HomeMy WebLinkAbout20070741 Ver 2_More Info Requested_20211117From: Annino, Amy M
To: victor. lofauist(abfrontier.com
Cc: David Brown(david.w.brown(a)usace.army. mil); Leslie. Andrea J
Subject: DWR 20070741Wade Hampton Golf Club - Request for Additional Information
Date: Wednesday, November 17, 2021 5:05:00 PM
Attachments: imaae002.ona
On September 10, 2021, the Division of Water Resources (Division) received your application
requesting a 401 Water Quality Certification from the Division for the subject project, with the
appropriate fee received on September 13, 2021. The Division published the Public Notice on
September 15, 2021, with the Public Notice Comment Period ending on October 16, 2021. The
Division has determined that your application is incomplete and cannot be processed. The
application is on -hold until all of the following information is received:
• The project proposes to replace existing water and sewer utility lines below the Whitewater
River (C; Tr) streambed via an open trench cut, with work performed in the dry. The
submitted plans also propose to impact the Whitewater River streambanks with
approximately 40 LF of rip -rap bank stabilization at the utility line crossing location. The
Division considers the application of rip rap rock to streambanks to be a permanent impact.
Please revise the submitted PCN and submitted impact plan sheet to account for the above
mentioned additional permanent impacts to streambanks at the site. The Division would
consider the current proposed plan to have a permanent impact of 40 linear feet.
• Please provide more details regarding avoidance and minimization of proposed rip rap
impacts on the left bank of the Whitewater River for this project. [15A NCAC 02H .0506(b)
(1)]
The submitted plans appear to show existing erosion on the NC 107 side (right bank) of the
stream and shows existing native vegetation on the left bank, which doesn't appear to be
eroding. This office believes that the rip rap proposed for the left bank of the Whitewater
River does not appear to be necessary, as the streambanks are currently vegetated and
stable. There also appears to be adequate space available to stabilize the left bank of the
Whitewater River after construction using native woody vegetation. Please eliminate the rip
rap on the left bank or provide additional information as to why it is necessary for this
project.
Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested
information for the proper consideration of the application. Please respond in writing within 30
calendar days. If all of the requested information is not received within 30 calendar days of receipt of
this letter, the Division will be unable to approve the application and it will be denied as incomplete.
The denial of this project will necessitate reapplication to the Division for approval, including a
complete application package and the appropriate fee.
Amy Annino
Environmental Specialist — Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
2090 U.S. Hwy. 70
Swannanoa, N.C. 28711
828 296 4656 office
984 232 1222 mobile
DEQ Logo
❑
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental
Quality has adjusted operations to protect the health and safety of the staff and public. Many employees
are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office
locations are limiting public access to appointments only. Please check with the appropriate staff before
visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your
patience as we continue to serve the public during this challenging time.