HomeMy WebLinkAbout20211733 Ver 1_More Info Received_20220118Strickland, Bev
From: Weikmann, Amanda <Amanda.Weikmann@arcadis.com>
Sent: Tuesday, January 18, 2022 10:45 AM
To: Homewood, Sue
Cc: Lastinger, James; McCall, Jeremy; Hill, Johnnie
Subject: [External] RE: Devonshire Streambank Stab
Attachments: Devonshire Stream Stabilization Project_sealed2022-01-12.pdf; NCDWR Buffer
Exhibit.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hi Sue,
Please see attached our updated drawings as well as a NC Buffer Exhibit for your review. A list of your comments from
December 16, 2021, and our responses, are included below.
1. Would you please provide a buffer/wetland impact plan sheet that clearly documents how you calculated the
buffer impacts (and where you indicate buffer and wetland overlap). I recommend using different colors to identify
different areas and/or overlapping areas. I see the wetland lines on the plan sheets but it's really hard to tell what
is existing lawn, what is existing "forested" buffer, where there are wetland impacts and buffer impacts etc.
A buffer impacts exhibit is included with this submission and should explain the impacts, buffers and other
overlapping areas.
2. Are you proposing to dewater the entire length of stream channel and do all the instream work at once, or dewater
each structure location individually? I just want to be sure we capture the temporary impacts correctly. If you are
only proposing to dewater each structure location individually then the temporary check dam shown at the bottom
of the project would be a concern for DWR. We don't allow temporary sediment control measures "in channel".
Dewatering will be done at each structure location individually. We have removed the temporary check dam.
3. On the plans there's a line identified as "tree line to be removed" and it looks like that area is proposed to be
replanted as lawn. Since this would be in the buffer area, could you explain this further for me please.
4. On the plans there's a statement to only clear necessary trees within LOD. Can you please provide a definition of
"necessary", or better yet, update the plans to include that explanation? The construction crew may have a very
different definition of "necessary" than you or I, and since it's in the buffer area I want to be sure we are all on the
same page.
5. Can you provide some assurance that the landowners understand that the impacts to the buffer are temporary
and they must allow natural regeneration in all locations were trees were present (with the exception of the
maintained sewer corridor). We've seen many projects like this where landowners are happy to have new lawn
and permanently maintain it like that when the permittee stated the impacts would be temporary. I recommend
that the City propose temporary "no mow/maintenance" signs in all areas they are proposing as temporary buffer
impacts at least for the first few years while natural regeneration and/or live stakes are small.
In response to comments 3 to 5: We have adjusted the notes and the drawing to show the existing riparian buffer
area to be reestablished as a buffer and replanted with trees. Existing lawn areas (at 12 Devonshire Drive within
the LOD up to the tree line and within the fence relocations at 10 Devonshire Drive, 2006 and 2008 Downing
Street). No mowing will be allowed within the riparian buffer. The City monitors stream buffer impacts across the
1
City for non -City constructed projects and will ensure these impacts will return back to existing conditions. See
updated planting plan sheet (C-3) or buffer exhibit for different planting areas.
Let us know if you have any additional questions.
Thanks,
Amanda Weikmann PE
Arcadis I Arcadis G&M of North Carolina, Inc.
+1 336 443 2479
From: Homewood, Sue <sue.homewood@ncdenr.gov>
Sent: Thursday, December 16, 2021 2:15 PM
To: Weikmann, Amanda <Amanda.Weikmann@arcadis.com>
Cc: Lastinger, James <james.c.lastinger@usace.army.mil>
Subject: Devonshire Streambank Stab
Hi Amanda,
I have reviewed this project and have a couple questions.
• Would you please provide a buffer/wetland impact plan sheet that clearly documents how you calculated the
buffer impacts (and where you indicate buffer and wetland overlap). I recommend using different colors to
identify different areas and/or overlapping areas. I see the wetland lines on the plan sheets but it's really hard
to tell what is existing lawn, what is existing "forested" buffer, where there are wetland impacts and buffer
impacts etc.
• Are you proposing to dewater the entire length of stream channel and do all the instream work at once, or
dewater each structure location individually? I just want to be sure we capture the temporary impacts
correctly. If you are only proposing to dewater each structure location individually then the temporary check
dam shown at the bottom of the project would be a concern for DWR. We don't allow temporary sediment
control measures "in channel".
• On the plans there's a line identified as "tree line to be removed" and it looks like that area is proposed to be
replanted as lawn. Since this would be in the buffer area, could you explain this further for me please.
• On the plans there's a statement to only clear necessary trees within LOD. Can you please provide a definition
of "necessary", or better yet, update the plans to include that explanation? The construction crew may have a
very different definition of "necessary" than you or I, and since it's in the buffer area I want to be sure we are all
on the same page.
• Can you provide some assurance that the landowners understand that the impacts to the buffer are temporary
and they must allow natural regeneration in all locations were trees were present (with the exception of the
maintained sewer corridor). We've seen many projects like this where landowners are happy to have new lawn
and permanently maintain it like that when the permittee stated the impacts would be temporary. I
recommend that the City propose temporary "no mow/maintenance" signs in all areas they are proposing as
temporary buffer impacts at least for the first few years while natural regeneration and/or live stakes are small.
I will consider the application on hold until receipt of responses to the above information. Please let me know if you
have any questions,
Thanks.
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
2
336 776 9693 office
336 813 1863 mobile
Sue.Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
This email and any files transmitted with it are the property of Arcadis and its affiliates. All rights, including without limitation copyright, are reserved. This
email contains information that may be confidential and may also be privileged. It is for the exclusive use of the intended recipient(s). If you are not an
intended recipient, please note that any form of distribution, copying or use of this communication or the information in it is strictly prohibited and may be
unlawful. If you have received this communication in error, please return it to the sender and then delete the email and destroy any copies of it. While
reasonable precautions have been taken to ensure that no software or viruses are present in our emails, we cannot guarantee that this email or any
attachment is virus free or has not been intercepted or changed. Any opinions or other information in this email that do not relate to the official business
of Arcadis are neither given nor endorsed by it.
3
DEMO & EROSION CONTROL FEATURES
TP
LO D
SF
TEMPORARY CONSTRUCTION ENTRANCE
(COG STD 436B)
TREE PROTECTION FENCE
LIMITS OF DISTURBANCE
SILT FENCE (COG STD 216)
FENCE TO BE REMOVED (AND RELOCATED)
PROPOSED FEATURES
x
LOG J—HOOK VANE
LOG ROLLERS
PROPOSED CONTOUR
RELOCATED FENCE
BUFFER IMPACTS
WETLAND
ZONE 1 BUFFER IMPACTS
ZONE 2 BUFFER IMPACTS
PLANTING FEATURES
LAWN (0.12 AC)
WETLAND & BUFFER SEEDING (0.08 AC)
BANKFULL NATURAL CHANNEL (0.04 AC)
NOTES:
1. CONTRACTOR TO FIELD ADJUST THE
PROPOSED CONSTRUCTION ACCESS TO
MINIMIZE LAND DISTURBANCE AND PRESERVE
EXISTING VEGETATION TO THE MAXIMUM
EXTENT PRACTICABLE.
2. FOR STREAM CROSSING, SEE SHEET C-4.
3. WITHIN EXISTING FORESTED BUFFER, REMOVE
TREES AS NECESSARY FOR CONSTRUCTION.
EXISTING FORESTED BUFFER TO BE
REESTABLISHED AFTER CONSTRUCTION AND
REPLANTED WITH TREES. NO MOWING WILL BE
ALLOWED.
4. IMPACTED BANKS TO BE SEEDED WITH
BANKFULL NATURAL CHANNEL SEEDING AND
PLANTED WITH LIVE STAKES.
5. ALL BUFFER IMPACTS ARE CONSIDERED
TEMPORARY AND IMPACTED BUFFERS WILL
BE RETURNED TO NEAR EXISTING CONDITIONS
(TO LAWN IF EXISTING LAWN OR TO
RIPARIAN BUFFER).
PIN: 7846950378
LAKE WINDEMERE ASSOCIATION, INC
2018 DOWNING ST
PoP
cwEna
WETLAND C
855
/
/
0+
/
N
s
BANK RE
ZONE / SEE NO
ZONE 2
XN \
N JANE E PARKER
N\N N
\ 860\
PIN: 7846952042
\
\\\
10 DEVONSHIRE DR
\ \
E
6
i
4„/
Z0
hul
NN
\\\ 4j).
\
\
EXFSTING LAWN WILL 13E—Nt ST
WITHIN THE FENCE RELOCAT
PIN: 7846940918
ROBERT NOLAN &
JULIEANNE BANE WILLIARD
2008 DOWNING ST
:
IN 41�39' N
E OVA EXITING FENCE
D\REP C - OUTSIDE
TOP OLOPE
tNN
TINIc LAB WICC'-BkRESTORED
EI CE RELOCATION
\\ \ Q
LC�G ROLLsR (Tl\
E :ETAIL bN DRAWI
;ETb4N D B
EX MH
Rtbh: 887'
hp:/34 - 2'
PIN: 7846940848
ALLEN SCOTT SHIPTON
2006 DOWNING ST
/vS
2
Ss
zo
w
0
RIM: 853.34'
INV: 842.74'
ZONE 2
855_
854
PIN: 7846942849
DAVID S &
JO ANNE RILEY LOMBARDO
12 DEVONSHIRE DR
853_ ESTIN LAWN IL
RESTORED TO TAW
TED FIMPACTS\
SEE ATE 3 � \
2
0
850
I Pt3/4"F
«
ziz
0
X MH
.17'
3��,
do
7'
BANK RE TORATION
SEE NOTE
J—HOOK (TYP)
SEE DETAIL ON DRAWINGS
ZONE NI
TLAP
PIN: 7846942702
S^ ' AMBER J &
,g52 / MATTHEW A GOLDFARB
54�
ZONEy / �
20% E155
i ZONE
g
14 DEVONSHIRE DR
MD NV OUT 9.7
c859. 3
CL 10.10
N
1,7
ti
\
855
850
845
840
835
—0+25 0+00
LOG ROLLERS
STA 1+05, ELEV: 841.5'
STA 1+28, ELEV: 842.5'
STA 1+51, ELEV: 843.5'
ENCASE SEWER PIPE
WITH #67 STONE
1 +00
PROPOSED GRADE
PIPE CROSSING
8" PVC SANITARY SEWER
INV: 842.31
2+00
EXISTING GRADE
LOG J—HOOK
STA 3+48
STA 3+59
(1PIPE CROSSING
8" PVC SANITARY SEWER
INV: 843.04
3+00
J
4+00
850
845
840
4+50
835
SENSITIVE INFORMATION
Not to be copied or
distributed without the
express written
permission of the City
of Greensboro.
Know what's below.
Call before you dig.
City of Greensboro Underground
Locates Information/pequests
COG Water Resources Dept._336-373-2033
GDOT Traffic Signal_______336-373-2606
COG/Guilford Co.Telecom___336-373-2084
COG Water Supply 336-373-5855
Tanks/Treatment Plants
GDOT Storm Water
336-373-2569
NPDES
General Permit
Applies
DISTURBED AREA =
0.24 Acres
0 10' 20' 40'
SCALE 1 "=20' — HORZ.
0
2' 4'
SCALE 1 "=2' — VERT.
FINAL DESIGN
3UFFE�
EXH H T
\OT F0�
CO\ STRU CT O\
ARCADIS
Design & Consultancy
for natural and
built assets
ARCADIS G&M of North Carolina, Inc.
7029 Albert Pick Road, Suite 101
Greensboro, North Carolina 27409
Tel: 336-292-2271
www.arcadis.com
License No. C-1869
REVISIONS
TYPE
CONTRACT
CONTRACTOR
AS —BUILT
AUTH. DATE
BENCH MARKS
JOB# 30055500
PO#
ROADWAY
SEWER
###
DESIGNED
CONST. SURVEY
BY AMW/JLM
BY
WATER
CHECKED
BY JLM
SIDEWALK
SCALE: AS NOTED
CITY OF GREENSBORO
ENGINEERING DIVISION
DEVONSHIRE STREAM
STABILIZATION PROJECT
NCDWR STREAM BUFFER IMPACT EXHIBIT
SHEET NO.
1 OF 1
CONTRACT SHEET
1 OF 6
Plot Date: Weikmann, Amanda; 1/12/2022; 12: 01 ; Layout: G1
SavedDate: 1/6/2022 Tim
DOCUMENTS\STORMWATER DESIGN\DEVONSHIRE DRIVE\CADD\SHEETS\GEN\G1.DWG
User: AWEIKMANN Spec: AUS—NCSMOD File: CAUSERS 2020 TECHNICAL REVIEW SERVICES
WATER
SEWER (16")
ROADWAY
L.F. X $1.50 = 1
L.F. X $1.50 = 1
L.F. X $1.50 = 1
TOTAL
ROADWAY TO BE PRIVATELY INSPECTED
DATE FEE (S) RECEIVED BY CITY OF GREENSBORO
0.00
0.00
0.00
$ 0.00
ARCADIS
Design & Consultancy
for natural and
built assets
ARCADIS G&M of North Carolina, Inc.
7029 Albert Pick Drive, Suite 101
Greensboro, North Carolina 27409
Tel: 336-292-2271
www.arcadis.com
License No. C-1869
City of Greensboro
Water Resources Department
Devonshire Stream Stabilization Project
PROJECT LOCATION
12 DEVONSHIRE DRIVE
so I,
MEN
Ale
Its rrPcII0A
Der -
CbftI. Ri deF
1
it uL! rIMm tJpn;1
Airp c rt
1
PARKIN & V
IILAU&
•
ikEr Atf u#
Aiairms Farm
Final Design
I It F,k J it
40Lin i ' Pd c ALr+
Marti age H III
ks vita
Earn Ito LdkL
adowocd Hut no,
4!I
#ldoe[iwid 13
a
ui`ford F I
Plecirrinnt
Ifriy:: uL
Livie
Vicinity Map
Scale: 1=6000±
LdkiWJ.d
GALLI MM LPN&
McLean
r we Ad chrc •
CITY OF GREENSBORO
MELVIN MUNICIPAL OFFICE
BUILDING (MMOB)
300 W. WASHINGTON ST.
GREENSBORO, NC 27401
CITY OF GREENSBORO
WATER RESOURCES DEPT.
2602 S. ELM-EUGENE ST.
GREENSBORO, NC 27406
'' 1C:A °1{'f/
L ' f'
fp
a_ ..SEAL "r'
036233
ovi 2/2a22
f• '� " G I N cc& �,Zs
Know what's below.
Call before you dig.
COG Water Re
GDOT Traffic
COG/Guilford
COG Water u
Tanks/T 't
GDOT Stor
round
uests
— 2033
3-2606
— 2084
373-5855
373-2569
COG Contract XXXX-XXXX - Project PXXXXX-XX - Devonshire Stream Stabilization Project
DEMO & EROSION CONTROL FEATURES
TP
LO D
SF
PIN: 7846950378
LAKE WINDEMERE ASSOCIATION, INC
2018 DOWNING ST
TEMPORARY CONSTRUCTION ENTRANCE (COG STD 436B)
TREE PROTECTION FENCE
LIMITS OF DISTURBANCE
SILT FENCE (COG STD 216)
FENCE TO BE REMOVED
PROPOSED FEATURES
X
LOG J—HOOK VANE
LOG ROLLERS
PROPOSED CONTOUR
RELOCATED FENCE
PROPOSED TREE LINE
855
850
845
840
835
—0+25
/
0+00
� s
/
0+Qo
L
/
s
G
60.29
�✓� F2 \ \ \ \ \
\\
, N \ PINS 84�5F`042 \ \ _
N
\ \ N `9.QJx�®N HIRE`DR G
\\ \ \ \ \858.50 \8s
N
\\\ \ X E H \\\�_ \�
\ °2 N RBI 6.5� \
\ \N \ `� 41.39' \ \
N NXN X N
REMOVE EXISTt\
AND REPLACEnID
u OF TOP OF SL &.
— 841. 34 ,
7
v
G \iii/bill
47.04 \
\ \
ZONE G 5Z0 �'
Ss
ZONE 2-n-INIF 2
PIN: 7846940918
ROBERT NOLAN &
JULIEANNE BANE WILLIARD
2008 DOWNING ST
LOG ROLLERS
STA 1+05, ELEV: 841.5'
STA 1+28, ELEV: 842.5'
STA 1+51, ELEV: 843.5'
\\
7
4
1+00
o
G47� \\\
6.47
LCC ROLLER (T1\
\E'€TAIL bN C-2
tiF
7
G
�846.42 EX MH
Rtvf:8 87'
li y342. 2'
20NFPIN: 7846940848
ALL2EI—COTT SHIPTON
2006 DOWNINGNST
2
SS
ZO
w
0
RIM: 853.34'
INV: 842.74'
89
ZONE 2
\PIN 74694284
_856-, `-J0 ANNE�ILLY LOMBARD-O,
855_ i 2 -9.Ey0NSH I D1
854�
853�
1.26
PROPOSED GRADE
7
7
PIPE CROSSING
8" PVC SANITARY SEWER
INV: 842.31
2+00
1
G
�n 9n
X MH
.17'
3/'2
s
I I
�-851.3�5
J—HOOK (TYP)
SEE DETAIL ON C-2
ZONE\I
1
--� B50
51i G / ZONE
4-851 53.09
I P�3/4"F
�848.70
EXISTING GRADE
LOG J—HOOK
STA 3+48
STA 3+59
PIPE CROSSING
8" PVC SANITARY SEWER
INV: 843.04
3+00
56.37L
iP
STREW
54.97zu
1
MD NV OUT 9.7
0359. 3
CL 10.10 z
m
N
\ 5� 4>/2\,
4_85 ioti
PIN: 7846942702
AMBER J &
MATTHEW A GOLDFARB
14 DEVONSHIRE DR
4+00
0
/77
4+50
855
850
845
840
835
CONTRACT SHEET
2 OF 6
SENSITIVE INFORMATION
Not to be copied or
distributed without the
express written
permission of the City
of Greensboro.
Know what's below.
Call before you dig.
City of Greensboro Underground
Locates Information/pequests
COG Water Resources Dept._336-373-2033
GDOT Traffic Signal__r___336-373-2606
COG/Guilford Co.Telecom_336-373-2084
COG Water Supply 336-373-5855
Tanks/Treatment Plants
GDOT Storm Water
336-373-2569
NPDES
General Permit
Applies
DISTURBED AREA =
0.24 Acres
NOTES:
1. CONTRACTOR TO FIELD ADJUST THE
PROPOSED CONSTRUCTION ACCESS TO
MINIMIZE LAND DISTURBANCE AND PRESERVE
EXISTING VEGETATION TO THE MAXIMUM
EXTENT PRACTICABLE.
FOR STREAM CROSSING, SEE SHEET C-4.
WITHIN EXISTING FORESTED BUFFER, REMOVE
TREES AS NECESSARY FOR CONSTRUCTION.
EXISTING FORESTED BUFFER TO BE
REESTABLISHED AFTER CONSTRUCTION AND
REPLANTED WITH TREES. NO MOWING WILL BE
ALLOWED.
O 10' 20' 40'
SCALE 1"=20' — HORZ.
O
2' 4'
SCALE 1"=2' — VERT.
FINAL DESIGN
JANUARY
2022
CA
��f}fir
•
•
.SEAL
r r~ .
— • 036233 -
01/12/2022 '
GJHC-
f}{f f11111‘.\�
ARCADIS
Design & Consultancy
for natural and
built assets
ARCADIS G&M of North Carolina, Inc.
7029 Albert Pick Road, Suite 101
Greensboro, North Carolina 27409
Tel: 336-292-2271
www.arcadis.com
License No. C-1869
REVISIONS
TYPE
CONTRACT
CONTRACTOR
AS —BUILT
AUTH. DATE
BENCH MARKS
JOB# 30055500 PO#
/1\ADDED WETLAND NAMES
/2\COG & NCDWR COMMENTS
11-10-21
AMW/JLM
1-3-22
AMW/JLM
ROADWAY
SEWER
WATER
###
DESIGNED
BY AMW/JLM
CONST. SURVEY BY
CHECKED
BY JLM
SIDEWALK
SCALE: AS NOTED
CITY OF GREENSBORO
ENGINEERING DIVISION
DEVONSHIRE STREAM
STABILIZATION PROJECT
STREAM PLAN AND CENTERLINE PROFILE
SHEET NO.
C1 °F 6
4' X 3' X 2' BOULDER ON
DOWNSTREAM SIDE OF LOG
TO SECURE IN PLACE (TYP)
B
PINT A
ELEVATION
LOG ROLLER LOCATION,
SEE PROFILE
1. LOGS WITHOUT ROOT MASS MAY BE USED IF APPROVED BY PROJECT
ENGINEER.
2. LOGS SHOULD BE AT LEAST 12" IN DIAMETER WITH A MAXIMUM DIAMETER
OF 36", RELATIVELY STRAIGHT, HARDWOOD, AND RECENTLY HARVESTED.
3. A SINGLE LOG WITH A MINIMUM DIAMETER OF 24" MAY BE USED IN PLACE
OF TWO LOGS.
4. USE FILTER FABRIC TO SEAL GAPS BETWEEN LOGS.
5. NAIL FILTER FABRIC TO TOP OF HEADER LOG USING 3" 10d GALVANIZED
COMMON NAIL ON 1' SPACING ALONG LOG.
6. LENGTH OF LOG VARIES PER TYPICAL SECTION.
7. STRUCTURE IS USED IN STRAIGHT SECTIONS OF CHANNEL TO CREATE
STEP POOL CHANNEL.
8. BOULDERS MUST BE AT LEAST 4' x 3' x 2'.
ARCADIS G&M of North Carolina, Inc.
7029 Albert Pick Road, Suite 101
Greensboro, North Carolina 27409
Design & Consultancy
for natural and
built assets
Tel: 336-292-2271
www.arcadis.com
License No. C-1869
EXISTING STREAMBED
MATERIAL OR STREAMBED
MATERIAL MIX
CLASS Al AND
I STONE (50% EACH)
NON —WOVEN
FILTER FABRIC
ON —SITE ALLUVIUM
LOG ROLLER DETAIL (LR) OLR
NOT TO SCALE
LOG ROLLER
ELEVATION AS
SHOWN IN PROFILE
4'X3'X2' BOULDER
ON TOP OF LOG TO
SECURE IN PLACE (TYP)
LOG ROLLER DIMENSION TABLE
STA 1+51
STA 1+28
STA 1+05
POINT
ELEVATION
843.63
842.65
841.58
F (DEGREES)
71
73
79
G (%)
5
5
5
L (FT)
5'
5'
3'
SCOUR
POOL
INVERT STONE LOCATION,
SEE PROFILE
HEADER BOULDER
SCOUR POOL EXCAVATED
PER PROFILE
CLASS Al AND
I STONE (50% EACH)
STREAMBED
ON —SITE ALLUVIUM
NON —WOVEN FILTER
FABRIC
STREAMBED ELEVATION
BACKFILL (ON —SITE ALLUVIUM) —
CLASS AI, I, AND #57 STONE
LOG J—HOOK VANE DIMENSION TABLE
STA 3+59
STA 3+43
L (FT)
4'
5'
W (FT)
1.5'
1.3'
F (DEGREES)
16
5
G (%)
12.5
10
SECTION A — A'
EXISTING STREAMBED
MATERIAL OR STREAMBED
MATERIAL MIX
INVERT STONE
ELEVATION,
SEE PROFILE
HEADER LOG
HEADER BOULDER
FOOTER LOG
SCOUR P00
— FOOTER BOULDER EXCAVATED
SECTION B — B'
LOGS SHOULD BE AT LEAST 12 INCHES IN DIAMETER WITH A MAXIMUM DIAMETER OF 30 INCHES, RELATIVELY STRAIGHT,
HARDWOOD, AND RECENTLY HARVESTED.
A SINGLE LOG WITH A MINIMUM DIAMETER OF 24 INCHES MAY BE USED IN PLACE OF TWO 12 INCH LOGS.
BOULDERS MUST BE AT LEAST 4' x 3' x 2'. ANCHOR BOULDERS MAY BE SMALLER BUT MAY NOT WEIGHT LESS THAN 1.0 TON.
INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER LOG AND EXTEND DOWNWARD TO THE DEPTH
OF THE BOTTOM FOOTER LOG, AND THEN UPSTREAM FOR A MINIMUM OF TEN FEET.
NAIL FILTER FABRIC TO TOP OF HEADER LOG USING 3" 10d GALVANIZED COMMON NAIL ON 1' SPACING ALONG LOG.
DIG A TRENCH BELOW THE BED FOR FOOTER LOGS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM
AND STREAMBANK.
START AT BANK AND PLACE FOOTER LOGS FIRST AND THEN HEADER LOGS.
CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS.
LOGS SHALL BE ANCHORED IN THE STREAMBANK BY TWO BOULDERS EACH WEIGHING NO LESS THAN ONE TON. ANCHOR
BOULDERS MUST BE COVER BY NO LESS THAN 1.0' OF SOIL.
************END OF LOG IN CHANNEL NEEDS TO BE ANCHORED BY BOULDERS***********
AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT.
USE WELL GRADED MIX OF CLASS AI, I, AND #57 STONE (EQUAL PARTS) ON UPSTREAM SIDE OF STRUCTURE.
PLACE EXISTING STREAMBED MATERIAL OR STREAMBED MATERIAL MIX UPSTREAM OF THE VDOT STONE. IN ADDITION, PLACE
EXISTING STREAMBED MATERIAL OR STREAMBED MATERIAL TO A DEPTH OF 1.0' ON TOP OF VDOT STONE.
FILTER FABRIC SHALL BE TRIMMED ALONG THE TRANSITION BETWEEN THE STONE BACKFILL AND THE HEADER BOULDERS SO
THAT THE FILTER FABRIC DOES NOT OVERLAP THE HEADER BOULDERS.
LOG J—HOOK VANE DETAIL (LJV)
NOT TO SCALE
SENSITIVE INFORMATION
Not to be copied or
distributed without the
express written
permission of the City
of Greensboro.
Know what's below.
Call before you dig.
City of Greensboro Underground
Locates Information/Requests
COG Water Resources Dept._336-373-2033
GDOT Traffic Signal_______336-373-2606
COG/Guilford Co.Telecom.336-373-2084
COG Water Supply 336-373-5855
Tanks/Treatment Plants
GDOT Storm Water 336-373-256!
CITY OF GREENSBORO
ENGINEERING DIVISION
DEVONSHIRE STREAM
STABILIZATION PROJECT
STREAM SECTIONS
;.4 "SEAL
036233
81/'2/2022 •
� GJ T
o,Pel cC
, I1111i
PLANTING FEATURES
X x x X x r
X " X X x X X X
x
x x x x x x x x x
x
X X X x % X X x X X X�
x
x
LAWN SEEDING (0.12 AC)
WETLAND & BUFFER SEEDING (0.08 AC)
BANKFULL NATURAL CHANNEL (0.04 AC)
PROPOSED FEATURES
X
PROPOSED CONTOUR
RELOCATED FENCE
PROPOSED TREE LINE
� s
/
/
L
1'
s
s
ZONE
ZONE
S�\
NN NN \ \ \ 860�
\ Nx` \ 859�
\\ \NN
\
N\N\
\ \ \ \N\ \
\ \ \ X15.IN\LAV WILL B EST$Q
THIN \HEN ENC . OCATION
4„'
hill
7
ZONE 2
EXISTING LAWN WILLZ u RESTORE
WITHIN THE FENCE' F LOCATI
SEEDING WETLANDS, BANKFULL NATURAL CHANNELS, AND NATURAL CHANNEL BUFFERS
TEMPORARY SEEDING:
- Mix 2 Species together
- Fertilizer to be determined by soil testing provided by Contractor and approved by Engineer/Owner
- Temporary grass to be cut prior to Permanent Seeding
Period
Seed Species
Application
Rate
(ibs/Acre)
Summer German Millet
(8/15 - 4/15) i3rowntop Millet
Winter
(5/15 - 8/15)
Rye Grain
Wheat
PERMANENT SEEDING:
10
10
40
30
- Mix 4 Species together
- Fertilizer to be determined by soil testing provided by Contractor and approved by Engineer/Owner
- Temporary grass to be cut prior to Permanent Seeding
Application
Rate
Period
Seed Species
(lbs/Acre)
Fall
(9/1 - 11 /1)
Whiter
(02/1 -4/1)
Deertongue
Soft Rush
Shallow Sedge
Fox Sedge
Switchgrass
Deertongue
Sweet Woodreed
Rice Cutgrass
Soft Rush
Shallow Sedge
Fox Sedge
5
2
2
2
3
5
2
5
2
2
ZONE 2
Table 6.11e
Seeding No. 3M for: Gentle
Slopes, Average Soils; Low
Maintenance
ZONE 1
ZONE 2
7
857
_856,
A 855_
--854
ENE
7
ZONE 2 .
853
-
7
1
JII
ENOTE1
\ \ zoN \ \\
Z%1 /g5a55 /
ZONE $g6
MD NV OUT 9.7
c859. 3
CL 10.10 z
m
N
0
/77
CONTRACT SHEET
4 OF 6
SENSITIVE INFORMATION
Not to be copied or
distributed without the
express written
permission of the City
of Greensboro.
Know what's below.
CaII before you dig.
City of Greensboro Underground
Locals Informatiripequests
COG Water Resources Dept. l336-373-2033
GDOT Traffic Signal__r___336-373-2606
COG/Guilford Co.Telecom_336-373-2084
COG Water Supply 336-373-5855
Tanks/Treatment Plants
GDOT Storm Water
336-373-2569
NPDES
General Permit
Applies
DISTURBED AREA =
0.24 Acres
NOTES:
1. IMPACTED BANKS TO BE SEEDED WITH
BANKFULL NATURAL CHANNEL SEEDING AND
PLANTED WITH LIVE STAKES.
co
Y
1-
co
>
SCIENTIFIC NAME
COMMON NAME
DIAMETER
LENGTH
SPACING
APPROX.
QUANTITY
Cephalanthus occidentalis
Bottonbush
0.5-2" DIA
30-36"
5' O.C.
18
Cornus amonum
Silky Dogwood
0.5-2" DIA
30-36"
5' O.C.
18
Salix nigra
Black willow
0.5-2" DIA
30-36"
5' O.C.
18
Seeding mixture
Species'
Tall fescue
Kentucky bluegrass
Sericea lespedeza
Korean lespedeza
Seeding note
1. After Aug. 15, use unscarified sericea seed.
2. Where appearance is a consideration, omit sericea lespedeza and
increase Korean lespedeza to 40 lb/acre.
Nurse plants
Between May 1 and Aug. 15, add 10 lb/acre German millet or 15 lb/
acre Sudangrass. Prior to May 1 or after Aug. 15, add 40 lb/acre rye
(grain).
Seeding dates
Rate (lb/acre)
60
10
15
10
Best Possible
Below 2500 ft: Aug. 15 - Sept. 1
Mar. 1 - Apr. 1
Above 2500 ft: July 25 -Aug. 15
Mar. 20 - Apr. 20
July 25 - Sept. 15
Mar. 1 - May 10
July 15 - Aug. 30
Mar. 5 - May 15
Soil amendments
Apply lime and fertilizer according to soil tests or apply 4,000 lb/acre
ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer.
Mulch
Apply 4,000 lb/acre grain straw. Anchor straw by tacking with asphalt,
netting, roving, or by crimping with a mulch anchoring tool. A disk with
blades set nearly straight can be used as a mulch anchoring tool.
Maintenance
Refertilize in the second year unless growth is fully adequate. May be
mowed once or twice per year, but mowing is not necessary. Reseed,
fertilize, and mulch damaged areas immediately.
'Refer to Appendix 8.02 for botanical names.
0 10' 20' 40'
SCALE 1"=20'
FINAL DESIGN
JANUARY
2022
0..s0 tCAll {0*
tr
a a .SEAL
— • 036233
01fa2/2022
/f}� lftl}t1
14It
ARCADIS
Design & Consultancy
for natural and
built assets
ARCADIS G&M of North Carolina, Inc.
7029 Albert Pick Road, Suite 101
Greensboro, North Carolina 27409
Tel: 336-292-2271
www.arcadis.com
License No. C-1869
REVISIONS
TYPE
CONTRACT
CONTRACTOR
AS —BUILT
AUTH. DATE
BENCH MARKS
JOB# 30055500
PO#
/1\ ADDED WETLAND NAMES
/2\COG & NCDWR COMMENTS
11-10-21
AMW/JLM
1-3-22
AMW/JLM
ROADWAY
SEWER
WATER
###
DESIGNED
CONST. SURVEY
CHECKED
BY AMW/JLM
BY
BY JLM
SIDEWALK
SCALE: AS NOTED
CITY OF GREENSBORO
ENGINEERING DIVISION
DEVONSHIRE STREAM
STABILIZATION PROJECT
PLANTING PLAN
SHEET NO.
C3 °F 6
11 Mar 2009
* DIGITAL FILE
0
0
0
0
m
0
c
0
L
N
0
0
0
N
L
Q
L0
1
NOTES:
- METAL FENCE POST
14 GAUGE MINIMUM
HOG WIRE (OPTIONAL)
EROSION CONTROL FABRIC
F_4_1
MAINTAIN ADEQUATE DISTANCE FOR
SEDIMENT REMOVAL 6 MAINTENANCE
F I i- I I
illllilllllilllllil—�
c1-
EX. EARTH
BACKFILL AND
COMPACT THOROUGHLY
SILT FENCE MUST BE ENTRENCHED AND
SECURED WITH COMPACTED SOIL. THE
"SLICING METHOD" MAY ALSO BE USED
TO INSTALL SILT FENCE (SEE NCDENR
"EROSION AND SEDIMENT CONTROL
DESIGN PLANNING AND DESIGN
MANUAL" SECTION 6.62) .
USE COG STD#432 STONE DITCH CHECK
FOR FENCE OUTLETS AT A MAXIMUM 100 FT
SPACING AND AT ALL NATURAL DRAINAGE
AREAS. (SEE SHEET 2 OF 2) .
- SPACING OF POSTS USING HOG WIRE WITH APPROVED EROSION
CONTROL FABRICS TO BE B ' -0 " ON CENTER.
- SPACING OF POSTS WITHOUT HOG WIRE USING APPROVED EROSION
CONTROL FABRICS TO BE 6.-0" ON CENTER.
POST.' METAL T-POST 5 ' -0" OR 6 ' -0" IN HEIGHT DEPENDING ON FILL
SLOPE (MIN. 1..3.3 L B/L F STEEL CONSTRUCTION) .
FABRIC.' 3 ' -0 " IN WIDTH (MUST BE STANDARD SPECIFICATIONS
FOR SIL T FENCE - AS TM D) WI TH 12 " BURIED IN TRENCH.
STONE: (IF USED) #4 WASHED STONE PLACED 1 ' -0" DEEP AT SILT FENCE.
- SPLICES IN FABRIC SHOULD BE OVERLAPPED A MIN. OF 4 FT.
- MAXIMUM DRAINAGE AREA = 1/4 ACRE PER 100 FT OF FENCE FOR 2% OR LESS SLOPE.
- SILT FENCE TO BE REMOVED AFTER CONSTRUCTION IS COMPLETE AS DIRECTED BY
THE CONSTRUCTION INSPECTOR.
PAGE ! OF 2
C I T Y OF GREENSBORO
SILT FENCE DETAIL
STD. NO.
REV.
430
12/06
03/08
03/09
PLACE TREE PROTECTION
FENCE AT THE CRITICAL
ROOT ZONE, WHICH IS
A CIRCULAR AREA
EXTENDING OUT 1.0 FT
FROM THE TREE'S TRUNK
FOR EVERY 1.0 INCH
OF TRUNK DIAMETER
MEASURED 4.5 FT
ABOVE GRADE
WOOD OR METAL POST.
ORANGE SAFETY FENCING
I5 REQUIRED. SPACE
POSTS ON 8' INTERVALS.
NOTES:
1. SEE PLANS FOR LOCATION OF ALL TREE PROTECTION FENCES.
2. ALL TREE PROTECTION DEVICES MUST BE INSTALLED PRIOR TO LAND DISTURBANCE.
INCLUDING THE CUTTING OF ANY TREES, AND MUST BE INSPECTED BY THE URBAN
FORESTER OR HIS DESIGNEE.
3. NO GRADING, TRENCHING, FILLING OR STORING OF MATERIALS IS TO OCCUR
IN THE TREE PROTECTION AREA.
4. TREE PROTECTION FENCE MAY NOT BE REMOVED WITHOUT THE APPROVAL
OF THE URBAN FORESTER OR HIS DESIGNEE.
5. THE TREE CONSERVATION AREA SHOULD BE DESIGNATED WITH "TREE
CONSERVATION AREA" SIGNS POSTED VISIBLY ON THE OUTSIDE OF THE
FENCED -IN AREA. SIGNS MAY NOT BE POSTED ON THE TREES. SEE
EXAMPLE BELOW.
f
TREE
CONSERVATION
AREA
ZONA DE
CONSERVACION
DE ARBOL
I
EXAMPLE SIGN
16" X 12" SIGN
1" BLOCK LETTERS
BLACK LETTERS ON WHITE BACKGROUND
1/4" BLACK BORDER
ALL WEATHER MEDIA
100' SUGGESTED SPACING BETWEEN SIGNS
CI T Y OF GREENSBORO
STANDARD TREE PROTECTION DETAIL
STD. NO.
REV,
448
03-0B
06-08
03-10
10 Oct 2007
* DIGITAL FILE
11 Mar 2009
* ❑IGITAL FILE
MAXIMUM
RETAINED
AREA TO BE
BY SILT FENCE
GROUND
SLOPE
(X)
SLOPE
LENGTH
(ft.) *
MAXIMUM
DRAINAGE AREA
(SO. FT.)
<2%
2%-5%
5%-10%
10%-20%
>20%
100
75
50
25
15
10, 000
7, 500
5, 000
2, 500
1, 500
SRO=ENG"\H
COG STD. #432 STONE DITCH
CHECK TO BE USED FOR SILT
FENCE STONE OUTLET
- ALL SIDE SLOPES ARE 2: 1
- STRUCTURAL STONE TO BE
'CLASS B' RIP -RAP
- 12" THICK LAYER OF #57
WASHED STONE FOR EROSION
CONTROL ON FACE
NOTES:
1. NON —EROSIVE OUTLETS ARE TO BE PLACED IN THE SILT FENCE AS SHOWN ON
THE PROJECT PLANS AND AS DIRECTED BY THE CONSTRUCTION INSPECTOR.
2. NON —EROSIVE OUTLETS ARE TO BE L OCA TED AT ALL NATURAL DRAINAGE
AREAS AND DEPRESSIONS, WITH THE EXCEPTION OF PERENNIAL STREAMS.
3. THE MAXIMUM DRAINAGE AREA IMPOUNDED AT EACH OUTLET MUST NOT
EXCEED 1/4 ACRE.
PAGE 2 OF 2
CITY OF GREENSBORO
SILT FENCE DETAIL
STD. NO.
REV.
430
12/06
03/08
03/09
DEFINITION.' GRAVELED AREA TO BE LOCATED AT POINTS WHERE VEHICLES ENTER AND LEAVE A CONSTRUCTION SITE.
PURPOSE' TO PROVIDE A BUFFER AREA WHERE VEHICLES CAN DROP THEIR MUD AND SEDIMENT TO AVOID TRANSPORTING IT ONTO PUBLIC
ROADS, TO CONTROL EROSION FROM SURFACE RUNOFF, AND TO HELP CONTROL DUST.
CONDITIONS: TO BE USED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND MOVING DIRECTLY ONTO A PUBLIC ROAD OR
OTHER PAVED OFF -SITE AREA. CONSTRUCTION PLANS SHOULD LIMIT TRAFFIC TO PROPERLY CONSTRUCTED ENTRANCES.
DESIGN
CRITERIA: AGGREGATE SIZE - USE "CLASS A" STONE, WITH GEO-TEXTILE LINER.
DIMENSIONS OF GRAVEL PAD - THICKNESS = 8" MINIMUM
WIDTH = 12' MINIMUM OF FULL WIDTH AT ALL POINTS OF THE VEHICULAR ENTRANCE
AND EXIT AREA, WHICHEVER IS GREATER
LENGTH = 25' MINIMUM WITH GEO-TEXTILE LINER
LOCATION = LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM
LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUC-
TION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC
ROADS.
SITE CONDITIONS MAY REQUIRE VARIATIONS FROM THESE DESIGN CRITERIA. VARIATIONS WILL BE DETERMINED OR APPROVED
BY THE APPROPRIATE CITY EROSION CONTROL AUTHORITY.
p0
caloe o
RO
°0?0o 00
/ •o 10, o0 0
00'0 000°Oov
oO0 .0�0+�
/ °voO Ooo 0 00{O
/ O0° o ?Oaov0:OlOoo°i�c,o
000°° °0 1°Ot°°o°000 °od,0 O
os ° 9oe;
�0�°°009 °ooaoO�a a ��9�°000
0 000 oOOe°v.r°vo°oo xo pOOea°O°ogv
o a oa+°o�Oo�vO�o9ovo0����0 00'000oo0'O:e
�v:o 000 oOoo�Oort0.9. ))°-°o°o°°OOooO°oo 000*'°;�°Oo
06 °r°°° o v °p° ►'O o o�v 0 0 o O
00 l0 00;�.9o.0la°- � o�o;° °°•9009°9�Oo}a°o°
v.o 0'v o oOOeoo O�o.o ov v ,y,00O oo�0°wo oo° °O � 0avv
aOOoo°�O, � °oo` oo° � o 0 00e� O._ o0
0vo� o oo0ovv°oO.Oro�o�0oo}O000 o0O of Ov°. � o 000 �
�°o 000°"O O,' o�0or°.Ov000-o 0 . oT o•�ovtor,w o1 r<vaaoO�ojoO o00 oi�0 S,
o.�°� '000°� pO�Oao°SOO�oo�'O�o OOOeoor°O�oo°0 00 o000eo a�OKO.v�ov o�00 °'�,T�
a a�> O�Or�r,.. ,�°��� �° cage0�s- �ooaool0�O�0oo00 0000ov o00
s �'§ isg 4y azsoFo IO.oOe0o0oo.0 00 o O OaoOgJ00000
-d��o+�v��a��s�..3�s.s��'o-�sv_c�su�`��� o oo 000
............ �A°o'o:°ro °100�?9i0 5 EO o0*�000►��9
o.::�...�ioi 000i .�o.�i.uo �o.....uo � 00�° ° 0
'.:�y'�'�°O�i°BOO°°rOOO vI Ooroo o'.O�O,�oOo
,,9;000 0 ° R °° 900 000 o°O
RP, O O
:::���c; j�. C•.boo00o° o a oOeoovo°�io,.00°Oo°�:::
0
••• s 00•vo.o ooP °�oO�O;eot0o0.oav10 o0[00
...� c +o. o.00.•
oov id0 0 1rvo8" MIN.:`cs 9►�Ofo o� ov0o.00vo0or°ooro*o 0000_,�s,�sQfvovOLOeo�o°O°fo.000�0 00 O.e° O°000:.����'tioo o°;a ov rota .000 '�.:O4Uv°0'oo0p o000000�0�Oho.o�000O°oo00�i*ooOO000}oo000, + ovo•-,_����° O°0,0 0° o'*+ oo �00 O..r on$ 9 • 000 O0oo0 0 0 O'99000000°°':_• o;1i°� :oo oo.o• o o +'0.0 000 o.oy os �vO:voOOv oo a oo°.00 Oo 00000° gr
i,> 000ao00;o 0 oo°000.SIO 0 ff'-..�� ���,?.?� �° 00 O:er io o s�40�g ...��.�0. O,o O� ,000 °o a �:..:.CLASS A " STONE..-"S!'o�e°*a�0oO e ,e•.....- OtOrio /
GEO-TEXTILE LINER
RESIDENTIAL CONSTRUCTION ENTRANCE DETAIL
NOTE:
IN ADDITION THIS TEMPORARY GRAVEL ENTRANCE WILL REDUCE IMPACT OF STREET FLUSHING FEE
EFFECTIVE JULY 1, 1997. CITY OF GREENSBORO ORDINANCE SECT. 26-27, "STREET FLUSHING FEES".
C I T Y OF GREENSBORO
TEMPORARY CONSTRUCTION ENTRANCE DETAIL
(RESIDENTIAL SITES)
STD. NO.
REV.
436—B
09/06
03/09
STAPLE
CHECK
1I ITI=—
--III E11
MATTING IN DITCHES
III=III-
11 11111 I I I-111 (I I I
-1 I I-11 I-11 I-11 I-111
MATTING ON SLOPES
NOTES
18"
(MIN.)
BACKFILL
6" ,
(MIN.)
MATTING SHALL BE
PLACED IN TRENCH
AND BACKFILLED
EXISTING
GROUND
STAPLES ON
1CENTERS
IN TRENCH
6" MIN
STAPLES ON
1' CENTERS
IN TRENCH
D
AGRAV
3'
6
X�Staple
X
N
X
D
AGRAM OB
THIS DETAIL APPLIES TO STRAW, EXCELSIOR, COIR FIBER MAT AND PERMANENT SOIL REINFORCEMENT MAT
(PSRM) INSTALLATION AND AS DIRECTED.
STAPLES SHALL BE NO. 11 GAUGE STEEL WIRE FORMED INTO A "U" SHAPE WITH A MINIMUM THROAT WIDTH OF 1
INCH AND NOT LESS THAN 6 INCHES IN LENGTH.
Staple Check Pattern
L
99
Staple
4''
D
AGRAV
CD
NOT TO SCALE
0
✓
✓
ROADWAY STANDARD DRAWING FOR
INSTALLATION
0
z
N
1—
a
(SHEET 1 OF 1
1631.01
//\
VAjAAjAAjAAjAAjAAjA
\ j/AAA/AAA/AAA/AAA/AAA/�AA:V�
STREAMBED MATERIAL MIX
PERCENT
SIZE
x Mix
ROUND RIVER ROCK/GRAVEL
5% — 10%
5/8"
ROUND RIVER ROCK/GRAVEL
30% — 35%
1-1/4"
ROUND RIVER ROCK/GRAVEL
60% — 65%
2-1/2"
12" (MIN.) STREAM
BED MATERIAL
(SEE NOTE 1)
//
%
AA%AA%AA%AA%AA%
/
�%/AA /%/AA%/AA%/AA
V/VA/VA/VA/VA/VA/VA Vim`
/Vj
yAA/AA/AA/,A
NOTES:
1. IN FILL SECTIONS, BACKFILL WITH EXISTING
STREAMBED MATERIAL OR WITH STREAMBED
MATERIAL MIX AS DIRECTED BY ENGINEER.
2. IN CUT SECTIONS, EXISTING MATERIAL SHALL
REMAIN IN PLACE IF IT MEETS THE
REQUIREMENTS OF STREAMBED MATERIAL MIX.
OTHERWISE OVER EXCAVATE AND REPLACE WITH
STREAMBED MATERIAL MIX AS DIRECTED BY
ENGINEER.
TYPICAL BED LINING DETAIL (BED)
NOT TO SCALE
CONTRACT SHEET
5 OF 6
SENSITIVE INFORMATION
Not to be copied or
distributed without the
express written
permission of the City
of Greensboro.
Know what's below.
CaII before you dig.
City of Greensborolitlnderground
Locates Information/Requests
COG Water ResoOrces Dept.l336-373-2033
GDOT Traffic Signal 336-373-2606
COG/Guilford Co.Telecom___336-373-2084
COG Water Supply_ 336-373-5855
Tanks/Treatment Plants
GDOT Storm Water 336-373-2569
NPDES
General Permit
Applies
DISTURBED AREA =
0.24 Acres
FINAL DESIGN
JANUARY
2022
L
1 .SEAL 'r"'.
036233
01/12/2022 -
�f $ P
i`''iiititt' `'�
ARCADIS
Design & Consultancy
for natural and
built assets
ARCADIS G&M of North Carolina, Inc.
7029 Albert Pick Road, Suite 101
Greensboro, North Carolina 27409
Tel: 336-292-2271
www.arcadis.com
License No. C-1869
REVISIONS
TYPE
CONTRACT
CONTRACTOR
AS —BUILT
AUTH. DATE
BENCH MARKS
JOB# 30055500 PO#
ROADWAY
SEWER
###
DESIGNED
BY AMW/JLM
CONST. SURVEY BY
WATER
CHECKED
BY JLM
SIDEWALK
SCALE: AS NOTED
CITY OF GREENSBORO
ENGINEERING DIVISION
DEVONSHIRE STREAM
STABILIZATION PROJECT
CONSTRUCTION DETAILS
SHEET NO.
C4 of 6
CONTRACT SHEET
6 OF 6
ANCHOR STAKE
(SEE DETAIL
THIS SHEET)
TIE-IN MATTING
UNDER (12" MIN.)
NOTES:
BACKFILL AND
TRANSITION INTO
STREAMBANK/NATIVE
SOIL
1 1/2" COMPOST AND SEED
1. ANCHOR ECM IN A 12" DEEP ANCHOR TRENCH AT THE TOP OF THE SLOPE OR TOP LIMIT
OF ECM PLACEMENT. BACKFILL TRENCH AND TAMP EARTH FIRMLY.
2. UNROLL ECM DOWNSLOPE FROM ANCHOR. OVERLAP DOWNSTREAM FABRIC SHEET WITH 6"
UPSTREAM FABRIC SHEET.
3. ANCHOR SEAMS AT 12" CENTERS AT EDGE OF OVERLAPPED SHINGLE.
4. WHEN ECM MUST BE SPLICED VERTICALLY, PLACE END OVER END (SHINGLED IN UPSLOPE
DIRECTION) AND OVERLAP UPHILL EDGE WITH DOWNHILL EDGE WITH 12" OVERLAP AND
ANCHOR USING TWO STAGGERED ROWS OF STAKES AT 6" CENTERS AT SPLICE. ADDITIONAL
FASTENING MAY BE REQUIRED WHERE MATTING IS CUT TO INSTALL PLANTINGS.
5. LAY ECM MAT LOOSELY AND ANCHOR SUFFICIENTLY TO MAINTAIN DIRECT CONTACT WITH
THE SOIL. DO NOT STRETCH ECM.
6. FOR SLOPES 2:1 AND STEEPER, USE 3 ANCHOR STAKES PER SQUARE YARD. FOR SLOPES
FLATTER THAN 2:1, USE 2 ANCHOR STAKES PER SQUARE YARD.
7. ANGLE STAKES SUCH THAT EXPOSED PORTION FACES UPSTREAM.
8. ANCHOR, FILL, AND HAND COMPACT END OF ECM UNDER FOOTER ROCKS WHERE
APPLICABLE.
9. REDUCE ANCHORING DIMENSIONS IN AREAS OF NATURAL RESOURCES TO BE PROTECTED.
EROSION CONTROL MATTING DETAIL (ECM)
NOT TO SCALE
CLEAN WATER OUTLET
(SEE DETAIL THIS SHEET)
'T/
SEDIMENT SANDBAG DIKE
0
i
SEDIMENT
SANDBAG DIKE
DIRTY WATER FILTER BAG
(SEE DETAIL ON THIS SHEET)
41
4)/1 B% B'
t %t
CLEAN WATER
0 SANDBAG DIKE
It
DISCHARGE HOSES
DIRTY
WATER
PUMP INTAKE
HOS
WORK AREA
A
•
•
•
INTAKE
HOSE
•
•
•
•
0)
1
WORK AREA
CROSS SECTION B-B'
STREAM BED
PLAN VIEW
WORK AREA
CLEAN WATER
SANDBAG DIKE
CLEAN
WATER
PUMP
TOP OF
BANK
FLOW
SUMP HOLE OR POOL
TOP OF
BANK
IMPERVIOUS SHEETING
CROSS SECTION A -A'
STREAM BYPASS SCHEMATIC (SB)
NOT TO SCALE
FLOW
LAY IMPERVIOUS
SHEETING UNDER
SANDBAGS
SQUARE CUT
CUT 3" OPENING IN
ECM PRIOR TO MAKING
PLANTING HOLE
vv/vv/
VAA �/
/VA%VA%/
am 1/2" - 2"
y DIAMETER LIVE
/ CUTTING
\ \
ECM
GRADE
/\/vv/\\VA\VA/,v
BUDS (FACING
UPWARD)
ANGLE CUT
/V> \ 30' - 45'
NOTES:
1. SOAK LIVE STAKES FOR 24 HOURS AND RECUT BURIED ENDS AT 45'
ANGLE IMMEDIATELY PRIOR TO INSTALLATION.
2. DRILL/DRIVE PILOT HOLES PRIOR TO DRIVING LIVE STAKES INTO GROUND.
MAKE PILOT HOLES SLIGHTLY SMALLER THAN LIVE STAKE DIAMETER.
3. INSTALL TWO (2) ROWS OF LIVE STAKES AT 45° ANGLES IN STREAM BANK
BEGINNING 12" ABOVE NORMAL WATER SURFACE AND EXTENDING TO TOP
OF BANK.
4. RECUT ANY LIVE STAKE TIPS DAMAGED BY INSTALLATION.
5. INSTALL WHILE DORMANT (LATE FALL TO EARLY SPRING). DO NOT ALLOW
STAKES TO DRY OUT BEFORE PLANTED.
6. ENSURE EXPOSED PORTION OF LIVE STAKE CONTAINS AT LEAST 3 BUDS.
LIVE STAKE (LSTAKE)
NOT TO SCALE
SANDBAG (TYP.)
CLEAN WATER
DISCHARGE HOSE
NOTE:
8 OZ. NON -WOVEN
FILTER FABRIC
VELOCITY DISSIPATOR
FLOW
1. PLACE DISCHARGE HOSE AND
ANCHOR IN CENTER OF
VELOCITY DISSIPATOR
CLEAN WATER
DISCHARGE HOSE
FILTER FABRIC
SANDBAG (TYP.)
z
0
10' MIN.
PLAN VIEW
/// /// ///
CROSS SECTION C-C'
SANDBAG (TYP.)
L_J
STREAM BED
CLEAN WATER OUTLET DETAIL (CWO)
NOT TO SCALE
_t
BAG PLACED ON HIGH STRENGTH
AGGREGATE OR DOUBLE STITCHED
STRAW 'J' TYPE SEAMS
TOP VIEW
II I -_ �_I- 1
-11 l 111=I I H I 1111, 11�111=I l I-�-I 11E111®111E1 i 1-=
III I. I III IIIIII I I I hi I I®I I hi I I®111 111=111
AGGREGATE OR STRAW
UNDERLAYMENT
SEWN IN SPOUT
HIGH STRENGTH
STRAPPING FOR
HOLDING HOSE
IN PLACE
- WATER FLOW
FROM PUMP
PUMP
DISCHARGE
HOSE
OPENING
ACCOMODATES
UP TO 4'
DISCHARGE
HOSE
FILTER BAG DETAIL
NOT TO SCALE
STREAM BYPASS & DEWATERING:
INSTALL BYPASS PUMPS AND SUPPORTING MEASURES TO DIVERT FLOW AROUND INSTREAM CONSTRUCTION SITES.
COMPLETE IMPLEMENTATION OF SEDIMENT CONTROL MEASURES, BYPASS PRACTICES, AND ASSOCIATED CHANNEL
AND BANK CONSTRUCTION IN THE FOLLOWING SEQUENCE:
1. BEGIN WORK AT THE UPSTREAM SECTION AND PROCEED DOWNSTREAM. IN SOME CASES, WORK MAY BEGIN
DOWNSTREAM IF APPROPRIATE. THE SEQUENCE OF CONSTRUCTION MUST BE FOLLOWED UNLESS WRITTEN
APPROVAL FOR DEVIATIONS FROM ENGINEER IS OBTAINED. ONLY BEGIN WORK IN AN AREA WHICH CAN BE
COMPLETED BY THE END OF THE DAY INCLUDING GRADING ADJACENT TO THE CHANNEL. AT THE END OF
EACH WORK DAY, THE WORK AREA MUST BE STABILIZED AND THE STREAM BYPASS PUMPS AND SUCTION
PIPES REMOVED FROM THE CHANNEL. SANDBAG DIKES MAY BE LEFT IN PLACE UNTIL NO LONGER REQUIRED.
WORK SHALL NOT BE CONDUCTED IN THE CHANNEL DURING RAIN EVENTS.
2. SITUATE SANDBAG DIKES AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA. PUMP STREAM
FLOW (CLEAN WATER) AROUND THE WORK AREA. DISCHARGE (CLEAN WATER) ONTO A STABLE VELOCITY
DISSIPATER MADE OF RIPRAP OR SANDBAGS.
3. PUMP WATER FROM THE WORK AREA TO A SEDIMENT FILTERING MEASURE SUCH AS A DEWATERING BASIN,
SEDIMENT BAG, OR OTHER APPROVED SOURCE. LOCATE THE MEASURE SUCH THAT THE WATER DRAINS BACK
INTO THE CHANNEL BELOW THE SEDIMENT SANDBAG DIKE.
4. AVOID TRAVERSING A CHANNEL REACH WITH EQUIPMENT WHERE NO WORK IS PROPOSED. IF EQUIPMENT HAS
TO TRAVERSE SUCH A REACH FOR ACCESS TO ANOTHER AREA. USE TIMBER MATS OR SIMILAR MEASURES
TO MINIMIZE DISTURBANCE TO THE CHANNEL. USE TEMPORARY STREAM CROSSINGS ONLY WHEN NECESSARY
ONLY WHERE NOTED ON THE PLANS OR SPECIFIED.
5. INSTALL ALL STREAM RESTORATION MEASURES AS INDICATED BY THE PLANS. GRADE ALL BANKS IN
ACCORDANCE WITH THE GRADING PLANS AND TYPICAL CROSS -SECTIONS. STABILIZE ALL DISTURBED STREAM
BANKS AT THE END OF EACH WORK DAY WITH SEED AND MULCH OR SEED AND MATTING AS SHOWN ON
THE PLANS.
6. REMOVE CLEAN WATER DIKE AFTER ALL INSTREAM WORK IS COMPLETED AND STABILIZED. ESTABLISH A NEW
CLEAN WATER DIKE UPSTREAM FROM THE OLD SEDIMENT DIKE AFTER THE FIRST SEDIMENT FLUSH. REMOVE
THE OLD SEDIMENT DIKE UPON ESTABLISHMENT OF A NEW SEDIMENT DIKE BELOW THE OLD ONE TO
LAYDOWN OR OTHER UPLAND AREA.
7. INSTALL A BYPASS ON ANY TRIBUTARY OR STORM DRAIN OUTFALL WHICH CONTRIBUTES BASEFLOW TO THE
WORK AREA. INSTALL A SANDBAG DIKE AT THE DOWNSTREAM END OF THE TRIBUTARY OR STORM DRAIN
OUTFALL AND PUMP THE STREAM FLOW AROUND THE WORK AREA.
8. IF A TRIBUTARY IS TO BE RESTORED, CONSTRUCTION SHALL TAKE PLACE ON THE TRIBUTARY BEFORE WORK
ON THE MAIN STEM DOWNSTREAM. CONSTRUCTION IN THE TRIBUTARY SHALL FOLLOW THE SAME SEQUENCE
AS FOR THE MAIN STEM. WHEN CONSTRUCTION ON THE TRIBUTARY IS COMPLETED, WORK ON THE MAIN
STEM SHALL RESUME. CONTINUE BYPASSING THE TRIBUTARY AROUND THE WORK AREA IN THE MAIN STEM
UNTIL ALL RESTORATION IN STREAM IS COMPLETE.
9. PROVIDE ACCESS TO AND MAINTAIN ALL EROSION AND SEDIMENT CONTROL DEVICES UNTIL THE COUNTY
INSPECTOR APPROVES THEIR REMOVAL.
10. REGRADE AND REVEGETATE ALL DISTURBED AREAS AFTER CONSTRUCTION.
11. IF CHANNEL BED EROSION IS OCCURRING, INCREASE THE MATERIAL OR PLACEMENT SIZE OF THE OUTFALL
PROTECTION.
12. REMOVE AND REPLACE DAMAGED OR LEAKING SANDBAGS.
13. REMOVE OUTFALL PROTECTION MATERIALS AND GEOTEXTILE FROM THE CHANNEL AT THE COMPLETION OF
EACH CONSTRUCTION STAGE.
14. CHESTERFIELD WILL WITHHOLD PAYMENT EQUIVALENT TO ALL FINES RESULTING FROM NONCOMPLIANCE WITH
APPLICABLE REGULATIONS.
15. STAY WITHIN THE LIMITS OF THE DISTURBANCE AS SHOWN ON THE PLANS AND MINIMIZE DISTURBANCE
WITHIN THE WORK AREA WHENEVER POSSIBLE.
SENSITIVE INFORMATION
Not to be copied or
distributed without the
express written
permission of the City
of Greensboro.
Know what's below.
Call before you dig.
City of Greensboro Underground
Locates Information/Requests
ea
COG Water Resources Dept._336-373-2033
GDOT Traffic Signal__r___336-373-2606
COG/Guilford Co.Telecom_336-373-2084
COG Water Supply 336-373-5855
Tanks/Treatment Plants
GDOT Storm Water
336-373-2569
NPDES
General Permit
Applies
DISTURBED AREA =
0.24 Acres
FINAL DESIGN
JANUARY
2022
�i4Lti111)11}!{
CA O /,r
'Q!SEAL+'r . Y
036233 - -
0i/12/2a22 °
f f''Hi 1111 1�x4\
ARGaDIS
Design & Consultancy
for natural and
built assets
REVISIONS
TYPE
CONTRACT
CONTRACTOR
AS -BUILT
AUTH. DATE BENCH MARKS
ROADWAY
JOB 30055500 PO
DESIGNED BY AMW/JLM
CITY OF GREENSBORO
ENGINEERING DIVISION
ARCADIS G&M of North Carolina, Inc.
7029 Albert Pick Road, Suite 101
Greensboro, North Carolina 27409
Tel: 336-292-2271
www.arcadis.com
License No. C-1869
SEWER
###
WATER
SIDEWALK
CONST. SURVEY BY -
CHECKED BY JLM
SCALE: AS NOTED
DEVONSHIRE STREAM
STABILIZATION PROJECT
CONSTRUCTION DETAILS
SHEET NO.
C5 °F 6