HomeMy WebLinkAboutWQ0031317_Monitoring - 12-2021_20220111Monitoring Report Submittal
Permit Number #*
Name of Facility:*
Month: * December
Report Information
WQ0031317
Global Nuclear Fuel Americas, LLC
Year:* 2021
Type* Upload Document*
NDMR, NDAR-1, NDAR-2, NDMLR Dec 2021 NDMR Report 156.16KB
FINAL.pdf
PDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
Confirmation Email Address: * karen.williams@ge.com
Name of Submitter: * Karen Williams
Signature:
Date of submittal: 1/11/2022
This will be filled in automatically
Initial Review
Reviewer: Plummer, Lauren
Is the project number correct?* WQ0031317
Is the monitoring report accepted?* - Yes NO
Regional Office* Wilmington
Accepted Date: 1/23/2022
GNwo
Global Nuclear Fuel
January 11, 2022
DEQ
Division of Water Resources
Attention: Information Processing Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
Subject: Monthly Monitoring Report
Global Nuclear Facility, Wilmington
NDMR Permit WQ0031317
Global Nuclear Fuel
Karen Williams
EHS Specialist
3901 Castle Hayne Road
P.O. Sox 780
Wilmington, NC 28402
USA
C 910-547-2758
Karen.willrams@ge Com
Attached are the December 2021 PPI001 and PPI002 Non -Discharge Monitoring Reports for the
Global Nuclear Fuel Facility in Wilmington, North Carolina. Note all effluent was reclaimed as
indicated in the report.
If you have any questions or need additional information, please call me at 910-547-2758.
Sin erely,
1J1 1 izz
K ren Williams
Environmental Specialist
Global Nuclear Fuel - Americas
MAW Nuclear Fuel
FORM: NDMR 10-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of 2
Peffnit No. .00
. r:T=-
ii
■ a
■ ■ •
�■��000m�������■���
FORM: NDMR 10-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page 2 of 2
Sampling Person(s) Certified Laboratories
Name: Mike Phipps Name: Environmental Chemists
Name: Jeff Hollis Name: Global Nuclear Fuel - Americas
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? M' cono�" El Non-Con#wd
it the facility is non -compliant please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator In Responsible Charge (ORC) Certification
Permittee Certification
ORC: Mike Phipps
Perinittee: Duane Olson
Canification No.: 9M38
Signing Official, Duane Wilson
Grade: WW II Phone Number. 910417-9373
Signing Official's Title: Wilmirxrton Plant Manager
Phone Number: 91"19 711fi Permit Expiration: 2
Has ORC changed slots the previous NDMR? � Yes (�' No
Signature parr
Signature Data
"I certify, urxlar penalty of law, that this document and all stixhmenta were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel property gathered and evaluated the Information submitted. Based on my
Inquiry of the person or parsons who manage the system. or those persons directly responsible for gathering the Information, the
By this signature, I certify that this report In accurate and complete to the hest of my knowisdge.
information submitted is, to the best of my Imowiadge and belief, true, accurate, and complete. I am aware that Mere are significant
penalties for submitting talon Information, includhV the possibility, of floes and ImprisonmerH for knowing vioisomm"
Mall Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
FORM: NDMR 10-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page 2 of 2
Sampling Person(s) Certified Laboratories
Name: Mike Phipps Name: Environmental Chemists
Name: Jeff Hollis Name: Global Nuclear Fuel - Americas
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit?
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not In compliance. Provide In your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary,
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Mike Phipps
Pttrrltfttlae: Duane 1Mlson _
Certification No.: 986fi38
Signing Official: Duane 1Mlson
Grade: Willi 11 Phone Number: 910.617-9373
Signing Official's Tide: Wilmington Plant Manaaer
Has ORC changed since the previous NDMR? Yea IT No
Phone Number: 910-019-7140 Permit Expiration: 021=023
Signature Date
Signature oats
I cartily. under penalty of Few, that this document and all attachments wen prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my
Inquiry of the penon or persons who manage the system, or those penars directly responsible forgathering the Information, the
By this Signature. I urtihr that this sport Is accurate and eamplste to the heat of myr knowledge.
Information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that then we slgMlicant
penalties for submitting false Infon, tion Including the possibility of fines and imprisonment for knowing vtoiatiom.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
I..