Loading...
HomeMy WebLinkAbout20140162 Ver 1_401 Application_201902191111 THE WOOTEN COMPANY E N G I N E E R I N G 20 1 40 1 6 2 February 14, 2014 Ms. Laurie Dennison North Carolina Division of Water Resources, 401 and Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27604 P L A N N I N G Re: Pre - Construction Notification Application Town of Ahoskie Reclaimed Water Distribution System A R C FI I T E C T U R E Ahoskie, North Carolina TWC No. 2277 -JD ►.,, ` ` ` Dear Ms. Dennison: _ 120 North Boylan Avenue Raleigh NC 27603 -1423 919.828.0531 fax 919.834.3589 On behalf of the Town of Ahoskie, we are submitting five (5) copies of the application regarding the above referenced project. The application fee was sent directly to the Mail Service Center and should be in the possession of Ms. Laurie Dennison. • Pre - Construction Notification Application, updated to include wetland mitigation plan • Letter from North Carolina Ecosystem Enhancement Program stating that wetland mitigation credits are available • Wetland Determination Data Form • Applicable construction drawings (reduced scale, Sheets 1, 2, 7, 8, 9, 12, 13, 21, 24,25) • USGS map showing location of project • SCS Soils map showing location of project I trust this information is sufficient for your review; however, if you should have any questions or require additional information, please do not hesitate to contact us. We will get you any information or clarification needed immediately. Sincerely, THE WOOTEN COMPANY Brian J. P. Oschwald, P.E. Enclosures: As stated. Cc: Tony Hammond, Town of Ahoskie (letter only) TWC File p -- AL 1171 OF W ATF9 =i 20140162 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre - Construction Notification PCN Form A. Applicant Information - R. 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑Yes ®No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ❑ No 2. Project Information 2a. Name of project: Wastewater System Improvements Project: Reclaimed Water Distribution System and Wastewater Collection System Rehabilitation 2b. County: He 2c. Nearest municipality / town: Ahoskie 2d. Subdivision name: n/a 2e. NCDOT only, T.I.P. or state project no: r n/a �rfde�r�t° 3. Owne Informatio n ncri 3a. Name(s) on Recorded Deed: Linear Project 3b. Deed Book and Page No. Linear Project 3c. Responsible Party (for LLC if applicable): Town of Ahoskie 3d. Street address: 201 W. Main Street 3e. City, state, zip: Ahoskie, NC 27910 3f. Telephone no.: 252 - 332 -5146 3g. Fax no.: 252 - 332 -1643 3h. Email address: tonyhammond @ahoskie.org Page 1 of 11 PCN Form —Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other, specify 4b Name N/A 4c Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name Brian J P Oschwald, P E 5b Business name (if applicable) The Wooten Company 5c Street address 120 N Boylan Avenue 5d City, state, zip Raleigh, NC 27603 5e Telephone no 919- 828 -0531 5f Fax no 919 - 834 -3589 5g Email address boschwald @thewootencompany com Page 2 of 11 PCN Form — Version 1 3 December 10, 2008 Version A B. Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) 1 b Site coordinates (in decimal degrees) 1 c Property size 2. Surface Waters 2a Name of nearest body of water (stream, river, etc ) to proposed project 2b Water Quality Classification of nearest receiving water N/A (Linear project in NCDOT RM/, Town of Ahoskie Property /Easements Latitude 36 27 Longitude - 77 01 (DD DDDDDD) ( -DD DDDDDD) N/A acres Ahoskie Creek C NSW 2c River basin Chowan River Basin 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Land uses throughout the project corridor include the Town of Ahoskie WWTP, Eddie Kane Steel factory, Hertford County Soil and Water Conservation Easement, Ahoskie Recreational Complex, Ahoskie High School,existing utility easements and along the roadside 3b List the total estimated acreage of all existing wetlands on the property 0 18 acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property rExplain rossing of Ahoskie Creek) he purpose of the proposed project n currently discharges its effluent water from the WWTP to Ahoskie Creek The purpose of this project is to e effluent discharge to Ahoskie Creek by constructing a reclaimed water distribution system to convey reclaimed users through Town Also, to perform sanitary sewer rehabilitation work on a portion of ouffall sewer from Everett Street to the Town's effluent pump station, Just north of Ahoskie Creek 3e Describe the overall project in detail, including the type of equipment to be used Project will install a reclaimed water distribution system through Ahoskie, including the construction of approximately 24,000 LF of reclaimed water line ranging in size from 4 -inch to 12 -inch Approximately 2,050 LF of existing sanitary sewer will be rehabilitated by CIPP methods and approximately 3,700 LF of existing sanitary sewer will be inspected by CCTV Construction equipment to be used includes front end loaders, rubber tire backhoes and trucks 4. Jurisdictional Determinations 4a Have Jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown Comments 4b If the Corps made the Jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c If yes, who delineated the Jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes, list the dates of the Corps Jurisdictional determinations or State determinations and attach documentation Page 3 of 11 PCN Form — Version 1 3 December 10, 2008 Version S. Project History 5a Have permits or certifications been req�the or obtained for this project (including all prior phases) asty ❑Yes ®No El Unknown 5b If yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑Yes ® No 6b If yes, explain Page 4 of 11 PCN Form — Version 1 3 December 10, 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ® Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ®P ❑ T Trenching for Reclaimed Water ® Yes ❑ No ® Corps ❑ DWQ 018 Line W2 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ ❑ Yes ❑ Corps W3 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W4 ❑ P ❑ T ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ 2g. Total wetland impacts 01 2h Comments See the attached letter from the North Carolina Ecosystem Enhancement Program stating their availability to provide mitigation credits for the buffer impacts greater than 0 10 acres 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Directional Drill Ahoskie Creek ® PER ❑ INT ❑ Corps ❑ DWQ 40 20 ❑ PER ❑ Corps S2 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S3 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S4 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S5 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S6 ❑ P ❑ T ❑ INT ❑ DWQ 3h Total stream and tributary impacts 20 31 Comments The reclaimed water line will be installed by directional drilling underneath Ahoskie Creek There will be no trenching through Ahoskie Creek as a result of this project Page 5 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a 4b Open water Name of waterbody 4c 4d 4e impact number — (if applicable) Permanent (P) or Type of impact Waterbody type Area of impact (acres) Tern orar T 01 ❑P ❑T N/A 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts 4g Comments 5 Pond or Lake Construction If and or lake construction proposed, then complete the chart below 5a 5b 5c 5d 5e Pond ID Proposed use or purpose Wetland Impacts (acres) Stream Impacts (feet) Upland number of pond (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P 1 N/A EP2 5f. Total 5g Comments 5h Is a dam high hazard permit required? 51 Expected pond surface area (acres) ❑ Yes ❑ No If yes, permit ID no 5� Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Other ❑ Catawba ❑ Randleman 6b Buffer impact 6c 6d 6e 6f 6g number — Reason Permanent (P) or for Stream Buffer Zone 1 impact Zone 2 impact name mitigation (square feet) (square feet) Tern orar T im act re uired? 81 ❑P ❑T N/A ❑Yes ❑ No B2 ❑P ❑T El Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h Total buffer impacts 61 Comments Page 6 of 11 PCN Form — Version 1 3 December 10, 2008 Version ' t D Impact Justification and Mitigation 1 Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Ahoskie Creek will be crossed by directional drilling methods and the sanitary sewer rehabilitation will be performed by CIPP Both of these construction techniques are trenchless and therefore minimize direct impacts to sensitive environmental areas 2. Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State? 2b If yes, mitigation is iequned by (check all that apply) ❑DWQ ❑ Corps 2c If yes, which mitigation option will be used for this El Mitigation bank project? ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank N/A 3b Credits Purchased (attach receipt and letter) 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program Type I Quantity 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan ❑cold 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 7 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required. 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 8 of 11 PCN Form —Version 1 3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? El Yes ®No 1 b If yes, then is a diffuse flow plan included? If no, explain why Comments No impervious area will be created as a result of this project Erosion ❑ Yes ® No control devices will be used as necessary during construction 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0 2b Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan, explain why 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan This is a linear utility project The stormwater management plan will utilize erosion control devices, including, but not limited to, silt fence, rock check dams, silt fence outlets and construction entrances There will be no BMPs required for this project 2e Who will be responsible for the review of the Stormwater Management Plan? ® Certified Local Government ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? Town of Ahoskie ❑ Phase II 3b Which of the following locally - implemented stormwater management programs ❑ NSW apply (check all that apply) ® USMP ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ® Coastal counties 4a Which of the following state - implemented stormwater management programs apply ❑ HQW El ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No 6 DWQ 401 Unit Stormwater Review N/A 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10, 2008 Version I F. Supplementary Information 1 Environmental Documentation (DWQ Requirement) 1a Does the project involve an expenditure of public (federal /state /local) funds or the use of public (federal /state) land? ® Yes ❑ No lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter ) ® Yes ❑ No Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? ❑ Yes ® No 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description There is no anticipated future growth associated with this project Upon completion of the reclaimed water system, it is possible that additional users will tie onto the system However, at this time there is no future development planned 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility No wastewater produced by this project Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ® No 5b Have you checked with the USFWS concerning Endangered Species Act impacts? ® Yes ❑ No 5c If yes, indicate the USFWS Field Office you have contacted ® Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? U S Fish and Wildlife Services, National Wetlands Inventory, Chowan River Basin Wide Water Quality Plan (September 2007), N C Wildlife Resources Commission, One NC Naturally, Coastal Region Evaluation of Wetland Systems (CREWS), N C Natural Heritage Program 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑Yes ®No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? N C Natural Heritage Program's Virtual Workroom 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e g , National Historic Trust designation or properties significant in ®Yes El No North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? N C Historical Preservation Office and N C Office of State Archaeology 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? I ® Yes ❑ No 8b If yes, explain how project meets FEMA requirements Underground utility project There will be no above ground structures in the floodplain 8c What source(s) did you use to make the floodplain determination? www ncfloodmaps com Mr Brien Lassiter, Mayor Applicant/Agent's Printed Name App nt/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided ) Page 11 of 11 PCN Form — Version 1 3 December 10, 2008 Version 1-- R cSf�(omt�yegYym t PROGRAM January 28, 2014 Tony Hammond Town of Ahoskie 201 W Main St Ahoskie, NC 27910 Project: Ahoskie Wastewater System Improvements Project Expiration of Acceptance: July 28, 2014 County. Hertford The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below Please note that this decision does not assure that participation in the NCEEP will be approved by the pen-nit issuing agencies as mitigation for project impacts It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved You must also comply with all other state federal or local government permits regulations or authorizations associated with the proposed activity including SL 2009 -337 An Act to Promote the Use of CompensatoU Mitigation Banks as amended by S L 2011 -343 This acceptance is valid for six months from the date of this letter and is not transferable if we have not received a copy of the issued 404 Permit/401 Certification /CAMA permit within this time frame, this acceptance will expire It is the applicant's responsibility to send copies of the permits to NCEEP Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work The amount of the In- Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www nceep net Based on the information supplied by you in your request to use the NCEEP, the impacts that may require compensatory mitigation are summarized in the following table The amount of mitigation required and assigned to NCEEP for this impact is determined by permitting agencies and may exceed the impact amounts shown below hnpact River Basin CU Location Stream (feet) Wetlands (acres) Buffer i (Sq Ft ) Buffer II (Sq Ft ) Cold Cool Warm Riparian Non-Riparian Coastal Marsh Chowan 03010203 0 0 0 0 18 0 0 0 0 Upon receipt of payment, EEP will take responsibility for pi oviding the compensatory mitigation The mitigation will be performed in accordance with the N C Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28, 2010 Thank you for your interest in the NCEEP If you have any questions or need additional information, please contact Kelly Williams at (919) 707 -8915 Sincerely, Ja es Stanfill se anagement Supervisor cc Karen Higgins, NCDWR Wetlands /401 Unit Kyle Barnes, USACE - Washington Anthony Scarbraugh, NCDWR - Washington g Brian Oschwald agent File AG, RP,StOrLf'L9... f"... PYOtt�ctu2� OGt.Y State MCDE�lR North Carolina Ecosystem Enhancement Program, 1652 Mad Service Center, Raleigh, NC 27699 -1652 / 919- 707 -8976 / www nceep net WETLAND DETERMINATION DATA FORM — Atlantic and Gulf Coastal Plain Region Project/Site Ahoskie Reclaimed Water City /County Ahoskie /Hertford Sampling Date 7/12/12 Applicant/Owner Town of Ahoskie State NC Sampling Point old wwtp Investigator(s) Mark Hussey (The Wooten Company) Section, Township, Range Landform (hdlslope, terrace, etc ) floodplain Local relief (concave, convex, none) concave Slope ( %) Subregion (LRR or MLRA) 153A of T Lat 36 16 25 622" N Long 76 59'34 154" W Datum WGS84 Sod Map Unit Name Bibb NWI classification PF01 /4A Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks ) Are Vegetation N Soil N or Hydrology N significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation N Soil N or Hydrology N naturally problematic? (If needed, explain any answers in Remarks ) SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes X No Is the Sampled Area Hydric Sod Present? Yes X No within a Wetland? Yes X No Wetland Hydrology Present? Yes X No Remarks HYDROLOGY Wetland Hydrology Indicators Secondary Indicators (minimum of two regwred) II Surface Sod Cracks (136) ❑ Sparsely Vegetated Concave Surface (68) Primary Indicators (minimum of one is required, check all that apply) ❑ Surface Water (A1) ❑f Aquatic Fauna (1313) High Water Table (A2) L-I Marl Deposits (1315) (LRR U) ❑ Drainage Patterns (610) �Q ICJ Saturation (A3) II Hydrogen Sulfide Odor (Cl) ❑ Moss Trim Lines (1316) r Water Marks (131) Oxidized Rhizospheres along Living Roots (C3) Dry- Season Water Table (C2) Sediment Deposits (132) �II U Presence of Reduced Iron (C4) Q Crayfish Burrows (C8) L+J Drift Deposits (133) II Recent Iron Reduction in Tilled Sods (C6) Q Saturation Visible on Aerial Imagery (C9) a Algal Mat or Crust (134) ❑ Thin Muck Surface (C7) II Geomorphic Position (D2) Q Iron Deposits (135) Other (Explain in Remarks) II Shallow Agwtard (D3) Q Inundation Visible on Aerial Imagery (137) ❑ FAC- Neutral Test (D5) Q Water - Stained Leaves (139) Q Sphagnum moss (D8) (LRR T, U) Field Observations Surface Water Present? Yes No X Depth (inches) Water Table Present? Yes X No Depth (inches) 8 Saturation Present? Yes X No Depth (inches) 4 Wetland Hydrology Present? Yes X No includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available Remarks US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2 0 VEGETATION (Four Strata) — Use scientific names of plants Sampling Point old wwtp Remarks (If observed, list morphological adaptations below) US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region — Version 2 0 Absolute Dominant Indicator Dominance Test worksheet Tree Stratum (Plot size 30'R ) % Cover Species? Status Number of Dominant Species 1 Acer rubrum 40 Y FAC That Are OBL, FACW, or FAC 7 (A) 2 Ligwdambar styraciflua 30 Y FAC Total Number of Dominant 3 Species Across All Strata 8 (B) 4 Percent of Dominant Species 5 That Are OBL, FACW, or FAC 88 (A/B) 6 Prevalence Index worksheet 7 Total % Cover of Multiply by 8 70 OBL species 5 x 1 = 5 35 =Total Cover 14 FACW species 65 x 2 = 130 50% of total cover 20% of total cover 145 3 = 435 Sapling /Shrub Stratum (Plot size 30'R ) FAC species x 1 Acer rubrum 30 Y FAC FACU species 10 x 4 = 40 2 Liquidambar styraciflua 20 Y FAC UPL species x 5 = 3 Ulmus amencana 10 N FACW Column Totals 225 (A) 610 (B) 4 Sahx nigra 5 N OBL Prevalence Index = B/A = 2 71 5 Hydrophytic Vegetation Indicators 6 Q 1 - Rapid Test for Hydrophytic Vegetation 7 0 2 - Dominance Test is >50% 8 El 3 - Prevalence Index is <_3 0' 65 = Total Cover 12 Problematic Hydrophytic Vegetation' (Explain) 50% of total cover 32 5 20% of total cover 13 Herb Stratum (Plot size 30'R ) 'Indicators of hydnc sod and wetland hydrology must 1 Arundinana gigantea 40 Y FACW be present, unless disturbed or problematic 2 Onoclea sensibdis 15 Y FACW Definitions of Four Vegetation Strata 3 Polygonum (spp) 5 N FAC Tree —Woody plants, excluding vines, 3 in (7 6 cm) or 4 more in diameter at breast height (DBH), regardless of 5 height 6 Sapling /Shrub — Woody plants, excluding vines, less 7 than 3 in DBH and greater than 3 28 ft (1 m) tall 8 Herb — All herbaceous (non- woody) plants, regardless g of size, and woody plants less than 3 28 ft tall 10 Woody vine —All woody canes greater than 3 28 ft in 11 height 12 60 = Total Cover 50% of total cover 30 20% of total cover 12 Woody Vine Stratum (Plot size 30'R ) 1 Lonicera japonica 20 Y FAC 2 Parthenoassus quenquefolia 10 Y FACU 3 4 5 Hydrophytic 30 = Total Cover Vegetation 6 Present? Yes X No 50% of total cover 15 20% of total cover Remarks (If observed, list morphological adaptations below) US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region — Version 2 0 SOIL Sampling Point Old wwtp Profile Description (Describe to the depth needed to document the indicator or confirm the absence of indicators) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Type Loc Texture Remarks 0 -4 10YR3/1 4 -10 10YR4/1 10 -20 7 5YR5/3 'Type C= Concentration, D= Depletion, RM= Reduced Matrix, MS= Masked Sand Grains Hydric Soil Indicators (Applicable to all LRRs, unless otherwise noted ) U Histosol (A1) Histic Epipedon (A2) Black Histic (A3) ❑ Hydrogen Sulfide (A4) ❑Stratified Layers (A5) Organic Bodies (A6) (LRR P, T, U) ❑ 5 cm Mucky Mineral (A7) (LRR P, T, U) ❑ Muck Presence (A8) (LRR U) ❑ 1 cm Muck (A9) (LRR P, T) ❑ Depleted Below Dark Surface (A11) ❑ Thick Dark Surface (Al2) Coast Prairie Redox (A16) (MLRA 150A) Sandy Mucky Mineral (S1) (LRR O, S) ❑ Sandy Gleyed Matrix (S4) Sandy Redox (S5) Stripped Matrix (S6) ❑ Dark Surface (S7) (LRR P, S, T, U) Restrictive Layer (if observed) Type Depth (inches) Linina. M =Matrx Indicators for Problematic Hydnc Sods' Polyvalue Below Surface (S8) (LRR S, T, U) 1 cm Muck (A9) (LRR O) Thin Dark Surface (S9) (LRR S, T, U) T❑ LJ 2 cm Muck (All 0) (LRR S) Loamy Mucky Mineral (F1) (LRR O) Reduced Vertic (F18) (outside MLRA 150A,B) Loamy Gleyed Matrix (F2) _E] Piedmont Floodplain Soils (F19) (LRR P, S, T) Depleted Matrix (F3) Anomalous Bright Loamy Sods (F20) Redox Dark Surface (F6) (MLRA 153B) ❑ Depleted Dark Surface (F7) Red Parent Material (TF2) -❑ Redox Depressions (F8) Very Shallow Dark Surface (TF12) Marl (F10) (LRR U) 1:1 Other (Explain in Remarks) Depleted Ochnc (F11) (MLRA 151) Iron - Manganese Masses (F12) (LRR O, P, T) 3Indicators of hydrophytic vegetation and Umbnc Surface (F13) (LRR P, T, U) wetland hydrology must be present, Delta Ochnc (F17) (MLRA 151) unless disturbed or problematic Reduced Vertic (F18) (MLRA 150A, 1508) Piedmont Floodplain Soils (F19) (MLRA 149A) Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) Hydnc Sod Present? Yes X No Remarks No data sheet was done for the upland area Upland area adjacent to described wetland consists of the Town of Ahoskle's old WWTP which Is now being used as a pumping station US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region — Version 2 0 ' O d y " j3QA1d Ncwsouis Gro.y 1-1h,11 SCI, u q9 i - i---- - - - - -- '_ z�— h____ --_" ._ -- 111 SM 12. ST it ^ re ,% Cern st • / I ®�� ern Tower �Cewii '\ / +1 �'l e e♦ . <.r ✓ /�v��r. :y Calvary le Nil Cem' .5 1-ibspy�fl a Y „`� �� zs t VV Ilk try IL j Hickory Disp gsal 1 \ r \ m {I �- / t I i enin. +t Cem n \\ 7Z0 .Cems .160 \ I r,' Jernigan Bridge First C / +6 /Jernigan \\ 7 I I I � Airport _ i AN t `t J ` `•, J!' r __�::�' -- Creek �� N AHH KI I 5' it Gt" 11j1 Cem):/ /h- I +, (j 0 �� a'�' �_I -� - ') )•fit' f � -.I• '� I - � ;�' yr I � i — •.t Trailer % - j s - i I z:1 - i' park % -..� I _ . =•Sandpit I. _ .,Buie -in i \. 1 •, I 1IUi� .�1 � �' '-._.-�_ .•••�`.w•^' 61 ""'dw �1 0� P��2•�Q�T1 cRadio ,,. _ IWRCS) I /ry '\ (`/ Ga81na Sta n '• 3 n BM 49 ` r J I "I t ,y 9r .� • ' �1 d`�� — Cem'- 1 t )')� �� \ 1. - • ;.1 _ ii a (. I, i n. �-- _ - _ _ _ __. � ' � ��}`'. :m .\\ 6J ` - �� -- - '_ .. (_ ` .._ '�__ _. - _ �. •2 `\1 I�� 4016 Idd! u CP rn:: - t Til- IndustualWaste' Pond A015 /PU�CJ 66 4e140mm-N• .. i.. 316 2'30" 1 317 I I318 • n+rearoK- ..a:wo„•.. ...n.c ecar -"n, viRCUnn -iw„ 'r, r 319 3200(*,.E. 7 7 "00 I .'f! (idol ROAD CLASSIFICATION ' CrA Ln CaA •r... -.- Be :- - Cr8° CrQ L .. ,y:�' �� ' Cr8 ' - `��.•Cr8_ n n Cab Cr6 Cry ` CA Ln Go q CrB 41 * CrA • Ln A GoA Ln a CrB x24 `` 1412 "� Ln .. rA: Ln U NoA'ti CrA Ln P Ln / Ln CrB G <P iil� Q LF CrA WT +J 6 U CrA C6 / fi CrC? ;rA CrA o� LY LF r LF Ln Ln e' CaA C Ln i Ln ;l CaA i j Ln C Cr6 i' wi II / Cr8 rA LF L Ln I i Ln t' CrB .NI `T :rA CrA ,%� -1 y.. rq n CrA / �CSA 1u Al ;a6 y 2. .. Cr BB Ln +i tat L�n � g L Ahoskie \ CCU, o_ ' Qj C) \�\ CsA a r z..}',�,..� \ _\ `qtr Ln r9 CrB Ln `J CrB CrB to = CaA LnCr6 �` Be •'• \\`_.. � ::,_.. CrB I CrA ' Se Ln- Ln ._ - - - -- l CIC2 J rB r Cr6 Ln CrC2 = GaA B e oQ LF LF / rC2� - i LF U Cr C ,r�wt r¢M LF Ln re CrB ",.s Ln Cr8 BB GyO ..�y Ly CrA Ln CsA W CrB -r Ro CaA LF CrA Cau CrA � (� \g� CrA c WN CrB CsA Co _,,U�n �; GaA CrB CaA Cr8 LF Ln CrA Ln CIA Y d Se II Cdq Ln y a WN �• UQ Ro Ln ^a .r Ud PtiP Be LF CrA CrA �a AtA Ln y CaA` Se CrA P9a'a Cry T uWN U F AHUSIE NORTH CAROLINA WASTEWATER SYSTEM IMPROVEMENTS PROJECT RECLAIMED WATER DISTRIBUTION SYSTEM FEBRUARY 2013 MAYOR G. BRIEN LASSITER TOWN COUNCIL OVERTON S. SUITER JR. (MAYOR PRO -TEMP) CUTHBERT M. COPELAND ELAINE E. MYERS MAURICE VANN WINFRED HARDEE TOWN MANAGER CHARLES A. HAMMOND PUBLIC WORKS DIRECTOR KIRK ROGERS THE WOOTEN COMPANY ENGINEERING PLANNING ARCHITECTURE 120 North Boylan Avenue Raleigh NC 27603 -1423 919.828.0531 tax 919 834.3589 License Number: F -0115 tC�,•. 4 IYE� �. CAM1i26 -�' FINAL DESIGN NOT RELEASED FOR CONSTRUCTION SHEET lOF 29 a m L _a 3 1 2 3 4 5 As p7 As p9 10 10" / B" RECLAIMED WATER LINE - EDGEWOOD DR / LAKEVIEW DR STA 74.50 TO STA 89.50 11 8" RECLAIMED WATER LINE - LAKEVIEW DR / MEMORIAL DR STA 89.50 TO STA 104.50 12 8" RECLAIMED WATER LINE - FORREST OR PUMP STATION STA 104.50 TO STA 119.50 13 8" RECLAIMED WATER LINE - CHURCH ST / CIRCLE DR STA 119.50 TO STA 130.50 6" RECLAIMED WATER LINE - MAIN ST / TALMAGE AVE, STA 130.50 TO STA 134.50 14 6" RECLADED WATER LIKE - TALMAGE AVE / US HWY 561 STA 134.50 TO STA 148.50 15 6" RECLAIMED WATER LINE - US HWY 561 / HERTFORD COUNTY HIGH SCHOOL RD STA 148.50 TO STA 163.50 16 6" RECLAIMED WATER LINE - HERTFORD COUNTY HIGH SCHOOL SITES STA 163.50 TO STA 173.94 05•/- 17 6" RECLAIMED WATER LINE - CURTIS ST STA 0.00 TO STA 14.50 18 6" RECLAIMED WATER LINE - CURTIS ST / ROANOKE CHOWAN HOSPITAL. CONNECTION STA 14.50 TO STA 21.58 30 8' RECLAIMED WATER LINE - JOHNNY MITCHELL RD STA 0.00 TO STA 6.10 14•/- 19 6" RECLAIMED WATER LINE - W CAMLIN ST STA 0.00 TO STA 7.0319 6" RECLAIMED WATER LINE - AHOSKIE PART( SERVICE STA 0.00 TO STA 1.2718•/- 20 4" RECLAIMED WATER LINE - MAN ST STA 0.00 TO STA 8.97 76 21 10" / 4" RECLAIMED WATER LINE - EFFLUENT PUMP STATION STA 0.00 TO STA 11.25 75•/- 22 RECLAIMED WATER PUMP STATION 23 CCTV INSPECTION AREA 24 MISCELLANEOUS DETAILS 25 MISCELLANEOUS DETAILS 26 IRRIGATION PLAN - FOOTBALL /BASEBALL /SOFTBALL /TEEBALL FIELDS 27 IRRIGATION PLAN - MULTI - PURPOSE FIELDS 28 RECLAIMED WATER ELEVATED TANK - ELECTRICAL SITE PLAN 29 RECLAIMED WATER PUMP STATION - ELECTRICAL DETAILS EROSION CONTROL CONSTRUCTION SEQUENCE 1 CLEAR SITE ONLY AS NECESSARY TO INSTALL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWINGS 2 NOTIFY ENGINEER AND NCDENR LAID QUALITY SECTION (910-433 -3300) FOR SITE INSPECTION PRIOR TO COMMENCING MAIN CONSTRUCTION OPERATIONS 3 ONCE EROSION CONTROL DEVICES ARE APPROVED BEGIN CONSTRUCTION OPERATIONS 4 MAINTAIN EROSION CONTROL DEVICES AS NECESSARY DURING _ - CONSTRUCTION ASPECT DEVICES AFTER EVERY RAINFALL EVENT AND ` - REMOVE ACCUMULATED SEDIMENT WHEN HALF FULL RECORD INSPECTION ON STORM WATER INSPECTION FORMS SUBMIT FORMS EACH MONTH WITH PAY REQUEST 5 AS CONSTRUCTION PROGRESSES, INSTALL ADDITIONAL EROSION CONTROL - -- DEVICES AS NEEDED OR DIRECTED BY ENGINEER ® 6 ALL DISTURBED AREA RELATED TO PIPE INSTALLATION SHALL BE FERTLF�D, -'- LIMED SEEDED AND MULCHED WITHIN 14 DAYS OF COMPLETION OF A14Y LAID DISTURBING ACTIVITY 7 FOR DISTURBED SLOPES OF 31 AND GREATER, THE DISTURBED AREA SHALL BE STABILIZED WITHIN 7 DAYS ALL OTHER AREAS SHALL STABILIZED WITHIN 14 DAYS 1 FGEND !HATER ESMIn m» .nm vAVL m EROSION R 2 raLr r�miesKw ®a mr unsa mrws - -• -•- a GENERAL NOTES (CONT) EROSION CONTROL NOTES (CONT) • wm.•w rK .� s ®Y019 lIR o„• INDEX OF DRAWINGS EROSION CONTROL CONSTRUCTION SEQUENCE (CONT) Q 11 THE LIMITS OF DISTURBANCE SHALL BE THE R /W, EASEMENT LINE 9 PROVIDE A GROUND COVER (TEMPORARY OR PERMANENT) ON Z ac.. wn . ww�a. os�amcr reuw+c rurz.eL atcma COVERSHEET 8 AFTER SITE IS STABILIZED REQUEST AN INSPECTION BY THE ENGINEER EDGE OF PAVEMENT OR SILT FENCE WHERE NONE OF THESE APPLY A LIMITS OF DISTURBANCE LINE IS SHOWN IN PLAN VIEW EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING AND A PERMANENT Z 1ES 0 v, caner, e a / eaar mm• w.cr m r� ao ucrw" UPON APPROVAL OF SITE STABILIZATION REMOVE TEMPORARY EROSION CONTROL DEVICES DRESS OUT AREA, AND SEED AND MULCH •iawL GROUND COVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING 90 CALENDAR DAYS (WHICHEVER S SHORTER) w� INDEX OF DRAWINGS / LEGEND / GENERAL NOTES / LOCATION MAP EROSION CONTROL NOTES DAYS WI FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT Lu nF d� w 12" RECLAIMED WATER LINE - WWTP ACCESS RD STA 0.00 TO STA 14.6215•/- GENERAL NOTES 1 INSTALL SILT FENCE OVER d AROUND TOP OF EXISTING PIPE m D 12" RECLAIMED WATER LINE - JOHNNY MITCHELL RD STA 0.00 TO STA 5.00 1 EXISTING UTILITIES ARE LOCATED APPROXIMATELY ON DRAWING CONTRACTOR SHALL CONTACT UTILITY LOCATE TO CONFIRM THE LOCATIONS AND INLETS AT DISTURBED AREAS ¢ o QpU S L 12" RECLAIMED WATER LINE - JOHNNY MITCHELL RD / EDDIE KANE STEEL PROPERTY- STA 5.00 TO STA 20.00 OF ALL EXISTING TELEPHONE, ELECTRICAL. AND TV CABLES GAS LINES AND OTHER UTILITIES AT LEAST 48 HOUR PRIOR TO COMMENCING WORK 2 INSTALL SILT FENCE AROUND SPOIL PILES PROVIDE EROSION CONTROL MEASURES AROUND STOCK/ = Z z ¢O °" ¢ ° 12" RECLAIMED WATER LINE - EDDIE KANE STEEL PROPERTY STA 20.00 TO STA 29.47 43•/- (EQUALITY STATION) - EDDIE KANE STEEL PROPERTY STA 24.76 51 TO STA 30.00 CONTRACTOR RESPONSIBLE FOR VERIFYING EXACT LOCATION OF THESE EXISTING UTILITIES THE COST TO REPAIR THESE FACILITIES IF DAMAGED, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR 3 WASTE PILES AND STAGING AREAS AS APPROVED BY ENGINEER 4 PROTECT STORM PIPE INLETS FROM SEDIMENT RUNOFF FROM c I NEW IRRIGATION LINES® - _ 12" / 10" RECLAIMED WATER LINE - AHOSKIE CREEK CROSSING STA 30.00 TO STA 45.00 2 THE CONTRACTOR SHALL NOTIFY NC DOT (252- 332 -4021) AT LEST 24 HOURS LAND DISTURBING ACTIVITIES WITH SILT FENCE STONE CHECK Phaski• H1 10" RECLAIMED WATER LINE - PARALLEL TO AHOSKIE CREEK STA 45.00 TO STA 60.00 PRIOR TO BEGINNING ANY WORK WITHIN NCDOT RIGHTS -OF -WAY R/W TEMPORARY EASEMENT AND /OR PERMANENT EASEMENTS ARE THE LIMITS FOR CONSTRUCTION DAM, OR ARC FILTER AS APPROPRIATE FOR SITE CONDITIONS scnooi NEW 8' RECLAIMED' WATER LINE 5 REPLACE DISTURBED STORM PIPE OUTLET PROTECTION WITH 10" RECLAIMED WATER LINE - NC HIGHWAY 42 CROSSING STA 60.00 TO STA 72.50 (EQUALITY STATION) - NC HIGHWAY 42 CROSSING STA 72.39 TO STA 74.50 3 THE CON CORNER MARKERS TAKE PRECAUTIONS NOT TO DISTURB EXISTING EASF2MENTS - EQUAL DISTURBANCE EATER AMOUNT OF RIP-RAP WITHIN 15 DAYS OF NEW IRRIGATION LINES© �� \ % a 10 10" / B" RECLAIMED WATER LINE - EDGEWOOD DR / LAKEVIEW DR STA 74.50 TO STA 89.50 11 8" RECLAIMED WATER LINE - LAKEVIEW DR / MEMORIAL DR STA 89.50 TO STA 104.50 12 8" RECLAIMED WATER LINE - FORREST OR PUMP STATION STA 104.50 TO STA 119.50 13 8" RECLAIMED WATER LINE - CHURCH ST / CIRCLE DR STA 119.50 TO STA 130.50 6" RECLAIMED WATER LINE - MAIN ST / TALMAGE AVE, STA 130.50 TO STA 134.50 14 6" RECLADED WATER LIKE - TALMAGE AVE / US HWY 561 STA 134.50 TO STA 148.50 15 6" RECLAIMED WATER LINE - US HWY 561 / HERTFORD COUNTY HIGH SCHOOL RD STA 148.50 TO STA 163.50 16 6" RECLAIMED WATER LINE - HERTFORD COUNTY HIGH SCHOOL SITES STA 163.50 TO STA 173.94 05•/- 17 6" RECLAIMED WATER LINE - CURTIS ST STA 0.00 TO STA 14.50 18 6" RECLAIMED WATER LINE - CURTIS ST / ROANOKE CHOWAN HOSPITAL. CONNECTION STA 14.50 TO STA 21.58 30 8' RECLAIMED WATER LINE - JOHNNY MITCHELL RD STA 0.00 TO STA 6.10 14•/- 19 6" RECLAIMED WATER LINE - W CAMLIN ST STA 0.00 TO STA 7.0319 6" RECLAIMED WATER LINE - AHOSKIE PART( SERVICE STA 0.00 TO STA 1.2718•/- 20 4" RECLAIMED WATER LINE - MAN ST STA 0.00 TO STA 8.97 76 21 10" / 4" RECLAIMED WATER LINE - EFFLUENT PUMP STATION STA 0.00 TO STA 11.25 75•/- 22 RECLAIMED WATER PUMP STATION 23 CCTV INSPECTION AREA 24 MISCELLANEOUS DETAILS 25 MISCELLANEOUS DETAILS 26 IRRIGATION PLAN - FOOTBALL /BASEBALL /SOFTBALL /TEEBALL FIELDS 27 IRRIGATION PLAN - MULTI - PURPOSE FIELDS 28 RECLAIMED WATER ELEVATED TANK - ELECTRICAL SITE PLAN 29 RECLAIMED WATER PUMP STATION - ELECTRICAL DETAILS EROSION CONTROL CONSTRUCTION SEQUENCE 1 CLEAR SITE ONLY AS NECESSARY TO INSTALL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWINGS 2 NOTIFY ENGINEER AND NCDENR LAID QUALITY SECTION (910-433 -3300) FOR SITE INSPECTION PRIOR TO COMMENCING MAIN CONSTRUCTION OPERATIONS 3 ONCE EROSION CONTROL DEVICES ARE APPROVED BEGIN CONSTRUCTION OPERATIONS 4 MAINTAIN EROSION CONTROL DEVICES AS NECESSARY DURING _ - CONSTRUCTION ASPECT DEVICES AFTER EVERY RAINFALL EVENT AND ` - REMOVE ACCUMULATED SEDIMENT WHEN HALF FULL RECORD INSPECTION ON STORM WATER INSPECTION FORMS SUBMIT FORMS EACH MONTH WITH PAY REQUEST 5 AS CONSTRUCTION PROGRESSES, INSTALL ADDITIONAL EROSION CONTROL - -- DEVICES AS NEEDED OR DIRECTED BY ENGINEER ® 6 ALL DISTURBED AREA RELATED TO PIPE INSTALLATION SHALL BE FERTLF�D, -'- LIMED SEEDED AND MULCHED WITHIN 14 DAYS OF COMPLETION OF A14Y LAID DISTURBING ACTIVITY 7 FOR DISTURBED SLOPES OF 31 AND GREATER, THE DISTURBED AREA SHALL BE STABILIZED WITHIN 7 DAYS ALL OTHER AREAS SHALL STABILIZED WITHIN 14 DAYS 1 FGEND !HATER ESMIn m» .nm vAVL m EROSION PiC1 /PAL raLr r�miesKw ®a mr unsa mrws - -• -•- a wa • wm.•w rK .� ®Y019 lIR o„• 1>0ffiffi $®EY 1E9. ®a COUOSIL �.r a wa • wm.•w rK .� ®Y019 lIR o„• sme SAN[ARY SEWER ac.. wn . ww�a. os�amcr reuw+c rurz.eL atcma u�x c �a�r�.-o4•� f3 1 STOR:. DRAINAGE 1ES 0 v, caner, e a / eaar mm• w.cr m r� ao ucrw" Q� •iawL NEW 12" RE WATER LINE CORNERS SHALL BE REPLACED BY A REGISTERED LAND SURVEYOR 6 WHERE AREA AROUND OUTLET IS DISTURBED AND NO OUTLET PROTECTION EXISTS BLASS "1" RIP -RAP SHALL BE PLACED 4 TEMPORARILY REMOVE MINOR ITEMS AS REQUIRED FOR THE INSTALLATION OF AROUND PIPE OUTLET AS DIRECTED BY ENGINEER THE UTILITY MINOR ITEMS SHALL INCLUDE BUT ARE NOT LIMITED TO EXISTING SIGNS MAL BOXES, TREES (UNDER 3 INCHES IN DMA.), SHRUBS (UNDER 6 FEET IN 7 PROVIDE EROSION CONTROL MATTING IN DITCHES AND SWA.ES HEIGHT) AND STORM SEWER PIPES REINSTALL ITEMS TO THEIR ORIGINAL CONDITION AS DIRECTED BY ENGINEER , TREES AND SHRUBS SHALL BE REPLANTED OUTSIDE OF EASEMENTS INCLUDE COST IN ' THE PER FOOT COST OF THE UTILITY BEING INSTALLED B DITCH LINERS SHALL BE PROVIDED IN Al DITCHES ; THAT ARE DISTURBED DURING CONSTRUCTION 5 SUPPORT EXISTING POLES, FENCES CULVERTS, PAVEMENT UTILITIES CURBING PAID OTHER STRUCTURES ,�URING CONSTRUCTION REPAIR DAMAGED ITEMS TO ® 9 PROVIDE GROUND COVER (TEMPORARY OR PERMANENT) - THEIR ORIGINAL CONDITIOFT AT NO ADDITIONAL COST ON EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWPIG ^} COMPLETION OF ANY PHASE OF GRAING AND A PERMANENT 6 OPEN CUT PAVED DRIVEWAYS PER SPECIFICATIONS PROVIDE PAVEMENT GROUND COVER FOR ALL DISTURBED AREAS WITHIN 15 PATCHING PER DETAIL UNPAVED ROADS OR DRIVEWAYS SHALL BE PROVIDED WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS WITH STONE PER PATCHING DETAIL SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR 14LV 61, DEVELOPMENT gj _� WATER 7 6 INCHES OF NCDOT ABC AGGREGATE SHALL BE PROVIDED FOR THE FULL WIDTH OF UNPAVED DRIVEWAYS AND ROADS FROM THE EDGE OF THE ROAD SHOULDER TO 10 FT PAST THE OPPOSITE SIDE OF THE PIPE TRENCH AND OTHER AREAS OF EXISTING DRIVEWAYS AND ROAD DISTURBED DURING CONSTRUCTION 8 NEW RECLAIMED WATER MAINS SHALL BE INSTALLED WITH A MINIMUM COVER OF 3' -0 ", GREATER DEPTHS MAY BE REQUIRED TO AVOID CONFLICTS WITH CULVERT CROSSINGS, UTILITIES AND OTHER STRUCTURES 9 EXCAVATED MATERIAL SHALL NOT BE PLACED ON THE ROADWAYS AT ANYTIME UNLESS APPROVED BY THE NCDOT DISTRICT ENGINEER 10 EDGE OF UTILITY TRENCH SHALL BE NO CLOSER THAN 3 FEET TO THE EXISTING EDGE OF PAVEMENT NEW 8" RECL WATER LINE ' J` .---- ElPuent Pump sumo., NEW 4" RECLAIMED WATER LINE 500' 250 D 500' 1000' 1500' - SCALE 1' - 500 /l C O aunt � LB _ Q® L VICINITY MAP NOT TO SCALE CD Lu 5 v� Lu _ $e 0 U x a� W ¢ay J N N IL (n Q wo O 0 �¢ Q O cc LL (1-o U p w O O a x Ln w W D f w °w z O <g z J ,_w fog w ° 3 w °¢ 0 O r w x BJPO DRAWN BY EBM CHECKED BY DLC PROJECT LN DATE 2277 JD FEBRUARY 2013 AS NOTED SHEET 2 DF 7 6 INCHES OF NCDOT ABC AGGREGATE SHALL BE PROVIDED FOR THE FULL WIDTH OF UNPAVED DRIVEWAYS AND ROADS FROM THE EDGE OF THE ROAD SHOULDER TO 10 FT PAST THE OPPOSITE SIDE OF THE PIPE TRENCH AND OTHER AREAS OF EXISTING DRIVEWAYS AND ROAD DISTURBED DURING CONSTRUCTION 8 NEW RECLAIMED WATER MAINS SHALL BE INSTALLED WITH A MINIMUM COVER OF 3' -0 ", GREATER DEPTHS MAY BE REQUIRED TO AVOID CONFLICTS WITH CULVERT CROSSINGS, UTILITIES AND OTHER STRUCTURES 9 EXCAVATED MATERIAL SHALL NOT BE PLACED ON THE ROADWAYS AT ANYTIME UNLESS APPROVED BY THE NCDOT DISTRICT ENGINEER 10 EDGE OF UTILITY TRENCH SHALL BE NO CLOSER THAN 3 FEET TO THE EXISTING EDGE OF PAVEMENT NEW 8" RECL WATER LINE ' J` .---- ElPuent Pump sumo., NEW 4" RECLAIMED WATER LINE 500' 250 D 500' 1000' 1500' - SCALE 1' - 500 /l C O aunt � LB _ Q® L VICINITY MAP NOT TO SCALE CD Lu 5 v� Lu _ $e 0 U x a� W ¢ay J N N IL (n Q wo O 0 �¢ Q O cc LL (1-o U p w O O a x Ln w W D f w °w z O <g z J ,_w fog w ° 3 w °¢ 0 O r w x BJPO DRAWN BY EBM CHECKED BY DLC PROJECT LN DATE 2277 JD FEBRUARY 2013 AS NOTED SHEET 2 DF VICINITY MAP NOT TO SCALE CD Lu 5 v� Lu _ $e 0 U x a� W ¢ay J N N IL (n Q wo O 0 �¢ Q O cc LL (1-o U p w O O a x Ln w W D f w °w z O <g z J ,_w fog w ° 3 w °¢ 0 O r w x BJPO DRAWN BY EBM CHECKED BY DLC PROJECT LN DATE 2277 JD FEBRUARY 2013 AS NOTED SHEET 2 DF Me a a L v v a, U G 4 I; o� . � o a, V � h N • q�i- a�iN� MATCH LINE STq SEE SHE 45 +00 ET g Iw w Iw P".'ty o/ w CMP w� \ Codwm LAO D Inv 00 19561 �-- PIN 5982 95 7J35 \ DB 156 PG 517 Wbado NEW 20' PERMANENT UTILITY w \ & ACCESS EASMENT ! w w —y. \ SILT FENCE Y-weuae R R Z z - a ( oo wv N Or Q W (F) N ¢z z ZZo W cc Q � tl FQi a TBM 23 /Ce,6ped Carney Co,c Bridge N 9NB597476 E 2591069 5169 JPR We Marker 177 N 925020 6711 E 2591215 3660 �_ r - - -- - - -- 40 { `i Property of w roan / M oek.e a PIN- 6244 4° w DB 716 PG 600 - --r NEW 10" PVC n - -; - - -� - - -�- - -- �-- {-- _, - - - -- - � -- - -- - I -- -r _ � - RECLAIMED WATE� LINE - }- - - ; - --j I - — - - - -- - - NOTE -- - - -- w {� ON 1 PRIOR TO PERFORMING DIRECTIONAL DRILL -l_40 -- xb w -- =_T_ CONTRACTOR MUST CONTACT AT &T 1 P c w I w - - - - _ __ -_ _ 1 - -- --L -_ { _ t - - I- _ _ _ �— 369I LF OF -1 "- FUSIBLE MONO PVC ___ BY D R C I NAL DRIL LNG - + 1 '•5_ 50 -LF- F 10', r - - - �- .� - f-- -R J I _ _ -i ____�.. J I - - I _ Properly of R50JJ ProPerbes LLC PIN5992 OJ 4497 I w Pro al I S w Perty OB 7JJ PG 769 3 w IN 5 of 6 7 7 PIN 5997 f6 7 74 -- - -+ _� I w OB 657 PG J99 w w w O w w Iw END NEW 10p- 45•g 30_ NEW 12" PVC NEW 10"-4�e BEND NEW- 12 "x10" EE ++ RECLAIMED WATER LINE Top of go Ot B4rcn� O I� (D j ©SILT FENCE Ex AT6T F�Der Heoe.au Opbc Morker Er arch _ - - _ UTILITY EASEMENT (WIDTH V� 51 40+ � Brehcn iop of BA at Brach ' MIN 3' COVER rr__- 2 � -- — - -- r r•4941 NEW PERMANENT _ _ ___ -"38+x____ —t-- w w w Qo H - IJ - -- _ - - - -- - - L - _ _ - - - _ I_� —J- ._ -- — - —1 - - wa w NLJ ' P M TILL T 5 - - - - - - - - - - - - - - Mosk�o - -- - - rox'h65 I W - _ - wetll*de creek R/W - R /I(� — — - - - ! - - _ - w we or - ' — NEW — - - - - R - LINE Z U) Ex 16 water Lma i it i I ! ' reM _ J LJ.I R/W _ _ - - -- Ex AT&T - -_ - FlLer OPnc Cable r Treesel NC7VA ROdroa - - - _ _ _ _ _ _ _- w Property o/ w NC /VA ROArood Lv W o s NC VA POIIOa _ _ - - - _ - _ - 40 w '�' FRMM l77 (n - - - - FM FM r H —Ex 16 S-tary S-1 Force Mom w R7w U —E, I6 Son,fary Sewer FPreem m (aGProx lo= oteonl= FM — — FM Er 16 EHNent Lrne FM — -- Ex I6 Walerl�ne FM N,Vp +- -I I_ Q R/W — — FM - FM FM fM _ Toppror laconon) - - 3 �I L - w w Property of 3 5�mons Jon, D"'d ill - - - - - - - - - - - - - - - - - - - - - - - - OPf ciMarkeoer ( 49J) ; - - NEW 10 RECLAI ED I w we tlandw 2 PIN5992 25 7644 De 519 PC J/6 P,aPe,ly of �+ WATER LINE (SEf EW 4" RE' `� RBOJJ Propernee LLC SHEET 21) (AIMED AT R LINE (SEE h P`L_l S9: a� 4!e7 SHEET 21) R R Z z - a ( oo wv N Or Q W (F) N ¢z z ZZo W cc Q � tl FQi a TBM 23 /Ce,6ped Carney Co,c Bridge N 9NB597476 E 2591069 5169 JPR We Marker 177 N 925020 6711 E 2591215 3660 �_ r - - -- - - -- - --r _- - - - - f - - - - - ! - I �0 I -I - -- - _-' �-- � � _� -- ,- ; -� i - - -f - -,— - r - }- - -; - - -� - - -�- - -- �-- {-- _, - - - -- - � -- - -- - I -- -r _ � - - - }- - - ; - --j I - — - - - -- - - j - -- - -- - - -- {� I -l_40 -- r � -- =_T_ 50 _ I -OF-1 2" R J _ _ - - - - _ __ -_ _ 1 - -- --L -_ { _ t - - I- _ _ _ �— 369I LF OF -1 "- FUSIBLE MONO PVC ___ BY D R C I NAL DRIL LNG - + 1 - - -- - -�- - �- I- x- 50 -LF- F 10', r - - - �- .� - f-- -R J I _ _ -i ____�.. J I - - I _ - - - 1 - _ o 35 -- - -+ _� — — — 30_ } I I E,- G—ade��i � I ' MIN 3' COVER rr__- 2 � -- — - -- r - -, —t-- �---- - --r- I _ _I - —f IJ - -- _ - - - -- - - L - _ _ - - - _ I_� —J- ._ -- — - —1 - - MIN - COVER - l- I 20 -- - -- -I --- - 15 I - - 15 ' I 1 t 1 • NEw 12 P RECLAIMED WATER ( -F - - LINE ' - { — - — - - - -- - - - ! - - _ - J COVER - Y _I - _ j' �a t "W "x' TEE r NE 12 tO E NEW - -- - F 10" I WATE — - - - - R - LINE -- - I r j T it i I ! ' - - - 1 r +- -I - a�.nn 32.00 33.00 34.00 35.00 _ 38.00 37.00 38.00 39.00 40.00 a _ Z C) CD Lu CF- " rzz WVJj WO F (n< W Q CC �U~ �Q LU 22wF ° MCC W gU cc �a Uw ¢]C W r 8 3¢ N, ��S1A �,SRp?ll � r •a s GINEF CgMpgE� .`' oT �0- •. DESIGNED BY BJPO DRAWN BY EBM CHECKED BY DLC PROJECT NO 2277 JD DATE FEBRUARY 2012 SCALE HOR7_1 =50 VERT 1•=5 SHEET 7 OF 29 7 pJf2013 pltcrg 4 9 9999 s 7/ m emorrr -1 4,0,2013 900 P.8 AM T \Projecls\Ahoskie -2277 \JD \Sheets \SIIECTS dgn O N N N W 1W ? ? O i� O Cr O 0 O 0 1 I §n I ati e - - 1 - - -- - -- - - 4 c II f Ub m £m ! Ct o Y i O T fi f oT'—T" —7— N / L iTF I I °- ! i� �i I! I ' 1 ! I I 1 I I i ,'i li I a / •N'/ I I { I f0 IAIR RELEASE I I I I I VALVE ST53-33 MANHOLE / AI 30 i I I I F jii ,III IIII I � I I !� IIII' I II m / < — —i I I I I —� —i I ' I I I i I � f —� — �II I+ I I I! i I I f 4� _L I i 't• / m 'I- P Tjj' --- I I I I I �' I I ! I I I I I I I I I - m m / 00t j i t l r- -- 1 1 -- �-° t - - -'; �d - _ Ill +_ i tin e -- -- f - �- -I- I- � — -I-F 1 i J__ ves t I I r V I I I I I I I ,1 I II I I I I I f finl -4-; -n rl 09 m 0, J _ILA- -tl- -_ 6 133HS 33S FINAL DESIGN O O Ln O (T O IN) O L4 O I� 00+09 VIS 3NI-1 Hot' 4 NOT RELEASED FOR CONSTRUCTION ' s THE WOOTEN COMPANY enc,xcralxe a, ex 1ue14cexlrecl gar X14 °781I i '4aE ISx4 Th REVISIONS PER NMOT O M/MENTS _ -- 4/11/2013 P I e3y �yt � TOWN OF AHOSKIE HERTFORD COUNTY NORTH CAROLINA WASTEWATER SYSTEM IMPROVEMENTS PROJECT I� �e RECLAIMED WATER DISTRIBUTION SYSTEM 10° RECLAIMED WATER LINE SR x 0 9 �r mm? O zc r = , < <�.• g o °'• „� PARALLEL TO AHOSKIE CREEK STA, 45+00 TO STA 60+00 ' s THE WOOTEN COMPANY enc,xcralxe a, ex 1ue14cexlrecl gar X14 °781I i '4aE ISx4 Th REVISIONS PER NMOT O M/MENTS _ -- 4/11/2013 /'FFGN My 22 60 EX 18" CMP :c/ Z To P of Bgnk Of Greck USE CONDITION 2 d� (SEE INSTALLAT40N DETAIL) iT � ONLS �f(V Goteposf p y Z � IJ U LJ oet �i l e { ` k V I { { { { { { weDOn73e { { { { { { { f { { { { { { { { { { f { - { { f { { 4 { c { { f wed eP { { AIR RLELEASF VALVE wooe w� MANHOLE' f n 4 f ANEW 10 "- 60•SEND f NEW 10"-45• BEND I NEW BORE PIT (APPROX SIZE 8, LOCATION) Property of CONSTRUCTION ENTRANCE 1-or M 0" 5992 07 5056 osx,e PROVIDE 112 LF OF 10' DB 601 PG 186 Qj D I PIPE IN 20" STEEL ENCASEMENT BY BORE I I )3 R �— 1 NEW RECEIVING PIT (APPROX SIZE Y LOCATION) Properly of Farmer SOmuelJ PIN 5962 97 5102 -NEW 10 "- 80•BENDI& 0 8 N Mondoned Pump Station / 4 I MOSKAE CREEK / Z z 1 1 __ _ O Town of Moek DB 6502 8PC 602 1 1 - W 9oFo= 1 - - - Top 281 1 Yr Proper fy o a T en of nv 94 1 1 1 cn WU I w - -�-1- - p TPP of 6Ppk P( Creek 40 N wW¢ 97 129 M N PM 5982 97 1296 35 = _ - -° - - - all o LU Z l i - - N De Pc r Top 2B dofo tneandonNE - - � r I 0 BEND i I I - 1 1 Q Sroa ox L-t-1 Z z cc Q 1 - � _I —_I 1 sell SSW 5340 TOO 29 JJ Toen of Mosk,e 08 72B PC 444 SSMH •5748 TOP 28 28 rIl , I f N d SSMH Properly o! (MOndonedl T­ Of Mosk,e Z 'r • _ o I 14 _ - 11 (Mwdonedl I J W P1N,3982 88 6688 LL — Il �LL�j NLc 15 1l OO Property oG V NEW 10" RECLAIMED 95 7335 / d 11 San,tory Sewer IT Stery Sower an, q +r 23 9 f1 ' 10 PJN5962 ER NE IJ6 PG 517 �� Lop of wnx If Geek WAT LI 06 co I N ..-• x rMOnd —W - - - •-3a :Teuy'����- JG T`NEW 10 " -22 5• w v " O 5 �- - - - {- - a�„ S = o° /'FFGN My 22 60 EX 18" CMP :c/ Z To P of Bgnk Of Greck USE CONDITION 2 d� (SEE INSTALLAT40N DETAIL) iT � ONLS �f(V Goteposf p y Z � IJ U LJ oet �i l e { ` k V I { { { { { { weDOn73e { { { { { { { f { { { { { { { { { { f { - { { f { { 4 { c { { f wed eP { { AIR RLELEASF VALVE wooe w� MANHOLE' f n 4 f ANEW 10 "- 60•SEND f NEW 10"-45• BEND I NEW BORE PIT (APPROX SIZE 8, LOCATION) Property of CONSTRUCTION ENTRANCE 1-or M 0" 5992 07 5056 osx,e PROVIDE 112 LF OF 10' DB 601 PG 186 Qj D I PIPE IN 20" STEEL ENCASEMENT BY BORE L N SSMH •5326 Top JO !! o I I \ UTILITY EASEMENT -- �— 1 NEW RECEIVING PIT (APPROX SIZE Y LOCATION) Properly of Farmer SOmuelJ PIN 5962 97 5102 -NEW 10 "- 80•BENDI& 0 3 Mondoned Pump Station / 4 I MOSKAE CREEK Property Of 1 1 __ _ O Town of Moek DB 6502 8PC 602 1 1 - W 1 1 SSW 5353 1 - - - Top 281 1 Yr Proper fy o a T en of nv 94 1 1 1 1 - -�-1- - p TPP of 6Ppk P( Creek 40 I 97 129 M N PM 5982 97 1296 35 = _ - -° - - - all NEW 10 " -45 L l i - - N De Pc r Top 2B dofo tneandonNE - - PP eicu s �I' ll BEND i I I - 1 25 - -- �- { -L - - =- - ! I 1 I MIN 3' COVER 1 - � _I —_I 1 sell SSW 5340 TOO 29 JJ Toen of Mosk,e 08 72B PC 444 SSMH •5748 TOP 28 28 rIl , I f N d SSMH Properly o! (MOndonedl T­ Of Mosk,e Z 'r • _ o I 14 _ - 11 (Mwdonedl I J W P1N,3982 88 6688 LL — Il �LL�j NLc 15 1l - 1 -- d 11 San,tory Sewer IT Stery Sower an, q +r 23 9 f1 ' 10 20 P s�Onenf E 11 Sen�1 emene �. I N ..-• x rMOnd —W - - - •-3a :Teuy'����- JG T`NEW 10 " -22 5• w v " O 5 �- - - - {- - a�„ S = o° N BEND O. P L N SSMH •5326 Top JO !! o I \ UTILITY EASEMENT -- �— (10' SEPARATION TYP ) NEW RECEIVING PIT (APPROX SIZE Y LOCATION) Properly of Farmer SOmuelJ PIN 5962 97 5102 -NEW 10 "- 80•BENDI& 0 3 Mondoned Pump Station / 4 I MOSKAE CREEK Property Of 1 1 __ _ O Town of Moek DB 6502 8PC 602 1 1 - W 1 1 SSW 5353 1 - - - Top 281 1 Yr Proper fy o a T en of nv 94 1 1 1 1 - -�-1- - p TPP of 6Ppk P( Creek 40 I 97 129 M N PM 5982 97 1296 SSMH •5154 = _ - -° - - - all NEW 10 " -45 t - l i - - N De Pc r Top 2B dofo tneandonNE - - PP eicu s �I' ll BEND i I I - 1 NEW 10 " -45• BEND Q_ JO 4 —_I 1 sell SSW 5340 TOO 29 JJ Toen of Mosk,e 08 72B PC 444 SSMH •5748 TOP 28 28 rIl , I f N d SSMH Properly o! (MOndonedl T­ Of Mosk,e Z 'r • _ o I 14 _ - 11 (Mwdonedl I J W P1N,3982 88 6688 LL — Il �LL�j NLc 1l E+ MondO d 11 San,tory Sewer IT Stery Sower an, q +r 23 9 f1 inv a t 20 P s�Onenf E 11 Sen�1 emene �. _ �-____ - - -- ..-• x rMOnd —W - - - •-3a :Teuy'����- JG T`NEW 10 " -22 5• w v " O r� Ex 12 Son,mry seer S = o° NEW 10" PVC _ BEND O. P `,NEW 20- PERMANENT _ _ \ UTILITY EASEMENT = m `CONSTRUCTION ENTRANCE Q (10' SEPARATION TYP ) NEW RECEIVING PIT (APPROX SIZE Y LOCATION) Properly of Farmer SOmuelJ PIN 5962 97 5102 -NEW 10 "- 80•BENDI& DB434 P058 1 VI P,.Perfy o1 K,ng Shrley Foye D9 671 PG 159 I o a _ PP ..y x,50 - ry N = h SSMN .5749 n r.p 10 OJ I u Io W MP\ SEE S 1 le _ _ LIMITS OF DISTURBANCE = m © (10' SEPARATION TYP ) 1 s 1 _ _ - / Fppr— LOCOtIOn Of 1 ,n 1 n 113 - -�- 4 Mondoned Pump Station / 4 I I _ - Property Of 1 1 / Town of Moek DB 6502 8PC 602 1 1 - - r 1 1 SSW 5353 1 - - - Top 281 1 - - nv 94 1 1 1 1 - -�-1- - - _ - -I -__- - - - .N - o { 8 B L_ _ 1_ _ l_- _(_ _ __ -NEW 10 "- 45•BEND ___� -NEW 1 '- 0• END I I I �- _ J I MIN 18" 7-- _ -- -112 LF 20" STEEL- 1 ' -Qiz s �,mry se +er = - _ I _ _ - _ I _ _ I SEPARATION _ _ -j- _ _ _ __ - - - - -L - - - - - 15 I - -_ -Q ENCASEMENT PIPE - - - - -- - - mx Is z6• - -- _ _ _ -- - -� - - fI 1j } ( 4 I--- -'I- -- +— _L._. -__ -� J.. ---i- � - -i —=�'-- - In � i i_....- __ ___-- —I_ ji = _L_1NEW 10 "_45• _ _i _ _�- _ -� - -� I -�Ex 10 HOPE Wafer L,ne _ I' _} i BE - LLL IAOPrax Locol,onl i — L i I _ ; _ _ - I - - -- 4 -_ _ _ _i_ ; - r 12 ScmtOry_$e.;_r'� -= f f :.. I _.�— L_.._L I __L_ —�__ - -- - _ —• —k-- Nv 967 _i —� 1— r— 5 i _ J o 7n.nn 71.00 72.00 73.00 74.00 -n - -- - aD.n J 83.00 0 _ _ _ '— _- — —� -I -- —T— _ _ _ = I I _ - -- - - -- - - -�- 4 - 4 I I _ - - - - T� -� -� -1 45 _ —r— i -- _ _ - - - r -4 - - -- -- - i - - - i - _� t - - - - - -�-1- - - - - - — - 40 - I - I I _ - -° - - - I - - _ �_a - t - - -- - - - - f J - - - o — -( _ - - -� 3 35 i I I - I I I Q <-- -i-NEW 10"_610'_ - - I� - -� - -�- _- I 1 - _ _ � —_I 1 1 _ _ - I I - _ __ _ � — �_ _ _ __`_ 1++ J JI > m I __ _ _ I 30 _ - I - - I -4 2 25 I I o _ -I N MIN 18" SEPARA I NEW 10" PVC _ _j 4 _ I I I t ocaJloeRECLAIMED W 20 J -n - -- - aD.n J 83.00 0 0.n O� - a N d m� U 4r IownalM l.0,e \ PW 5962 -68 6668 08 650 PG 607 NLSC NEW 8' -45• BEND 5 .0 Sa Cory Sewer( AD c ndoned) D NEW 8"-45• BEND W9otlen Refornvig W°II = SILT FENCE �t PP " /Guy ; NEW 8" RECLAIMED - ° Crvl Dr rrl r WATER LINE craxa _ _c, 1 M' CONSTRUCTION ENTRANCE Q m RIW SSMH •5517 �a rT1 1 rr^ NL (rap M ndane rrl (n _ - - - --- SSMH -t 12 Or m _____ ___________ ___ __ ravel afn _ • `• w /T4 RCP � D ___ - - x 8- sarJlory sewer _ k _ i _� Inv 2662 Properly of Top of Bank of Creek t .— Ex !0 Sanrtory Basn�ghl MrchoelH 1 x PDIN B 5799B2 J 9P0 0 +9I217I ocf a Q � Y Swr (Abao da ned) R/W 6 4. 2667 M Top J6 12 SILT FE C/L In 2742 a Ex Fn c1 ppaO IVaadt ` FORRE57 DP Property o/ PUMP STATION Town of Ahoskre w ` Lle 6 62 88 6688 1 �x g 05 650 PC 602 i x SILT FENCE nE17WE50 _ \ — Woods ,S\ \ Conc ltnwrmenl \ N 92996289 912 E2E5lBe9v J -\ 1058 4 Property of \ Baght Mlaha lH Wetlande enr PIN 596i 90 9136 SSMH 5604 D6592 PG 122 ` Top 3J JS .4 0, y OW 2800 SSMH 5613 Eoser^ 1 rap 3657 enj 00.1 Y lnv Out 2927 Ex 4� Perman NLS _ NEW 8' -22 5• BEND 11� NEW B 45•BEND O r V ?I J� ^� ` '�-A \( `�J \� B sor7POth 3� v �J E� (� . �� A�vG�V )Woods B,Prap f Cr a/L / *f' J \ PW 598J 90 9136 Al) 4 / ` w ToP JJ J7 06592 PCH2T C) ° o Inv In 18 66 AILS ��}, r Property o/W ytl° Inv C., 2856 sSMH •5677 sown f MosYre 30 mqf� NEW 8" RECLAIMED opG��ay, t °I r 5997 00 3674 WATER LINE 5651 SILT FENCE 0 12961 9 °OB PC Top JJ 51 i ° y0 Woode Inv In 2901 +1- ` Inv Ouf 2891 Wl5ods/Neflands Woode _ Sawa -- Jar, w gr fL Gm6 8nht UGL aBo w +4 `N` L4 m! P-/Y rtk 91 Gr-PP_ k - - S_K So PW 598J 90 9136 To moods r`- DB 592 PC 121 v- W W.tl NEW B " -45• BE D� '� • u '' w wh I NEW 8 " -22 5• BEND I Propert / ProPerfY of Janee H gh Jones Hug, p,N 5997 00 5/98 Praparty of I OB 761 P6 478 Basnr9hf Michael M PIN 5981 90 9 176 00 392 P0122 Z�R z V O G I- C/) NU Q w J Cc 0 w t r ; J cr O a0U Z z Ix S « p N sUs zz t c a r ¢ Z ., Q U �Pm �,�2 Z _ W - F- O - a = e Lu w - = �- - - Lj $ a� Z a� w � rY Z 'os w w J r p+j z w w O ¢ F- - 2 g w N Y w d H 0 DD N o w a O CC Qw ww w Cc cr Z 00 Q (n — — -- -- - - -- - - -- -- w — f—sd45 3 gillCc 45 i o 40 -- -- -- � i 40 0 35 - -- 35 - - - -- - I - - -- - - -- craee- ` - MIN 3' 30 - - - -- _ -- -- - - COVER 30 t""N x,141, - - - -- - -- __ - - - -- 25 san,tar 5.:.l 25 p/% �- E� -MIN 3' COVER Ex 24 RCP,.. - — - - _ _ NEW RECLAIMED 8" PVC WATER LINE SEPARATION MIN 7 -- MIN 18" �0 4 20 Er ro Samtor - -_ 20 DM GM BY �Po — -� SEPARATION MIN 18' _ DRAWN BY EBM sewer -- SEPARATION - -- - -- - CHECKED BY - — 15 DLC 15 — — ROJECT NO - - - 227 JD _ - DATE FEBRUARY 2013 10 10 SCALE HORZ 1 n50' -- - -- ---- -- -- -_ -- __ VERT 1 =5 cJ -- - -- - -- — - 5 SHEET 12 OF 29 105.00 108.00 107.00 108.00 109.00 110.00 111.00 112.00 113.00 114.00 115.00 118.00 117.00 118.00 119.00 SS"N ;5717 Quo 'o, 7507 In JO 62 0.1,042 0 0 Isey o, bi 0) (2)NEW 8-45'BEND I,- NEW 8-1125' BEND U') 5 I P,.P."/ of Lo Uri I Wood, T.- t An o- PlAt 97 00 3674 _LIMITS (10' SEPARATION. TYP OF DISTURBANCE D8, PC 'A MATCH LINE STA 130-50 J6 Tree 8-22 5' SEND SEE THIS SHEET od, CONSTRUCTION I t ENTRANCE NEW I ;-;R 22 5• SEND Guy JO P- J7 Nood, NEW 8"-225•BEND on ft.& NEW 8" RECLAIMED b NEW 6" PVC RECLAIMED WATER LINE (5' OFF u i I WATER LINE (2 5' OFF EDP) BOC,TYP) Property of PW599J 00 5453 1- 3943 LP DS 677 PC 521 hl I C I- J4 72 Property a II MH Hertford County 8-d of Ed-b- Nop�,ty of AW5993 10 0941 Jo... Hugh 21 An. C,, V J� OPEN CUT D6 PC p NEW 8" PVC RIW 10 P.- RECLAIMED WATER LINE IS pOp (5- OFF SOC, TYP ) wv NEW 8".6" REDUCER NEW 8"x8" TEE 26 OPEN CUT e C6 onc walkway k t 89 2 W.0', - — 5 60 4 cant NEW 8" &/,w NEW 8" GATE 45• BEN p VALVE BOX ,, 60 RI I I NEW 4" PVC wv"FH �v SIB R.. j RECLAIMED WATER LINE 3: z SH9 R.. 3 (SEE SHEET 20) cc w ucs�- cr w p"PlIty Of Properly 0' - W NEW Is tugn.h. Raynor So,. a Mid Eost D-I.P-1 Corporation cn;� Or BENDIJ PW 599J 00 8298 PIN 5993 00 9414 D6 542 PC 424 118471 11G- 0 ' NEW 8'-225 • BENI, C RACTORTO FIELD LOCATE HIGH ONT POINT AND INSTALL NEW AIR RELEASE L � it,, Cl. VALVE w/ MANHOLE AT If HAT HIGH POINT pu Property o1 I- 3h n, tote L--d P-M-bw 15 CMP PIN 5991 01 3197 SSW ;6 Property of DR487 PG8178 Top 4 17P To- of M,oku, 'n J4 52 PIN 5.99J 00 5922 E, ltdcl M J4 56 TPED 08 PC Er u1c telephone Inv Out-J4 4B CPED I Er "C '."on. C) PP E, UIG NEW 6"-45*BEND Is PVC T".,I-, P,,p,r! of 1 4 , I y --- of 'no-k';4 r. ,n 10 J6 5 CjUqp PIN 93 c 08 PC 1 55 4 132+00 -0- 4- NEW 6-45* NO FH F, a Wafer Lme ~ LL J7, Concrete x �75v PVC 4010 NLS,, lod County Board :j Li p,.p,ty of NEW 6" PVC RIW Li ,o of Ed-t- o P#v 59 J 10 094 RECLAIMED WATER LINE = W OB PC (2 5' OFF EDP) NEW AIR RELEASE u, VALVE / MANHOLE MATCH LINE STA 130+50 SEE THIS SHEET SSUM -6727 top 43 81 M. Out 39 32 Z z (D 0 R Fn W 0 LLJ CR 0 zzcr ilu LL cc 120-00 121-00 122-00 123-00 lz4-vv lzb-IjU lz/... Iza-v RKECD dc, LIJ Q a I Lu ip W ;� LU Z U9, 0 < 1,- co 52 3: z a- 0 cc w ucs�- cr cc cn;� Or cl) U) 0 NEE MMMMME a M SEE I a MMMMM ME MMMMMM M MM MMMMMM M 1111111M MEE 1111111IMME M MMMME M M MMMM MM M ME MmmM MEMO EMMEME M MMMMMMMMEMM M M ml M MM MM M M a M All M M MM a a M MEMEN M MEE MM mM mIiiiiii M EMEMMEMME M MIMI MEMM mmmmmm MMwm=MMMM MMMEEMIMMM #MEE MEGINEMMEli M Ml M 0 ME MEE ME ME Emma FEE MME 0 OEM M ME111111111111110 mommmmmm MOM M MIG msMMMMMMMMMM M MM MMMM MMMMMMM MM MMMMMM 1111111MIMMM M 11111 M MME a =E am M OEM M 1101MM M w losos ME am MEMMD'O -E MMM NYE M MMr! M= MEMME 0 ommal WE MHE ME E M-MEMEM miiiiiiI IMM1111111111111 MEN M mm ME CCCC Mal a a 0 N a EMEME M 0 Em ME M ME P. 11 M- 0 a MM LRW a mMM w Iiiiiii W, I rA- a low MEMEM WR EM M MM am M k D��CCCMMCCCCC M E MMMMMEMMMMM WASIMM 111111111111110 niiimimiiiiiimmm am M mmmm OEM r" M M M11111111111111111M M IM M M MMEEEE M MEE MM MMN MMMEM M MM MEE M MM=lEM Mm M MEE MmM MM M M a M M M ME M MM MMEME mMMM C. am MEE M M ME MEMM MMMM a ME MMMM MMMMMMMMMIMMMMM MMM mom MEN MEEM ME MEE MMM Ml M MM MEMWEEM MM M a M 0 OEM M mmimiiiiiimmmmm __wMmE M M M M M M 120-00 121-00 122-00 123-00 lz4-vv lzb-IjU lz/... Iza-v RKECD dc, LIJ Q a I Lu ip DESIGNED BY BJPO DRAWN BY ESM CHECKED BY DLC PROJECT NO 2277 JD DATE FEBRUARY 2013 SCALE HORZ I --W VERT I'S SKEET 13 OF 29 13 W ;� LU Z U9, 0 < 1,- co 52 3: z a- 0 cc w ucs�- cr cc cn;� Or cl) U) 0 DESIGNED BY BJPO DRAWN BY ESM CHECKED BY DLC PROJECT NO 2277 JD DATE FEBRUARY 2013 SCALE HORZ I --W VERT I'S SKEET 13 OF 29 13 c v c a v c u� OI c Q `^ c •� i 1.00 2.00 3.00 5.00 B•uu /•UU Y Z w C:, e U R LU z `€ oC .' cNi �P8 FIF S W Z W IAJ �N ¢0v) hc 20 3cn N 8M La 0 O y3LU LU 'vLL d a� LU W 0 0 w x �,sM C v11M 3 ��OF 1 h',2t7 a s x tP 1 tD'3 DESIGNED BY BJPo CHECKED BV DLC PROJECT NO 2277 JD SCA(E. HORZ 1 -50 VERT i'=5 SHEET 21 OF 29 21 Wood9 1 (!3Op RadS Mf—n Pole U OJ R i O�narefe R } } SrrSM0 •519 N i icp ?9 } cr Z J~ g otePOSf o } } } OBLDO 0pfeposf 1 _ SSMH Z Z CC iLj CC Tao 3 74 7e 1 LL OL i i i Property oI Simons John D—d M ; + i W .dl } } Clorhar $� PIN 592 25 7610 Woflonds 085 19 PC 376 } } } 5$$$MMMH 5157 } } 88 ®Well TOWN OF MIOSKIE ORICWM WWTP } } NEW AIR RELEASE 1 } } SSMH •5104 VALVE w/ MANHOLE WE MARKER Praper•y o/ 177 Top 33 84 MAINTAIN 7 5' SEPARATION I tl °'•h °r FROM EX IN S 2 16-777 1 PIN 5991 PC 391 OB 657 PG 393 ER.,T P SEWER iTYP a 1 r ' Property ar T.— o1 Maskre PIN 5992 N 9563 D8286 P040 PROVIDE 90 LF OF 14" D I RECLAIMED WATER LINE IN 90 LF OF 20" STEEL ENCASEMENT } } } } i ; NEW} 10" (:IkTE VALVE &}BOX "z4" REDUCER Y Ex 10 Permpn f of 2 Easement } wood: } } } ) } NEW 10 ; NEW 4" RECLAIMED } 4 P Y } } } NEW BORE PIT (APPRO�( } } WATER LINE (10' OF NEW RECEIVING} } ; 1 } }SIZE d LOCATION) } i i i EX FORCEMAIN) } } } } } } PIT (APPROX SIZE m� NEW "- 45•BENDr weNa ^ds i 4 i i } } i NEW AIR RELEASE4 } } } 6 LOCATION) i i A i W } } } n W 4" -22 5• BEND } } } ; VALVE w/ MANHOLE w.0 nds } } } NEW 10" RECLJ4EO i } } } WATER LINE (SEE; } Woods } } i i } pehands SHEET 7) }� r � ¢ s Woods 5�_ �E� Pde wpads 1 1 rM Ex 16 Sanitory Sever_ ♦ryd Woods phony gyr1p- Ex 10 Permonenl Ue orcam ty Easement °i ! E r6 ElrWenl Tap of Bank of Creek Cola !'lavrao/ n SSMH 5075 f 10 Pe_ x / °o1— nry^a Woods `� Top 3143 ^� ` UhYty f°.+a My iH 84 g ram 'a SSMH 5060 Top 3231 AypSK /F CREEK _ , NIOSKiE CPfEK _ 1 1 8 �1g 1 t T a — Id� Ex Heodeoll rpm NEW 12" RECLAIMED 1� •' 1 �� 1 NEW 4'- 45•BEND pl� DrBPjsF WATER LINE (SEE SHEET 7) 1 , -� m i 1 ` -E ° 1 _ or cv 4 f t Dn( v rechnobgy 1 Nwrunum Cost 9f TachrW gy LLC 1 __ Nv 1816 RN Rpp A/ ,am Costing LLC 1 PW 5992 03 4497 ? 1 11 P/N5992 OJ 497 08 611 PC 979 D6642 PG 979 1 g 1 1 7811 Ch(ppsd Corner � 5s9aa(I i � Concrete r M, 924 97478 E 2581009 3168 1.00 2.00 3.00 5.00 B•uu /•UU Y Z w C:, e U R LU z `€ oC .' cNi �P8 FIF S W Z W IAJ �N ¢0v) hc 20 3cn N 8M La 0 O y3LU LU 'vLL d a� LU W 0 0 w x �,sM C v11M 3 ��OF 1 h',2t7 a s x tP 1 tD'3 DESIGNED BY BJPo CHECKED BV DLC PROJECT NO 2277 JD SCA(E. HORZ 1 -50 VERT i'=5 SHEET 21 OF 29 21 Z Z (!3Op U OJ R QWy N cr Z J~ g o _ Z Z CC iLj CC LL OL 1.00 2.00 3.00 5.00 B•uu /•UU Y Z w C:, e U R LU z `€ oC .' cNi �P8 FIF S W Z W IAJ �N ¢0v) hc 20 3cn N 8M La 0 O y3LU LU 'vLL d a� LU W 0 0 w x �,sM C v11M 3 ��OF 1 h',2t7 a s x tP 1 tD'3 DESIGNED BY BJPo CHECKED BV DLC PROJECT NO 2277 JD SCA(E. HORZ 1 -50 VERT i'=5 SHEET 21 OF 29 21 o- m "`" o� 0 ao W WIRE MESH STAPLE (PAVED AREAS) 12" THICKNESS 1-2 1 294 LOCATIDNS 4 N OR NB BITIA®10U8 CONCRETE (UNPAVED AREAS) SILT FILTERING FABRIC OVERL ALONG EDGES (TIP ) OVERL CONC ENCASEMENT STONE FILTER OF 1" GRAVEL PLACED BOTTOM — BoTTOM TIP (�A� AREAP) AT 3000 PSI Z AGAINST FENCE WHERE REQUIRED I - -- - -__ —_— — tMOO P MENT PAVED AREAS) S 8'-0 MAX 8 -0 MAX n cwi — —I— — — — — — — I PAVED AREAS (r n H OR NO BITUMINOUS j It J 12• THICKNESS 1 -2 Ul ;'� -- TT,,��'' -- '''fir,, CONCRETE P,�Q Ow ^I <p VALVE ¢ Q «- r NETTING OR MATTING I / 7YP FINISHED ' TL�4, l �. GRAPE IN UNPAVED c1 AREAS RSE BASE AOSS 4 M TAMPED BACKFILL a " . 4 O 2" 3" COARSE - v WIRE BACKING I G� _ VALVE BOX NOTE TO CONTRACTORI O m r e 14 GAUGE W f- VALVE BOX SHOIA -0 NOT `N M ANCHOR ^ CONTACT MAIN OR NOT AGGREGATE APPROVED (8 "z6" MAX o DITCH _ NOT SILT FILTERING OPENING) Nf z — ----- — -- - - - - -- —rt I I e NN! 1 ENTRANCE APPLICABLE AT ALL POINTS OF INGRESS AND EGRESS UNTIL 133 LB /FT w SITE IS STABILIZED STEEL POSTS INSTALLATION OF LINER MAINTENANCE 2 0 SECTION Y�IE PLAN FRONT 1 APPLY LIME, FERTILIZER, AND SEED BEFORE INSPECT AFTER RAINSTORMS TAMPED BAC (FILL 2 CONSTRUCTION ENTRANCE SHALL BE PLACED FOR MAXIMUM UTILITY BY LAYING LINER FOR EROSION OR FAILURE BLOCKING 1 01P MAY BE USED FOR VALVE BOX EXTENSIONS _ ALL CONSTRUCTION VEHICLES REPAIR ALL WASHED OUT z NOTES `L 2 LAY LINER FORM TOP OF DITCH OF CHANNEL AREAS BY REGRADING, 2 VALVE OPERATING S N MUST BE EXTENDED O 3 PERIODIC TOP DRESSING AND ROUTINE MAINTENANCE SHALL BE PROVIDED A) POSTS SET AT DEPTHS OF 4' FOR EARTH BACKFILL ANCHOR DITCH IS 9 "Xs" THAT THE DEPTH 6 NO GREATER THAN S FROM ON ENTRANCE AS REQUIRED CONTRACTOR SHALL STOCKPILE FRESH AND FILL IS TO BE COMPACTED AND UNROLL IT DOWNGRADE DO NOT RESEEDING, AND REINSTALL- SECTION THE EXTENSION SURFACE USING A MANUFACTURER APPROVED E %TENSNJN NR STRETCH OR LEAVE WRINKLES ING MULCH wf_ STONE ON SITE 3 PRECAST CONCRETE ENCASEMENT IS ALLOWED I,�` j B) PROVIDE ADEQUATE EXCAVATION AHEAD OF SILT FENCE TO ACT AS A VELOCITY BREAK AND SILT TRAP OUTSIDE OF THE PAVED AREAS 3 BURY THE UPSLOPE END IN A SLOT 6 4 ANY MATERIAL THAT MAKES IT TO EXISTING PUBLIC ROADWAY SHALL BE " DEEP u REMOVED AND CLEANED IMMEDIATELY C) CONTRACTOR MAY USE ALTERNATE MATERIAL OR METHOD UPON APPROVAL FROM PROVIDE STAPLES ADN OVERLAP AS SHOWN ABOVE ENGINEER 1 TEMPORARY CONSTRUCTION ENTRANCE z SILT FENCE 3 TEMPORARY DITCH LINER 4 STANDARD VALVE BOX INSTALLATION 24 NOT TO SCALE 24 NOT TO SCALE 24 NOT TO SCALE 24 NOT TO SCALE w tx I IIf 1 -STEEL PIPE SUPPORT ASSEMBLY REQUIRED TOP OF COVER o PIPELINE OA PR �INT DF DARNER PPE 9 TWO 1" DIA HOLES p ''-IEEE ENC,LSEIIENT PIPE REQUIRED FOR ALL (D TYPES OF COVERS WATER, SANITARY ' A x % STEEL PLATE SEWER d STORM I + CLASS 8 RIPRAP WATER ^ WET ADDRESS sT NAItlER PRE a\\ ET ADDRESS 't N (n 12" OF NCDOT •5 OR 1 1 6 I/2 1' of (Trn I CITY STATE DPCODE I r •57 WASHED STONE , M'PECUUIED WATER MAUI (t50 PSq *' "I f0 F TOP ELEV OF STORMWATER a ¢ n BOW 9AAOE NDxoi DAW10 2 s/4• . r BaTS CAm+c Erro SEAL Nc I > m LLQJ It �Lwj /2 S P NOT TOCSCILEON z FORINFORL(ATIONORIN W/ NEX OUTS EA E� O 0 F e4. SIDE OF PRE SUPPORT = ¢ w CASE OF RUPTURE CALL TYP < �N O e BOTTOM OF O° WEEKDAY poat MM%X%MR EXISTING SLOPE COVER I /2' MIN WEEKEND G) �= + � ENCASEMEN,#A,,%' YLATE STRAP O CC W FILTER CLOTH I LAG BOLTS pO,P I Alf Ifry InQ (TYP OF 4) a' NOTES SIDE VIEW 2-1y" f.f nrn I I'S (,., I A It %' THK ww Sn HEIGHT AND WIDTH DETERMINED BY --{ N MIN 1'-11 NOTE EXISTING TOPOGRAPHY AND SEDIMENT 1'-111 t WITH la4 ER PRI E ATO CERIChT NU40E MA STEEL PUTE STORAGE REQUIRED RI ow ^pa LICA R exeawED IN E Inrcexe NOTESf I vIIF ILIGAELE aECLAIMfiI WAi Fa M Ix 812E "A• • S" FOR PPES 14• ,VI UNDER 2 KEY RIP RAP INTO THE DAM FOR LAC BOLTS `e Di — LI ve.EL °A° - t2" FOR PIPES 76" All OvR GARNER PSTABILIZATION (TYP OF 4) E'f4 EcOTGX R AP ENV NEEa IRATE • Mu ueTO rr oa Ailiin vEC lecanouxo 2 ENTRE PRE SUPPORT ASSEMBLY TO BE 1 �_, HT TIONNI AXELEII ASCII GRACE I41x I FU90N BoN0E0 PVC I� EXISTING SLOPE -U' uee x LerFr u Xe ereEL coer I41x 1 Icy MOM x IM IN 1 F •5 OR 57 WASHED STONE ouxr eloxe a4cX ro EAGr oN IoaT ¢ 4 �B I ,- I/1 �4 3/E END EO SCALE VARIES ` r.{I 2,_9 I/+ NOT TO scKE r5"\ I MANHOLE RING AND COVER /6 PIPELINE MARKER DETAIL 7 PIPE SUPPORT IN ENCASEMENT KEYED RIPRAP 24 NOT TO SCALE 24 NOT TO SCALE 24 NOT TO SCALE i FILTER CLOTH FRONT VIEW -� 4 STANDARD MANHOLE � FINISH GRADE ,,,NPMfupfr ......-- .....� -. MOTE PnP nP Torun IucTel I ATIONC USE A MECHANICAL FIN GRADE IN PAVED RING AND COVER - �•._4(N GA/?� y MAiNTEN ONCE; 1 INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (I/2 (NCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED 2 ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM CORRECT ALL DAMAGE IMMEDIATELY JOINT TAPPED CAP TAPPED FOR 2" NIPPLE IN LIEU OF TAPPING MAIN CAP SHALL BE PROPERLY INSTALLED WITH THRUST COLLAR SLOW-OFF ASSEMBLY FOR 2 MAINS ARE TO BE CONSTRUCTED AS A CONTINUATION OF THE MAIN WITHOUT THE SERVICE SADDLE AND WITHOUT THE CORPORATION STOP OR MAINTAINED AREAS— Isle "1" srANDARD PRECAST CONCRETE MANHOLE WI Ojjen SLAB TOP SECTION GRADE ADJUSTMENT IF NECESSARY > FIN GRADE IN UN MAINTAINED 12 MIN ' AREA9 2 0 MAX z f SQ FT BEARING AREA b N' 45 MAX 6PIPEA - _' a 1," " fe �I" 1� a Scryu'� 'O ��` 33 " ( d �•'' 'yF(j J+:Gifw£ "♦ FITTING 4" 6" 8" 12 16 SO BEND 3 5 7 10 16 DE ORTEE 2 3 6 8 11 46 OR LESS 1 2 DAMS AS NEEDED TO MANTAN DESIGN HEIGHT AND CROSS SECTION �O WATER IP THRU M (DIP THRU MANHOLE) AROUND PIPE TO PREVENT 1-8 AROUND PIPE 3 REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO INSTALLATION INLET VALVE ACCESSIBLE THROUGH MANHOLE RING z f ""' -'m 0's vuI a� EXCAVATE AS NEARLY VERTICAL AS POSSIBLE Fu CON15 N ° DESIGNED BY CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, FINISH GRADE 4 MIN 6 MAX WITH VALVE WRENCH AIR RELEASE 's BJPO AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM AID STONES TO a VALVE PROVIDE POLYETHYLENE 4 MIN //�C/1 t /.r\ DRAWN BY EBM u DAMS AS NEEDED TO MANTAN DESIGN HEIGHT AND CROSS SECTION �O WATER IP THRU M (DIP THRU MANHOLE) AROUND PIPE TO PREVENT 1-8 AROUND PIPE 2 VALVE- THREADED BOX COUPLING CONIC FROM BONDING TO PIPE A 1A GREATER THAN OUT MIN ��' SECTION •A A" CHECKED BY DLC L THE DISTANCE SUCH THAT POINTS 2' BRASS LINE- COMPACTEA 2 THREADED BACKFILL BRASS PIPE z TYPE K COPPER PIPING SIDE DIAMETER OF PIPE PROTECT NO 2277 JD + A AND B ARE OF EQUAL ELEVATION CONCRETE BLOCKING 6 TYP) 2 BRASS BALL VALVE ( ° AT TOP OF PIPE y _ =ICI= tl titi �� B A MIN 1/3 C Y AT WATER 2 GATE VALVE OR 3000 P 51 MAIN — --- 2 TAPPINGS ADDLE 8 V CORPORATION STOP DATE FEBRUARY 2013 =IIII -IIII = _III —SF1M� _ L��6 - —Ili— CURB VALVE (MUELLER ORISEAL U `-2 THREADED BRASS PIPE (24 MIN LENGTH) �° ° ° ° PIPE SUPPORT ° Z Z SCALE =T — IIII=III IIII= T1110,, -__ p OR APPROVED EQUAL) �QF HORZ —'I' =III = IIII = IIII =1� =I _Q( —IIII _IIII_ III—IIII— I =I1 I \ + �- STOP NO 87 STONE 1 4 DIA 4 MIN -T CONC'iHRUST BLOCK CONC TO BE POURED BJO L/J cc VENT I'=S '. E =IIII= I — IIII = IIII = III =1IIr -i11 =IIII- CORPORATION MULLER H 9968FORD F400 OR F500 OR WATER DISTRIBUTION SERVICES R WAIT 4 0 DIA NOTE. 190 MIN BEARING AREA OF UN EQUAL DISTURBED AGAINST FIRM UNDISTURBED EARTH LLJ D� J QJIa -� n SPACING WHERE MANHOLE COVER IS NOT EARTH REQUIRED P61 CONCRETE ¢Z Oct SHEET Z4 OF 29 C COVER CAST IN SLAB SHALLNBE FOR FITTING AS LISTED Z NOTE- DO NOT PLACE CHECK DAMS IN LIVE STREAMS USED INSTEAD OF THE STANDARD RINOANDCOVER IN CHART A" THRUST BLOCK FOR Z O LL a AND SPACING s STANDARD 2" BLOW -OFF ASSEMBLY 10 WATER MAIN AIR RELEASE MANHOLE 11 HORIZONTAL PIPE BENDS 24 a CHECK DAM pq NOT TO SCALE '� 24 NOT TO SCALE 24 NOT TO SCALE 24 NOT TO SCALE b ti 4 U a c C a� h� c c n _C c � � � 4 U \ o- CO m`n� it a NOTIFICATION OF COMBINED SELF - MONITORING Z z AND SELF - INSPECTION FORM 75WF FINISHED GRADE 10 -0 10 -0 THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED 9J 2008 j TYPICAL CONCRETE THRUST iN i MIN \ I TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND - DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT w ¢ W ai rn COLLAR MIN OF 12" INTO TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION FOLLOWED RULES DETAILING THE DOCUMENTATION OE Z z J r 8 y UNDISTURBED MATERIAL ALL y CLASS B CONTROL PLAN IS BEING Q O AROUND a OF THESE INSPECTIONS TOOK EFFECT OCTOBER 14070 ZZp ilu LINE POST BRACE RAJ CONCRETE TYPICAL BEND _ WRAP PIPE WITH 4 ML -- TO SIMPLIFY DOCUMENTATION OF SELF - INSPECTION REPORTS AND NPDES MONITORING REPORTS, DWO AND DEMLR DEVELOPED A COMBINED FORM THE SELF - INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF - ¢ POLYETHYLENE PLASTIC TO PREVENT BOND `� ay �\ \� \ MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES THE FOCUS OF THE SELF - INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES 0 D TRENCH BOTTOM ROD �IE TENSION WIRE ACCORDING TO THE APPROVED PLAN THE INSPECTIONS SHOULD BE CONDUCTED THE PROJECT, AND CONTINUED UNTIL PERMANENT SECTION •7CA AF TER EACH PHASE OF CAN BE ACCESSED AT GROUND COVER IS ESTABLISHED THE FORM a FINISHED GRADE HTTP / /PORTAL NCDENR ORG /WEB /LR /EROSION -- - EXCAVATION FOR COLLAR V TRENCH 2" " o IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM PLEASE CONTACT TYPICAL CONCRETE THRUST WIDTH MIN > i' THE RALEIGH REGIONAL OFFICE AT (919) 791 -4200 COLLAR MIN OF 12" INTO e e UNDISTURBED SOIL ® e ^ z 9 I CONCRETE FILL TVP ALL POST �- Z _ WRAP PIPE WITH 4 ML w 12 POLYETHYLENE PLASTIC TO PREVENT BOND CLASS B CONCRETE W &_ ELEVATION C �° i THRUST COLLAR FOR VERTICAL BENDS z CHAIN LINK FENCE 25 NOT TO SCALE ° -m uJ € m o 25 NOT TO SCALE z_ U W MIN 2" OR MATCH EX> ASPHALT THICKNESS NF-.w J WHICHEVER IS GREATER EXISTING ZZ uO Q SURFACE L�++g p ay � JICRUSHEC�j STONE ' r MIN If ma W �¢ w 12 12 pp COMPACTED MIN 8" CABC OR yQ 7n" a FILL MATCH EXISTING y3 I j S EX GRAVEL GRAVEL THICKNESS, ¢(g TRACER SURFACE WHICHEVER IS w /) 1 12' 1 WIRE GREATER I" MIN MN w 72 12" ' CARRIER PIPE Q coi COMPACTED 3 A 3 FILL ROAD CROSSING DETAIL TRACER 12' 12" WIRE M MR CMRIER PIPE GRAVEL DRIVE REPAIR MIN 2' OR MATCH EX DETAIL ASPHALT THICKNESS, WHICHEVER IS GREATER EXISTING SURFACE -0 C �SN CAIRO 8' CABC ,,A v w t2.. 12 Q U MM 4" OR MATCH C S n CONCRETE 4; / THICKNESS PLUS ONE ` OJ [EXISTING INCH, WHICHEVER IS 1 ' 12" GREATER arow MIN M DESIGNED BY BIPO CARRIER PIPE w DRAWN SY o O STONE BASE ASPHALT DRIVE REPAIR n" EBM CHECKED BY DETAIL ra DLC 7' 1" MIN MIN PROJECT NO 2277 JD DATE / CARRIER PIPE FEBRUARY 2073 SCALE HORZ r=sD CONCRETE DRIVE REPAIR DETAIL VERT 1 =5 SHEET Z5 OF 29 NOTE ALL OPEN CUTS ALONG SOIL ROADWAYS SHALL BE BACKFILLED WITH APPROVED SUITABLE MATERIAL AND PROPERLY TAMPED IN ACCORDANCE WITH SPECIFICATIONS 25 s TYPICAL TRENCH SURFACE REPAIR 25 NOT TO SCALE