Loading...
HomeMy WebLinkAbout20190593 Ver 6_I-5111_I-4739 Individual Modification Wake_Johnston January 21 2022_20220121 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J.ERIC BOYETTE GOVERNOR SECRETARY January 21,2022 U.S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest,NC 27587 Attn: Mr.Andrew Williams NCDOT Coordinator Subject: Modification Request for Section 404 Individual Permit, Section 401 Water Quality Certification and Neuse Riparian Buffer Authorization for Interstate 40 Widening and Improvements from I-440/US 64 (Exit 301) to just north of SR 1525 (Cornwallis Road), including improvements to NC 42 and SR 1010 (Cleveland Road) in Wake and Johnston Counties, Federal Aid Project No. IMNHF-040-4(139)301; TIP Numbers 1-5111 and 1-4739, Division 5. Debit$570 from WBS Element 42346.3.1. Dear Mr.Williams: As you are aware, the North Carolina Department of Transportation (NCDOT) applied for permits for the subject project on May 7,2019,and modifications on December 20,2019,May 28,2020,and August 31, 2020. The Corps of Engineers issued the Section 404 permit for the project on September 6, 2019, and modifications on February 11, June 11, and October 1, 2020, respectively. The North Carolina Division of Water Resources issued the 401 Water Quality Certification for the project on July 10, 2019 (NCDWR Project No. 20190593) and modifications on January 22, June 3, and September 16, 2020, respectively. This correspondence is to request modifications to Sites 1,4,44,47,and 48. Site 1: There will be a reduction in stream impacts, as the contractor will not replace 2 @ 42"pipes,per NCDOT preference. Additionally,the noise wall will now be shortened along with the berm ditch. • 13 linear feet decrease in permanent stream impacts • 14 linear feet decrease in temporary stream impacts • 1,334 square feet decrease in Allowable buffer zone 1 impacts • 856 square feet decrease in Allowable buffer zone 2 impacts Attached are the following revised permit drawings depicting the affected area, all of which have a revision date of November 19,2021: • Permit Drawing 3: Ditch detail sheet • Permit Drawing 9:plan sheet 4 without contours • Permit Drawing 10: plan sheet 4 with contours • Buffer Drawing 5: buffer plan sheet 4 MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION TELEPHONE: 919-707-6000 LOCATION: ENVIRONMENTAL ANALYSIS UNIT FAX: 919-212-5785 CENTURY CENTER,BUILDING A 1598 MAIL SERVICE CENTER 1000 BIRCH RIDGE DRIVE RALEIGH NC 27699-1598 WEBSITE:NCDOT.GOV RALEIGH NC,27610-4328 Site 4: Noise wall installation required a stormwater drainage system shift beyond the cut/fill line and outside of the noise wall(Plan Sheet 7),which resulted in moving the noise wall further to the east(Plan Sheet 8). Therefore, additional buffer impacts are proposed. • 1,187 square feet increase in Allowable buffer zone 1 impacts • 973 square feet increase in Allowable buffer zone 2 impacts • 614 square feet increase in Mitigable buffer zone 2 impacts Attached are the following revised permit drawings depicting the affected area, which have a revision date of either November 19,2021 or January 6,2022: • Buffer Drawing 7: plan sheet 7 • Buffer Drawing 8: plan sheet 8 • Buffer Drawing 45: buffer summary table Site 44: The following three modifications area proposed. 1) Wetland WEP(1)impacts were not accounted for originally while buffer impacts in the same area were permitted. Since this entire area was needed for construction access and for installation of erosion control measures, mechanized clearing in wetlands is now proposed for the portion of this wetland within the ROW. 2) Outlet of SEQ: Design adjustments eliminated the need for a 54"WSP trenchless installation at -L- 115+00 to STA 118+00 by keeping stormwater along west bound side of the highway. The resulting pipe systems were slightly shortened during the field adjustment so that they would better align with the stream channel and prevent instability to the stream bank. Additionally due to construction accessibility and existing channel instability, rip rap was extended to the ROW line. 3) In the upstream of SEQ (-L- RT east bound side), there was a temporary channel change previously permitted. But based on site conditions, the contractor and Division agreed that the site would be more stable if the stream was left in the temporary channel as opposed to shifting back to the original, thus the temporary stream impacts are now permanent. No additional increases to surface waters,wetlands,nor buffers are proposed in this area. • 0.01 acre increase in mechanized clearing in wetland • 11 linear feet increase of permanent bank stabilization • 11 linear feet decrease of temporary stream impacts Attached are the following revised permit drawings depicting the affected area, all of which have a revision date of November 19,2021: • Permit Drawing 7: Ditch detail sheet • Permit Drawing 91: plan sheet 42 without contours • Permit Drawing 92: plan sheet 42 with contours Sites 47 and 48: Based on field conditions, the contractor had to adjust the pipe placement which necessitated a larger PDE to allow for installation of a berm (requested by NCDOT Central Hydraulics Unit). This made stream SLW at site 48 a total take, increased buffer impacts at Site 47, and removed temporary stream impacts from site 47 due to the new limits of riprap (the temporary stream impacts became permanent - location of bank stabilization of permanent impact now starts where stream is no longer realigned). Site 47: • 35 linear feet increase of permanent stream impacts • 24 linear feet decrease of permanent bank stabilization • 11 linear feet decrease of temporary stream impacts • 270 square feet increase of Allowable buffer zone 1 impacts • 981 square feet increase of Allowable buffer zone 2 impacts Site 48: • 69 linear feet increase of permanent stream impacts • 51 linear feet decrease of temporary stream impacts Attached are the following revised permit drawings depicting the affected area, all of which have a revision date of either November 19 or December 14, 2021: • Permit Drawing 7: ditch detail sheet • Permit Drawing 96: plan sheet 45 without contours • Permit Drawing 97: plan sheet 45 with contours • Permit Drawing 124: summary table • Permit Drawing 125: summary table • Buffer Drawing 51: buffer summary table • Buffer Drawing 52: wetlands in buffer impact summary table Compensatory Mitigation These changes resulted in a total increase of 10 feet of stream impacts, including changes at Sites 1, 44, 47 and 48. For riparian buffers, there are 614sq. feet of additional impacts in buffer Zone at Site 4. Site 44 also has an additional 0.01 acre of mech clearing in wetlands. NCDOT has requested the appropriate additional mitigation from the N.C. Division of Mitigation Services, and a copy of their acceptance letter is attached. REGULATORY APPROVALS Section 404: NCDOT requests modification to the USACE Individual 404 Permit for the project as required for the above-described activities. Section 401: We are also requesting modification of the Section 401 Individual Water Quality Certification and Neuse Riparian Buffer Authorization from NCDWR. We are providing this request to NCDWR, for their approval. Authorization to debit the$570.00 Permit Application Fee from TIP No. I- 5111/I-4739/WBS 42346.3.1 is hereby given. A copy of the permit modification request and its distribution list will be posted at https://xfer.services.ncdot.gov/pdea/PermApps/. If you have any questions or need additional information, please contact Gordon Cashin at gcashin@ncdot.gov or 919-707-6107. Sincerely, E14DocuSigned by: ,6k C. R4c4.444 I11 AAAD1248B309416... for Philip S. Harris,III,P.E., C.P.M. Environment Analysis Unit Head ,STATEa` ROY COOPER. o Governor 47 a ELIZABETH S.BISER n� Secretary *`$` v10,,, MARC RECKTENWALD NORTH CAROLINA Director Environmental Quality January 19,2022 Mr. Philip S. Harris, III,P.E., CPM Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh,North Carolina 27699-1598 Dear Mr. Harris: Subject: DMS Mitigation Acceptance Letter: I-5111 /I-4739,I-40 Widening,Wake and Johnston Counties References: USACE 404 Individual Permit issued September 6, 2019 and Modifications issued February 11,June 11, and October 1, 2020 (USACE Action ID 2009-00556) NCDWR 401 Water Quality Certification issued September 4,2019 and January 22, June 3, and September 16, 2020 (NCDWR ID 2019-0593) The purpose of this letter is to notify you that the Division of Mitigation Services(DMS)will provide the additional stream,wetland, and buffer mitigation for the subject project. Based on the information supplied by you on January 18,2022,the impacts are located in CU 03020201 of the Neuse River basin in the Central Piedmont(CP)and Northern Inner Coastal Plain(NICP)Eco-Regions, and are as follows: Table 1 —Additional Impacts (feet/ acres) Neuse Stream Wetlands Buffer(Sq.Ft.) 03020201 Non- Coastal CP/NICP Cold Cool Warm Riparian Riparian Marsh Zone 1 Zone 2 Impacts(feet/acres) 0 0 102.000 0 0.010 0 0 921.000 *NOTE: Some of the stream impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. This additional impact and associated mitigation needs were not projected by the NCDOT in the 2021 impact data. DMS is currently providing stream,riparian wetland and buffer mitigation for the impacts associated with this project located in cataloging unit 03020201 of the Neuse River basin as required by the 404 and 401 permits issued in 2019 and 2020, as shown in the below table (in mitigation credits) D E��,- North Carolina Department of Environmental Quality iDivision of Mitigation Services ®Jl� 217 West Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 NOI1 I H CAFROIN/ Depettment of Environmental ouainx\ 919.707,8976 Mr. Harris TIP 1-5111 /1-4739 January 19,2022 Page Two Table 2—Current Permitted Impacts and Associated Mitigation Requirements provided by DMS (based on issued permits) and Revised Anticipated Impacts(based on mitigation request) Total Permitted Mitigation Provided by Additional Revised Total Impact Type Impacts DMS per Issued Impact(for Impacts* (feet/acre/sq ft) Permits(Credits) approval) Stream(warm) 6,452.000 12,904.000 102.000 6,554.000 Riparian Wetland 1.010 2.020 0.000 1.010 Non-riparian 0.000 0.000 0.010 0.010 Wetland Buffer—Zone 1 291,081.000 873,243.000 0.000 291,081.000 Buffer—Zone 2 161,873.000 242,810.000 614.000 162,487.000 *Some of the additional stream impacts may be proposed to be mitigated at a 1:1 mitigation ratio.See permit application for details. DMS will provide the amount of mitigation as determined by the regulatory agencies. All buffer mitigation requests and approvals are administrated through the Riparian Restoration Buffer Fund. The NCDOT will be responsible to ensure that appropriate compensation for the buffer mitigation will be provided in the agreed upon method of fund transfer. Upon receipt of the NCDWR's Buffer Authorization Certification,DMS will transfer funds from the NCDOT 2984 Fund into the Riparian Restoration Buffer Fund. Upon completion of transfer payment,NCDOT will have completed its riparian buffer mitigation responsibility for the additional buffer mitigation required for TIP Number 1-5111 /1-4739. Subsequently,DMS will conduct a review of current NCDOT ILF Program mitigation projects in the river basin to determine if available buffer mitigation credits exist. If there are buffer mitigation credits available,then the Riparian Restoration Buffer Fund will purchase the appropriate amount of buffer mitigation credits from NCDOT ILF Program. This mitigation acceptance letter replaces the mitigation acceptance letter issued on April 26,2019 and January 15,May 27,and September 11,2020. DMS commits to implementing additional sufficient stream,wetland and buffer mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In-Lieu Fee Instrument dated July 28,2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information,please contact Ms. Beth Harmon at 919-707- 8420. Sincerely, (%:rea JG pi/aiI-m.6pi James`B. Stanfill DMS Asset Management Supervisor cc: Mr. Monte Matthews,USACE—Raleigh Regulatory Field Office Ms. Amy Chapman,Division of Water Resources,Wetlands/401 Unit File: I-5111 /I-4739 Mod 4 � NorthWest Carolina Jones DepartmentStreet11652 ofMail EnvironmentalServiceCenter QualityI 1Raleigh DivisionNorth of MitigationCarolina27699-1 Services 217 , 652 NORTH[.THO_INA o.n.*..ntow Emnronmenlal /".° 919.707.8976 PROJECT REFERENCE NO. SHEET NO. l-5//i/l-4739/U-6093 2D-2 DITCH DETAILs •• 1 PERMIT DRAWING ROADWAY DESIGN HYDRAULICS DESIGN SHEET 3 O F 12 5 ENGINEER ENGINEER DETAILREVISED 1 V19/2021 AD DETAIL AE DETAIL AP DETAIL AT SPECIAL LATERAL BASE DITCH SPECIAL LATERAL 'V' SWALE SPECIAL LATERAL BASE DITCH ( Not to Scale) ( Not to Scale) ( Not to Scale) STANDARD BASE DITCH ��� ( Not to Scale) Natural �\�P,� Natural Natural Ground ?• O� Fill Natural o� Fill j 1 Slope Natural ° Fill 1 Ground Ground DETAIL BF X d • D 3 f3I \°'\ Slope Ground Fq °r D F\a'�'�e� Slope � FALSE SUMP I Ground 4f or D �� O ter I �i l Min. D=2.0 Ft. Min. D= SEE BELOW I B I ( Not to Scale) O Geotextile B Min. D=SEE BELOW Min. B=3.0 Ft. B= SEE BELOW Max. d-SEE BELOW Min. D=SEE BELOW Outside Ditch Ll- STA. 63 +81 LT, B=2.0', MIN D-1.5' Traffic Flow A 20: 'I2.0 B=4.0 Ft. -LWB- STA. 33 +50 TO STA. 34+50 RT L=172 BEG. EL=202.40 END EL=201.50 S=0.52% NO' Type of Liner= CL B Rip-Rap -L1- STA. 16+00 TO STA. 17+00 RT, D=1.0' -Y1RPBD- STA. 32 +50 RT, B=4' MIN D=2.0' -L1- STA. 65+76 TO STA. 66+00 LT -Ll- STA. 33 +50 TO STA. 34+00 LT, D=1.0' L=173', BEG. EL=231.15', EN EL=224.00', S=4.1% GI MIN D=1.25', MAX d=1.25' -Ll- STA. 56+50 TO STA. 57+00 LT, D=1.0' -Y1RPBD- STA. 38+00 LT, B=6', MIN D=1.0' E' S etc. -Ll- STA. 67+00 TO STA. 71 +00 LT, D=1.0' L=50' BEG. EL=242.00' END EL=244.00' S=4.0% -Ll- STA. 72 +50 TO STA. 73+00 LT, D=1.0' -Y1iRPBD- STA. 38+50 LT, B=6' MIN D=1.0' S= Ditch Slope C Proposed Ditch -Ll- STA. 107+60 TO STA. 109+00 RT, D=1.0' L=248', BEG. EL=244.00', EN EL=234.00', S=4.0% -L1- STA. 112 +50 TO STA. 115+00 LT, D=1.0' -Li RT- STA. 472 +65 LT, B=6', MIN D=1.0' -Ll- STA. 113+50 TO STA. 121 +50 RT, D=1.5' L=211' BEG. EL=212.20', END EL=214.30', S=1.0% -L1- STA. 115+50 TO STA. 121 +50 LT, D=1.0' DETAIL AY -Y3 RPA-, STA. 23 +52 RT, B=2.5', MIN D=2.0' -Ll- STA. 125+00 TO STA. 126+00 LT, D=1.0' STANDARD BASE DITCH L=16', BEG. EL=251.00', END EL=250.90', S=0.62% -L1- STA. 126+50 TO STA. 12 7+00 RT, D=1.0' ( Not to Scale) -L1- STA. 12 8+50 TO STA. 130+00 LT, D=1.0' DETAIL BB -L1- STA. 130+00 TO STA. 131 +50 RT, D=1.5' Natural Natural PIPE OUTLET CHANNEL STABILIZATION ai -L1- STA. 132 +50 TO STA. 134+00 RT, D=1.0' Ground 2•/ 9,•:\ Ground Y. -L- STA. 135+00 TO STA. 135+50 LT, D=1.0' d I D DETAIL BA ( Not to Scale) a RIP RAP AT EMBANKMENT -L1- STA. 138+50 TO STA. 140+00 RT D=1.5' "''" urul� qe _ Natwal Q -L1- STA. 140+50 TO STA. 142 +00 RT, D=1.5' Geotextile B Min. D= SEE BELOW ( Not to Scale) Ground FT,ST�A 2/ ,to �,� Ground -Ll- STA. 137+00 TO STA. 138+00 LT, D=1.0' '�c A To tie ,,\N. ti G T=15" (CL I) Max. d= SEE BELOW 10'min. \S��a T=12" (CL B) W -L1- STA. 138+50 TO STA. 139+00 LT, D=1.0' B SEE BELOW 66 -NW6- STA. 36+34 TO STA. 37+34 LT, D=1.0' Ditch ( ) Geotextile Geotextile -LWB- STA. 18+00 TO STA. 19+00 LT, D=1.0' Grade 1.0'min. T=15" CL C -Y1RPBD- STA. 29+75 TO STA. 30+50 LT, D=1.0' Type of Liner= SEE BELOW & 12" (CL B) CHANNEL BED (4 ' � (Variable) 1, * -L1- STA. 59+50 TO STA. 61 +00 LT, �� dMIN. D=2.5' MAX d =2.0', B=4.0', TYPE OF LINER=CL I RIP-RAP GEOTEXTILE Length= SEE BELOW 1:::: d s.1 FROM -Y2A- STA. 09+ 78 TO STA. 10+06 RT, Type of Liner= CL I or B Rip-Rap - Keyed-In (SEE BELOW) a MIN D=2', MAX d=1.5' B=3.0', TYPE OF LINER=CL B RIP-RAP V) N _ Type of Liner= SEE BELOW -LEB- STA. 12 +14 RT, L=10', CL B RIP RAP FROM -Y2A- STA. 10+18 TO STA. 11 +05 RT, -Y1RPBD- STA. 46+80 LT, L-10', CL B RIP RAP J Q o DETAIL BK MIN D=1.5, MAX d=1.3, B=3.0', TYPE OF LINER=CL B RIP-RAP -Ll- STA. 40+20 LT, CL I RIPRAP SPECIAL CUT DITCH w/HINGE -Y1RPA- STA. 32 +43 RT, MIN D=2.0', MAX d=1.7 , B=3.0 cum 44 In V) ( Not to Scale) L=42', BEG. EL=226.40', END EL=225.10', S=3.30% p 0, -� �! Natural TYPE OF LINER=CL B RIP-RAP DETAIL BP 02 (D Co Ground BERM BASE DITCH Z N O�v-4 ���, Front DETAIL BN J w W Q 4 -•0 �,i co a �A °� Ditch DETAIL BM CHANNEL CHANGE ( Not to Scale) p 3 M�Q� d F/pe; D \a'c'�e Slope BERM BASE DITCH ( Not to Scale) b NI O I ct I ( Not to Scale) b Natural ../ \d,��e • Natural LL Q�2� Geotextile - Min. D= 1.0 Ft. b y I Proposed Ground °rF o,c v=c c Type of Liner= CL I Rip-Rap Max. d= 1.0 Ft. etl I Natural _ Fill Slope Ground Wit D vI:k = d er ` ..--°' a = )-�rv) L?! Natural?/ \d``\` I-- v I -L1- STA. 144+00 TO STA. 144+50 RT °r F RDWY- Ground 4.1 . 1"/Ft. W �240�1 -Y3RPA- STA. 22 +00 TO STA. 22 +50 LT Grounddl F/after D fr.\ d D D�,:. ` _ / Min. D= 1.0 Ft. '�L•i�'' - ,4 O_M Max. d= 1.0 Ft. Q W Q •�W O `g .> GEOTEXTILE Min. D=1.0 Ft. Exist. Channel' Min. B= 4.0 Ft. � � Min. D= 1.5 Ft. Max. d=1.0 Ft. Min. b= 4.0 Ft. Type of Liner= Concrete 141414.. DETAIL BR Max. d= 2.0 Ft. B=2.0 Ft. -NW3- STA. 10+96 TO STA. 12 +49 RT a0Qa 4 v DETAIL BQ SPECIAL LATERAL 'V' DITCH Min. B= 2.0 Ft. -NW3- STA. 16+26 TO STA. 16+77 RT `1 W J~Ja -.1 SPECIAL CUT DITCH ( Not to Scale) Min. b= 4.0 Ft. Type of Liner= Concrete Type of Liner= Class "I" Rip Rap a2�W a I\ v Q 1 ( Not to Scale) Fill -NW6- STA. 32 +76 TO STA. 33+77 LT Q ti?ct Q 0 Front 2•, d( Slope -L1- STA. 149+00 LT 00,Et .c Ditch Natural Fj or `L' \\e'( 031� 0O Natural �'1 �e� Slope Ground Offer D F\o �Q ��Cr� Ground f?j°r F\d'` dl DETAIL CE lVLuc3 •/w D GEOTEXTILE DETAIL CC , ' cLI ° cu er Min. D=SEE BELOW Min. D=SEE BELOW DETAIL CD STANDARD V DITCH OIL O SPECIAL LATERAL BASE SWALE w/HINGE ( Not to Scale) DETAIL CF lV O� �? Type of Liner= SEE BELOW Max d=1.2 Ft. ( Not to Scale) TOE PROTECTION Et CI _.. ...1-- Natural BERM DITCH O Q2� rZ ( Not to Scale) Natural Natural 2 i O v 2 -L1- STA. 123+00 TO STA. 123+50 RT, D=2.0' -Y3RPA- STA. 22 +50 TO STA. 23+85 LT, CL 1 RIPRAP, D= 1.0' Ground ii, \a,�,cet Ground �.j T 1 Ground ( Not to Scale) Z C.? QQ OI, O -Y2- STA. 16+00 TO STA. 16+50 LT, D=1.0' -Y3 RPA- STA. 23+85 TO STA. 26+00 LT, CL 1 RIPRAP, D= 1.5' �,‹ oC Fill O D �" z J ti ti Q N L Z ti -Y2- STA. 17+00 TO STA. 19+00 LT D=1.0' -Y3RPC- STA. 24+50 TO STA. 25+00 RT, MATTING, D=1.0' j 3'1 Sloe ,L.1 �� FILL d = Q Q Q , p SLOPE p Q N O a W N -Y3RPC- STA. 19+00 TO STA. 2 9+00 LT, D=1.5 offer Tr' GROUND RAL F\'P N 3 v I� N W W O Min. B Ii 5.0' 4.0' 5.0' `-B I d Geotextile QO (4 jjQ Q DETAIL CA DETAIL CB 6.0 F Min. D=1.0' GEOTEXTILE Min. D= 1.5 Ft. 2.0' � WW Q vri ��Q�� � BERM BASE DITCH Min. B=4 Ft. Type Rip-Rap Max. d= 1.0 Ft. d= 1.0 Ft. T e of Liner= CL I Ri Ra ( Not to Scale) SPECIAL LATERAL BASE DITCH i I i 1 1 I Q •I ( Not to Scale) -L1- STA. 148+50 TO STA. 150+50 RT -Ll- STA. 40+25 TO STA. 40+40 LT ?/ D .I I O OON i ,yet Type of Liner= CL B Rip-Rap d � 0pp000 N Natural ?j° �Q\off RDWY -Ll- 30+00 TO 30+50 RT Geotextile NcV NN Jc 1 O Ground r T o Natural DETAIL CL I ! III !I I 0 N d = 'Pp/ ' u9'. Ground 2•j 'Z� Slope Min. D= 1.5 Ft. oONOrn SPECIAL CUT SWALE w/HINGE 1� i i i i I B GEOTEXTILE d t • ° DETAIL CJ ( Not to Scale) Type of Liner= CONCRETE Max. d= 0.5 Ft. totp p) Min. D=1.5 Ft. Natural Yp O O 00000 Max. d=1.5 Ft Geotextile B, SPECIAL LATERAL 'V' DITCH Ground 9P, a,c,ke< -NW6- STA. 33 +77 TO STA. 36+34 LT Cr e of Fill -NW2- STA. 16+00 TO STA. 18+92 RT ( Not to Scale) '9 F i i I i i i I I Min. B=2.0 Ft. Min. D= 3.0 Ft. DETAIL CK `.*/or D 31 Slope -NW4- STA. 10+31 TO STA. 29+12 RT 2222222 2 Min. b=4.0 Ft. 0 0 0 0 0 0 o O Max. d= 2.5 Ft. v) tit vt0 �v)cn tt Type of Liner= CL B Rip-Rap B= 6.0 Ft. Roadway Roadway STANDARD 'V' DITCH °ffer -NW4- STA. 29+12 TO STA. 33+00 RT -»»» > Type of Liner= SEE BELOW •• ( Not to Scale) Min. E-- Min. D=1.5' -NW4- STA. 33 +00 TO STA. 45+15 RT cu cu cucucucucu 14.1 -LEB- STA. 23+00 TO 25+50 RT -L1- STA. 61 +00 TO STA. 62 +00 LT CL 1 RIPRAP F�9j OR D `L'.\��� 6.0' W ki ki ki -NW3- STA. 10+00 TO STA. 10+96 RT N N���� -Ll- STA. 62 +00 TO STA. 62 +50 LT, CL B RIPRAP �4 F\,P -NW3- STA. 12 +49 TO STA. 16+26 RT 2222222 2 Min. D=1.0 Ft. Natural Natural -NW3- STA. 16+77 TO STA. 19+60 RT O O 00000 O Ground j D �.•\ Ground -L1- STA. 140+00 TO STA. 140+50 RT -NW1- STA. 16+96 TO STA. 21 +40 LT -Ll- STA. 112 +50 TO STA. 113+50 LT -L1- STA. 142 +00 TO STA. 144+00 RT -NW5- STA. 11 +80 TO STA. 14+80 RT -Ll- STA. 132 +50 TO STA. 135+00 RT -NW5- STA. 15+30 TO STA. 27+30 RT DETAIL CG DETAIL CH -Ll- STA. 133+50 TO STA. 135+00 LT Min. D= Ft. -NW6- STA. 19+47 TO STA. 21 +09 LT SPECIAL LATERAL 'V' DITCH SPECIAL LATERAL BASE DITCH -L1- STA. 135+50 TO STA. 136+50 LT DETAIL CP -NW5- STA. 27+30 TO STA. 29+51 RT ( Not to Scale) ( Not to Scale) -L1- STA. 61 +00 TO STA. 61 +50 RT CONCRETE DITCH -NW5- STA. 35+80 TO STA. 42 +31 RT -L2LT- 457+50 TO STA. 458+88 LT (WITH RIP RAP SLOPE PROTECTION) O� ( Not to Scale) O Natural z �.� ' . Fill DETAIL C N Natural •\ �� Fill Ground F4,1 j OT �.' Slope Vq • \e Ground �c / OR D ��p.� Slope TTFR F SPECIAL LATERAL BASE DITCH ~i°,6i �ot\c"4,1 p TTFR Min. D= 1 Ft. ( Not to Scale) DETAIL CO CONCRETE f B= 4 Ft. STANDARD BASE DITCH D- 0-1 Ft.* Min. D= 1 Ft. Natural ./o 1 of Variable ( Not to Scale) -Ll- STA. 57+00 TO STA. 57+30 LT -L1- STA. 32 +00 TO STA. 38+00 RT Ground d I/offer D F\d.\\ec SlFiol pe e Natural *UTILIZE 2:1 SLOPE AT TIE-IN WITH MSE WALL -L1- STA. 66+00 TO STA. 67+00 RT p Natural DITCH AND TRANSITION TO MATCH SLOPE -L1- STA. 124+00 TO STA. 124+50 LT ..• '' Ground 1 Ground -Ll- STA. 152 +00 TO STA. 152 +50 LT -L1- STA. 68+00 TO STA. 71 +00 RT Geotextile B �'I OF PROPOSED ROADSIDE DITCH. TRANSITION -L1- STA. 145+50 TO STA. 146+00 RT LENGTH SHALL BE A MINIMUM OF 10'. PLANS PREPARED BY: -LWB- STA. 18+50 TO STA. 19+50 RT Min. D= SEE BELOW -Y1RPBD- STA. 30+50 TO STA. 33+00 LT INSTALL CLASS B RIP RAP AT BASE OF Max. d- SEE BELOW Min. D= 1.0 Ft. CONCRETE DITCH AND EXTEND TO BASE -Y1RPBD- STA. 15+50 TO STA. 18+00 RT -Y1RPBD- STA. 32 +50 TO STA. 36+00 RT -Y1RPBD- STA. 18+50 TO STA. 21 +00 RT B= 7.0 Ft. -Y1RPBD- STA. 29+50 TO STA. 32 +21 RT -LWB- STA. 20+50 TO STA. 24+50 LT B= 4 Ft. OF PROPOSED ROADSIDE DITCH. RS•sil Type of Liner= CL I RIP RAP -L1- STA. 113+00 TO 113+50 RT -Y1RPBD- STA. 60+75 TO STA. 63 +00 RT -Ll- STA. 144+50 TO STA. 144+79 RT, Rip Rap Slope Protection= 4 TONS CL-B Rip-Rap -Y3RPA- STA. 26+00 TO STA. 28+00 LT 8 SY GEOTEXTILE -Y2- STA. 13+31 TO STA. 16+00 LT MIN D=1.25', MAX d=1.25' RS&H Architects-Engineers-Planners, Inc. -Y2- STA. 19+00 TO STA. 22 +25 LT -L1- STA. 145+00 TO STA. 145+50 RT, FROM -L1- STA. 29+84 TO STA. 30+09 RT 8521 SIX FORKS ROAD, SUITE 400 -Y2- STA. 25+25 TO STA. 27+90 LT MIN D=1.0', MAX d=1.0' FROM -L1- STA. 30+47 TO STA. 30+72 LT RALEIGH, NORTH CAROLINA 27615 -Y2- STA. 41 +25 TO STA. 42 +50 LT NC LICENSE NO. F-0493 (919) 926-4100 PROJECT REFERENCE NO. SHEET NO. 1-5111/1-4739 2D-6 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER DETAIL BX DETAIL AR DETAIL AS DETAIL AT BERM STANDARD BASE DITCH SPECIAL LATERAL'V'DITCH STANDARD BASE DITCH (Not to Scale) (Not to Scale) (Not to Scale) (Not to Scale) b Natural Natural Natural Natural Ground NF:),X1NGroundNatural , Ground 1 Ground Ground D �•' H dNatural 3, 1 °< Fill ��/C° 2yMin.D=2.25 Ft. Ground poyto. D FVo'6a Slope v Geotexe �g� °n'e� Min.D= SEE BELOW Min.D= 1.0 Ft. Max,d=2.25 Ft. B= SEE BELOW b= 1.0 Ft. When B is<6_0' B=5.0 Ft. Std.No.876.01 Min.D= 1.0 Ft. -L-STA.429+48 RT,L=250',S=0.3% DOCUMENT NOT CONSIDERED FINAL -Y1RPA-STA.17+50 RT,L=35' Type of Liner= CL I Rip-Rap BEG.EL=273.50',END EL=272.80' UNLESS ALL SIGNATURES COMPLETED -L-STA.447+93 RT,L=34,5=2.1% -L-STA.454+50 TO STA.455+77 RT D=2.5',B=3.0' BEG.EL=257.30';END EL=256.60' -Y5LPB-STA.13+82.47 TO STA.17+50 RT PERMIT DRAWING SHEET 7 OF 125 REVISED 08/11/2020 DETAIL AU DETAIL AV DETAIL AW DETAIL AX DETAIL AZ REVISED 11/1/ 9/2021/ SPECIAL CUT BASE SWALE LATERAL BASE DITCH BERM BASE DITCH LATERAL BASE DITCH LATERAL'V' DITCH REVISED 021 (Not to Scale) (Not to Scale) (Not to Scale) (Not to Scale) (No}to Scale) Natural `3'7 0< Front Natural I f— Natural 1 RDWY Natural jC4q OR \O%� b Ground or A'1 es Ditch Ground 7 1„fit_ Fill 7 '3' Ground F,q '� 1�.}. Fill •i' ♦ 6 Ground 3. �' C 6 Natural I h Fill F7ah`e D F�°� Slope d I D 'S.: Slope d yryD� d( � D F '', Slope Ground 3.y D ,j.� 15fl. Slope Min.D=1.0 Ft. GEOTEWILE Min.D=1.0 Ft. � '• GEOTEXTILE '� GEOTEXTILE-2 Min.D=SEE BELOW Min.D= 1.0 Ft. Max.d=1.0 Ft. Min.D= 2.25 FT. 6=5.0 Ft. B=4.0 Ft. Max.d= 1.0 Ft. Max.d= 2.25 Ft. 'When B is< 6.0' B= 4.0 Ft. B=4.0 Ft. *When B is< 6.0' B= 4.0 Ft. -L-STA.237+00 TO STA.241+50 LT b= 5.0 Ft. b=5.0 Ft. 6= 5.0 Ft. Y2-STA.55+75 TO STA.57+50 LT,D=1.0' -Y2LPD-STA.16+20 TO STA.18+81 RT,D=1.0' -L-STA.229+50 TO STA.231+50 LT,CL B -L-STA.122+50 TO STA.126+50 LT -L-STA.231+00 TO STA.231+75 RT,CL I -Y2RPD-STA.24+43 TO STA.25+27 LT,D=2.25' -L-STA.231+75 TO STA.233+00 RT,CL I -L-STA.234+50 TO STA.238+00 RT -L-STA.233+00 TO STA.234+00 RT,CL B -SR1-STA.10+70 TO STA.12+50 LT,D=1.0' -L-STA.234+00 TO STA.235+00 RT,CL B -LCDWB-STA.99+23.62 TO STA.103+26.82 LT,CL I -YI-TEMP-STA.19+50 TO STA.21+39 RT,D=1.0' -L-STA.235+50 TO STA.237+00 LT,CL B -Y2RPA-STA.22+75 TO STA.23+40 LT,CL I -L-STA.243+00 TO STA.245+50 LT,CL B -L-STA.263+00 TO STA.268+88 LT,CL B DETAIL BE -L-STA.263+50 TO STA.265+00 RT,CL B CONCRETE -L-STA.274+50 TO STA.275+00 RT,CL B B HIIND DITCH WALL PROP.NOISE WALL DETAIL BA DETAIL BB DETAIL BC DETAIL BD VARIES 0-5'*** RIP RAP AT EMBANKMENT PIPE OUTLET CHANNEL STABILIZATION PIPE OUTLET CHANNEL STABILIZATION STANDARD BASE DITCH = 4, 2, VARIES** (Not to Scale) (Not to Scale) (Not to Scale) V (Not to Scale) Natural Bed I- 10'min. Natural Natural __ Elevation � Ditch Chit ——F"'+,^N r „O,—_—v�.MI Groun l Natural Ground Ground 3•7 TD ,61 Ground —— ——— Grede 1.0'min. r t�T=15" (CL I) o n ,.'t" T=15"(CL q dt w ,A.� ?•,7 D=SEE BELOW &12" (CL B) ,r _ erTY� T=12"(CL el O T=15.(CL I) Geotextile ,PPROX BERM SLOPE Of 10% GEOTEXTILE T 1 Ge2.otextCL ile B� Min.D=1.0 Fr. a racai s PORTION N OEsoens ooa.YnonRwnu w DEPTH GREATER THAN 6. unon AT nu or PANEL CHANNEL BED Max.0=1.0 FT. (Variable) Channel Bed *When B is< 6.0' B=4.0 k. Type of Liner= SEE BELOW Length= SEE BELOW Length= SEE BELOW (Variable) DETAIL AT NOISE WA(I Type of Liner- CL I or B Rip-Rap-Keyed-In(SEE BELOW) Type of Llner= CL B Rip-Rap 7 Type of Liner= CL I or B Rip-Rap-Keyed-In(SEE BELOW) - - -0 -L-STA.257+25 RT,CL I RIPRAP 'Rip-Rap in Channel bed,no geotextile -L-STA.245+56 RT,L=20',CL I RIPRAP -Y1-STA.30+05 LT,L=50',S=1.6% -L-STA.259+50 TO STA.271+00 RT,D=0.5' -L-STA.272+82 RT,CL B RIPRAP -L-STA.169+12 LT,L=5',CL B RIPRAP -L-STA.290+70 LT,L=35',CL I RIPRAP BEG.EL=315.80,END EL=315.00 -L-STA.276+00 TO STA.280+25 RT,D=0.5' O -L-STA.272+87 RT,CL B RIPRAP -L-STA.172+65 LT,L=8',CL B RIPRAP -L-STA.121+50 RT,L=20',CL B RIPRAP -Y1RPD-STA.23+00 TO STA.23+31 LT,S=7.2% -L-STA.355+00 TO STA.366+50 RT,D=0.5' -L-STA.273+27 RT,CL B RIPRAP -L-STA.176+20 LT,L=36',CL I RIPRAP -L-STA.124+36 RT,L=30',CL I RIPRAP BEG.EL= 302.27,END ELEV=300.0 -L-STA.250+00 TO STA.251+00 RT,D=0.5' p -L-STA.274+95 LT,CL B RIPRAP -L-STA.284+50 LT,L=5',CL I RIPRAP -L-STA.126+90 RT,L=30',CL I RIPRAP -Y1RPD-STA.23+31 TO STA.23+96 LT,S=9.2% -L-STA.256+50 TO STA.258+50 RT,D=0.5' s -L-STA.322+48 LT,CL B RIPRAP -L-STA.396+41 LT,L=45',CL I RIPRAP -L-STA.275+43 LT,L=25',CL I RIPRAP BEG.ELEV=300.00,END ELEV=305.96 -L-STA.258+50 TO STA.262+00 RT,D=1.0' 0 -L-STA.322+88 LT,CL B RIPRAP -L-STA.369+00 LT,L=5',CL B RIPRAP +' -L-STA.323+13 RT,CL I RIPRAP -L-STA.386+30 RT,CL I RIPRAP -L-STA.381+90 RT,L-5',CL B RIPRAP -L-STA.395+82 RT,CL I RIPRAP -L-STA.416+93 LT,L=10',CL B RIPRAP -L-STA.447+84 LT,L=64',CL I RIPRAP m -L-STA.405+84 RT,CL I RIPRAP -L-STA.461+38 RT,L=30',CL I RIPRAP DETAIL BJ DETAIL BU 3 -L-STA.406+05 RT,CL B RIPRAP -L-STA.111+82 LT,L=35',CL I RIPRAP* -o -L-STA.447+72 LT,CL I RIPRAP -L-STA.144+04 LT,L=40',CL I RIPRAP TOE PROTECTION BANK STABILIZATION DI -L-STA.447+93 LT,CL I RIPRAP Not to Scale (Not to Scale) -L-STA.174+80 RT,CL B RIPRAP -L-STA.1 71+49 LT,L=55',CL I RIPRAP* I I -L-STA.171+49 LT,L=55',CL I RIPRAP 1.5:1 or Flatter m -L-STA.210+62 RT,CL I RIPRAP -L-STA.205+30 RT,L=55',CL I RIPRAP RETAINING -L-STA.215+34 LT,CL I RIPRAP Now -L-STA.215+52 LT,CL I RIPRAP -L-STA.233+34 LT,L=45',CL I RIPRAP WALL N -L-STA.234+09 LT,L=40',CL I RIPRAP Ground b G'°°° 2' -L-STA.247+67 LT,CL I RIPRAP -L-STA.247+67 LT,L=50',CL I RIPRAP _ -L-STA.270+63 LT,CL I RIPRAP -L-STA.270+61 LT,L=33',CL I RIPRAP ply-- id t. CLASS II RIPRAP d=2.0 Ft. GEOTEXTILE b=2.0 Ft. Geotextile 7 U Type of Liner= CL II Rip-Rap i -L-STA.105+80 TO STA.111+00 LT -L-STA.103+95,Length=225' o -L-STA.104+40,Length=250' 7, DETAIL BF = ; DETAIL BG DETAIL BH f 3 FALSE SUMP - . FALSE SUMP FALSE SUMP rn ro (Not to scale) c� (Not to Scale) (Not to Scale) • DETAIL BW 0 , Median Ditch , Outside Ditch DETAIL BV SPECIAL LATERAL'V'DITCH 7 Traffic Flow 7 (Nato style) Outside Ditch �2,0'� ►2'H ► Zg.: 0.7 2,� HAZARDOUS SPILL BASIN ...01111111111 Traffic Flow ,0•� 20:) TOTAL CAPACITY REQUIRED:Cl B) GI - (See Chart Below) ►I GI TOTAL CAPACITY.0'F FREEBOARD C2 of E _-5� etc. __S F,' a. + �°°c Slope Natural 1 Fill E e�c• t S— etc. MIN EL2 Groans 7 o ""`or - Y8RPA-STA.23+00 RT orye D L S=Ditch Slope tb Proposed Ditch S=Ditch Slope C Proposed Ditch Slope ,S- C1=17780cf S=Ditch Ditch u'. Dl '. > Ditch Grade L Ditch Grade L C2=18036cf C 0.0% To 2.0% 20' Over 4.0% To 6.0% _ 40' EL1=251.0' Min.D= 1.0 Ft. LLi Over 2.0% To 4.0% 30' Over 6.0% 50' } EL2=255.0' co \ / D1=3.0' -Y1RP6 TEMP-STA.12+50 TO STA.13+28.76 RT l- ' • s L1=96.0' SLUICE GATE EL1 B2 Ll=48 00 Ili wt1DWL Bl _ Q/� 0_ / \ �- SZ 0 30� Ri-Xi o P:(919)878-9560 H— Ll —.1 8601 Six Forks Road,Forum 1,Suite 700 C Raleigh,North Carolina 27615-3960 N O L2 - NC License No.F-0112 N i N I Engineers I Construction Managers I Planners I Scientists www.rkk.com poi_o• I DIY G Responsive People I Creative Solutions Elpi IR ANG�L .BR. pL, ib 1-51I1/1-4739/U-6093 4 Wt '�>iiiitOARAM .,. .„. AGM Z �X 12 / III�����, y,^^ DENOTES IMPACTS IN Nt5 p8 Y X, - j////mil SURFACE WATER SHEET EJ OF �Z5 SHEET NO. y LE N oaf: S Zp� XX , I ROADWAY DESIGN HYDRAULICS "ARC T��MJ� S�M�N X�X I --- F (-) �� '' \ REVISED �1/19,2OZ� ENGINEER ENGINEER / i` F --- BARRIER y //� IMPACTS S IN SURFACE WATER zo1. xsiliiir /i I. x x11 ibliiiikaffilltibil"v x C C C c pROP.50� rn �!� \\1-, INSET 6 TRIANGLE GREENWAYS COUNCIL /— �G48'CHL CC NWl STA10+00.00 = . . of \)cP7 Z8 \Iti. ‘, LWB- STA2+53 (I •. L 1 ' , ,l SITE 1 • " DOCUMENT NOT CONSIDERED FINAL EDDIE CLINTONARD UNLESS ALL SIGNATURES COMPLETED IN CONSTRUCT/ON �> NTO -LWB- STA2+5322 = == gi :SY' . �� ... �. �JP"`�,.>.� p # � EA\ , , , EDDIE BER Hl— ����� � / • ` TONS CLIRIP,I�APi , �- /°11111 \ CLINTO �rr omit, -(0 ��� i�1 GEOTEXTILE.�. ?f. +1 �� \ lk �"' 11 F v.our-;,oz ..--•'•-�" RETAIN - DLO' . •JIA , \ \ . .. .......r.,41110 411-20 s -C.....--'' -Al 4 tt Q _ \\ i$ 0 +o. INV SIT'ENTSSLLC ,r\ \ : .1B ..._-. ..A_I ...1s.•te- _ - .. C C tC� // / 9y - ,�, wr'�'r' T�} Ne ,i - 1-..-- rallia Jf \ / ^/FLOWABX ' .. • Mil THG \ ' C C s�.�' • NG U \\ C F 7., _ Liu% M. N $3 x�X• \ krri4B�' C — � SP.LAT.BASE SWA F rnKS / ,.. j — � ..DE TO DETAIL M • �� pX E1P �� —�� - C mT \\ RETAIN L - -- < O — y � SEE DETAIL AE ,,,.����...___.,...����..•___..•JJB 1� -- ((� \\ 5I PLUG•AND FFILL .1.1111111111111111111111111111.. S3 m • —��►�P RETAIN I — ijimijW : . lit `••.- (v 7, :,IllilleIIIIIIIIIr- ' i:--ce ���, S/ SP.CUT SWALElaill1111:„: I �p�4�+—, 2GIB-WSS WHINGE WALE // // 2GIA-WSS E/E IDETAIL G o, m 1141111111111.11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 �� SEE DETAIL G // // 14.1 p\\ RETAIN MiR —� v/l ll�r \�1,.,.. 8 RC_III WSS �, nq --�-� —� / //p 2GIB-"'i 2� _ � _.--0. ����p G G RETAIN\--71/7 C\P \ RETAIN �,L—��►--►—1-1—.—.�.p�p —i—,—.—3 — � RETAIN \\\C— RC` �Z. IIIIIII"MMMMMIMIMIMIMIMMMMIIIIIIIIPIAIOIllIllIll\ - _ RETAIN // // _i—.°---p----►-►�p / �p ��_p •. / REPLACED W/T.W RCP V8 _i w•. • TIP#I-5338 �*�► .. .. .. c', RE AIN S �'►�p----0„_p \ I RETAIN \\ REMOVE \1/_.: % RETAIN C z 5'i \ V TAIN O CD O nr \ .. .. .. .. S�i;�NN!11N !• RETAIN aZ L /_. -E. ti I. - _ RETA ' .. .. .;i-. _ RETAIN 0 ......,1....,. T� // C p1iCH FEl __� Fq RETAIN .. - '1 RETAIN a —/ C \ ,� C \ =_-- C ,0 •BURIE.�i .T '. Q Z. _ DI — „4. +�iR RETAIN EXIST.HW C C C co < GRANITE RIDGE \� �V , ill y HOMEOWNERS ASSOCIATION INC Ti "'� W SITE 1 - EXITM6R/• R' i N I� (i `r f N :c li, / 2L■5 0 25 50 -�� RIDGE 1 \ O \\N\ m m ■ � �1�� m �► 1�'„ ° `� 1 A5 WAL TER SCALE FOR INSET m 3 t ) BRAND,III 50 25 0 50 100 PROP.SOUND BARRIER m Lu \R l '' ` 1211`" < J \ JOHN le"--)\ ALNDREwi L•J'. SCALE j _� ' — _ \ BEVERLY ROSSREIT-ZEL \ QBRAND 3 N S PREPARED B✓EDELORIESE I I-- WALKER } _X / C BERM DITCH I 601/ c+ RS i SEE DETAI CF p N°". /��C _ -- `SEEM BASE DITCH / RS&H Architects-Engineers-Planners,Inc. ,s! SEE DETAIL BP THOM ,• B �/ ALEI SIX FORKS ROAD,SUITE 400 U NCR LICENSE NO.F-04930(9 9)926-4100 o, - rSIE AN .BR .. Wilk SHEET NO. '•1 W x +.4,� 1P111 ` ►r-- i� G1WA \ 1-5111/1-4739/U-6093 4 A � / :::::;; G VNtS / OCKE f $ ZAMA �� :: SHEET 10 OF 125 ROASIGN HS N j ,� °/�✓//'/�r�j{12D wD /� �y/J E WATER "Www i m w p f� 1�l����Z�1��� �_,��_ __ SITE 1 ' '. 71111110, l DOCUMENT NOT CONSIDERED FINAL �� � _ _, • rill -— EDDIE BERNARDCLINTON UNLESS ALL SIGNATURES COMPLETED • • • • • !..��`.� • ,ice-"-'�7:.____--- -- .� \ �' �'` __ <I ■■I��/�� .ice:: 1 T a L I RIPI I�AP i * .Y . * Y _\\ lk MEri•ra..-...\ \ Ill�1 1��� •/� y�A30$ TEXTILE; - - \ �� r OUT 2 i �� 7:1' RET\ 4L / . ,. : '''''11,..-- ..... -/0' CIO- . •JA \ \ \ V. _ ,---0, jr.y. �_J�� . . k4,44 r K TN G a _ Ailler m KS 161111111111111.11111- ,.-- 7 ---- viiiiiiiiiiiiiiiiiiiii - 611- 1 3 � � rrim nwar 4111 r iL. =X `Fs �� - SEE DETAIL AEH � _- ,^ _ �- � 7 ---- PLU LL J _ �,. �'1 .1f=ems :7 !' ���� lli�V `'�� 111111 it _. .Y. _� -(� _ .► _ > I- RETAIN —��► ��'aan ►� ice— �n':ii_ MTL ��. iralli _ .!'� Q� o � 41.1MIMIMW Aim i_ v. � wrtgr.._ I RETAIN .., "REMOVE -�- ]' f.D MT �� ��.� 01 �_�. - _ram _ ��3 FS +.=ice _,a:'..1.„ �_ ��� ' __ — OTs= -- V m \ mil!_— t. —_— ���!�n�—�-RET— I('� Z LIJ 1i� —H� - �A_1'April _ /'aGP���� RETAIN m ♦�..i. ,VL'\ P f�_� ��� „o •/- `,��'� ^- � RETAIN ` �� . ligt `\\ Olitipivii-, - � � (lam 7 r-------------------------, ----- _____-, - ,, LLJ ,w r L. N II 25 0 25 50 N I •m �� - 1- \ fili �— SCALE FOR INSET -0 LVE ���■ 50 25 0 50 100 '_�OP.SOUND BARRIER m Z r0 _--- _. _ SCALE0,1?g/r a =�� :/_ _ tr — U .,5E 'REi/ � -IP'i �`�— r � J Q � WI N PLANSPREPARED B✓+DEL Ri'S lipl - cIT. III ���__— , - No., RS1 BE B ..I C RS&H Architects-Engineers-Planners,Inc.s,FORKS , D �\� \\ \ NCR L CENSE NOTE-04O93DI9 9 9266- 0100 GF TTur.._ cr j DENOTES IMPACTS IN PROJECT REFERENCE NO. SHEET NO. ^ PERMIT DRAWING // 4+;,.,,ij 5/ll/1 4739 42 215 0 25 50SURFACE WATER A'�; NAD 83 SHEET 91 OF 125 //� DENOTES FILL IN �'Arj�j4 j/1iC� R'W SHEET NO. SCALE FOR INSET WETLAND /CIS" .q PS/// ROADWAY NGIN ENGINEER HYDRAULICSENGINEER DENOTES MECHANIZED ' ���/�'.'�i /-I_ 50 25 50�0 .".".*. CLEARING ����I�I'��`'����/// r C ilill �; -' I //// DENOTESIN WE7LAVATION ,� \ I - I` SCALE "/// DENOTES TEMPORARY C. r,I� /•, :,' C //' FILL IN WETLAND _ �• e - °A 9 (�J, //% 0, .o k �Cjp . JB DOCUMENT NOT CONSIDERED FINAL WE P 1 `VI /�O UNLESS ALL SIGNATURES COMPLETED SON-L. •t", _ _ REVISED 08/11/2020 . `'A' ab REVISED 03/02/2021 SEQ SITE 44 L;d 1E REVISED 07/13✓2021 \ 40 INSET A REVISED 11/19/2021 POSITION RIPRAP TO t MAINTAIN CHANNEL �1 Iq �9 WIDTH AS WATER EXITS PIPE 48 TONS CL I RIP RAP W/75 SY GEOTEXTILE • LENGTH DETAIL B SEE INSET A (SEE DETTAIL BB) 10'WIDE BERM TOP ELEV.=228.0' SEE DETAIL J BE W/CL B SERIP DITCH ** V� �'-'• SEE DETAIL AW '' F _ Q A ti TOE PROTECTION TOE PROTECTION Jr.� ERM V DITCH / 1 W/CL I RIPRAP W/CL I RIPRAP � j'f/s F _ SEE DETAIL AK 4 ;Zd % SEE DETAIL O , ...........................................iiln ri - -.r >�^W nssy_!4s? SEE DETAIL 0 inii .............................................. r r run y rrwr� ' `''• \ /__— C rnr r it.nnirn it rrr nr r r n rrrr nrrn pr r r Nil a i _X� iY}yr r X 5�� LLJ r 1RI....i.... n../ r.. r r r..t.--'S"�,....al F — aiw uorl� LLl / 11) • -.1: r - .• :I• r - "C P \ —— -_ 7=�C x x \ r .. .. .. ICEXIO• :•.. FS —�—— W/CL B RIPRAP a-:ii ♦_ I .rir I ..r aLI C P CONC ' SEE DETAIL I N,� M... ■If BOWS \ PF� •• .... 2GIB-WSS REU 7- �. 0d'o0L m s N---_— .: , WSF - - -- — i N.. r • — — O O ;ILL— ` _ — — _ — — — -L.fR__�'. — -- — - - , is, -- -- - D s .ILL• INTERSTATE 40 WBL 24'CONCMin = i" _ 3 — -- — — — 1 ju— %�- — _ — _ = N TB 2G18-ST_ —— — __ Q .. . — -- __ ._. -�'i i- —°- — — `!, — — _— __ — — TB 2G1 — — .— _._ — _ •— — —_ 6 66 15"RCP-III 3J... r'''or'` — 1. REM•VE i ' r E a TB 2GI8-ST '�'// �' I— 15"RCP-III '4 15"RCP-III I N -- -• W-- -- ---- O -O r INTERSTATE 40 EBL 24'CCj�>@, Iill J--- _ _----------- J c O - C/► N Lu T - �_ r_ 4- O rn A a ;1. Pj#%r-/-,a -vim F',A- , ,/IF ./i ./,n,.! a -. 1/ fY e -- J I'ir/sirair i I'�Ij��j-Sir,w/-_idA,ftvir,,Afa/•I r%a-may", �,�►r-it/�,mar j/ re.�//f/,/�' - 3 = ...r. „.le, lj,l�%'I/I j/r.../j'/„iC ti �%1./i�/1a/.Ii -,1 sr i///:�I ,. /I//Ii��-i'./tI u 0 ? rn .4 ,! ,e/A.a'I,� r ri -- - >-,,.'-�-�- cam. 1 _ rn v ()'Witi i4r ajr Sirlir...jr itITAI,/ //f D/ kj/ ,0%,Sir*'!/I'./I!%r,IIs,"Ai�I fAioxifir."IAA - - - aiw Now' Ij�!/� irefi�j,/"sr,II/#I� 4,- : s /,!j it r#'! 'I%#/,!//Af ,4 "or// /l../,� _ — -—--- F /i ce/�sir / -44-,I�# Ij�%��d'�/� a�A',s/�j//�Ii i�Ii��/s''sir�III J �sr 9I��I /"Yrl SITE 4 - ROw LE \ \\ ,1g / i inr Ii ,I/,l S !� />� Ark-f/ 1 I I / r° < /%OI/,/'//j/�Ij��/j��sp.„..j/ ,/'I //l; �i �IIa i>?Id #f ,,, �Y= ', air gi ,".1 -- N � EX.ROW i W �,Ara/i Ij' I I Ij // / 1/ Ar�iF.►i ! /j !% // a I. /i,Ii_ i..�IiI�l� Sr a: 011.44 i� .++ i vJi �.��j/Ii#�= \ / 7- —I ARMOR 21 SIDE - i�,`p•.L-fir — fit-. SLOPES W/CL II W0IFFAME'/•i•smiAvE0+r' � // / r :lp 11,1:M.-- 'AU, I _ TEFtPOItARY PIP .YE{y+ ,rw�_�— "7— ��►�.�,�I� ,� 1Y012\CONSTRUCTION, I N ..yy� 18 TONS CL I RIPRAP .__ __� ----Ia �-. ` _.y�r/••• .'r._. TO BE PLUGGED & l Z m SEE INSET B � i ,E FILLED POST CONSTRUCTION ET B Wd8 SY GEOTEXTILE r. \ �' _ ` GLENN MILLER (SEE BC) 3 --___ ------ +�` .s TEMPO d' I S161J ''�NEL \ -W EO�7/ DB 4092 PG 374 E DETAIL C *RIPRAP ON SLAT, ,n.,rr+ err r CLARITY / __ 7 e \ FOR CON ". .TID1J . `/E P / �4 >e TO BE BAC ff�� \ p ,`r��n OST CONSTRUU�7�i �, t' BZ 2 U _NN MILLER \m ,_ \ ,` \ 8 2 k4N°s WEO \ Co f,. CO WEN 4092 PG 377 \\�\'d �! epUN°qak p Lp'�-t 0 'v 66 PG 176 \\\ / BI \ess a Ju Lid /V S E 0 er _ 4 i �— > TB 41 7\EH-....„.„,,,....„,...., o44 44 (� �, —TB TB TB CP O \�"'w a,��� zF 41 \ ei1c�°� SP - ? µ74Npy, ire �I �l �' ' �y� B ---- SITE 43 °N°,„as" ,, I� -- — --- — _ _ — — _---- --- ., , "`�',• ', , ,+ , ,cam L 81 y \.ate-_ �'* „ � ;110 � GLENN MILLER Bll \ -N � A T T ¢ DB 4092 PG 377 LE PB 66 PG I76 B1� T FIKOC P ., .I _ I P.(919)878-9560 j / t 86g1 Six Forks Road,Forum 1,5uite 700 BI7 -\ �� q -�l -N1, o s Raleigh,Not)Carolina 27615-3960 N'� -' )M�_�� 41 dl \ NC License No.F-0112 / _ �I\e-N �I.x-31 o �J BI��� \>,y y/ \ -y,e w �I_�I_� W Engineers rkk.colmonsWdion Managers Planners Scientists voms. 2 \ , / / Responsive People I Creative Solutions �/� DENOTES IMPACTS IN . - PROJECT REFERENCE NO. SHEET NO. 25 0 25 50 %�// SURFACE WATER ' L PERMIT DRAWING ���.,Ab! �� N; 5/ll/1 4739 42 SHEET 92 OF 125 //� DENOTES FILL IN P���� r•�8r"ic � RMI SHEET NO. SCALE FOR INSET WETLAND �it/4V *60sr DENOTES MECHANIZED `/�� ,,��>,►.A�y1`�, NNtl ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 50 25 0 50 100 ******* CLEARING .0:- ., �`a���r - II�il► r 1 / DENOTES EXCAVATION , v �� '� �, �� ����� IN WETLAND �• ��' o SCALE { DENOTES TEMPORARY N ���0� ////%/FILL IN WETLAND c �r'!Sr _ t��I�AO.�_♦ I. zq, •, O DOCUMENT NOT CONSIDERED FINAL WC P(1) 1 ` UNLESS ALL SIGNATURES COMPLETED G REVISED 08/1 V2O2O zap 410 . '' SEQ SITE 44 mok, '�' ( 1/ R/ EVLSED o3/O2/2o21 ��� .L _ VISED 07/13l2021 .•SMON 16 — 3. R ED 11/19/1021 NTAIN p IDTH T ,'' E. m 5 :I/ `S 10'WIDE ' ,TOPE '- DETAIL Jr' ERM 'BASE .TC �� .jf♦ Mil 7m CLr B PRAP 3 ql--4.1 ' NI zSEE AILW •f �' PRO �7/7 I' DITCH "\ / i'yy4' �y W E I AIL y - _ O O ""y'.. i�niriii iii..,...iii � _ SEE DETAIL AK , re +..`e .m. s , T ROTECTIsill �� E D AIL 7 -s DETAIL O WI 7 . y siri1s F• .`i' . a° IIL �r,,-2* LU �"_ .n•1 I N -`1: i .a.t... urt ;.. _. r 7i: Coy : APO _ — - SE.� IPRA rd 1L — . frAfiraii LLI / ` !16 7S1 r r _�, s • I y F,. to -, - �� Ws: - -wil _ w• :1 m Jr • o : 1 �s y 4_ F•W AMMINIFANIE __ __ _ —J 'ILL �`� ar— 40 WBL 24'CONCMILIMIM _ =._ IN .- Z _ _ ETMMI - _ _ _ — — IQ — MEI r Iir REMOVE - a ' N D1 W -- O ffeig � -. DI I r .RSTATE 40 EBL 24'.(j�:�@, --- MIN= allirAlliro N -161141111 to a �, ' alb_t B Yn rli3� s_ i.Sr a �is�i ` 4 3 ___ _ -Ir. I�� --- V1 Gff A!e 4 ./E ,riy Li ..i t EI ice• _L4.0_,S.D �riM4?i ii�A ♦ �'A I�r� R7 70 tir v U' �'i r���Ii'. er--, 04,'t"m i=,i-ii#ivo�lpmOA.��'O_'�pe'� 3ig�i��it-� - NrithtilL_ - - - 1111111 --- ,�� s sttit� _r. ..44:0 y�A�i rol..0,.�."� ,tTs.v e'O;sree o s g o,' % r l ss irw.., SITE 4 ' RAY M. - c- <.17/iI,ei,Vi Ij•�i tie--.p,,0,P.!!ri �` :�Jl55 ,��...4 • � � i r #,�I ��_ — itiiiirv s•Y.rJ Ws%�di��iL_Ijl �I �Ii �1 �Ii����ll +I'f►s'��/i i_gr�/ �P go� I��'#!' I 41 ..�♦ ,,, ARMOR 21 SIDE • - �ybItzii = /.' , SLOPES W/CL II �''�� rs"'®���a+; H TO :_ ✓�� . "_�s�i ` " �' . ." III E `� re�{�1y�s -IT4 C -A�!��I� iot ,y,,3 �„a • :RIPRA' SEE C C- I1.1`LT B •.- � ���� . FILLETOP BE**7ta .�:\ jrg • (SEE DETAI 2BCI LE I��II JJ GG1 ; ��r_ WEO 111 ��IIIII B11 L409. . 3 - fjw" r'•�- ' 7 , TEMPO d' SIC71,1 "14NEL - , �., tE.. FOR CON rIQ�J -A EH , •J `�r�1JZi :_�.r. �� 2 TO BE BAC .fJ, � � � SEP ■�•�� i �rr� i ,��1\��` 20� et p r� \` . n O5T CONSTRUU�7�i \j � >4�fj` o a �2 WEO(2) : rY\ co WEI\ '09 P 3 ,. \>a\ '° /, 4. 41 eI - epOryDaa,pe `� 1fil• I• _ _.��`.. ����' bay b•ooho. . ..cirri- �t.7�atr-- -- 441. o ----on SITE 43 ,NO� 0"qa -�' ~... -N -N + BY7�I '.. �F ,. �_� �� y s:,P,� , ;' . �` +'w,�� �=ems-Alr j-- ti� 't,ii 11.0A0:---- Illir lur ix -N w e �'� -. '.i r t+ flu^°ICI i 4 4 N w� PB 66 PG 176 ' ‘16, vilifw... WI, 4IF # -411 lir in 1 i it 4.0110:4 itt .10:ft: 6601 Six Forks Road,Forum 1,Suite 700 .-E iiii IMMW Raleigh,Nodh Carolina 27615-3960 N N ----'---- NC License No.F-0112 030a4 likr( 01 Engineers Censimdion Managers Planners Scienlisis ,S i wmv.rkk.wm L 2 _ _� _ �_ Responsive People Creative Solutions 3 PERMIT DRAWING DENOTES FILL IN / ���, v INSET C _ �� . 37 SXEET 960F 125 �/� WETLAND MATCHLINE Y_1 3— STA. 67+00 SEE SHEET 67 `\ a y 15111""1 w."° 45� SCALE FOR INSET • FI W f'r �r so zs so 14° �.- ♦i so � f a. 1 1 a y...,..x ���\`� ��. O C �,y�i oo°w�'�.E°`�"" mN�rE,. pir, / DENOTES IMPACTS IN sPa3-s 4 E ° \ / >f o '� Y 'nnf�l / fig( 1 / �: SCALE - a, .11 ////// SURFACE WATER -1 C.� ❑j , � •• .�',�1>S+� n INCOMPLETE PLANSc �7/z/ DENOTES TEMPORARYlik _' r _ `�1�PI'� ����D &' ryv((n / 4 Wit'I �,OQ. PI; 4�� • ^� / // IMPACTS IN SURFACE WATER ' \m --' - �� Iv 13� /J / 21323 v.awK / s�..x uc —?� 1���' Q ,f�� OTCB / '' �b`r r and ,y , INSET A • !� TXOTcoX,oERERXXu u. a c wE I " �'sf� tiYd�=/�'m / HP /o ei 132A \� DOCUMENT \\ eS , I, I s \ "° 8°%180 O . Q\,O, %/�I` RXcessAu TIMES con.}erzo Emir�� L, *4,. i_—_.� •, ,_��b ........ p ' '► _ -� FI C�i�;. E_ -�.• . ,(! '..m REVISED 082 2021 E _ - e • O Q y - t / ,J / •\A0 d z „-. _ �� �1 �� _ o �� REVISED 1>n9ao21 ii,Q•W . _ ,—, y N ,, , 0.. _____..,--A, -:':1,,,,-„ , H-__ . I 1.10.;,-- - __: -._.--....- n,. -- , ,,, / / . ‘...7,/ = _ ,,,.. _____________ _ _ _,___,_..... ltsw. ______ ____________—_—________„_ ,_—_ ___ --.Almik9s-„,...r,„.. ......,_ i '72' ; .r A IV.___,--- ___.,_ ,,, , \ ,N..., �i o.,u / 1 z414,i,C3C),; rnilliTh.1111"111"'.. r';'''-4.1411441"*NE,,,'"Illi!..71.4. 1.111111k.,,,„'''''..'"WIIIIIIIIIIP:t0,It.. :i'. .---'''''--- ,".,.,,..snzLocx:vELI '. 'IPA% ..v \.,. \'''\11 ,„ //'7. N7 ,7, '> \\\:. ' �PI W ` , haQI _°:.§ 'mac".:°S x ., ,e1- ,= 4 , I ti H ' A N i6 I 5 ue 11'IghA �' SITE 48 �� '�� �I �V �y= \;:-�, ,w°,. miff I,° :'''' -- ° II 11 �\ �6 ros.° s INSET Btiii "°I INSE. E a� .rt 1a I l P 2 P 1� ;._.�I 1!7I'" �c050 e+Bl 7a, / // \ 1V. f / I`r` `..: n' _�` 1 R!, " 0.50% 1.3% e`,/ // sra onus ur :11* 59Zet w, • -V & \` � , 1 urzwv swu[sP, ,n°nu.. /�44 -, , \ �ig;, 11%84100. %*� II ,. =L...... id_66%L 1 % \\ alp SEE�INSETI ry0 ¢��.^+w• � •, �.w:t''( . �v` .,. eINN I f.9•66. � k6 II "�..r. . \,.. \ \\\ a1r/�y 615 \ Ea EMS y�p =°yew.. � '` 'w�=nm��' "Q,, 0 1v 1�� ** fl o .Av fl \\ s�°�.���_ �71%1� L� � ��i,� �� �AA'�� '1� �:.twiPJ � SEE INSET B \ \ � / ®``� • �\ a^J \` `O YIR15+)466AI sormv ,�, \ ® ��@� .�1 ^tl"`o OVA t.mae6% 7G ftPl p ds� `3 1+'` 'ii' \� ? \\,.'kA:�� '� / +} .ff°n.,u illy 11�` IS �;j ,.:3�t' ` `•,,... + • ram',,, `•':��\`.a.,° ' o u � h, :rµo"wo °x�x .. ,,,_ • ....... _ „.. \- Ex,FMmY eel 1 11 ,y Q'v \\\\ o-ed I� ! li `�'` �4� ` Y� _ \\ I' •"?I n'I \' s.\\ \ \ T°x.',°a. Q I s n: i * ��ffb SLU I I» I I =t o v v I v� �: � T \ v �� � I I I• .11 i1 A \a 3 \ \ ��� -,. - WOE ® r0\1V9t4 \ \ \ `' w �, 1 �" I - SITE 49 !! I "11 � =s cs sc-1,"c -L'I I 4z . _ V T,,it,?„,,,, ,, _ ' w _ .°o° , 1 x \ m'\ \ I/ dam' , Il IIIf "� \\\\\\ '\ .. , � ,I' I \ ' j • 11, 1 �, = s v_,wI ' � \ � \ / s / I ��II 1.1d210% 115% \\\\\\�\� \ \ � � S�IC g , o<mrourvi 11 R, _ W, , _ \ \ \ �•• _ ji-L3-STA.,64+62.16 RT \ \ \ \�'' R;reesu evr \ RF.� \ \ �.�� �rx )4 �. \ \ W 4orc\� ( 2d1`< 1.30% \\ \` \� \\ '�,� M. % i8 a'9. _ n 'R' F 56 xccx \ \\ \ \ \ \ \\ \ N..— il,.......,,,I III��- • . I __ a°x.�vr.ux� .....aI_s-NP �% sy�yff°.Tue. vv �•�-\ E - � SET C ,y A V ��_, ....- y�Q' _ • F.,.. \ . : IR'. A26+25.m. n � MR. \ \\\ °- LCDE9-STA.41+3J.59 �\ \- \ I �' a sr°e rtxnu SU % T` I - \\\\\\. 11 �it}J• \ \\ ° EL bFIi i.Yx L _ \ 2.- z I ,r`n SELF / IIF+IA�,..:__...Yr \ \ \\. 64 N ,,, s l I I' ed:�o1 ,.. / mG'ws'fk,h5"{� ,1. ! F , �F+ y' t�/ _ i° �..i'��=—=na,�.n°.n-- --- 'n"wN.., , \�\ "\ \\� 'a. I I o �6' I Mill i I la. ry y }r, d6\ h9 ,jf� ate.s�i\ �i�r t._��x `_--- 7a 1i \\\\\" \\, A,II` IVg u„I( L \ _! �= .0 ` E" S 4II:.\ �i I HP' f ll `P I n� ene�> �� - N. NN.,....,.:I11• ° xe • 1,` 'Ev a°w �. c I a,,,z v =u.b�ss ® ��� �1 ` °Nsx4 �► W'�\ m a.. 31 we xw.e,e P `�_.� s(_ iTf- h�_J -- �I 's,. y' • --miss- --- - - , �I } Y `.: 7J . --. - - .'::- --_ __ --nip-`'... r i .`„ I ~�:_ %— - _ -.'.�, s '��` `' \ l 7. �J e rxr / a.-�.'. —� �. l _ 1 `sn_ j�' x \� ec ° s�ceZ-' _- r_ -I\/�.raaws ' 1 sn s�- R .� °, v�,4 -Y,e-22 42-62" R E St 1 I a � -fir J \ V� 1� i ° &Boi i l � �F r: a .. :": , ._� �s�.� _ i. 2iY[R.�M" �° en t .°.., . \ '� �I.o9v /9r f�� 'G � v~ �"\ � :,%wa'r` �,a�wL� - \\ . ;�o. °'`_°- - .:,f r'm a" LP ram / u`Yk'z 1 . "%iii+ - ' II -4-—_a 46- �' @�D.x:`tEg �' �. ` .�i ', "I��I ' '.°aeA�f4« Y�7r �����►„ " ��..., \ •b :. re g : � .'t }, , '-... A,2+04 n ., .fx"f..c '�a` ::. \ 8-_ /c' ;e9r1�1 - j 1 4 R:. p RI ° \\ `9it.„,,, \\ '� / \' ........ a �ll�i,�p i:� �E, o -. I'x s - n% 161% -� t0 1 ..Me \`..�, :! lia "'" of ;.j:. e�, ,, - .elk f ' I — —_��.}'i 7 SEE INSET E �V �� \ •s-I m 54. 6'','A rcN sY+d tickir - Q� I:/ C o_ en % , -YIRPD-STA.15+62 Tug sv°smsn Bent \ V °remn o Y19-20:i30.03 V \ E .� �. / LP '""/ \\ x! r _ i` rnj h IWOBI' AXw �`�� �4� 1.uC�� .I:�e v� "® ;" / 1 I � - „+,: , - _ .. ... � /' � fp SITE 49SLU "1 S INSET D Ci ,07:.xo..E. -... P - V . _ �eYF'.v s- e,A..y u.E n♦ 1 �,�/ A 't 0 \/ • 53 lY f+5 SEE SHEET 66 / °::q " I,4 5, „'.CBE MI I ? j° z 04 �;� I•Z` ....C9,Ex C�Rx.l�x'�� GRAPHICALE ne,�o ♦�. HLINE —Y1A STA. 3'4 0 iggi MATCHLINE —Y1 3— STA. 51+50 SEE SHEET 66 5 -1V4� �s�� " 0 5 0 0 63 / G) I II PLANS t F� revlsoxs 35� PERh T9D OWING F / DENOTES WETL FILL IN Lle. -: A i � ��� NSET C /57 47, ° I �"45°SCALpLE FOR IHSE pMATCHINE Yl 3— STA 67+00SEE SHEET 67r � s . y ��511151�A5� �o ��� DENOTES IMPACTS INra3 sR : d rI' xI'° ay�I � �i�l��. ^o-.�om C� •.. �O �IFIa°xm wFx Fx°xF�SCALEa�►ll1C:� ///// SURFACE WATER � . 1 ""° its I /,� a."��. �� '*`'/ w.,m°�°.,."aeril /• DENOTES TEMPORARY .vm /a I I ', AV ,az ' ,tea oc»s v..Y' c ":„....„.-- � � may' /��� IMPACTS IN SURFACE WATER ` I �"�rue , ,I" z 'L,... 111 •L.� v"' ' \ I J .?:. 03 13Urr /� e, oacOx[xi xoi coxs oeneonxu 1 n x1 4 #, A xx"ESSALLDIDNATxx xCx_.ETNx 'I%y d '°� Mid / . HP ;/ ` REVISED e 0 7/1 32 0 21 _ - i� iaTsR A•.+r�_-,lir/�'QA 1 \ A.IO+S.]8 ��� c - E', .. a iiiit y i q© +t*�✓`-_ — N.rs— e i I '� I \s �.. ���b.v�., S Ap �^. 0��\�O`I REVIDD 827/1021 t�' _ay 4611-,., , u.,0 v.-1A_c...._41%"' q''.."-. 7"."Z''''..'.------•^..”......_-""iiiielP.- -.4041114t?°A L.,... ' ld'W.L`'*st 4 1 T�35�1iL REVISED 1V192021 x ----..r..-E-7.. ....,iimiiiiiiimith.f,p-'-,,. . - "7......o �Oi lite 2111,__711" , , ------------- -: ...,-----' ;2 - >�—��\ a`u"4E L. :.v�° '` ° ` mow, / �►�`� \r I � , ,•:,, , . ,h, 11 \ �I�\ 4 ...10:_ 41b. 51:1 �� , \ I11 xa \ ew..,rF d y4+ < _ \ II r. o, \,\"�\ <\ \ w�\ SITE 48 �� 1401 ,if r<, m it .we '1414141 z��QACO its*l Nei \ Ojos• ' onu, < :� ®. % � Z I� xw„wxe s 471,0‘ �.�hV' °.°Mx.... ``�... _' iSl �� 1l�'� _ �;._.-'-- -7•%.,........:.----- \sTn ia�\� . � ' y, S E INSET 1/,� / I: C21 it..5_::._.4''-'"ft"'MllikiqifllitillIl7 ,- w,"4"4.0N,,.,...........,........ ----------- ____ ...>\\ „ \ , 'Z'''_1;,,,A, en Emu r Z1'?',V.NN / ' y1P�P Q .. f �,^ .r *+*._`:, 0 m ... :..:`o% a17 „srt ! M� ...N.1 ��I � . ,::i wu 1 l I 1 ` I .� Noo - ' '.� "''*r 7►ft _ ,! J J' SEE INSET k§ e © it, a - >,�\ T.xy _,-�\ �� :t. a �.} �\ q:�. LC p- „ —,. _ n 1 ° \� \ ,�°�.�-_ - -.i,�i�lt : �,,,,,'i� \\o 'er' ,j t �I Yry FxiFMxYs� 1 1v I. F . 1 ".... I r ��1._ 1' ��,+�1 a. `. �'� 'vim vv� �\ r"o r`�E°,E� ..�� � �`t.:�\�a .. 1� -it:: II1%1/4-,„, .._ --- . .'. 14 / I\ �= �1 "� • �v A WOE �► \ r: 1 \� A �� i .� SITE 49 Ulli- , y ' , x p 'Y£coux,v Ali 1 d:::_,,,:: 1 $ / ).a' .• __ \\ x. - I , STA.16+. R].dl': �� �\\ �\\ \\ ►. ����� \'► q . • u,./ 1.'. �-�, —ZS�•n+t s-pfl a'9.-=M I L"Ii , �\ \ \���....�\\\ a s n.26+]5] .. � \ Nmti �\ ... 1 iii.V7 N" ,- ii-,,,,, 1 ii 1, s.i-'114%"1/4.,,,,, ,.,, ac L> -� � % � LCDE-vA.4+3].: _ \ vy z o ll e T� �1 ...°p , \ oe ' `.--- _ 1 KN., � �7 f .: 'D ( 1 .. .. a ,x , `n \ — �� "4. 14 0,� iwaimantroy "---- , (.,, -,zert, '4/4k...., v. .A. ...." 0, _......._, ,., ...,.,._,„ a 0___ ..6-.4-- - "1' " 'elea.1-1....1N, 'Lt / I ,/"-- _,.......41110"--—7%1/4.'''------ \ ' I 1 1 r`•I.II:ft *** i `,.......--a . ,,..........,.-,- +10 „ .w°° - ,S" > I`r1 s.°'s^'°. 1 a to° , �+ / * .►ei�Y _ ,�_ \ e� % \N -464k. p I,°°° � � � 1�.. 7 m��wx xFxd eT - � � � � — �� � "A ..�\ �'�I q. p 1 e� �i 1' I � �zCi4 szA .`s�,l. 1 i `'' �' 1 rd �� � `�t��� v V '�j' �L� ..-10+4 9� en � es � �"� � .J 1 ' 1 ... .�i. •,e z`wss ., Ai,. -RH >. .< 1� .e .,xo ... .../-°.,,:„ 111 q.. -`.i �" r��,< i .�I. xl �; ... I,� _ ' �I� --_.__-- 6� c°F - ..° °z - tea•. - �- \� \._ �i O • — �� ;ems:. ssilk °' � =�2 � `A�� °° 6 � � , \ _ne-zz dz.sz'"�r 'en i — j ® �A rE1 � 1^ _ Yn � ° .. --� -�� '1� �_ -o°F m,° xcL.°�x°.° i / ::. >. �<�q�, _ - c _ 1140 sa< s. 'j»,>., >.:: ,� ::7� \ Q'1p .:gal. --- �•ItYtr , • ram , dA �r�� � >�� °.y..�� �' uro eZ':fii8 .' (( I. 1 o��I Y`7 � -.� ./ \\, 4. L �" I r�-'- _• .�\�-/, ._.• p lz+od- .;�' �fx"f�.ee Wit.., �.= - - .. 1 Lxx v m °n a �,I .,.xs ,oD x°x o •., \ ''' \ Q (fie , \ �, •�.o-° G �' v ..f � " 1�' '° y \ ��� �. c°M° owzzz 'z 1.30%',.dR% "\:�"'`F'N' / 1��- / n.. 5 ]1 " LP F \ °,QV,. I I� WOB t � ., I .�.i/i ^:. n�20.30.03 ..I� �o II �,�*a - g r ,j —-v"cl�5'1 \ %�O 1�II 1� `��y�4 "p°.EE. s I .,. r;lM '1 1 � - s _ 3°° " b b� SITE 49 1f11, SET oti\ C� x»E L 4�I [® s 1rA v,m� " � r♦ t ® Wp IN 53 / T 66 `. "a,, �hmM CBIli o , NE —YlA STA. 34+50 SEE SHEET MATCHLINE Y1 3— �A. 511+5 SEE SHEET �© W�"' • ��� r GRAPHIC E 55 °\ • �.� HLI — 66 ,\v''V 5`p GRAQPH SSICOAL I WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -LWB- 18+77 LT Rip Rap Outlet Pad - SZ < 0.01 < 0.01 20 20 2 -Y1 RPA- 32+52 RT Channel Work at 48" CSP Inlet - SAA < 0.01 29 2 -YIRPBD- 31+06 RT Prop Rdwy Fill - SAA 0.01 45 2 -Y1 RPBD- 30+62 LT Rip Rap Outlet Pads - SAA < 0.01 < 0.01 12 10 3 -Y1RPBD- 46+74 to 48+93 LT Prop Pipes & Bridge Construction - SBB < 0.01 0.05 24 240 4 -L- 39+21 LT Rip Rap Outlet Pad - SB < 0.01 < 0.01 13 10 4 -L- 40+19 LT Ditch Outfall - SB < 0.01 < 0.01 18 27 5 -L- 59+13 to 62+63 LT Channel Change - SC 0.03 < 0.01 352 12 6 -L- 64+53 RT Channel work at 8'x8' RCBC inlet- SD 0.02 < 0.01 78 11 6 -L- 65+38 LT Channel work at 8'x8' RCBC outlet- SD 0.01 < 0.01 51 30 7 -L- 90+96 RT Channel work at 10'x9' RCBC inlet - WC, SF < 0.01 0.04 0.06 0.02 85 90 7 -L- 91+39 LT Channel work at 10'x9' RCBC outlet-WD, SF 0.01 0.08 < 0.01 80 10 8 -Y3RPA- 23+91 LT Prop Rdwy Fill and Rip Rap Pad - SNN < 0.01 59 8 -Y3RPA- 23+45 RT Channel Change - SNN < 0.01 < 0.01 12 4 9 -Y3RPA- 17+58 RT Rip Rap at pipe outfalls - SOO < 0.01 < 0.01 23 8 TOTALS*: < 0.01 0.05 0.24 0.11 901 472 0 NOTES: *Rounded totals are sum of actual impacts Revised 07/13/2021 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS April 2019 Wake County I-5111 / I-4739 42346.3.1 Revised 2016 09 09 SHEET 120 OF 125 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size /Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 39A -L- 98+30-99+62 LT ROADWAY FILL - WEM 0.07 0.02 39B -L- 101+93-102+66 LT ROADWAY FILL - WEM 0.01 0.01 40 -L- 103+59-104+95 LT & RT BANK STABILIZATION - SDG 0.14 < 0.01 334 10 41 -L- 107+69-109+35 LT ROADWAY FILL -WEP(1) 0.02 42 -L- 104+95-108+09 RT ROADWAY FILL - SDN, WEN 0.29 0.01 0.05 0.02 200 43 -L- 110+24-110+66 RT ROADWAY FILL - SEO < 0.01 40 44 -L- 111+78-114+64 LT & RT 60" RCP, ROADWAY FILL- SEQ, WEO(1) 1 0.04 0.03 0.04 0.01 0.02 261 -L- 111+58-111+85 LT BANK STABILIZATION - SEQ < 0.01 35 45 -L- 144+01-144+56 LT 48" CSP - SEU 0.01 154 -L- 143+75-144+08 LT BANK STABILIZATION - SEU < 0.01 < 0.01 40 11 46 -L- 164+25-164+78 RT 30" CSP/36" RCP - SEA, WOE 0.02 0.01 168 47 -Y1 RPA- 16+63-17+14 RT 54" CSP - SLV 0.01 97 -Y1 RPA- 16+58-16+65 RT BANK STABILIZATION - SLV < 0.01 21 48 -Y1 RPA- 16+66-17+11 RT 36" CSP/ROADWAY FILL, RIPRAP - SLW < 0.01 83 49 -L- 171+49-174+67 LT & RT 66" WSP/66" RCP - SLU, WC, WOB 0.06 0.03 284 -L- 171+40-174+63 LT & RT BANK STABILIZATION - SLU < 0.01 < 0.01 64 30 50 -LCDWB- 64+67-68+61 LT & RT 60" CSP, CHANNEL CHANGE - SLS,WOA 0.05 0.02 0.06 < 0.01 588 57 51 -Y2RPA3- 23+20-23+82 LT ROADWAY FILL -WNZ 0.02 -Y2RPA3- 20+23-23+20 ROADWAY FILL - PBL 0.58 -L- 199+51-205+31 ROADWAY FILL, 66" RCP - SLR 0.02 230 -Y2RPD3- 15+76-16+19 LT BANK STABILIZATION- SLR < 0.01 < 0.01 55 15 52 -Y2RPD3- 23+65-24+43 LT DITCH, ROADWAY FILL-WGG 0.01 0.02 53 -L- 210+53-215+65 LT 54" RCP/66" RCP - MILL BRANCH 0.06 < 0.01 401 7 -L- 210+21-210+61 RT BANK STABILIZATION - MILL BRANCH < 0.01 < 0.01 29 17 TOTALS*: 0.55 0.08 0.04 0.14 0.98 0.02 3045 187 0 *Rounded totals are sum of actual impacts REVISED 08/28/2019, 12/12/19, 7/2/20, 8/11/20, 7/13/21, 8/27/21, 11/19/2021, 12/14/21 NOTES: 1. Temporary diversion channel for construction to be backfilled post construction NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DECEMBER 2021 WAKE AND JOHNSTON I-5111 I-4739 o SHEET 124 OF 125 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 54 -L- 232+69-233+35 LT 54" WSP - SJ, WI 0.06 _ _ < 0.01 82 -L- 233+33-233+44 LT BANK STABILIZATION - SJ < 0.01 < 0.01 45 10 55 -L- 233+94-234+19 LT 48" RCP - SK, WJ < 0.01 < 0.01 78 -L- 234+02-234+11 LT BANK STABILIZATION - SK < 0.01 < 0.01 40 10 56 -L- 246+22-246+77 RT CHANNEL CHANGE - SEE < 0.01 < 0.01 102 10 57 -L- 246+73-247+65 60" WSP - SDD, WFF 0.01 0.02 < 0.01 238 10 -L- 247+59-247+78 LT BANK STABILIZATION - SDD < 0.01 < 0.01 55 9 58 -L- 269+75-270+63 LT 36" WSP - SQ < 0.01 100 -L- 270+58-270+85 LT BANK STABILIZATION - SQ < 0.01 < 0.01 33 27 TOTALS*: 0.09 0.06 < 0.01 773 76 0 PROJECT TOTALS*: 0.78 0.17 0.11 0.17 1.55 0.21 7744 1495 REVISED 08/28/2019, 12/12/19, 4/22/20, 7/2/20, 8/11/20, 7/13/21, 8/27/21, 11/19/21 _ NOTES: *Rounded totals are sum of actual impacts NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS NOVEMBER 2021 WAKE AND JOHNSTON I-5111 I-4739 SHEET 125 OF 125 ii �5� ANG�1 .BR. • • p�, ib 1-51/1/1-4739/U-6093 4 k .. pAkAMY —. re __- �Opt�z —X�X 12 :•••:•:•:•••:O MITIGABLE IMPACTS ZONE 1 BUFFER DRAWING RAN SHEET NO. Y LEN6 /HpRON oaf. 1e Y SnA�ADNs Zp�pB —X X - F , ••••••••••• SHEET 5 OF ROADWAY DESIGN HYDRAULICS k S 11�UMJ ` Yx� — J�1�1+!r l REVISED 1 OF 521 ENGINEER ENGINEER zo wD x r t x x x 041 c c c pROP.50� BRIER R► �C 48'CHL C/I ilkaaligkailibil"v 404001111110 C C \ . . ilt. ‘ RETAIN t �� Q1 NWl STA10+00.00 = -LWB- STA2+53 •f/ •'� L 1 - \ IN CONSTRUCT/ON • TAIN x UNLESS ALL SIGNATURES CUMENT NOT COMPLE COMPLETED ED FINAL -LWB- STA2+53. = °= \Q SITE 1 "Nip AREA \\\ CPOD \ . .. t.,R�• �.��30 SOY GEOTEXTILERAP / JI- 1. +y e ;.--�... \\ .. Exb INV.OUT=1�9. YS�\\ -.. J5� \\ RETAIN \ 7 ' - l fl II \ qg•CHL L / 'clii:Irl `\ 41i ,� _ - -- rii WHO C _— RETAIN ,d, i' ^/.... \ likikt BERM D ��, .. C C_ _ - �. .. ..� - 1�^�`' � MTL \ SEE ; Ty ..J��''��� STANDARD 'V'DITCH X/x \\ k 46•C� C .......... — --- �' SEE DETAIL .1.. SP.LAT.BASE SWA�h rn � ,3- STANDARD 'V'DITCH :% • DE TO 111 x ��=- — SEE DETAI • �O� DETAIL M rri7 \ , `\\ RETAIN L „' -- 0 SEE DETAIL AE JB wn.AH I < ((� \ 11" P.DET. i mil PLUG AND FILL \ 51 —� - ,r'L AN/ CBLE FILL REM,O O Om RETAIN � N m Lti 7� _ RETAIN _ R1PRA�1 SEE D � - /�/� '�� W/HINGE WALE / WHINGE WALE // SEE DETAIL G soilli SEE DETAIL G // // ki RETAIN tJTR _ °�'// //p \\ /�L C C RETAIN // / RETAIN C`\ ► ► \ RETAIN // // \ I P MTL // // • \ RET —— (.) \ / C � 6- N // /// w REPLACED W/4 RCV r] RE AIN S \ I s RETAIN \\ REMOVE '4lr riT o ,,, ay RETAIN u +YI � J TAIN O 2 a J BERMDITCH/' -ET W 7 - SEE DETAIL CF RETA ' RETAIN Z. in J jam/ C p11 CH� ` \ _ 11, ` RETAIN • 1 RETAIN - 2 �Lij •� U � � -- C BERM DITCH '� m. C \\ = —_ C �0 PAV. BURIE.�� ..T T. U �l -D W ��/� SEE DETAIL CF , C \ --- C .,, y • „_ y L r\"<', BERM BASE \ '• BERM DITCH "•-I •CHL „,! ISZ M C �."� y C - \� DITCH -\ SEE DETAIL CF �', �•' `. m illy - ,\ SEE DETAIL BP \ BERM DITCH i LLI RETAIN EXIST.HW N � � EXi r a4" W� MO Rm Ri•. a I.IJ SEE DETAIL CF I I 4. r O N\ ,01 m coi' \ e �► `✓� 50 25 0 50 100 D N3 `1I11� PROP.SOUND BARRIER �� Z I "" • SCALE N • - — N �I t.\\a — A \ `��I1F 0 PLANS PREPARED W. SEE DETDAIC CF p \ N Rstim 0.. /�,°C --- `BERM BASE DITCH / RS&H Architects-Engineers-Planners,Inc. - SEE DETAIL BP SITE 1 \3 DDI 8521 SIX FORKS ROAD,SUITE 400 RALEIGH,NORTH CAROLINA 27615 N��, NC LICENSE NO.F-0493(919)926-4100 0 0- PROJECT REFERENCE NO. SHEET NO. c /-5111 1-4739/U-6093 7 ;,-♦ ��AAD RNJ SHEET NO. —_ ����. ���Q^Fy �x�t�K�4 ALLOWABLE IMPACTS ZONE 1 -.... A.J ' 1 ROADWAY DESIGN HYDRAULICSENGINE ` ENGINEER ENGINEER \\\\\\, ALLOWABLE IMPACTS ZONE 2 -----__7 v% p ������y.-• MITIGABLE IMPACTS ZONE 1 BUFFER DRAWING lU6093-00 /OCK SHEET 7 OF 52 REVISED 1VI9/2021 OUARRY LDINGS L? -Y2 TClyL/NE S STA. 3 11 / J 7z'cNL i SEE S 7-� DOCUMENT NOT CONSIDERED FINAL m x _ =+ l f 50 50 25 0 50 100 1/' UNLESSALLSIGNATURES COMPLETED / U _ G1l �7 �1�11S� � ���' its\\ /r"�, it- W y /`,�;. / / / NAROLD T.WALL l `\ '' \\ \ /'- - .e,^, Jt`a' l..II .� J Le,, j V'i c.` BALL\ ALSJ LLC s� \ y �m;ro rii )f� �// `� 1, " \\ sd 'pQ ,_ F L/�/(4 /{ 1 c U6093-00 c 4g•cxL C g �v • tl \gib - - ""��/ , �k ! • EARNEST PAUL ADAMS.- \ SITE 4 ��{�{ ' cB E � y 1 0 nP CB-E 'S rn wititik Gi�l r_y; I Al "E'n� '{ti •�,/� \ 1 v U6093-004 .£SO 26 TONS CL I RIP RAP 9 SEE DETZL06•__ - i'•1. �F ' / \ 50 SY GEOTEXTILE r. \\ C _ , / ..1 /) INV.OUT=248.0' 00 BERM 'V'D T i i �/C-- ��� �\ / / // I / 18" E E SEE DETAIL IA IP EIP , N - , _ \ Ic/ 2LJJ w 1 11 N. — -- w W - \ // / /L JB H - \�BvvSlab Lid r 7. ` a' 2 .. RCP-IV Y/ �r� I / SP.CUT SWALE SPECIAL LA E �� 4 4 h r " 5"CSP /• I Ili! / W/HINGE SPECIAL LATERAL N'SWALE „ ., ., SEE DETAIL TK�.• S ''�-�- _�--- n _ //W ' /�'1,/�����,,�'�'/A a. E.. A G .. .. SEE DETAI E SaLCd._WS 9a.�`�_, ,r._ - L'V'DIT y. '.ONVERT DI T .. -�- PA NW O < T -R /��=sr-J.�.: .,...T..Jt- .�i.: Ni .-� ti N Z W �/i /i MTL SEE DETAIL CP > > FS EoP �/_ N I VCONC i ILL--._ O -F1FbPbTED EN L" ED ///N --f ~ 2 O _ N1111De eat"ta. - i/ .. • ••0500 C. - a. — W/PLOWABLE FILL Q W CONC UNDERNEATH RRID[;F l �/ �l�f •'AINADP SV57 M 1-40 FBC 35'CONC N eor / l/1��.: '�ll�/'1 ._ l`� 3 - CABLE a �z� TB 2 // a Q I -LT- J/IIMI//=_9,. I-fl- BT -�- —a--�-7--0--0--E U- 1 TB n,roacl --u --u - 0--0- a 0- 0- � -II u I- I- / / TB 2GIB-ST 18"RCP III TB 2GIA-ST REMOVE , , / / / / O 29 '15"RCP III 15"RCP III �� 36U0.94 I // /FAO // " E 9 WT(�D IFH LL Z �/ (/ PL G AND FILL ij2 In • 11 OP — +I"''lD/L?7/L'S'0iX- _ ,T�--- 1-40 EBL 4rcoNc --_// VII Z�•W 1 �1, 4'//1/ I — 1—��$� J�// SF.EAT'V'DTICH �' -YIRPBo- l F� �//F TAIL CP �fi{; 1 / �` i > i = Is ,I SEE DETAIL K Z 1--- r . _ +���y:-" �. . RCP\\ , @F=25T39 !��4�T/L•►%... JB w:MH CB G /_�._'_���.10;/�� 511 IAP 2.4" . / .. .. • .. .. .. .. • .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. . .. .. .. I REMOVE .. .. .. .. .. .. .. .. r Q ►.e„t„:„1. • f rt OWS / / SP.CUT DITCH W/HINGE SP.LATERAL BASE DITCH 'II �i m ej'� E� 'F rlifly-F114-7.: I, / _/ SEEDETAIL LSEE DETAIL CH 22EBOWS"O.- C; t i SPECIAL LATERAL'V'DITCH SEE DETAIL Kr 4� ya 24"RCP-III -----�-- --_ �_ -----�-�- __ --,,,- ��r�L"-26 lwssum Tr \ 2 EBOWSAP 2 / C C t C CLCHW`_" C4, CC C ~, CB-F/ �_ BERM DITCH ' BERM DITCHC PROVIDENCE OF RALEIGH HOMEOWNERS ASSOC.INC. ,ya 18"RCP-IV R/W NOx L 11R1L°�" SEE DETAIL CF oeaSEE DET BERM DIT CF - SEE DETAIL CF_c's' ' ' A / / .0 N 6.0 y 866 CONC A 0- FSj1 ' .. E ® ., .. .. .. .. .. .. .. .. .. .. I DI (V�x I e 6 A N 2054'S4'W '"'" •4'S4'W N 20'54'S4'W N 20'S4'S4'W N 20'S4'S9'W 2 g59954' N 18'I_^ C�Tw�. I99.99 N EIP_ NOS .. .. w N' 10' r 0 50.06' S0.05' 50.06' WALL - t11T� .,7, . N O v 4. ' ° U6093-00 .. 45.n, 514yo'w r ay d / �/ ° OVE 50.1- 5 60'WD .n. 74.38, a '� /x— .. 15"RCP-IV H -O 1 // ;./ ,��/,,... .. .. .. .. .. x l_— ,a,.., M '{t w N 0514'I0 W �`b .AB T'�x 1 ISFD _ r / ,w / �.• ® W ;I i I -p O Ac'' N OSY�./O w I4.63' RIP RAP y �X COS'/ m = o C' = 65, i +1'� ��.� o = e W a M o % fl L3 uL� W 2IS 4 QB fs CoNC k l/ \� e%a,hy2\AT^ /��Ns,• �t` WJ r eLa c_ca m cxr o _- s„ a r \ \esa J `�l E \�y`V AJ '=JJ 4 WJ W j - �2 KZ x-d'a - K2 ; 'J K= N 4' 40 G��60 0, �i-', SEE STA. 30 - (.9 _"=9 " r_ _ o0 0 ' o : M m_ py0 \��/' 30 oD1 b�NEE �50 __ i_ ._ �_ "tip= _ 0 :P �,ry• 6 �� . y N T S k— z y ,o'' a°e/so PROVIDENCE OF RALEIGH TOWNHOUSE OWNERS ASSOC.INC N P l M 2 ix > ?i \ PLANS PREPARED B✓.\�c, a = cs as PVT 4RSoII Y NOL o?E RS&H Architects-Engineers-Planners,Inc. oo c ro..a 8521 SIX FORKS ROAD,SUITE 400 RALEIGH,NORTH CAROLINA 27615 Ua, NC LICENSE NO.F-0493(919)926-4100 PROJECT REFERENCE NO. SHEET NO. m — — fit/ /-5110-4739/U-6093 8 / ��Hqb 8 RNJ SHEET NO. __ ROADWAY DESIGN HYDRAULICS J�, IENGINEER ENGINEER / :*4::*4 / BUFFER DRAWING �i4i4i4�i4i N MITIGABLE IMPACTS ZONE 1 ��4l�4l��i / , //, SHEET 8 f 52 MITIGABLE IMPACTS ZONE 2 REVISED V(>/L022 SITE4Th/2= p DOCUMENT NOT CONSIDERED FINAL �+ / \ 2t. UNLESS ALL SIGNATURES COMPLETED SB / BRANDON JOHNSON SR. y \ LJ / KALUBI M.TSHIYONGA ; _,----1 c 'r S b = .4( 1 �rm 7 .. .. .. I J 0 dd �. ' 0/ 1,•') x t ,,, 4, \A, oi .\---\-1 1 lo \-------104 . . 1::4\ Cf*, aSpo 61 V ., 0_,,_'4 \0 , 51 ////� mom NO OWNERS Assoc. 25F0 25F0 9 025F%, D' ; 0� ; s c^ ,ate KIM S.ROBINSON �' ENETA E. 0 2 s a $ Q o d' c / ///�` MCAUSTER ;cowl:- �76� cDNc ,, m rL 3 ' O^M 4110 _ COAL 3 TONS CL I RIP '' '' '' '' < / ly 10 SY GEOT m 4 INV.OUT- 0.0' RIP RAP IL EMBANKMENT , Pfr y TS SEE DETAIL BA I r♦ L tiffs 4� .4,� , BERM DITCH MST c / . r TANDARD V'DITCH 0` .'E�E':f•� SEE DETAIL CE SEE DETAIL CF IP T RAYF F F C - C C C .CIF t4'/ 48'Yl�l.& I W �- i LLI '''W b:‘,r"V/ 111 LLI \�,;, C SPECIAL CUT DITCH LLJ i N g •,�I / i ` SEE DETAIL LATERAL'V'DITCH ,SEEFEI' GE DETAIL L SPECIAL CUT SWALE REMOVE N W MRCP III F J% ' . SEE DETAIL .. I{ET 2GI._W • REMOVE LI L ✓✓ LLI •� > 24.RCP �,� - -. -_ 1 24'R LLI > —> .. .. .. .. :x EM 3,'RCP III N 2GIB=WSF IR"TYPE EOP DI £� IB' N FS MTL RL� pl FS 4 • Q 2GIB-WSF EOT /a'CONE -1/ EOT 10 CONL % 0 ± 0 PLUG AND FILL �� 1-TO WEE J5'CBW6 /RETAIN I— g �� �N/��...AaE�ILL� � �f —�� - or �/— EDT T-nmr- N I M o 1-40 WB 9 >>�3� // — i-t00 IN O' 15"RCP III OTB 2GIB-ST CABLE 24"RCP III 45y0G •'��" CABLE is ' r� I �� I� H N I -/- 15"RCP III TB 2GIA- 1�2GIA T I D D D I 11 U Mi I� L 1_,__,_.._181",RCP III 2GIB-ST I I I N '; 22' TB 2GIB-ST TB 2GIB-ST ui ► '4 L 'B�'�'I �-„CA0.C'r-31- I-n -T-n---ZIT- I J ., "pIl u 24"RCP III Ea I �I. ~ .ki _I I 'N 6 EOP 1-40 EB REMOVE EDP I 6 I Z -� X E� RETAIN I-40 EEL JJ CONC E� RETAINt r�— J r� eC ---- -IIMF I� EDT i ram-J 71= �— -------------- ,-----_—_—RETAIN .� ---- N J r , I U ----- EOP -- Q, V I— Q EOP RETAIN U' alp - Q ' '' 18"CSP 2 ELBOWS SPECIAL LAT.V DITCH SEE DETAIL K __ - > 0- > 1 > _ —R/R IqN %ISIHC R F r C —� RRO9VENCE IIF,RALEIGH C > I1 C C BAR"10N C C ---c— --' C C c TOWNHOUSE OWNERS aSSOC.INC I PROVIDENCE PF RALEIGH HOMEOWNERS ASSOC. \ BERM DITCH BERM DITCH \a BERM DITCH , � IO' SEE DETAIL CF SEE DETAIL CF _c CONC SEE DETAIL CF N WALL `2Vb �16d6 r PROVIDENCE DEVELOPMENT OF RALEIGH LLC d\ cr co zsrD �� O c IN , tih PROVIDENCE DEVELOPMENT OF RALEIGH LLC CO PROVIDENCE DEVELOPMENT OF RALEIGH LLC lF __K -044r \ \I I 0 , 0 , // i / PLANS PREPARED Ere, . 50 25 0 50 100 R$gi1anne11nc._, 1�i��Ts a 8521 SIX FORKS ROAD,SUITE 400 -— ,� SCALE RALEIGH, T LICENSE NO F-0493H 0 NC (919)926-4100 I. ON5 MATCHLINE —Yl 3— STA. 67+00 SEE SHEET 67 e" 5rr"r-�39° I "`45— rrtxKi=i�i�il ALLOWABLE IMPACTS ZONE 1 zl� Y1RPB3 STA 20+93. SPB3 S f- r J, � �04 1"" -� : / // SHEET 36 OF'S2 I \\\\\\\\ ss�iEliEO <z - %�% izS* �3% Pd i.Oa 1% 1 r � l / `\ , ALLOWABLE IMPACTS ZONE 2 Y6Ff„Edf C j"' ,(rye,�'1 . I v (`V� r AA\\\V rNc�o�e�eca e�exa fl -- ��` o o r �I�" II I � ) L �n / 2\\ ��eNp riiiiiii4 MITIGABLE IMPACTS ZONE 1 c3 ,fie . . r rrt.rtrtrt.♦ fi• it IC nd712-‘ �� rt �\ ®en //�// ( rt --, `jJ�j o ® MITIGABLE IMPACTS ZONE 2 V"EEwr1REVISEDE0.7.7.121 ` .ue ©ti ,l , we rGi vrt ,r..'rt +. �„� i 11/�� pl .. Jrt�C>>L� AI'�P l.za/ ! 3W / / \\� j////� REVISED 08272021 �, ti�r� _ 4... s I _ Y �.,". .. ruu i 91 " C�i�s. ��\6.v§ i eo o s _% �%40 120 TONS CL I RIP RAP � � 1 - �` REVISED 1VI92021 W/223 SY GEOTEXTIL: j�.Ad ��� ,, / ON BANKS ONLY ,♦O. i.♦♦♦I _ — F`� lw-iz.--,,,-- -- ` x / `,-.�� yYY�a vLENGTH 55' 1�. i�• ET A - -1�.. :♦♦Y �j - e�7I \�_ \ - "�/ / ^\\\\- qd�, \ �2 ' �15-(SEE DETAIL BB) ^ __- -_-- .omR , \\a �p / Jr,' B H 1S- :u 1 4 v /* ♦♦ I. ♦♦♦ OE PROTECTION Nilikl*' . \ � \ ' .\ - f ./, dd1�+O♦♦♦♦`\ .1♦♦*` W/CL I RIPRAP ���.� ���• I • +!��''�� .� BZ ♦♦♦♦♦♦♦! 1 ��♦♦♦N EE DETAIL O �� ` �I IA AV A 1 +S/ a ‘',:: `� a • � � ..II T eu.minas ya V `.,� a. �� ���o�► �i♦i. �I® ►+�11� AT,AA♦:..• V �,1 o u � �AA 6 `� SITE 48 �\ �� , " sP u.aP .Y.441,, •ppr , .•_ ��.." �. ;,u SEE ELBOWS ycAO ��-3►��;�I : 1� .I< �� o+p�"Iliv� W ,I I_�1 �" j14,,r,i \\ \ _\ M EA N I \,>�\ ,��.. r1: �' .. ,. -=•s+♦d,9,. ♦♦�'?� ` . '�.,,.,"°w, ,` b. 1 1 1 I ^ l— _ o `' ;`"°.�°pF.� .. • INSET A te, \.,. - ,o, ) ♦♦♦,R �••♦�7 ,. ►♦I � ♦��- `����:� � I .� \I `� -- o �� \\ z -rs: .ro°:. °.�.,"w,. P\\\•�:.\ / 4 Sr..- EE DETAIL AN LATERAL V • a�V♦ >♦♦� �. A���j���♦41 ( ►�►� r�.�A�1�\71111:,.,7411.11 l �cowe s7 ae+s.�a< / �° �'VV ®�_� ��.;�b�Et \ ��oLUR�� �.♦ !♦♦ s alo=le.a .�, � � . 0.50% 1 3% .. // ""°„ 3 G�: k. Vityy LATERAL BASE swALE .4fr s ♦�� 1.. /� ®°r �•�„ A\ '�����d �� ±��� ��.°i: BDO .:I�♦� I� ��♦♦II .O :"+ �� � � // .�.\V it ,��m .\ N. •I11�„r.�� ►♦G�i .,il SEE DETAIL AM mil.✓. ',1 irl 1• �!. 5 t1 LP . .\\\\ ` �f , ji♦.! Ate e, ��� IS CS ` ii`-°su`i6d+6z.do L ` •riJ!"� \/ I♦�� ►, ♦♦♦♦♦♦�► �� ��� A 2 TONS CL 6 RIP po41 . , ♦ , c 5 C ►¢' Vi. �.. 2 06% 1.17% \\ 1 ��f J-o• 4 ♦ ►♦♦♦♦♦♦�� 4 W/7 SY GEOTEXT E "o,a-�"'����♦�♦w♦♦♦ 2GIB-WSS �� O � -�a..,... V �� AV "F .YY � �� �OODi ►ic \ iii; `" . \ \ \\�� y p SIT 7 \\ �•4♦.♦♦♦�� A3� HW ! C \ �` � SR�.,M.�� �o `� ` �_ \, A. .N � < ", D� ,n�... I \ : ♦♦ RIP RAP AT \ �� � �F`" �� / ' n ,Ru \\\ EMB NKMEN - n D�.\ ` �\ 1. �1` `� \ 4 v1 \ .y �� �, I •' � \ _ ` FE-YIRPA3 15+d66 �! \ \ ` � \ ` SEE rETAILBA \ !!�I \ � m%�oPo- ,o .cy.\ ry-A��� �:Vim/p �41''IlSiihh.. . 2 TONS CL B RIP RAP ,11'g`��11 °r-.., ! _`. W/7 SY GEOTEXTILE :^",ff�°..u" �� I� 17! ,1�� ,.?� � .� \� rt .� iaROm OE. �•y SEE INSET B h 44 �� ©10 G \ 11 f6 III° ►J �•�. ` I 1,�� �� \��\ I I rt rt 1 � � '... NSET I3� .+ III roR.C,°a. e �, Jr: i�sew1�_ \\ \ / ",�� .� �SLU I II II wv y v �A: WOE ��� � �2rr� �� N.., � ee b SITE 49 w \ w \0 �... n `\� � �z, iYr7R� • \\\�\\��� \\��\��� � ICI Vir:4A111 Fl`ES 34O RCP/// iipbri' \0.\ m r \\\ Os' 1,1 STA.164+62.16 Rr ,. �� tir. ,1, o�'Y «� A ;A �- • .4,,, ♦ A` ®i i �s 4� p 224, 1.30% ���� �� .� � NA��<< J F � ti O ® ��� tip\, ,P R ^t. 'GL`�,44.A. � y ���'FT ����- 1Y,IB-WSF r �� i _ELDER A.C1+ _ �L �d♦� i A +e �, ��� / ��1._!rY r. � 3�se JEE I �� �,� r1°.44."E1di.S" j �� ��..®,♦,'� \ ..P/, +Po..,;\ o.e6% \. `� Imo"—� ! IN y� ��� � Dom\ ��� �.\�\ 6s -;:r_____ ` '7�QQ♦Ciie,f,Tro* ri D �. 4. 46IIP�' ��,�.,'�►�+ 7s�r.�->s.,,,,.�;;_ —- _- _ ��. - '°` . w '• ' . \ \\, \\�\'' a., IHp, giii , r r ..-10+4 3 �a�'��yl/ �1 � �♦♦��i}• j •- .wv.,� a,° \ \ \\ ,.. _ -RN . .a \ sv��,..6. ♦�♦'' .r S?:♦♦♦♦ ,i' P¢4Tz :4111::_„,.,\l .1:,'<i _I �> _ �' �+►" kW.:. :.sh.\� p \\\ y;_'D \\� \\\ 174 �S ig,e� \� Y Psi♦,.," - 1��♦♦�i�� AI II $ 1' 1j „� � ' � � e — vim A \ I s w:,°..E� D.,,, 1ypiJ,Sr ♦.♦.♦.♦.♦Aik /� a.. `s' _.__ _ a x "'' -- _ �� \:! �• • a -N Q. � 4'�;; ♦♦®♦� y r ,.. «� 1 �''� - _ v Nr'''''2'. Ra, ` JABO' $s*, �� ..►•►P♦ dvt�` 'yV AN& Aft�4 _na- ip r ' \ y�- / ' r i�, � @�D.Z':°�E8 I I l pao„„ �,,v s eOs d�` \ 't, i♦♦w1 ♦♦♦♦/ ,..� mac• _ r °�f `\\ i8 ''1( ® �\ 1 °n dY'�tea ♦♦♦♦/ ,,,-„--/�:1 'w' — �A � �° ® \ ���4 `.� �:���►� L ♦♦♦♦♦� % V° ��-, ` _ �A': A` Ioi�T..� � V,i —ern.=—�_�,/.:%/� LP ��, 7s/a® 4� A\' (� ` ...r -��� 13�° , 'k°ia "'c-� -1'- ��I�.� / -( �y ___ F � is r� � i -ri RPD- EEOsv csmsxr STA 15 6J]1 .° �� . N. �V -J r Eno ..woo,.....s ! - RR�E. I N S Q .��, = .w _ b� o _ eeo !� / 7t �n t SLU WU � 53.0�. «•��� rt al (55 t�� ii 1 - . C o 0 PROPER!. "C RAJ_OF", I 0 CS \ � C,t..Z". 44 !�.� "� `a`�r g� A� , �<r SEE INSET C� GRAPHIC SCALE �9t T/' 'C r-..ram-DRA,N -ram SPECIAL FCNT DITCH MATCHLINE Yl_3- STA. 51+50 SEE SHEET 66 r �, y�kr �3����D _pa n _ 111.1 — 2rf�l\�Fln.! _-,V PLANS .....=o.io.i..:« . k RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ZONE ROAD PARALLEL No. (From/To) Size / Type BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL 1 ZONE 2 CROSSING IMPACT (ft2) (ft2) (ft2) (ft2) (ft2) (ft) (ft) (ft) 1 -LWB- 18+74 LT Prop 36" Welded Steel Pipe Outfall X 335 335 2 -Y1RPA- 32+57 RT HW Replacement& Prop Berm Ditch X 2710 1734 4444 2 -Y1 RPBD- 30+60 RT Prop 48" & 15" RCP Pipe Outfall X 2307 1296 3603 3 -LWB- 31+71 to 34+63 LT Proposed 42" CSP Pipe Outfall & Prop HW X 23470 15180 38650 4 -L- 38+50 to 40+00 LT Prop Pipe Outfall &Widened Roadway Facility X 2731 1293 4024 4 -L-40+19 LT Pipe Outfall X 1984 519 2503 4 -L-40+00 to 40+85 LT Widened Roadway Facility X 614 614 6 -L-64+70 RT Prop 72" W.S. Suppl. Pipe, HW& Rip Rap X 6006 3970 9976 6 -L- 65+16 LT Prop 72" W.S. Suppl. Pipe, HW & Rip Rap X 6315 3866 10181 7 -L- 91+13 RT Prop Dual 96" Suppl. Pipes Plus HW& Channel Impovements X 4730 1390 6120 7 -L- 91+37 LT Prop Dual 96" Suppl. Pipes Plus HW& Channel Impovements X 3337 795 4132 8 -Y3RPA-23+91 LT Prop Pipe &Widened Roadway Facility X 7488 8136 15624 8 -Y3RPA- 23+46 RT Prop Pipe &Widened Roadway Facility X 1066 1030 2096 9 -Y3RPA- 17+52 RT Prop Pipe &Widened Roadway Facility X 1906 1389 3295 10 -L- 144+75 to 152+66 LT/RT Prop 30"W.S. Pipe, HW & Channel Relocation X 15337 3414 18751 11 -L- 151+69 RT Prop 30"W.S. Pipe & HW X 2045 1410 3455 12 -L- 149+34 LT HW &Widened Roadway Facility X 2873 1514 4387 13 -L- 157+91 RT Plug and Fill Ex. Pipe X 199 199 13 -L- 159+69 RT Widened Roadway Facility X 652 652 TOTALS*: 23291 10821 34112 62200 36729 98929 0 0 NOTES: Revised 1/6/2022 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS April 2019 Wake County I-5111 42346.3.1 Revised 2018 Feb SHEET 45 OF 52 RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ROAD PARALLEL No. (From/To) Size / Type CROSSING BRIDGE IMPACT ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) 39 ONLY IN PERMIT SET 40 -L- 99+00-107+44 LT & RT BRIDGE X 14449 7030 21479 1104 2993 4097 41 ONLY IN PERMIT SET 42 -L- 106+42-107+44 RT ROADWAY FILL - SDN, WEN X 7169 5126 12295 43 -L- 109+63-114+04 RT ROADWAY FILL - SEO X 7471 4557 12028 44 -L- 110+99-115+29 LT & RT 60" RCP- SEQ, WEO(1) 1 X 12849 6826 19675 45 -L- 143+25-145+12 LT 48" CSP - SEU X 11384 6539 17923 46 -L- 164+25-164+78 RT 30" CSP / 36" RCP - SEA, WOE X 10987 7345 18332 47 -Y1 RPA- 16+15-17+72 RT 54" CSP - SLV X 5620 2993 8613 48 ONLY IN PERMIT SET 49 -L- 170+95-175+40 LT & RT 66" WSP / 66" RCP - SLU, WC, WOB X 20163 9924 30087 50 -L- 178+00-184+97 LT&RT 60" CSP, CHANNEL CHANGE - SLS,WOA X 38684 25634 64318 51 -L- 199+51-205+31 ROADWAY FILL, 66" RCP - SLR, WNZ X 17316 9930 27247 52 ONLY IN PERMIT SET 53 -L- 209+51-217+29 LT & RT 54" RCP / 66" RCP - MILL BRANCH X 27804 17778 45582 54 -L- 232+37-234+37 LT 54" WSP - SJ, WI, WJ X 8694 5213 13907 55 ONLY IN PERMIT SET 56 ONLY IN PERMIT SET 57 -L- 246+11-248+25 LT & RT 60" WSP - SDD, WFF X 15680 9394 25074 58 -L- 269+75-270+63 LT 36" WSP - SQ X 10972 7749 18721 TOTALS*: 28762 15236 43999 181583 113795 295378 0 0 PROJECT TOTALS*: 115552 55966 171518 302460 169490 471950 0 0 NOTES: 1. SEQ under fill slope RT is a total take, 765sf of Mitigable BZ2 Impacts accounted for in totals but not hatched in plan view due to location outside PDE NC DEPARTMENT OF TRANSPORTATION REVISED 8/28/2019 8/27/2021 DIVISION OF HIGHWAYS 12/12/2019 11/19/2021 JANUARY 2022 7/2/2020 1/6/2022 WAKE / JOHNSTON 8/11/2020 I-5111 / I-4739 7/13/2021 42346.3.1 Revised 2018 Feb 8/11/2021 SHEET 51 OF 52