HomeMy WebLinkAbout20091321 Ver 2_Application_20110912w� W.
�° r -y
STATE OF NORTH CAROLINA
4o6 I?
N�sgNL_V4 RU �I
DEPARTMENT OF TRANSPORTATION '04, a
w 41
BEVERLY EAVES PERDUE Eugene A. FN [y.
GOVERNOR SECRETARY
August 11, 2011
U.S. Army Corps of Engineers
Wihnington Regulatory Field Office v Z
%�
P.O. Box 1890
Wilmington, North Carolina 28402 -1890
ATTN: Mr. Ronnie Smith
NCDOT Project Manager:
Dear Sir:
Subject: Permit Modification for Section 404 Nationwide Permit 13, 23 33 and Section
401 Water Quality Certification for the replacement of Bridge 46 over the Cape
Fear River on US 401 / NC 211 in Harnett County. Federal Aid Project number
BRSTP- 401(146). Debit $570 from 33490.1.1; TIP No B -4138
Enclosed please find the revised site plan for the temporary Rock Causeway for the above
referenced project.
At the Environmental Pre - Construction Meeting that took place on September 22, 2010,
the contractor, Dane Construction, Inc, had discussed the relocation of the Rock Causeway. The
attached site plan shows the proposed Rock Causeway directly under the existing Bridge 46. This
alignment will aid the contractor in the removal of the existing bridge and provide a safe means of
undertaking the demolition. We are requesting a Permit Modification for the Nationwide Permit
33 which addressed the Temporary Rock Causeway.
If you should have any questions, or need additional information please contact James J. Rerko,
PWS at (910) 437 -0207.
Sincerely,
C
Gregory J. Thorpe, D. Environmental Director
Project Development and Environmental Analysis Branch
W /ATTACHM ENT
Mr. Brian Wrenn NCDENR DWQ (5 Copies)
Mr. Mason Herndon NCDENR DWQ (1 Copy)
P. O. Box 1150, Fayetteville, NC 28302 -1150 - Telephone (910) 437 -0207- Fax (910) 486 -1959
t F
W/o attachment
Dr. David Chang, P.E., Hydraulics
Mr. Greg Perfetti, P.E., Structure Design
Mr. Victor Barbour, P.E., Project Services
Mr. Mark Staley Roadside Environmental
Mr. Greg Burns, P.E., Division 6 Engineer
Mr. Jay Bennett, P.E., Roadway Design -
Mr. Majed Alghandour, P.E., Programming and TIP
Mr. Art McMillan, P.E., Highway Design
Mr. Scott McLendon, USACE, Wilmington
Mr. Travis Wilson, NCWRC
Mr. Gary Jordan USFWS
Ms. Anne Deaton, NCDMF
Mr. Ron Sechler, NMFS
Mrs. Natalie Lockhart, PDEA Project Planning Engineer
l:
Dane Construction, Im
PO Box 800
Mooresville, NC 28115
Telephone 704- 664-5042
Fax 704-663-2475
September 2, 2010
NC D%arhnent of Transportation
Attn:' Mr. Randy K. 'Wise, PE
PO Boot 1150
Fayetteville, NC 28302
Reference: Contract. C202335 — Harnett County
(Dane Project No. 10-145) — Bridge over Cape Fear River and Approaches on
US-401
B-4138
Subject: Causeway Layout Modification
Dent Mr. Wise:
To follow up with our earlier discussion regarding the temporary causeway on the above project
please accept this letter as our request to modify the permitted layout. The permit for this project
allows for a construction access and temporary placement of fill within 0.81 ac ofthe Cape Fear
River for two phase construction of a temporary amsiruc Lion causeway_ Attached is a copy of
our proposed modification for your iefereitce. We are requesting' that Phase 3 and 4 be allowed to
access the existing structure for demolition operations. Please consider our request and notify us
of your decision.
If you have any questions or require farther won, please feel free to contact me.
sincerely,
DANE CONSTRUCTION, INC.
Adam Holcomb
Project Manager
Cc: Project File