Loading...
HomeMy WebLinkAbout20170887 Ver 1_Mitigation Information_20220119From: Davis. Erin B To: Baker. Caroline D Subject: FW: [External] Wildlands Cane Creek UMB, Bethel Branch Site (SAW-2016-02365) Year 3 Annual Monitoring Report Review and Credit Release Request Date: Friday, January 21, 2022 4:58:56 PM Laserfiche Upload: Email DWR #: 20170887 v.1 Doc Type: Mitigation Information From: Tugwell, Todd J CIV USARMY CESAW (USA) [mailto:Todd.J.Tugwell@usace.army.mil] Sent: Wednesday, January 19, 2022 1:33 PM To: Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov>; kathryn_matthews@fws.gov Cc: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.miI>; Jason Lorch <jlorch@wild landseng.com>; John Hutton <jhutton@wildlandsinc.com>; Jeff Keaton <jkeaton@wildlandseng.com> Subject: [External] Wildlands Cane Creek UMB, Bethel Branch Site (SAW-2016-02365) Year 3 Annual Monitoring Report Review and Credit Release Request CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon, The below reference bank Sponsor has submitted an Annual Monitoring Report for NCIRT review, and is requesting a release of credits. The Annual Monitoring Report has been posted to the RIBITS Cyber Repository for the bank site (see link and instructions provided below). If you are unable to access the document or prefer to have a hard copy mailed to you, please let me know as soon as possible, and I will arrange to get you a copy of the report. This review will follow the process outline for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)), which requires an IRT review period of 15 calendar days from the date of this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. Comments provided after the 15-day comment deadline may not be considered. If you would like to request a site visit prior to submitting comments, please notify me as soon as possible but prior to the 15-day comment due date. If a site visit is required, the due date for IRT comments will be extended to 15 days after the date of site visit. Once I have received a request for a site visit, I will coordinate with the IRT and Sponsor to arrange for the on -site meeting; however, please note that due to workload it may take a month or longer to arrange the meeting. Within 30 days of the conclusion of the IRT review period (comment deadline), a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve or disapprove this credit release. Sponsor: Wildlands Engineering Bank Name: Cane Creek Umbrella Mitigation Bank Site Name: Bethel Branch USACE ID: SAW-2016-02365 River Basin: Cape Fear HUC: 03030002 County: Chatham Requested Credit Release: Year 3 Annual Monitoring 10% of the total stream restoration and/or enhancement credits: 520.2 Warm Water Stream Credits 15% of the total wetland restoration and/or enhancement credits: 0.471 Riparian Wetland Credits 15-Day Comment Start Date: January 19, 2022 15-Day Comment Deadline: February 3, 2022 45-Day Credit Release Approval Deadline: March 5, 2022 NOTE: Deadlines will be extended if an on -site meeting is requested. Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside appropriate folder to view and/or download the documents. Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f? p=107:10:3637108807302::::P10 BANK ID:4458 Thank you and please contact me with any questions, Todd TugwelI Mitigation Project Manager Wilmington District, US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 (919) 210-6265 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service- surve Thank you for taking the time to visit this site and complete the survey.