Loading...
HomeMy WebLinkAboutSW5220101_Application Completeness Review Checklist_20220124Application Completeness Review Checklist Project Name; Pc. fs JMcy"I ?r���i►�� Date Delivered to CO: I !�ioI z0-22 BIMS Received/Accepted Date: l/Zc(/2oYZ Project County/Location: $, / a, , Uyt� ; �, *BIMS Acknowledged Date: )/Zq/?Z7 Rule(s): P<lPhase II E]OWR/HQW 1-1WSWS Goose NSW Other Permit Action: Ne Major Mod / Minor Mod / Renewal / Transfer **New Permit #: _C1 G/ Existing Permit #: r TE Cert on File? Permit Type: (V/ LD / LD Overall / HD &LD Combo General Permit / Offsite / Exempt / Rescission SCM Type(s): offsite to SW: Master PE Cert on File? Development Type: C ercia / Residential / Other Subdivided?: Subdivision or ng e For New or Transferred Permits Permittee is: Stream Class: Property Owner(s) DDeveloper Lessee Opurchaser EIHOA EISA Map ORW Map Paperwork Emailed Engineer on: ElSupplement(s) (1 original per BMP) ®O&M with correct/original signatures (1 original per 8MP except LS/VFS and swales) Application with correct/original signatures ®Corp or LLC: Sig. Auth. per SoS or Signature Authorization letter or report M$505 (within &mo) Check#(s): FiNo Fee Soils Report: w/SHWT or General Report ®Calculations (signed/sealed) Deed Restrictions, if subdivided: **Signed & Notarized Template Correct T Recorded Covenants Recorded Plats E150% or more Lots Sold List Project Narrative KrUSGS Map Email Address: Design Engineer Email Address: Property Owner ®Deed Email Address: Lessee Lease Agreement 0Email Address: Purchaser Purchase Agreement Email Address: Developer Email Address: HOA Representative Plans [A2 Sets Wetlands: Delineated or No Wetlan ®Vicinity Map ®Project Boundaries Legend Layout (proposed BUA dimensions) DA Maps Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Existing Conditions ®Landscape Plan Grading ®PE Seal REVIEWER NAME: NOTES TO REVIEWER: *Enter BIMS Acknowledged Date on this Sheet 353 / f�**FOR NEW Projects -Enter New Permit # on lv �5 c Z$ Supplements & Deed Restiction Templates. �81S r y At )W,y k 5L/b4, s;.o G:WQ\\Reference Libra ry\Procedures\Checklists\Completeness Review Checklist_2018 03 13