HomeMy WebLinkAbout20181598 Ver 1_RFI-051 (2)_20220120 REQUEST From:Balfour Beatty FOR RFI No.: RFI-20001021-051 Contact Person: Robert Mann INFORMATION Date: 01-18-2022 Contract No. C204177 Critical Path:O Yes ❑ No Project: Havelock Bypass Project Subject: In Water Moratorium Time Extension Specification References: Drawing References: Request: Balfour Beatty would like to request a two-week time extension for the in-water moratorium slated to begin February 151". 2022. There have been multiple hurdles that have impacted the project schedule for Structures 5/6 including permitting conflicts, Covid related personnel disruptions, and material supply disruptions related to Covid. BBII has tried to overcome the schedule and material conflicts by implementing a night shift and working both crews 7 days a week. The two-week time extension would allow the installation of all necessary production pile, and trestle for substructure construction to continue without interruption. Please advise if the request for time extension is acceptable. Response Required By: ASAP Reason for Time Constraint: Structure Material Scheduling Response: TRANSMISSION TRACKING LOG No. of Pages Date From To Note REQUEST From:Balfour Beatty FOR RFI No.: RFI-20001021-051 Contact Person: Robert Mann INFORMATION Date: 01-18-2022 Contract No. C204177 Critical Path:O Yes ❑ No Project: Havelock Bypass Project Subject: In Water Moratorium Time Extension Specification References: Drawing References: Request: Balfour Beatty would like to request a two-week time extension for the in-water moratorium slated to begin February 151". 2022. There have been multiple hurdles that have impacted the project schedule for Structures 5/6 including permitting conflicts, Covid related personnel disruptions, and material supply disruptions related to Covid. BBII has tried to overcome the schedule and material conflicts by implementing a night shift and working both crews 7 days a week. The two-week time extension would allow the installation of all necessary production pile, and trestle for substructure construction to continue without interruption. Please advise if the request for time extension is acceptable. Response Required By: ASAP Reason for Time Constraint: Structure Material Scheduling Response: TRANSMISSION TRACKING LOG No. of Pages Date From To Note