Loading...
HomeMy WebLinkAboutSW4210803_Supplement-EZ Form_20220120SUPPLEMENT-EZ COVER PAGE FORMS LOAOF❑ °ROJECTINFORMATION ---- - T ~ 1 Pra ect i Community Road Substation 2 Project Area ac _-- 2.457 Y 3 Coastal 4Netlarsd Area 4 Surface Water Area (ac) — -- fl__ 5 B Is this project Hior i.ow Density? —� Does this project use an off -site SCM? € Low No — — 'OMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided {feet — 30 no water features on_site�_,__ . 8 Wili the vegetated setback remain vegetated? 9 If SUA is proposed in the setback, does it meet NCAC 02H.100314} c-d ? _ NIA 10 Is streambank stabilization proposed on this project? —___-- No j IUMBER AND TYPE OF. SCMs: f 11 Infiltration S siem._....�,..w.....,.w......w._x,.......^�.,.,a.�.,�_,a:��r.,.,.�,_,�,,...��.��:-�,�n��.�-w,r.�,..,�.�.�_.�:,Y,�,� _12 Sioretention Ceti 13 Wet Pond 14 Stormwater Wetland _ 15 Permeable Pavement—--— _18 17 18 Sand Filter Rainwater Harvesting (RWH) Green Roof ._19 I evel Spreader-EilEer Strip (LS-F5)— 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 126Ht�e=Wrra-- I FORMSLOAUD ESIGNER CERTIFICATION € 27 Name and Title: _ Dan E�6rewer,�pept�ManagerJ 28 Organization: ESP Associates, Inc. 29 Street address: 20484 Chartw_ell Center Drive, Suite D 30 City, State, Zip: Cornelius, NC 28024_ 31 32 Phone numbers : Email_ 704-990-9428 — dbrewer@espassociates.com Certification Statement € certify, under penalty of law that this Supplement-EZ form and all supporting information were.prepared under my direction or supervision; that the information provided in the form. is,.to the best of my knovAedge, and belief, true, accurate, and complete; and.. that.the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. �!� r. Signature of Designer Date DRAINAGE AREAS 1 Is this a high ciensity_prnject? No -_-- If so, number of drainage areaslSGMs € 0 3 _ foes this protect have low dens€ty areas? ___ Yes 4 If so, number of low density drainage areas __ - 4 5 (Is allipart of this project subject to previous rule ' 1 versions? No FORNIS LOADED ji]RRINAGE AREA INFORMATION Entire Site s f 4 Type of SCM _ 5 Total drainage area (sq ft 107029 6IOnsite _ drainage areas ft 107029 7 Offsite drainage area (sq ft) 8 __ (Total BUA i_ n projects ft) 1194 sf New BUA on subdivided lots (subject to 9 ermittin t� I New BUA not on subdivided lots {subject to 10 permitting) (sf) 1199 sf__ 11 #Mite BUA (sq ftj 12 _Breakdown of new BUA not on subdivided lots- Parkin �� . 9 (sq ft) _.__-d'�--�C Sidewalk (sq ft) _ ( Roof (sq ft) Roadway (sq ft) Future sq ft). Other, please specify in the comment bo--x ? I below (sct ft 1199 sf New infiltrating permeable pavement on 13 - subdivided lots (scLft New infiltrating permeable pavement not on 14 subdivided lots s ft Existing BUA that will remain (not subject to 15 permitting) (sq ft) 1J 16 (Existing BUA that is already permitted Lg ft j BUA roar 20 1 Design volume of SCM (cu ft) —4 21 1 Calculation method for desian volume rIONAL INFORMATION Please use this space to provide any additional information about iho 22 LOW DENSITY t)� ESiGN REQUIREMENTS FOR _LOW _DENSITY PROJECTS FROM 02H.1003 Is project bholds sein elow density thres€ forth the applicable stormtivater rule? _; Yes 1 2 ,Does project maximize dispersed flow and minimize channelization of flow? Yes 3 JHas the use of piping been minimized per .1003(2)(c)? T � I -Yes 4 (Side slopes of the vegetated conveyances {H:V} TTm 3 sf 5 (Maximum velocity in the vegetated conveyances during the 10-year storm? 6 7 JAre curb outlet swales proposed? _ No ff Maximum longitudinal slope of curb outlet swale(s) 6 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H;V)- 10 , Minimum Length of curb outlet swale(s) (feet)- 11 Are treatment swales used instead of curb outlet swales? No _w- 12- 13_ _ Is stormwater released at the edge of the setback as dispersed flow? m - Yes- Have been t ) 14 stom:water outlets designed to prevent downslo a erosion? Yes Are variations to rote .1003 proposed. _.._._._ --- N__ nstor:�00� � A6DITiONAL � �p.Hn w� ��s.�� ����. �• INFORMATION x Conveyance Swales are present on site as well as a non -required (non-SCM) detention basin. The low density project provides detention to eliminate any concentrated flows or erosion downstream. Swale # Drainage J Pervious Area BUA area t Q ac (ac) slope V., f m (fps) _ V , ; � Flow depth (fps) ((tj.: -: Jac){cfs). I 2.67 0.03 ' 2.64 0.60 13.55 2.00 d 5.50 !! 2.84 ? 1.26 2 0.11 0.000 0.11 0 60 0.46 S( 3.63 5,50 ` 1.23 i 0.35 3 0.19� ! 4) OD Y_0.19 i 0.60 i- 0.79 3.88 l 5.50 1.56 WYi uW 0.411 4 0.87 i 0.00 0.87 0.60 3.63 j 1.60 5 50 { 1 19 € 1.01 722 =� :12 13 17. .20 24 27 28 24 30---