Loading...
HomeMy WebLinkAbout20091321 Ver 2_Application_20110912w� W. �° r -y STATE OF NORTH CAROLINA 4o6 I? N�sgNL_V4 RU �I DEPARTMENT OF TRANSPORTATION '04, a w 41 BEVERLY EAVES PERDUE Eugene A. FN [y. GOVERNOR SECRETARY August 11, 2011 U.S. Army Corps of Engineers Wihnington Regulatory Field Office v Z %� P.O. Box 1890 Wilmington, North Carolina 28402 -1890 ATTN: Mr. Ronnie Smith NCDOT Project Manager: Dear Sir: Subject: Permit Modification for Section 404 Nationwide Permit 13, 23 33 and Section 401 Water Quality Certification for the replacement of Bridge 46 over the Cape Fear River on US 401 / NC 211 in Harnett County. Federal Aid Project number BRSTP- 401(146). Debit $570 from 33490.1.1; TIP No B -4138 Enclosed please find the revised site plan for the temporary Rock Causeway for the above referenced project. At the Environmental Pre - Construction Meeting that took place on September 22, 2010, the contractor, Dane Construction, Inc, had discussed the relocation of the Rock Causeway. The attached site plan shows the proposed Rock Causeway directly under the existing Bridge 46. This alignment will aid the contractor in the removal of the existing bridge and provide a safe means of undertaking the demolition. We are requesting a Permit Modification for the Nationwide Permit 33 which addressed the Temporary Rock Causeway. If you should have any questions, or need additional information please contact James J. Rerko, PWS at (910) 437 -0207. Sincerely, C Gregory J. Thorpe, D. Environmental Director Project Development and Environmental Analysis Branch W /ATTACHM ENT Mr. Brian Wrenn NCDENR DWQ (5 Copies) Mr. Mason Herndon NCDENR DWQ (1 Copy) P. O. Box 1150, Fayetteville, NC 28302 -1150 - Telephone (910) 437 -0207- Fax (910) 486 -1959 t F W/o attachment Dr. David Chang, P.E., Hydraulics Mr. Greg Perfetti, P.E., Structure Design Mr. Victor Barbour, P.E., Project Services Mr. Mark Staley Roadside Environmental Mr. Greg Burns, P.E., Division 6 Engineer Mr. Jay Bennett, P.E., Roadway Design - Mr. Majed Alghandour, P.E., Programming and TIP Mr. Art McMillan, P.E., Highway Design Mr. Scott McLendon, USACE, Wilmington Mr. Travis Wilson, NCWRC Mr. Gary Jordan USFWS Ms. Anne Deaton, NCDMF Mr. Ron Sechler, NMFS Mrs. Natalie Lockhart, PDEA Project Planning Engineer l: Dane Construction, Im PO Box 800 Mooresville, NC 28115 Telephone 704- 664-5042 Fax 704-663-2475 September 2, 2010 NC D%arhnent of Transportation Attn:' Mr. Randy K. 'Wise, PE PO Boot 1150 Fayetteville, NC 28302 Reference: Contract. C202335 — Harnett County (Dane Project No. 10-145) — Bridge over Cape Fear River and Approaches on US-401 B-4138 Subject: Causeway Layout Modification Dent Mr. Wise: To follow up with our earlier discussion regarding the temporary causeway on the above project please accept this letter as our request to modify the permitted layout. The permit for this project allows for a construction access and temporary placement of fill within 0.81 ac ofthe Cape Fear River for two phase construction of a temporary amsiruc Lion causeway_ Attached is a copy of our proposed modification for your iefereitce. We are requesting' that Phase 3 and 4 be allowed to access the existing structure for demolition operations. Please consider our request and notify us of your decision. If you have any questions or require farther won, please feel free to contact me. sincerely, DANE CONSTRUCTION, INC. Adam Holcomb Project Manager Cc: Project File MEN- loss v Ra ISO_ 'ip �Nx Ngpl .'N K RUA VA4 j.. 5 ` ! ( U11 011 C4=IM Malt