HomeMy WebLinkAboutSW6220101_Plansheet - Misc. Detail_20220119 (2)PLAN VIEW INFLOW STRUCTURE SKIMMER DEWATERING DEVICE ON STONE BEDDING MIN 8" BAFFLES INFLOW DEWATERING ZONE FILTER CONSTRUCTION SPECIFICATIONS 1. CLEAR, GRUB & STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL PLACE TEMPORARY SEDIMENT CONTROLS BELOW THE BASIN AS NEEDED. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOOD VEGETATION, ORGANIC MATTER AND OTHER OBJECTIONABLE MATERIAL PLACE THE FILL IN LIFTS NOT TO EXCEED 9INCHES AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6INCHES TO ALLOW FOR SETTLEMENT. 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. 4. PLACE THE BARREL ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4 INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. PLACE A MINIMUM OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURER'S INSTRUCTIONS 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACHED THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT. ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. 7. INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTEND POSSIBLE. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8 INCH STAPLES. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE ONE PIECE. IF MULTIPLE SECTIONS AREA REQUIRED, THE UPPER SECTION SHOULD OVERLAP THE LOWER SECTION SO THAT WATER CANNOT FLOW UNDER THE FABRIC. EMERGENCY SPILLWAY STONE BEDDING' SEDIMENT STORAGE ZONE 8. DISCHARGE WATER INTO THE BASIN TO PREVENT EROSION. USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY. 9. CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. 10. INSTALL POROUS BAFFLES AS SPECIFIED. 11. AFTER ALL SEDIMENT PRODUCING AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. 1• FREEBOARD / \ f/ 66" MIN. ELEVATION OF EMERGENCY SPILLWAY SPILLWAY EMERGENC' SPILLWAY SCH ao PVC **SKIMMER CAN BE PURCHASED FROM J.W. FAIRCLOTH & SON INC. PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAIRCLOTH SKIMMER. SKIMMER MAINTENANCE INSPECT SKIMMER SEDIMENT BASINS WEEKLY AND AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. EXCAVATE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITH SEDIMENT CONTROLS. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. UNCLOGGED THE SKIMMER AS NEEDED. CHECK TO MAKE SURE ORIFICE INSIDE OF THE SKIMMER IS NOT CLOGGED, IF SO, REMOVE THE DEBRIS. IF SKIMMER ARM OR BARREL IS CLOGGED, REMOVE THE ORIFICE AND CLEAR THE DEBRIS. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE TRASH AND DEBRIS FROM THE SKIMMER AND POOL AREAS. NTS PIPE OUTLE WELL-DEFINED PIPE OUTLET TO FLAT AREA - NO WELL-DEFINED CHANNEL GRAVEL OR FABRIC SECTION A -A NOTES 1. LA IS THE LENGTH OF THE RIPRAP APRON. 2. D = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER FABRIC OR BLANKET SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. PLAN GRAVEL OR FABRIC �' I I-ll 11=1 11=1 11= D I I I�-(` Ei I I 1=1 11= FILTER LAYER GRAVEL OR FABRIC SECTION A -A MAINTENANCE INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT G INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. 1 TEMPORARY SKIMMER BASIN 2 TYPICAL RIP RAP APRON GRASSED OR RIP RAP LINED SWALE (D 4.00'[1.22M] NOTE: THIS CROSS SECTION IS TO BE USED FOR THE ENTIRE LENGTH OF THE SWALE. 8.00' [2.44M] • SEE PLAN FOR WIDTH 2.00' [0.61 M] EXISTING 4.00' [1.22M] GRASS OR RIP RAP LINING GROUND • SEE PLAN 0.7 STAPLES PER SQ. YD. (0.8 STAPLES PER SQ. M) Ife SEE PLAN FOR ® L 1 Y DEPTH 1 T- 2.00' [0.61M] 3.00' [0.91M] • 1.50' [0.46M] SEE PLAN 4.00' [1.22M] • SEE PLAN L T 2.00' [0.61M] CONSTRUCTION SPECIFICATIONS: • 2.00' [0.61M] :7 4.00' [1.22M] 41 1. REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER 4.00' [1.22M] • COMPACTED SEE PLAN OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA. • • SUBGRADE 2. EXCAVATE THE CHANNEL AND SHAPE IT TO NEAT LINES AND DIMENSIONS SHOWN ON THE PLANS PLUS 0.2 FT OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW 1.3 STAPLES PER SQ. YD. 1.7 STAPLES PER SQ. YD. FOR BULKING DURING SEEDBED PREPARATIONS AND SOD (1.5 STAPLES PER SQ. M) (2.0 STAPLES PER SQ. M) BUILDUP. 3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL SO THAT SURFACE WATER MAY ENTER THE CHANNEL FREELY. 4. ESTABLISH GRASS IN THE CHANNEL IMMEDIATELY. 1.50' [0.46M] 1.50' [0.46M] 3.00' [0.91 M] • 3.00' [0.91M] • • • 2.00' [0.61M] • • 4.00' [1.22M] • • 1.00' [0.30M] MAINTENANCE & CONSTRUCTION: 2.00' [0.61 M] • • • 4.00' [1.22M] 1. INSPECT THE SWALE FOR EROSION ONCE A WEEK AND AFTER EVERY RAINFALL. • • • 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED AREAS. • • 3. MAINTAIN PROPER CROSS SECTION UNTIL THE SWALE IS STABLE. 3.4 STAPLES PER SQ. YD. 3.6 STAPLES PER SQ. YD. 4. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES. NTS (4.1 STAPLES PER SQ. M) (4.3 STAPLES PER SQ. M) 5 TYPICAL SWALE CROSS SECTION 6 STAPLE PATTERN FOR 4' ROLLS 4.00' [1.22M] • • TRENCH WIDTH 8.00' [2.44M] I-_ I 1 I I TRENCH 2.00' [0.61 M] GRADE WIDTH • -III III- __ ___ II I 1-11I ' -I I M I I -I I I I I -I -III 4.00' [1.22M] -III w III i-III I-II1= • -III J = 1- -1 I I -I I Z I I MI 1 0.7 STAPLES PER SQ. YD. -1I1 I -III w W -1 I I -I (0.8 STAPLES PER SQ. M) -1 1 I- 1-_-111-11 18" 1I1-1I1- ® o -III III II1-1 -11-� 1 I it I -I I 1 <° 1II- I I I -III I I -I ' I I -III 1.50' [0.46M] (A) O -1 I 1 < '° 4d < ,a a.d, III-1 4.00' [1.2t 2M] • • 2.00' [0.61 M] II1-1 Il 11- 2.00- [0.61 M] 2.00' [0.61 M] • • 11, 1. 1I-a n. a • 40 4.00- [1.22M] a °" :eUTILITY . ° "� _ ll 12 -III 6" LINE - d " a .: it I M a ° (DIAMETER ° 4.00' [1.22M] n• -1 -III " ..II ♦ VARIES) I • -11 1 1 ANTI -SEEP 111 I COLLARed`� . • e _ 1.3 STAPLES PER SQ. YD. 1.7 STAPLES PER SQ. YD. 1 t 11 I -1 e II111- (1.5 STAPLES PER SQ. M) (2.0 STAPLES PER SQ. M) w JII-III- III I_ 12• I I -I 1 MI1-_1II- -111 1 I- 111-- �46M] [0.46M] 3.00' [0.91 M]3.00' [0.91 M] • • • • • •ANTI -SEEP COLLAR. 1.50i1I1, 111 CLASS B CONCRETE. T •� [0.61 M] T • • • I • • • 4.00' [1.22M] • • • • 1.00' [0.30M] SECTION A -A • 2.00' [0.61 M] • • • • • • PLAN VIEW • • • • • 00'[0.30M] NTS 3.4 STAPLES PER SQ. YD. 3.6 STAPLES PER SQ. YD. (4.1 STAPLES PER SQ. M) (4.3 STAPLES PER SQ. M) 7 ANTI -SEEP COLLAR 8 STAPLE PATTERN FOR 8' ROLLS NTS NTS 3 DRIVE POSTS 24" INTO THE GROUND MAXIMUM 4' O.C. AND EXCAVATE A 4" X 8" TRENCH UPHILL ALONG THE LINE OF POSTS. STEP 1 ATTACH THE JUTE NETTING OR OTHER FABRIC APPROVED BY THE ENGINEER TO THE STAY WIRE AND POSTS, EXTEND THE BOTTOM OF THE FABRIC 8' INTO THE TRENCH AND TURNED OUT 4" IN THE TRENCH OR USE 8" EROSION CONTROL MATTING STAPLES. STEP 3 ATTACH WIRE FENCE TO POSTS AND EXTEND THE BOTTOM OF THE FENCE 8" INTO THE EXCAVATED TRENCH AND TURNED OUT 4" IN THE TRFNr.H BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF THE SILT FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. THE TOP OF THE FABRIC SHALL BE 6" HIGHER THAN THE WEIR. STEP 4 NOTES: 1. GRADE THE BASIN SUCH THAT THE BOTTOM IS LEVEL 2. INSTALL THE BAFFLES AS SHOWN ON THE GRADING PLAN. BAFFLES SHALL EXTEND THE FULL WIDTH OF THE BASIN. 3. DO NOT SPLICE THE FABRIC, USE A CONTINUOUS PIECE ACCROSS THE BASIN OR TRAP. 4. POSTS FOR THE BAFFLES SHALL BE 4' OC. MAINTENANCE 1. INSPECT THE BAFFLES EACH ACTIVE DAY ON SITE BUT IN NO CASE LESS THAN ONCE PER WEEK AND AFTER EACH RAINFALL EVENT. MAKE ANY REPAIRS IMMEDIATELY. 2. REMOVE SEDIMENT DEPOSITS WHEN THE MEASURE REACHES HALF FULL. TAKE CARE TO AVOID DAMAGING THE BAFFLES WHEN THE SEDIMENT IS REMOVED. 3. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE CONTRACTOR UNTIL THIS ACTION IS APPROVED BYAN NCDENR REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE CONTRIBUTING DRAINAGE AREA IS STABLE. 4. PLACEMENT OF BAFFLES: INLET ZONE- 35% OF LENGTH FROM ENTRY POINT FIRST CELL - 25% OF LENGTH FROM INLET ZONE SECOND CELL- 25% OF LENGTH FROM FIRST CELL OUTLET ZONE - 15% OF LENGTH FROM SECOND CELL POSTS MAX 4' O.C. TOP STAY WIRE OR ROPE JUTE NETTING OR EQUIVILENT FX BOTTOM OF FABRIC BURIED 8" 2 IN EXCAVATED TRENCH & = TURNED OUT 4" IN THE �9 TRENCH, OR PINNED WITH 8" w EROSION CONTROL MATTING s STAPLES. SLOW STEEL POST DRIVEN 24" INTO GROUND SECTION A -A BOTTOM ANCHORE POROUS BAFFLES PERSPECTIVE VIEW BELOW WATER SURFACE Vv COMMON NAME SIZE SPACING oN GE OF NORMAL 1 00 JL Alb AIL UPLANDS (ABOVE WATER SURFACE) SHALLOW WATER PLANTS SHALLOW LAND PLANTS COMMON NAME BOTANICAL NAME COMMON NAME BOTANICAL NAME WATERPOD HYDROLEA QUADRIVALVIS JOE PYE WEED EUPATORIUM FISTULOSUM PICKERELWEED PONTEDERIA CORDATA RED CHOKEBERRY ARONIA ARBUTIFOLIA IV11" LIZARD TAIL SAURURUS CERNUUS CARDINAL FLOWER LOBELIA CARDINALIS BULLTONGUE SAGITTARIA LANCIFOLIA SILKY DOGWOOD CORNUS AMOMUM WATERPOD 4 IN CONTAINER 24" O.C. MAXIMUM PICKERELWEED 4 IN CONTAINER 24" O.C. MAXIMUM LIZARD TAIL 4 IN CONTAINER 24" O.C. MAXIMUM BULLTONGUE 4 IN CONTAINER 24" O.C. MAXIMUM BLUE FLAG IRIS 4 IN CONTAINER 24" O.C. MAXIMUM JOE PYE WEED 4 IN CONTAINER 18" O.C. MAXIMUM RED CHOKEBERRY 1 GAL CONTAINER 48" O.C. MAXIMUM CARDINAL FLOWER 1 GAL CONTAINER 48" O.C. MAXIMUM SILKY DOGWOOD 1 GAL CONTAINER 48" O.C. MAXIMUM SWAMP MILKWEED 4 IN CONTAINER 18" O.C. MAXIMUM INLET ZONE 25% OF SURFACE AREA MBER URFACE AREA A * BLUE FLAG IRIS IRIS VIRGINICA * SWAMP MILKWEED ASCLEPIAS INCARNATA PLANT SUPPLIERS NOTES * ALTERNATE PLANTS CAROLINA GREENERY, WEST END, NC 910-947-3150 MELLOW MARSH FARM, PITTSBORO, NC 919-742-1200 1. PLANT SPACINGS SHALL BE A MAXIMUM OF 18 INCHES ON CENTER. PLANT DELIGHTS NURSERY, RALEIGH, NC 919-772-4794 2. PLANTS CAN AND SHOULD BE MIXED MATCHED DURING THE PLANTING PROCESS. CILL IDE NATIVE PLANT NURSERY, RALEIGH, NC 877-479-2673 SHALLOW LAND PLANTS AND SHALLOW WATER PLANTS CANNOT BE MIXED TOGETHER. 3. SOIL SAMPLE SHOULD BE TAKEN PRIOR TO SAMPLING AND FERTILIZE AT RECOMMENDATION FROM SOILS ANALYSIS. **VEGETATED SHELF AND SLOPES ABOVE THE PERMANENT POOL ELEVATION SHALL HAVE A MINIMUM 4. ALL SLOPES AND AREAS ADJACENT TO THE WET POND SHALL BE SEEDED WITH BERMUDA OF 6" TOPSOIL. SUBGRADE SHALL BE ADJUSTED TO ACCOUNT FOR ADDITION OF TOPSOIL IN THESE GRASS FOR A PERMANENT GROUNDCOVER. AREAS SUCH THAT THE ELEVATIONS SHOWN ABOVE ARE TO THE FINISHED GRADE OF THE TOPSOIL. 5. ALL INSTALLATIONS SHALL BE FROM A QUALIFIED PROFESSIONAL. 4 VEGETATED SHELF PLANTING DETAIL TRM INSTALLATION -5" 2» O 6" 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS A. DOWN OR B. HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM' STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING ON BLANKET TYPE. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. MAINTENANCE: 1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. 3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE REINSTALLED. NTS NTS 9 EROSION CONTROL BLANKET INSTALLATION CHANNEL INSTALLATION 0 NTS NTS fl) . . . . . . . . . . . . / \j\\j\j %` %` I- � ..............................// \ \ \\ \\ // 6. \/\ /\/\ ..................................... \/ ..... ............................. \� 4"-6" 6" \� \\/\ ` `. ................................. ......................... 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30 CM) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) ACROSS THE WIDTH OF THE BLANKET. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4" - 6" (10 CM -15 CM) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2" - 5" (5 CM -12.5 CM) (DEPENDING ON BLANKET TYPE) AND STAPLED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 M - 12 M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES STAKES APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NOTE: * IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. A NOTE: B C CRITICAL POINTS * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF NECESSARY TO ALLOW STAPLES TO SECURE THE A. OVERLAPS AND SEAMS CRITICAL POINTS ALONG THE CHANNEL SURFACE. B. PROJECTED WATER LINE C. CHANNEL BOTTOM/SIDE ** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6" (15 cm) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. MAINTENANCE: 1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. 3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE NTS REINSTALLED. 10 EROSION CONTROL BLANKET INSTALLATION 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com 11DARo ,���� 2Oi O` G • �O •• 7 I • 4� SEA • 0274 .• G ► NE •.����� v -I / REVISIONS PROJECT NAME WOODSHIRE SUBDIVISION PHASE 7 SITE & EROSION CONTROL DETAILS CLIENT 1041 B Robeson Street Fayetteville, North Carolina 28305 Phone: (910) 339-6330 Fax: (910) 964-9089 PROJECT INFORMATION DESIGNED BY: CALEB DRAWN BY: CALEB CHECKED BY: SCOTT PROJECT NUMBER: 1070 DRAWING SCALE NOT TO SCALE DATE RELEASED JANUARY 17, 2022 SHEET NUMBER C-6m 1