HomeMy WebLinkAboutSW6220101_Plansheet - Grading/Drainage Plan_20220119KRAMER ROA� _ 7177 SITE Qom\ titi"° `� pFz y0 / � 5 s w O N I NORTI-1 VICINITY MAP NOT TO SCALE CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE CONSTRUCTION CONFERENCE. 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE, SILT FENCE OUTLETS, AND DIVERSION BERMS WHERE SPECIFIED. 3. CONSTRUCT TEMPORARY SKIMMER BASINS. 4. CLEAR AND GRUB THE SITE AS NEEDED. 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS REMAIN GRASSED. 6. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN. 7. INSTALL UTILITIES. 8. INSTALL INLET PROTECTION ON ALL NEW STORM WATER INLETS. 9. PERFORM FINE GRADING. 10. INSTALL AND PREPARE BASE COURSE. 11. PAVE ROADWAYS. 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. 13. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES. 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. 15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF TERMINATION (NOT). THE NOT IS AVAILABLE AT: HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE OF TERMINATION PROCESS. NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300. N /F FLORENCE C. WELLONS DB 1594, PG 382 GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) �_6 INV_ _ �.�.NURSERY ROAD - SR 1117_ _ 5.0433 33 3 `_ 3 36(1 - - -3 S4 c 3�0 '�� 4 335`r= -� .s-25�3Lv �� `�� - _ _ _ _�Z78 379 7 3 3 S SS3 ��� 3 0 \ �s \ L \ \\\' 60' R/W (PUBLIC) - -� - 00- .. • = w = 3g= (� S �� u'Q� ww�--L ww wig c "�/�i�. E5/8" ERB I I ERB I 5 \\ I I\_4 /--\\ I I\ 3\ I 5 I WOODSHIRE PHASE ONE I PI 2001, PG 1298I I I I g 3 3 3 355 54 • '� / -ITT _ RCP L �3 r `��i :_a.:_^:• _ �-• ` i 3 • _ _ _ _ _ _ _ _ _ _ �. /7 OOl _ _ ._ _ �P /� _ _ . - 1- _z 5/8" L �" LOCH /a„ --_�. � 0 -49-=�- - \ � \,o- ulv Ulm_ INVl��T��� -- -- -- -- -- / ERB ERB E. \\ Elk ERB SE- \ �Ol DIV!�ZQL 1 ••_ :--�_- I 5/81, O 5/8" I 27/ _ _ _ _ _ _ } ERB I ERB - >-• \�C \ \ \ `� \ \ 1 ( I o O I WOODSHIRE PHASE ONE /--\ /--\ - PB 2001, PG 1298 W< I 6wworsFi OC W tI W .. ..�/ /...\ .\. \ ' 5 QLO EI63 ER 26 \ \ \ . ♦ \ \ \ \ \ I g61 � 35a- g50 g54 3y2 Q � �� ♦ I f"I '� � \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ gQ♦7 � o ` c'� II \ \ � v. I , \ � "� `� r' L W W `W \ ♦ \\ \ \ \ \ 1 I \ 1 1 \ 1 \ \ \ \\ \ \ \ \ 1 I I1 \ I ERB I _ o 523 O. I 0 _O _l __OOI - (�,OO`�• O O_ ��M � O-.. N �- .M -O3 � �•� Co ou 5/8 Cl) co co(o 5102 510 ERB R8B" � MLO 362Cl) M0 DUNBAR DRIVE 50' R/W (PUBLIC) cP- SR 2241 347 1" .n 361 __ 353 j1j k7 CI �WW I \ \\ \ \ Q, 1 /2 1 /2 I# 68.2 CI #15001 M 3 50' �W (PUBLIC DUTILITY S TACCESS) w ro N o 0 0 o W W� \\ • W . WW W �� \\\1\I I I I I I I I I I I I I I I\ I I \ \\ \\ MR/ IN 364.88 n 1/2„ ERB ERB m s 9 sw s� o us o r o c3+ w o WW �W WW W �W WW W I I I LEGEND: iKiv BUT 364 71 ERB TIC 367 78 �� w N ` l I ( PK O PK-PK NAIL EiP Oa EIP-EXISTING IRON PIPE EIS O EIS -EXISTING IRON STAKE ENLO ENL-EXISTING NAIL ERBO ERB-EXISTING REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PVC - POLYVINYL CHLORIDE RCP - REINFORCED CONCRETE PIPE CI - CURB INLET PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY ss SANITARY SEWER LINE FM FORCE MAIN LINE SD STORM DRAINAGE WETLANDS PERMANENT EASEMENT X FENCE LINE TREE LINE x 208.47 SPOT ELEVATION BENCHMARK N WATER VALVE FIRE HYDRANT ❑❑ WATER METER ® CATCH BASIN TREE GRAVEL 0 SOIL WETLANDS 330 MAJOR CONTOUR 337 MINOR CONTOUR - roc- roc- LIMITS OF CONSTRUCTION - sF - sF - SILT FENCE LINE - iN - iN -JUTE NETTING OINLET PROTECTION INV IN 364.55 o 1 4I 362 60 3 361 - / - - - - INV OUT 364.49 "' / 1 1 360 --- iLO 154 J Lr454,jW M M � 455 456 IERe' 457 458 459 M 0 364, U 1153 w Q z CI #15085 1/2"' ' c 360 362 360 355 J TC 366.02 ERB 0 INV IN 362.19 358 35� I O U 1/2" _ 0 2„ 355 353 W m ERB I\ 152 ; 483 I 482 (o � d Q \-' 484 I II 481 it 480 M O LO Lo COco INV ' 357 �u�i rni O 357 3Sg. ws 5 2 N CO co M ,yl'/(//,✓ Co 'co II 346 1 M I 344 MM ^ N V co 340 (.�j M V 337 W (T M 460 I M 461 462 463 464 465 466 M 467 35 45 340 335 3 k� 340 335 325 479 478 477 M 476 M 475 M 474 473 472 0 (O N M MM I 0 V M M V tp M M NM o M� Efm3 13 • / *5 �Q� �xv. W v W W (v. ,,, W \ ,,, LQC L 498 /i o� .moo rw\\ N 2a - _s 1� W W W \" ♦ \ \ \-� h stJ �s 287 cp \ 283 285 Nt T/O1 2agi�•�ni;:r:r:r. `-\ \) r�••rv•u 5OO �¢2�'J ' ��l.�T./J.�'•. W V, W W W V. \ ` ' W / / / / I% W W � W � 1✓� W W W i� w � W W `L � W V. W 3Oo ��c�� - G � L W V. W W � W Y' W W V. V. \ / // / I /I / I l//I / i // /II /i I � jI I /I I llI /II / Ij i 1 I II II�W� W W W V.�� V WW � W W VW W W y�' W� W `W/ W W 'W L WVV. WW W WW WW W VW. V`L W W VV. W WW 'VL WV. VV. W WV. WVW WL W WW W W WV. W �W W W VW V V VW WWVWW WW VV. W WW y. VW. V{ . W WWW W VWW W W W� W W WV. WW W� •WL WWVW VW WW W VW W W VWV ` V\ -O- 5 2O-O W 148 -J� 2►/'//1� -JO IV.7..I V �W W Y1 1 `W` � =V�. -'`-r � '�%�-i=JY•i r W �" W W� \ .L \SW/aV"C/W �//�rI I5 a ERB 5/8 5/8" 0C0r1�o Cl #8700 /2' V W4 WW\W WV\ W `WV/�. (�(`V/. V. W WV. WV• WV. W \\W\ W �\`\ , y•L\ E-RB \ _ W W V. W W W y\. W W /V W W W W W� W W v W W/ W \W W ' W W • V �' WI W \ IERB ERHOOD 358.01 147 ERB W 5/a 5 / ERB \ ,1/ \4-1-9INV OUT 355.00 M5/g" 5 a' ERB.ERB ERB ERB/�ERB i 420182 �434 �422� \ 14�1_8 \ rW \W WW vW W V. W W vW � �. W �. � ♦� �. 5 8' S/8" I I (M\ I �v. �_ \ I�433; / \ 5/8.,- ERB �423 _ \I\`\\� �435`\ \ \\` II \ _ __� I \\\ \�\\♦ / /\\ ` v W W tW�� v ` �183, / \ \�\ 5/8 \ \ -` \ \\ / \ / I t\ \ / \\ ERB 5/a° 184 / , JJL' WOODSHIRE PHASE SIX ` „ • " W ERB ERB �\ \ �r ��, ti PB 2013, PG 5 \ \ IOW WOODSHIRE PHASE FIVE - \ \ ✓ ���/ \ / GRADING NOTES PB 2007, PG 9481_ / K�\ \ ` _436 WOODSHIRE NPARTNERS, LLC. W �� W 41 W . 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND 5/8 �438 ; /\ I� / �l`� 3 Y \ �` \ \\ \ \ \ \� �/ I \ ' DB 2668, PG 901 MUST BE VERIFIED BY THE GENERAL CONTRACTOR.ALL SPOT ELEVATIONS ERB / \ r/ \ \ - ti /y�OVR( I `�\\\ ARE TO THE FINISHED GRADE OF THE CURB, UNLESS OTHERWISE NOTED. 09 G I _ 2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES SHALL HAVE A �� CROSS SLOPE NO STEEPER THAN 2% AND LONGITUDINAL SLOPE NO \ I CO SD?� ���(�I� <PVgL\Ci / ` ✓ \ i- ` W� STEEPER THAN 5%. 5/8" �� y,� 50 / �f\ I (� I I I 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND / - L\ \.�� � f DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED ERB V OOJ \ \ SAG 00 EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL / J0 \ 1 / ��/ G / \\ l II�C, ►I I I I I I I / I / INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES EROSION CONTROL NOTES STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. AND PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT ON THIS PROJECT. \ FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES, 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE \ \\ ( I III 7 I I WHETHER SHOWN OR NOT ON THE PLAN MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY / I 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP AND FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE RUNOFF PRODUCING RAINFALL BUT IN NO CASE LESS THAN LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS COVERED IF LEFT MORE THAN 24 HOURS. ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THEY WILL BE HELD BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. \ 7 \ \\ t' RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED �\ CAUSED BY HIS OPERATION. PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A MAINTAIN A PROPER BARRIER. DEVICES IMMEDIATELY. EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDARS SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH \ I WHICH HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT / \ �/ NOTIFIED. I 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS EARLIEST POSSIBLE POINT DURING CONSTRUCTION. WIND AND RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS , 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE WITHIN 90 CALENDAR DAYS FOLLOWING COMPLETION OF A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON CONSTRUCTION OR DEVELOPMENT. DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN AREAS TO BE PAVED. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY MANUAL. 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE FINAL REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY STABILIZATION AND PERMANENT VEGETATION HAS BEEN CONSTRUCTION. GRAPHIC SCALE REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF LAND DISTURBING ACTIVITIES. 910-433-3300 ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE THE 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS THE CHANGE. 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE ACTION PRIOR TO REMOVAL. NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN. 100 0 50 100 200 400 DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT 1, 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION ARISE ON SITE IS PJ GAY. CONTACT 910-237-0572. KNOW what's below. Call before you dig. 1 � www ��j 322 32p 310\�\ 29S W WW Lt 0 N 315 F.,\" V. W V. W W V. W • V. W ^ W W `` V. W W W W V \ \ \\ \\ \ \\\ \ \\ \\ \\ \ \ \\ \ \ \ liqi II Nl 3/ 504 15 ♦ � / \� - W W \� W IW W W \\ \\ \\ \ \\\ \ \\ \ \\\ \ \ • W ♦\\\ \\ \\ \ \\ \ \ \ \ \ \ \\\ \ \ _ \\\ wws www w`�o �' �\ 316 503 \ �• � •• W W W � .. � ,.� � . \ \ \\\ \ \ \ \ \ \ \ \ \\ \ \ \ - / 30 \ \ - 330 321 z ; so,� A t �^a �Z . ,�, �, � � W � W W �. � �. �• \ \ \ \\ \ \ \\ \ \\\ \ \ \ \\ \ � O 32S �L \ �' W / 18 /�G�� �^� 502 �^o wosoo2 \� W �.W1.. W W � �. � W W �. w •. � "' ♦♦ \\\\\\\ \ \ \ \\\ \ �i / / i W - � w'I, OC V N/ 'Y I I W W V. V.Nt / �,� e s A w w a WOODPINE WAY OC�1 O iW /WI.'1 �'�� S5 w o w h w GQ o w o f °' 50' R/W (PUBLIC & UTILITY ACCESS) g \�' �I � I / W Wu W. W� �� �W Wes` \ \♦�` \ \\ \ \ // / ❑ \// y150 w CI #8609 HOOD 361.39 WOODSHIRE PHASE FOUR INV OUT 357.62 \ PB 2006, PG 316 INV I�149; / G� 355 355 -353 5/) W U) Cn 0 0� li pv / L / •� 33 329 - ■ �N485 486 W 11I 487 0) M 488 M 89 490 LO .; ■0 W 1/2" ERB 354 C . 352 , Mho 3�� g�5 O III ( I W W • W W I W W W W W y y BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION OCCURS. ACTIVITY. CONTROL BLANKET OR EQUAL SUBSTITUTE. 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL 13. STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF THE BOX FOR 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET FROM ALL STRUCTURES UNLESS OTHERWISE NOTED. ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. 14. ALL STORM PIPE TO BE CLASS III RCP UNLESS OTHERWISE NOTED. REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS ( IN FEET ) 1 inch = 100 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com .•••• ••. •% `9 i • 4� SEA 0274 CC)1 1111g���``` OH7-,2.z REVISIONS PROJECT NAME WOODSHIRE SUBDIVISION PHASE 7 OVERALL GRADING AND EROSION CONTROL PLAN CLIENT 1041 B Robeson Street Fayetteville, North Carolina 28305 Phone: (910) 339-6330 Fax: (910) 964-9089 PROJECT INFORMATION DESIGNED BY: CALEB DRAWN BY: CALEB CHECKED BY: SCOTT PROJECT NUMBER: 1070 DRAWING SCALE HORIZONTAL: 1 "=100' DATE RELEASED JANUARY 17, 2022 SHEET NUMBER THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-3mO