HomeMy WebLinkAboutSW5220101_Application Completeness Review Checklist_20220124Application Completeness Review Checklist
Project Name; Pc. fs JMcy"I ?r���i►�� Date Delivered to CO: I !�ioI z0-22
BIMS Received/Accepted Date: l/Zc(/2oYZ
Project County/Location: $, / a, , Uyt� ; �, *BIMS Acknowledged Date: )/Zq/?Z7
Rule(s):
P<lPhase
II E]OWR/HQW 1-1WSWS
Goose NSW Other
Permit Action: Ne Major Mod / Minor Mod / Renewal / Transfer
**New Permit #: _C1 G/
Existing Permit #:
r TE Cert on File?
Permit Type: (V/ LD / LD Overall / HD &LD Combo
General Permit / Offsite / Exempt / Rescission
SCM Type(s):
offsite to SW:
Master PE Cert on File?
Development Type: C ercia / Residential / Other
Subdivided?: Subdivision or ng e
For New or Transferred Permits Permittee is:
Stream Class:
Property Owner(s) DDeveloper Lessee Opurchaser EIHOA
EISA Map ORW Map
Paperwork Emailed Engineer on:
ElSupplement(s) (1 original per BMP)
®O&M with correct/original signatures (1 original per 8MP except LS/VFS and swales)
Application with correct/original signatures
®Corp or LLC: Sig. Auth. per SoS or Signature Authorization letter or report
M$505 (within &mo) Check#(s): FiNo Fee
Soils Report: w/SHWT or General Report
®Calculations (signed/sealed)
Deed Restrictions, if subdivided:
**Signed & Notarized Template
Correct T
Recorded Covenants
Recorded Plats E150% or more Lots Sold List
Project Narrative
KrUSGS Map
Email Address: Design Engineer
Email Address: Property Owner
®Deed
Email Address: Lessee
Lease Agreement
0Email Address: Purchaser
Purchase Agreement
Email Address: Developer
Email Address: HOA Representative
Plans
[A2 Sets Wetlands: Delineated or No Wetlan
®Vicinity Map ®Project Boundaries
Legend Layout (proposed BUA dimensions)
DA Maps Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc)
Existing Conditions ®Landscape Plan
Grading ®PE Seal
REVIEWER NAME: NOTES TO REVIEWER: *Enter BIMS Acknowledged Date on this Sheet
353 / f�**FOR NEW Projects -Enter New Permit # on
lv
�5 c Z$ Supplements & Deed Restiction Templates.
�81S r y At
)W,y k 5L/b4, s;.o
G:WQ\\Reference Libra ry\Procedures\Checklists\Completeness Review Checklist_2018 03 13