Loading...
HomeMy WebLinkAboutSW6220101_Design Calculations_20220119 (10)DATE DESIGN PHASE 11-3-21 PRELIM rPROJECT NAME PROJECT NO CONSTR / Xshire Subdivision Phase 7 1070 REVISIONTION RECORD BY Harnett County, North Carolina CEK OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES-43 Pipe Dia= 42 in Q10 = 67.12 cfs Qfull = 165.58 cfs Vfull = 17.19 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s Length Storm Outlet Structure FES No.= FES-48 Pipe Dia= 15 in Q10 = 3.62 cfs Qfull = 18.43 cfs Vfull = 14.99 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Zone D50 DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Q10/QfuI1 = 0.41 V/Vfu 11 = 0.94 V = 16.2 fps = 6 = 14 in = 21 in = 2 = 31.5 in = 35.0 ft = 10.5 ft = 38.5 ft Q10/Qfu11 = 0.20 V/Vfu11 = 0.78 V = 11.7 fps = 3 = 10 in = 15 in = 1 = 22.5 in = 10.0 ft = 3.75 ft = 11.3 ft 1070-Storm Drainage for Spread.xls LATEST REVISION: 1/19/2022 9:35 AM PAGE 1 OF 3 DATE DESIGN PHASE PRELIM 11-3-21 rPROJECT NAME PROJECT NO CONSTR / Xshire Subdivision Phase 7 1070 REVISIONTION RECORD BY Harnett County, North Carolina CEK OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES-50 Pipe Dia= 15 in Q10 = 1.64 cfs Qfull = 5.74 cfs Vfull = 4.67 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Storm Outlet Structure FES No.= FES-55 Pipe Dia= 36 in Q10 = 33.18 cfs Qfull = 46.96 cfs Vfull = 6.63 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s Length Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Q10/Qfu11 = 0.29 V/Vfu11 = 0.85 V = 4.0 fps = 2 = 8 in = 12 in = B = 18 in = 7.5 ft = 3.75 ft = 8.8 ft Q1 o/Qfu I = 0.71 V/Vfu11 = 1.08 V = 7.2 fps = 3 = 10 in = 15 in = 1 = 22.5 in = 24.0 ft = 9 ft = 27.0 ft 1070-Storm Drainage for Spread.xls LATEST REVISION: 1/19/2022 9:35 AM PAGE 2 OF 3 DATE DESIGN PHASE PRELIM 11-3-21 rPROJECT NAME PROJECT NO CONSTR / Xshire Subdivision Phase 7 1070 REVISIONTION RECORD BY Harnett County, North Carolina CEK OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= PIPE 1 Pipe Dia= 15 in Q10 = 4.04 cfs Qfull = 15.60 cfs Vfull = 12.70 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Storm Outlet Structure FES No.= FES-59 Pipe Dia= 36 in Q10 = 72.48 cfs Qfull = 91.36 cfs Vfull = 12.91 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s Length Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Q10/Qful1 = 0.26 V/Vfull = 0.83 V = 10.6 fps = 3 = 10 in = 15 in = 1 = 22.5 in = 10.0 ft = 3.75 ft = 11.3 ft Q10/Qful1 = 0.79 V/Vfu I = 1.10 V = 14.3 fps = 4 = 10 in = 15 in = 1 = 22.5 in = 24.0 ft = 9 ft = 27.0 ft 1070-Storm Drainage for Spread.xls LATEST REVISION: 1/19/2022 9:35 AM PAGE 3 OF 3