Design Storm 1 10 -YR storm Surface Acres C-Value r'l Asphatt/Rooftop 0.39 0.95 Grass 0.16 0.2 Total A' 0.55 Weighted 'C' 0.73 Intensity'i ' i'r 7.1 Qi = CiA 2.88 cis Q to DA-11 11 Drainage Area = 27.059 SF Drainage Area = 0.62 Ades Design Storm = 10 -YR storm Surface Acres C-Value (+J Asphalt/Rooftop 0.42 0.95 Grass 0.20 0.2 Total A' 0.62 Weighted 'C' 0.71 Intensity's ' rsr 7.1 f3; = CiA 3.12 cis Revision Date: 3125/2007 '1 LA D-F 5 Z O ra O 0 6 CO Z O0 Hj N J 56 IL ZZ_ W Q 2O V � WO il Y W Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y = O O O O O O O O O O O 0 0 0 0 v x a All A N m m A eD A A N m CD o CD w t0 en A d Ifs N VA OI O N N - M (A+� O V A O v v °D m W o m co Q m ryOD 0 4 v a O L6 L O m m O fh f� f� (6 W �^ J:3 �► y CO CO O O M M M 4 M (7 (r9 (7 M M M lO WO M O CD CD M M 1 0 O O O O 0 0 O O O 0 O O O O O x� LU LU W W w M W M W M O co W A I� co CD co N co N M O tO M O CO CO CO M W co to ... CC CO C7 P) 'Q Y M O co co I-- A 1, M m �+ W yya M M M A P N co co p M N N N I� N CA CA O N Wa o 0 0 0 a 0 0 0 up> 0 Ipn 0 0 0In 0 a 0 0o pcos O O O O O O (ow O O O O po O O O O J (/� O C G G CD G O O 0 0 O C O O d W o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e so c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 c 0 0 0 6 0 c W W W W W W W W W W W W W W W W a a a a IL a a a a a a IL a a a 0 0 0 0 0 0 0 0 o a o c o a o x x x x x x x x x x x x x x x aH o 0 o m Cn o K a R N N CV M M M N N t m (O r CD r Wr- q O A r r O r � Q �- o c p W N N N r CC':' rb O M M COD OOf 4 4 4 ao ao f' N N pOj CV Yf F N CO IC' LO CO 1� m GA W d y y y h y N r r r r r tdfl 15 D-F' -15 C200705300028 6213 02/03/2007 11:10 AM P6, 41 LIMITED LIABILITY COMPANY ANNUAL REPORT NAME OF LIMITED LIABILITY COMPANY: Brunswick -Stu & Associates, LLC STATE OF INCORPORATION: NC SOSID: 0648000 Date Filed: 2/22/2007 2:15:00 PM Elaine F. Marshall North Carolina Secretary of State C200705300028 SECRETARY OF STATE L.L.C. ID NUMBER: 648000 FEDERAL EMPLOYER ID NUMI Privacy Redaction NATURE OF BUSINESS: Real Estate Investment REGISTERED AGENT: H . Arthur Sandman REGISTERED OFFICE MAILING ADDRESS: PO BOX 19808 Raleigh NC 27619 REGISTERED OFFICE STREET ADDRESS: 7200 Stonehenge Drive, Suite 204 Raleigh NC 27613 Wake PRINCIPAL OFFICE TELEPHONE NUMBER: 919 - 6 7 6- 8 7 9 0 PRINCIPAL OFFICE MAILING ADDRESS: 7101 Creedmoor Road Raleigh NC 27613 PRINCIPAL OFFICE STREET ADDRESS: 7101 Creedmoor Road Raleigh NC 27613 MANAGERS/MEMBERS/ORGANIZERS: Name: H . Arthur Sandman Title: Member Manager Name: Title: Name: Title: Address: PO Box 19808 City: Raleigh Address: City: Address: City: OF,VNUAL,R PORT MUSTWE COMPLETED BY ALL LIMITED LIABILITY COMPANIES MUST RrF SIGNED BY A MANAGER/IVEMBER State: NC Zip: 27619 State: Zip: State: Zip DATE H. Arthur Sandman Manacfer TYPE OR PRINT NAME TYPE OR PRINT TITLE ANNUAL REPORT FEE: E-Paid Secretary of State 0 Corporations Division O Post Office Box 29525 0 Raleigh, NC 27626-D525 WRrTTEN CONSENT BY MEMBER- MANAGERS OF BRUNSWICK-STU & ASSOCIATES, LLC i he undersigned, being Member -Managers of BRUNSWICK-S`IFU & ASSOCIATES, LLC, a limited liability company organized and existing underthe laws of the State of North Carolina (the "Company"), holding at least a Majority Interest in the Company (unless otherwise defined herein, all capitalized terms shall have the same meaning ascribed to them in the Company's Operating Agreement), in accordance with Section 5.04 of the Company's Operating Agreement, do herelry consent and adopt the following resolution and do hereby direct that this written consent be filed with the records of the Company: "RESOLVED_ That JOHN BAKER, acting individually in his capacity as a Member -Manager of the Company, be hereby authorized in the name of and for account of the Company, and on such terms and conditions as he may deem proper, to sign, execute and endorse such documents as may be necessary or required for the development of the Property (excluding loan documents which shall require the signature of both the undersigned Member Managers)." This resolution is effective this the 9a day of April, 2007. STATE OF NORT]Ei CAROLINA COUNTY OF WAKE I certify that the following person(s) personally appeared before me this day, each acknowledging to me that he or she signed the foregoing document H. ART M SANDMAN and JOHN BAKER, Member -Managers of BRUNS WICK-STU & ASSOCIATES, LLC, a North Carolina limited liability alseal) My Commission Expires: cindylcorporaazelgenerNkorp remlution Erunswiek-sm 4-9-07 Permit No. 5-4-0SS-0 `7 0 - �;,?? (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Rice Creek Plantation— Phase 1 (Pond 9) Contact Person: Brian Hall (Bowman Design%1 Phone Number: (910) 755-6526 For projects with multiple basins, specify which basin this worksheet applies to: elevations Basin Bottom Elevation 18.0 ft. (floor of the basin) Permanent Pool Elevation 24.0 ft. (elevation of the orifice) Temporary Pool Elevation 26.0 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 10,792 sq. ft. (water surface area at the orifice elevation) Drainage Area 359,755 ac. (on -site and off -site drainage to the basin) Impervious Area 157,355 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 30,064 cu. ft. (combined volume of main basin and for. ebay) Temporary Pool Volume 24,835 cu. ft. (volume detained above the permanentpool) Forebay Volume 6,214 cu. ft. (approximately 20% of total volume) Other parameters SA/DA1 0.0179 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 1.50 in. (2 to 5 day temporary pool draw -down required) Design Rainfall 1.00 in. Design TSS Removal 2 85 % (minimum 85% required) Form SW-102 Rev 3.99 Page 1 of 4 Footnotes: 1 When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BUT manual provides design tables for both 85% TSS removal and 90% TSS removal. H. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials 65 tt a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). S H b. The forebay volume is approximately equal to 20% of the basin volume. 19S t4c. The temporary pool controls runoff from the design storm event. S 4 d. The temporary pool draws down in 2 to 5 days. P-04 e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. 4 g. The basin side slopes above the permanent pool are no steeper than 3:1. I3s+ h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). 13sif i. Vegetative cover above the permanent pool elevation is specified. 1:K44 j. A trash rack or similar device is provided for both the overflow and orifice. I k. A recorded drainage easement is provided for each basin including access to nearest right-of- way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one)'(1 does* does not incorporate a vegetated filter at the outlet. This system (check one) 0 does`* does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads �4.50feet in the main pond, the sediment shall be removed. When the permanent pool depth reads _3.75 feet in the forebay, the sediment shall be removed. Sediment Removal El. 20.25 Bottom Elation _19.0 T 2 FOREBAY BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 24.0 - - - Sediment Removal Elevation _19.5- - _ - - - 75% - Bottom Elevation �18.0_ 25% MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name: John Baker Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, 1"-- f a4VIn , a Notary Public for the State of Ald-' `1 64X.J /'A A-- Countyof AMW OYe4e , do hereby certify that �—j6h*i personally appeared before me this day of 2-10'r'' 206 ,and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, ,e1',4i11"0e," F. e'er •• • • �' NOTARY ' ,�* • PUBLIC A 0 • a ��yzy nR�o�ro`;•.� SEAL My commission expires t Pa4y7-- /9.94// Form SWU-102 Rev 3.99 Page 4 of 4