December 22, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
Duke Energy Progress, LLC
ATTN: Mr. Nuwan Wijesuriya
550 S Tryon St., Ste 4500
Charlotte, NC 28202
RE: Project Name: Reems Creels 115kV Tap Line
Acres Approved: 20.9
Project ID: BUNCO-2022-004
County: Buncombe
City: Asheville
Address: I-26
River Basin: French Broad
Stream Classification: C
Submitted By: Mr. Wyatt D. Yelverton, P.E.
Date Received by LQS: December- 21, 2021
Plan Type: Energy Infrastructure
Dear Mr. Wijesuriya,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain the
COC prior to commencement of any land disturbing activity. The eN01 form may be accessed
D .,, North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
�j��j Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
NDaTH cnJ;CH a
oepawenioHn,ifowenulanay / 828,296,4500
Letter of Approval with Modifications
Duke Energy Progress, LLC
ATTN: Mr. Nuwan Wijesuriya
December 22, 2021
Page 2 of 3
at deq.nc gov/NCG01. Please direct questions about the eNOI form to the Stormwater
Program staff in the Raleigh central office. If the owner/operator of this project changes in
the future, the new responsible party must obtain a new COC.
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Your cooperation is appreciated.
S� er
s iaith
Assist
ssis
Regional
Engineer
Land Quality Section
Letter of Approval with Modifications
Duke Energy Progress, LLC
ATTN: Mr. Nuwan Wijesuriya
December 22, 2021
Page 3 of 3
Enclosures: Certificate of Approval
NPDES NCGOI Fact Sheet
Modifications
ec: Mr. Wyatt D. Yelverton, P.E. wyatt.yelverton@hdi-inc.com
cc: Regional Office file
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Reems Creek 115kV Tap Line
Project lD: BUNCO-2022-004
County: Buncombe
For final plan approval, on or before Friday,January, 7, 2022, please provide to this office
the requested documents listed below.
1. As discussed during the express review meeting, please provide plans showing the
relocation of the wattles in the riparian areas. {G.S. 113A-57 (3)).
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
'p,
Qlot
It
�Fw
`C CD r VR_EATS
CD
CD va
n rD
CL
A�
�+ ft W C
o
C�
bd o � o
ti
c�
VolCD
°, ¢,'