Loading...
HomeMy WebLinkAbout20140157 Ver 1_401 Application_20190219o`'oF wA 7 -! `9 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 10 PCN Form – Version 1.3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information r'�- 1. Processing 4' 1 a. Type(s) of approval sought from the Corps: X Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 27 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? --FE—IYes X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): X 401 Water Quality Certification – Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification – Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes X No For the record only for Corps Permit: ❑ Yes X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X No 2. Project Information 2a. Name of project: Stonegate Development Stream Restoration 2b. County: Watauga 2c. Nearest municipality / town: Boone 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: The Standard at Boone, LLC 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): Jeff Wakeman 3d. Street address: 16930 West Catawba Ave., Suite 206 3e. City, state, zip: Cornelius, NC 28031 3f. Telephone no.: N/A 3g. Fax no.: N/A 3h. Email address: N/A Page 1 of 10 PCN Form – Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a Applicant is Agent ❑ Other, specify 4b Name 4c Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address 5. Agent/Consultant Information (if applicable) 5a Name Derek Goddard 5b Business name (if applicable) Blue Ridge Environmental Consultants, P A 5c Street address 1305 South Collegiate Drive 5d City, state, zip Wilkesboro, NC 28697 5e Telephone no 336 - 844 -4088 5f Fax no 336- 838 -4318 5g Email address derek @brec biz Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no (tax PIN or parcel ID) 1 b Site coordinates (in decimal degrees) Latitude 36 206517 Longitude - 81 672126 (DD DDDDDD) ( -DD DDDDDD) 1 c Property size acres 2 Surface Waters 2a Name of nearest body of water (stream, river, etc ) to Boone Creek proposed project 2b Water Quality Classification of nearest receiving water C,Tr + 2c River basin New River Basin 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The site and surrounding area is highly urbanized land located in a fioodplain with almost 100% existing impervious surface Boone Creek, the Subject of impact, is encapsulated in culvert pipes on almost the entire length of the property 3b List the total estimated acreage of all existing wetlands on the property o acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 924 Perennial 3d Explain the purpose of the proposed project To restore the natural function, dimension, pattern, and profile of the encapsulated stream to the maximum practical extent possible given the site constraints 3e Describe the overall project in detail, including the type of equipment to be used The project will remove all culverts on site that encapsulate Boone Creek and Restore 904' of Boone Creek based on the Attached Plans The project will utilize a track excavator 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes( No ❑ Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination, what type ❑ Preliminary Final of determination was made? 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Unknown Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes X No ❑ Unknown this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes X No 6b If yes, explain Page 3 of 10 PCN Form — Version 1 3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a Which sections were completed below for your project (check all that apply) Wetlands X Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary ❑ Yes Corps W1 P T No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps El No El DWQ 2g Total wetland impacts 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 X P ❑ T Restoration Boone Creek X PER ❑ INT X Corps X DWQ 15 904 S2 P X T Dewatenng Boone Creek X PER ❑ INT X Corps X DWQ 15 20 S3 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ ❑ PER ❑ Corps S5 ❑ P FIT ❑ INT ❑ DWQ E] PER E:1 Corps S6 ❑ P ❑ T ❑ INT ❑ DWQ 3h Total stream and tributary impacts 924 31 Comments Page 4 of 10 PCN Form — Version 1 3 December 10, 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts 4g Comments 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a ❑ Neuse El Tar-Pamlico El Other Project is in which protected basin? NA ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required'? ❑Yes B1 ❑P ❑T ❑ No El Yes B2 ❑P ❑T ❑ No ❑ Yes B3 ❑ P ❑ T ❑ No 6h Total buffer impacts 61 Comments Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Impacts undertaken in this project will have a net ecological uplift by improving water quality through the creation of riparian buffers that do not exist in the encapsulated stream This is the only practical alternative for restoration Dewatering methods will be used to reduce sedimentation Erosion control will be adhered to for sensitive watersheds 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Stringent erosion control standards for sensitive water sheds will be adhered too The project will be dewatered during construction per the plans 2. Compensatory Mitigation for Impacts to Waters of the U.S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State9 ❑ Yes No 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this projects ❑ Mitigation bank ❑Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the protect result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required, 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes X No within one of the NC Riparian Buffer Protection Rules? 1 b If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No Comments 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this projects 55 % 2b Does this project require a Stormwater Management Plan? ❑ Yes No 2c If this project DOES NOT require a Stormwater Management Plan, explain why Project is in forested, rural setting All stormwater is diffuse flow over vegetated surfaces 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes No ❑ attached? 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? X Yes ❑ No Page 8 of 10 PCN Form — Version 1 3 December 10, 2008 Version F. Supplementary Information 1 Environmental Documentation (DWQ Requirement) is Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ® No letter) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3 Cumulative Impacts (DWO Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWO Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility N/A Page 9 of 10 PCN Form — Version 1 3 December 10, 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat 5b Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ❑ Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ® Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? http / /www ncnhp org - http //www saw usace army mil/WETLAND /esa - http / /www fws gov /nc- es /es /es html 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? http / /ocean flondamanne org /efh_ coral /ims /viewer htm 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? http / /www hpo ncdcr gov 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ® Yes ❑ No 8b If yes, explain how project meets FEMA requirements FEMA LOMB will be Obtained 8c What source(s) did you use to make the floodplain determination? http / /www ncfloodmaps com Derek Goddard 213/14 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION Book / Page 1096/371, 1388/290, 1610/030, 1A/5944, 131/227, 168/596, 1227/244, 384/344, PIN: 2910 -15- 3047 -000; 2910 -15- 3072 -000; 2910 -14- 4905 -000; 2910 -14 -4849 -000; 2910 -14- 4883 -000; 2910 -14- 6613 -000, 2910 -14- 7647 -000; 2910 -14- 6823 -000; 2910 -14 -5944 -000 in Watauga County, NC STREET ADDRESS. 287 -339 Faculty Street, 784 -862 Blowing Rock Road, Boone, NC 28607 Property Owner: The Standard at Boone, LLC C/O Mr. Jeff Wakeman The undersigned, registered property owners of the above noted property, do hereby authorize Derek Goddard , of BREC. PA (Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing , issuance and acceptance of this permit or certification and all standard and special conditions attached Property Owner's Address (if different than property above). The Standard at Boone, LLC C/O Mr Jeff Wakeman 16930 West Catawba Ave Suite 206 Cornelius, NC 278031 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge The Standard at Boone, LLC C/O Mr Jeff Wakeman Auyr dSignature pate. y tI /l3 )1-3 UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICa SURVEY jj� i z UNrTED, STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE BOONE QUADRANGLE NORTH CAROLINA - WATAUGA CO. 7.5-MUW-FTE SERIES frOPOGRAPHIC) � A 81.31'30' UNrTED, STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE BOONE QUADRANGLE NORTH CAROLINA - WATAUGA CO. 7.5-MUW-FTE SERIES frOPOGRAPHIC) � A 81.31'30' 36° 12 32"N 36° 12 19 "N 3 Sod Map — Watauga County, North Carolina 3 (SOILS MAP) 439410 439460 439510 439560 439610 3 Map Scale 1 1,980 d printed on A portrait (8 5" x 11 ") sheet Meters m NN 0 25 50 100 150 /V 0 50 100 200 300 Map prgecbon Web Mercator Comer coordinates WGSB4 Edge txs UTM Zone 17N WGSB4 USDA Natural Resources Web Soil Survey 16M Conservation Service National Cooperative Sod Survey Sod Map — Watauga County, North Carolina Map Unit Legend SOILS MAP 3 € `a Watauga Gourity�Norlh,Caroiina (NC189) - - a ati v „u Map Unit SymEioi TM s Map Unit Named tAre "s in AOI Pe ent�'of AOI t` °> CkE Chestnut- Edneyville complex, 30 to 50 percent slopes, stony 08 91% Ur Urban land 33 396% Ux Urban land, flooded 43 514% Totals for Area of Interest 83 1000% USDA Natural Resources Web Sod Survey 11/1212013 i" Conservation Service National Cooperative Sod Survey Page 3 of 3 STONGEGATE DEVELOPMENT STREAM RESTORATION VICINITY MAP (NTS) NORTH CAROLINA COUNTY MAP (WATAUGA COUNTY) TOPOGRAPHIC SURVEY: ENGINEER: SHEET INDEX: APPALACHIAN PROFESSIONAL LAND BLUE RIDGE ENVIRONMENTAL CS1 COVER SHEET SURVEYORS & CONSULTANTS, PA CONSULTANTS, PA CS2 NOTES 1480 US HWY 421 SOUTH 1305 SOUTH COLLEGIATE DRIVE Cl OVERALL SITE PLAN BOONE, NC 28607 WILKESBORO, NC 28697 C2 PLAN & PROFILE PLAN LICENSE: C -2398 LICENSE: C -3448 C3 PLAN & PROFILE PLAN D1 DETAILS D2 DETAILS CITY/TOWN: BOONE, NC *PYRIGHT 3013 BY BLUE RIDE EM1NOWAENTAL CONSULTANTS PA ALL RIGHTS RESERVED SITE COORDINATES: LATITUDE = 36.206883° N LONGITUDE = - 81.672259° W LOANED ORGIVENTOOTHERS, REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE FUDGE ENVIRONMENTAL CONSULTANTS PAIS PROHIBITED AND ISA VIOLATION OF FEDERAL COPYRIGHT LAWS PUNISHABLE BY FINES UP TO$100 ODD PER OFFENSE w w cn w O U i 19 U S 0 E l HE CS1 LL NPDES INSPECTION NOTES 1 THIS GENERAL PERMIT IS APPLICABLE TO POINT SOURCE DISCHARGES FROM CONSTRUCTION ACTIVITIES DISTURBING ONE OR MORE OR DELEGATED LOCAL PROGRAM SHALL BE CONSIDERED TO TAKE THE PLACE OF A NOTICE OF INTENT FOR COVERAGE UNDER THIS GENERAL PERMIT FOR THOSE PROJECTS REOUIRPIG THIS PERMIT COVERAGE COVERAGE UNDER THIS GENERAL PERMIT SHALL BECOME EFFECTIVE UPON ISSUANCE OF AN APPROVAL FOR THE EROSION AND SEDIMENTATION CONTROL PLAN BY THE LAND DUALITY SECTION OF THE DIVISION OF LAND RESOURCES OR DELEGATED LOCAL PROGRAM. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION AND LAND DISTURBING ACTIVITIES APPROVAL OF THE EROSION AND SEDIMENTATION CONTROL PLAN SHALL BE OBTANED 2. THIS PROJECT IS SUBJECT TO THIS PERMIT IN ADDITION TO THE APPROVED EBSC PAN BECAUSE ALL CONSTRUCTION ACTIVITIES DISTURBING I OR MORE ACRES OF LAND ARE SUBJECT TO STORMWATER PERIAMING REQUIREMENTS UNDER THE NATIONAL POLLUTANT DISCHARGE aNNATION SYSTEM (NPOES). REFER TO A COPY OF GENERAL PERMIT NO NCGO100DO AND GRANTED COVERAGE UNDER THIS GENERAL STORMWATER PER69T 3 THE APPLICANT MUST COMPLY WITH THE APPLICABLE TERMS AND CONDITIONS OF THIS STORMWATER PERMIT AND ARE SUBJECT TO ENFORCEMENT BY THE DIVISION OF WATER QUALITY FOR ANY VIOLATIONS 4 APPLICANT MUST IMPLEMENT THE EROSION AND SmIMENTATION CONTROL PLAN APPROVED FOR THE PROJECT BY THE NC DIVISION OF LAND RESOURCES (DLR) OR BY AN APPROVED LOCAL PROGRAM. ADHERENCE TO THAT EM PLAN IS ENFORCEABLE COMPONENT OF THE STORMWATER PEW 5 A RAN GAUGE MUST BE KEPT ON SITE 9 ALL EROSION AND SEDIMENTATION CONTROL MEASURES MUST BE INSPECTED AT LEAST ONCE A WEEK AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN A HALF INCH (DURING A 24M PERIOD). IF ANY DEVICE FAILURE IS SEEN, IM IAEDATE CORRECTIVE ACTION MUST BE TAKEN. T ALL OUTLETS WHERE STORMWATER RUNOFF IS LEAVING THE SITE MUST BE INSPECTED AND EVALUATE THE EFFECT ON NEARBY STREAMS OR WETLANDS, CORRECTIVE ACTION MUST BE TAKEN (AND RECORDED) IF SEDIMENT IS BEING DEPOSITED OFF SITE OR IN A STREAM OR WETLAND OR IS CAUSING A VISIBLE INCREASE IN TURBIDITY (CLOUDINESS)) OF ANY AFFECTED STREAM. B IF SEDIMENT IS BEING DEPOSITED IN A STREAM OR WETLAND DWO MUST BE CONTACTED WITHIN 24 HOURS 9 RECORDS MUST BE KEPT OF THESE INSPECTIONS. 10 PROVIDE THE OPERATION AND MAINTENANCE (O&M) NECESSARY TO MAINTAIN OPTIMAL PERFORMANCE OF STORMWATER CONTROLS. THIS MEANS TAKE CORRECTIVE ACTION IF EILSC FACILITIES ARE NOT OPERATING PROPERLY 11 REGULAR INSPECTIONS ARE A CHANCE TO CHECK IMPACTS TO NEARLY WATERS IF SIGNIFICANT AMOUNTS OF SEDIMENT ARE OBSERVED NOTIFY DWQ WITHIN 24 HOURS AND PROVIDE WRITTEN NOTICE WITHIN SDAYS (SEE PART 0. SECTION E OF THE PERMIT). PLEASE COPY CORRESPONDENCE TO DLR. 12. PREVENT STORMWATER CONTANINATIDN FROM EQUIPMENT USED DURING CONSTRUCTION. THIS INCLUDES PREVENTING SPILLS OF OLL, FUELS COLUWTS CEMENT HYDRAULIC FLUIDS ETC FEDERAL GUIDELINES MUST BE FOLLOWED AND LABEL RESTRICTIONS WHEN USING HERBICIDES, PESTICIDES AND FERTILIZERS. 13. DEMOLITION DEBRIS AND OTHER BUILDING MATERIAL MUST BE DISPOSED OF PROPERLY MANAGE DISPOSAL OF LETTER AND SANITARY WASTE NPDES INSPECTION RECORD PROJECT MONITORING FOR THE WEEK BEGINNING, RAINFALL ARAN GAUGE MAIL DE MANTANEDORM AND A RECORD OF THE DALY RANRLLLMIONISSIA L BE KEPT MEASURE NDENTTIFACTION Ba SET '�POND� SEDNENYTRAP DATE OF INSPECTION MTIALSOF INSPECTOR OPERATING PROPERLY(YRQ CORRECTIVE ACTIONS TAKEN DATE ACTION TAKEN NONE HKi10UALTTY WATER (HOW) ZONES T DAYS NONE SLOPES STEEPER THAN II DDAYS F SLOPES ARE tO OR LESS N LENGTH AND ARE NOT STEEPER TFAN 21 14 DAYSALLOWEA SLOPES 31 OR RATTER 14 DAYS T DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH ALLOTHERMEAS WRX SLOPES FLATTER THAN 41 14 DAYS NONE V.CEPT FOR PERDtETERSAD HOWZONES) BASED ON AUGUST S, 2011 NCDWO REVISIONS OUTFA STORMIWATER DISCHARGE OIJTFALL IDENTIFICATION GATE OF INSPECTION QOTJALg OF INSPECTOR 19 EROSION SEEN NEAR OVTFA L? (YRQ DESCRIBE EVIDENCE OF OTHER POLLUTANTS DISCHARGING FROM THE SITE SUCH AS OIL SHEEN DISCOLORATION CEMENT WASTES. SANITARY WASTE FERTIIZERS OR FUEL OR MATERIAL STORAGE LEAKAGE DDAYS NONE HKi10UALTTY WATER (HOW) ZONES T DAYS NONE SLOPES STEEPER THAN II DDAYS F SLOPES ARE tO OR LESS N LENGTH AND ARE NOT STEEPER TFAN 21 14 DAYSALLOWEA SLOPES 31 OR RATTER 14 DAYS T DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH ALLOTHERMEAS WRX SLOPES FLATTER THAN 41 14 DAYS NONE V.CEPT FOR PERDtETERSAD HOWZONES) BASED ON AUGUST S, 2011 NCDWO REVISIONS VISIBLESE06FNTANGVRSTRFAMTURSIDI Y RECORD CDRRECTNE ACTIONS TAM IN ASSESSMEMOFCONTROL MEASUIWAEWE. • M THERE ANY VISIBLE SEGMENT DEPOSITED NA STREAM. WETLAND OR RPM? YES NO DATEM DWO CONTA:TED7_ LS THERFANP VISIBLE SEDIMENT DEPOSITED ON ADJACENT PRDAERTYIM? YES NO DAMS) 15 THERE ANY VISIBLE DECREASE N STREAM CLARITYT(YN) HAS THE FINAL kMM T (TRO SYTHISSRRiCTLNEICERTTFY NACCCRDWMWMPARTISBC LRIO)OFTHENMIOEFOPSWTINT THIS REPORT B ACCURATEAND COWLETE TO THE SETT OF MY KNOWLEDGE. SIGNATURE OF PERN4TTEE OR DESIONF.E DATE NPDES GROUND STABILIZATION CRITERIA SITE AREA DESCRIPTION STABILIZATION TIMEFRAME STABILIZATION TtMEFRAME EXCEPTIONS PERMETER MES, SWALES, W04ES MID SLDPES DDAYS NONE HKi10UALTTY WATER (HOW) ZONES T DAYS NONE SLOPES STEEPER THAN II DDAYS F SLOPES ARE tO OR LESS N LENGTH AND ARE NOT STEEPER TFAN 21 14 DAYSALLOWEA SLOPES 31 OR RATTER 14 DAYS T DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH ALLOTHERMEAS WRX SLOPES FLATTER THAN 41 14 DAYS NONE V.CEPT FOR PERDtETERSAD HOWZONES) BASED ON AUGUST S, 2011 NCDWO REVISIONS NPDES NOTES THE PERMIT CONTAIN CONDITION REOUR NG GROUND COVER WITHIN 14 DAYS ON DWURSED RAT AREAS AND 1 DAYS ON ALL PERIMETER OILES, $WALK DITCHES. PERIMETER SLOPES AND ALL SLOPES STEEPER THAN T HOLQDNTAL TO 1 VERTICAL SEE GROUND STABILIZATION CRITERIA TABLE ABOVE THS 0 DIFFERENT FROM THE F'ROVLSIRNS OF THE NC SEDMFMATDN POLLUTION CONTROL ACT AND THE SEDIMENT CONTROL COLMSDNS RULES N ADDITION TO THE WICKER TD1E FOR STABLLQATION, R MUST OCCUR AS SOON AS PRAA T, BUT IN ANY EVENT WITHIN 14 (OR 71 CALMAR DAYS FROM THE LAST LAlDD6NRBPNG ACIMTY • THE PEW REWIRES STABILPATDN WITHIN 1 DAYS FOR PORTIONS OF PROJECTS WITHIN THE SEGMENT CONTROL COLNSSKN DEFINED 1NIGH QUALITY WATER ZONE.. • TO MEET THE FEDERAL REWIEMINF FINN SETTLING BASINS TXRLET STRUCTURES SWALL BE UTILIZED THAT WITHDRAW WATER FROM THE SURFACE FOR BASIN OR TRAPS THAT HAVE A DRAINAGE AREA QU LESS THAN 1 ACRE. THE EXIST04G S'TAJOARD RECIIWEMENTS APPLY • THE NCO 010000 PERWITEE MUST "LOCATE AREAS DEWATED FOR MIAWAGDMENT OF LAND CLEARING AND DEMOLMON DEBRIS CONSTRUCTION AND DOMESTIC WASTE AND HKARDOUS OR TOXIC WASTE THIS LOCATION SHALL BE AT LEAST ED FEET AWAY FROM STORM DRAIN INLETS AGO SURFACE WATERS LSAESS R CAN BE SOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVALABIE • THE PERNITTEE MUST 10CATON OF STOOL PIES LOCATE EARTHEN MATMAL STOOK PILE AREAS AT LEAST 50 FEET AWAY FROM STORM CLAN IMETS AND SURFACE WATER UNLESS P CAN BE SOWN THAT NO OTHER ALTERLATNESARE REASONABLY AVAILABLE • DESIGNATION ON THE PANS WHERE THE SPECIFIC GROUND STABILIZATION REQUIREMENTS APPLY AS PER SECTION ILS2 OF THIS PERMIT • DESIGNS OF BASSI WITH SURFACE WITIORAWAL AS PER SECTION ILBA OF THIS PEARR NOT BE REUSED SOLD LOANED OR GIVEN TO OTHERS, MANDATORY SELF INSPECTION PROGRAM THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED 01 RODS TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND-DISTURBING ACTIVITIES DISPECTA PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TAKE EFFECT OCTOBER 1 2010 THE SELF 4SPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES THE FOCUS OF THE SELF-INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED THE SELF4NSPECTKON REPORT FORM WILL ALSO BE AVAILABLE AS AN EXCEL SPREADSHEET FROM THE LAND DUALITY WEB SITE AT HTTPJAVWW.DLRENRSTATENC USPAGESISEDIMENTATIONIIEW HTML EFFECTIVE OCTOBER 1 2010 PERSONS CONDUCTING LANMISTURBNO ACTIVITIES LARGER THAN ONE ACRE MUST WSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT AND DOCUMENT THE INSPECTION N WRITING. DOES THIS ONLY APPLY TO PROJECTS APPROVED AFTER OCTOBER 1, 20107 NO R APPLIES TO BOTH OLD AND NEW PROJECTS WHO CAN CONDUCT THE INSPECTION? THE FINANCIALLY RESPONSIBLE PARTY, LANDOWNER OR THEIR AGENT MAY CONDUCT THE INSPECTION. IS A SPECIAL CERTIFICATION REOUIRED TO DO THE INSPECTION? NO WHAT IS THE GOAL OF THE SELFINSPECTION PROGRAM? TO MALI= SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL FLAN IS BEING FOLLOWED INCLUDING THE INSTALLATION AND MAINTENANCE OF MEASURES, AND THE PROVISION OF GROUND COVER IN A TIMELY MANNER WHAT HAS TO BE INSPECTED? ALL OF THE EROSION AND SEDIMENTATION CONTROL MEASURES, INCLUDING SEDMITATION CONTROL BASINS, SEDIMENTATION TRAPS, SEDMENTATKON PONDS ROCK DAMS, TEMPORARY ONERSWNS, TEMPORARY SLOPE DRAINS, ROCK CHECK DAMS SEDIMENT FENCE OR BARRIERS ALL FORMS OF INLET PROTECTION STORM DRAINAGE FACILITIES, ENERGY DISSIPATERS, AND STABILIZATION METHODS OF OPEN CHANNELS MUST BE INSPECTED WHAT ELSE HAS TO BE CHECKED? THE NEED FOR GROUND COVER SHOULD BE CHECKED TEMPORARY OR PERMANENT GROUND COVER MUST BE PROVIDED ON EXPOSED GRADED SLOPES AND FILLS WITHIN 14 CALENDAR DAYS OF THE COMPLETION OF A PHASE OF GRADING. PERMANENT GROUND COVER MUST BE PROVIDED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (60 DAYS IN HQW ZONES), WHICHEVER TERM IS SHORTER, UPON THE COMPLETION OF CONSTRUCTION OR DEVELOPMENT DO NEWLY INSTALLED SEDIMENTATION CONTROL BASINS HAVE TO BE MEASURED? YES, THE ACTUAL DIMENSIONS OF THE BASINS HAVE TO BE CHECKED, USUALLY WITH A TAPE MEASURE, AND COMPARED TO THE DIMENSIONS ON THE APPROVED PLAIT 00 NEWLY INSTALLED SEDIMENTATION CONTROL BASINS HAVE TO BE MEASURED BY A PROFESSIONAL LAND SURVEYOR? NO GENERALLY THE WIDTH AND LENGTH OF BASINS CAN BE MEASURED WITH A TAPE MEASURE A LEVEL AND SURVEY ROD MAY BE USEFLA IN CHECKING THE DEPTH OF A BASIN. ONLY RELATIVE ELEVATIONS COMPARING THE BOTTOM AND TOP ELEVATIONS ARE NECESSARY WHAT IS A SIGNIFICANT DEVIATION FROM THE APPROVED PLAN? A SIGNIFICANT DEVIATION MEANS AN OMISSION, ALTERATION OR RELOCATION OF AN EROSION OR SEDIMENTATION CONTROL MEASURE THAT PREVENTS THE MEASURE FROM PERFORMING AS INTENDED IF THE APPROVED EROSION AND SEDIMENTATION CONTROL PUN CANNOT BE FOLLOWED A REVISED PLAN SHOULD BE SUBMITTED FOR REVIEW DOES IT REQUIRE A SPECIAL FORM? A SELFBISPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113444.1' IS AVAILABLE FOR USE. IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN EXCEL SPREADSHEET AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF EROSION AND PRACTICE OR I CAN I JUST USE THE NPDES SELF - MONITORING REPORT? THE NPDES SELF- MONITORING REPORT MAY ONLY BE USED TO REPORT THAT THE MAINTENANCE AND REPAIR REQUIREMENTS FOR ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENTATION CONTROL MEASURES PRACTICES AND DEVICES HAVE BEEN PERFORMED WHEN DO THE INSPECTIONS HAVE TO BE DONE? UNLIKE THE NPDES SELF-MONITORING REPORT, THE SELF- INSPECTION REPORT FOR LAND-DISTURBING ACTIVITY DOES NOT HAVE TO BE WEEKLY RATHER THIS REPORT IS COMPLETED AFTER EACH PHASE OF THE APPROVED EROSION AND SEDIMENTATION CONTROL FLAN M COMPLETE NOT EVERY OMICT WILL HAVE ALL THE POSSIBLE PHASES UIT71IF[TIM-PI'M INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES CLEARNG AND GRUBBING OF EXISTING GROUND COVER COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS INSTALLATION OF STORM DRAINAGE FACILITIES COMPLETION OF CONSTRUCTION OR DEVELOPMENT ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. WHERE DO I MAIL THE REPORT? DO NOT MAR THE REPORT THE RECORDS MUST BE MADE AVAILABLE TO THE EROSION CONTROL INSPECTOR AT THE SETS ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE AVAILABLE ON THE SITE. ANY INSPECTION REPORTS SWILL ALSO BE MADE AVAILABLE ON THE SITE BLUE RIDGE SELF INSPECTION FORMS T raTv +s,�.r,v MS P ECnra,N 0, lAr D aONRORrNG RZO OR ACTVES UNDER ORYA`EA OEYML PERKIT H COtOO A1lD SELHNSYECTO) kECORCS FOR latlp D'SFVQA Y'O ACTMiIEii PEAO S. +IJA ANI P-1A Pa, ri,n nAArt C—pm aloe R L to Ay NNaemAPiw,'y a, Pa.WVr�nrk AV YLOetCaW Party SJ0. 1!, Olepan rexumtebna ecnmr+mVita awrq �y anar,mCEP Fxr seer R•,mnxrarar r•nmc«ur �xrraaq-ea Lnl•,r WLOU)l0 STARR.GATiON TPMp*RAM39 Slly Naa Smpr.rat,en P fm `G+ PpnvwmrCM1es,fvrN_ am stapes )W hem JµlPn ewalr:lNa.�RaA1Toa•s roa xen. sa 1Mn31 im nm m<tcm 4ss.nl mane Rye mi •mac,rr7'pn:+la .mkrree a s 1 mnamr + T +ra. Pleas. mr. man m m All Pth+ Arab rm sloop Raltd Ian a / f Crya Neng vs'M ra p•n bra mtl HONEam -^ Pn,abxe w, m sat +Pn r v� -• <a� re,rr r•.nruw..•. rru,k�A�r -.r, Fr.m R.. l ^vrli ak, - NI b Y 9 ri 4 O r xS1AOV�ms ec:stM ,sp Y•CM WqO MPJI— UNOARW\SAYDW -N Ia h0UR10P A WUNFALL —T GR-1- RYAN OS 14.1 PER . HOUR PERIOD E.— erd Ssdtmerw- Control Mess — 1RSpected 1 UuSCnav Acb..N•na•d M Ga6Gt..9.atSlt111R2m,"t 91..L —m Cerro¢. (�.�� " ,a,.'a•e,a trara,e m•m�s,wra •varN v cvrox rs•.n Vu� t I I J I RY•a» np,tlbb^^n�eP' <n_.viN!arwvrn LTb 2v MMe !nwru�t+�id�•rtA�ep tlPN -t2rp ee p.T FAbbl, efa[vCapea pl N.as ?+Tara Ty Ulv eaprr<'eerw.lnarvf eaSr. rJmui er4v yv,.�Lr..n�nad Vtto-UeP SCZJixa ^W mmt �a..,s anaR per, A^na SOOr muC M In•,r:Rq a —1 ONCE PER 7 CALMDAR OAYS.,D NITNN Ta NJIJRE OFARAINFf1l EVENn CRF TFA MAN 08�YCN PE,12a NOU'1 PFJ110D (8tomm.aler Oischa sOUTIaRS it -s P.cted • --a � -- -y- - -- , — -- b, 1.rM a v.aa A+y r r InvPaclk Rtpod Vl.�Lk Somme ^bt viLN, 24H.n yr rreUanUeb c'P• ^y rip a�sm -awn m«� .reax DADA. 3• ri r Lv M Qua tp Tngk ^6 Fb,. s ee"acna ,n >oAac Ib a aeva[tr- PPnv[I. , ate PASS r5'w Oat3,F+T E?Cr rsvans+YY eM Y ! JraY'IVf. rvfn7x 1rY•1 L A, AR rrC 0110UYO STAR.r.AT10N M—ber —m lPIr J, Pram al Gr - anasv5xa.an�mrLar.ya.lka @x4lar.. rinacayaaPbTa f„fr an 'a* 'p r7o-iIdne ACllv ^a Na<tladM 'r o+Wm +Z,.bLe_Hr m ( I Pm,art mnP, Oa "Y 4aMaA Rh. a.l •xttpPlm 4aNCOYa o, Neeave• N,s rC; ,<ae c.m it Pro P •c 4 -.—.y lies Pp :P r� apa ce.mr Iau"PCLTOR rrawPrAP. A 'NIMq➢ ua •, Uarl DADA'•+% Oa "Y 4aMaA Rh. a.l •xttpPlm 4aNCOYa o, Neeave• N,s rC; M In rR sa LOplmrW Sun 0wa«aN OF FEDERALCOPYRIGHT LAWS RINISMINE BYFNES UPTOS100000 PER OFFENSE Ptaw a'0radml '_ -•�- �iwrck SaeP k:ab4.bm x TT `K V ? S m d�Z'U U pro _. f U IY l O f 1 ', STONEGATE DEVELOPAMNT STREAM RFSTORATI� BLUE RIDGE ENVIRONMENTAL CONSULTANTS PA ASH CARP ''�., DATE REVIS 0 m ENGINEERING I PLANNING I ENVIRONMENTAL " 0 - q i PREPARED FOR 4P THE STANLURD AT BOONE 11L - �► NCBELS ENGINEERING FIRM r-344 SITE PLAN }7 $ g 18880WESTCATAWBAAVE. F P 33 3 T SUITE 208 VCNN� - 3i�' CORNELIUS NC28031 13DS&oUlN Cau MM ORNE x'1ieu NOee Ti/VC WLKES80RO NC 28897 8W'ALecLq '' 'rrlr 1� RELEASED FOR AGENCY REVIEW - NOT RELEASED FOR CONSTRUCTION 02MM2014 DO NOT SCALE - PLANS MUST BE RECEIVED AS A COMPLETE SET STONEGATE DEVELOPMENT STREAM RESTORATION BLUE RIDGE ENVIRONMENTAL CONSULTANTS PA qN 9AR., DATE �MS ENGO.ERPIG I RANNBIG I ENVIR00JENNTAL GFE PREPARED POR nni 4s THE STANDARD ATBOONE LLD �► NCBELS ENGINEERING FIRM 9CJN8 PLAN & PROFILE 33 g 18510 WEST CATAWSAAVE. SUITE 70e LGINk tZ:' 3q g CDRNEUUS NC 780.71 IM SOUTH COLEGATC ORM Sx 4m . riyC CHVQ ��• 3' VAUKESBORO. NCn W hW'abscn¢ RELEASED FOR AGENCY REVIEW - NOT RELEASED FOR CONSTRUCTION OV17014 DO NOT SCALE - PLANS MUST RF RFCFIVFD AS A COMPI FTF SFT STONEGATE DEVELOPMENT sTREiIA RESTORAnoN BLUE RIDGE ENVIRONMENTAL CONSULTANTS PA �tH CAR�4.,, DATE REW"S ENGPIEERING I PLANNING I ENVIRONMENTAL OpC98ipH u u PREPARED FOR. ag wTHE STANnMM AT BOONE LLC NCBELSENGWFERNG FIRM 8CJN8 PLAN & PROFILE _ 16MOWFSTCATAWBAAVF F P q SURE 206 'T'GINEE 33 CMIE LS NC28031 1] 06 SOUTH COLLEGIATE DRNE 3783NAMA . TVNC WAO:8800 N 281197 NA CHJ.. RELEASED FOR AGENCY REVIEW - NOT RELEASED FOR CONSTRUCTION 0P17074 DO NOT SCALE - PLANS MUST BE RECEIVED AS A COMPLETE SET h r� ig INR Jill F m Are l 9 6118 FEM OHMX r � � g r D n rn f f fiI z ' /) V � r 9 O gai 9= O z m D r ° i� ig INR r�� R R Rig sTONEGATE OEVELOPMENrsTRFw RES9oRATroN BLUE RIDGE ENVIRONMENTAL CONSULTANTS PA ENGINEERING I PUNNING I ENVIRONMENTAL pB98 PREPARED FOR vTHE STANDARD AT SOONE lLC � - � NCSELS ENGINEEROJG FIRM CCJIA6 In 16990 WEST CATAWBA AVE P S P 33 8 SURE 106 4C ...XXX CORNELIUI NC11111 I>0530U1NC0LLE0WE ORNE i161M�0EE . %iN J WCJQ930R0 NC 28W I�'1haeMx RELEASED FOR AGENCY REVIEW - NOT RELEASED FOR CONSTRUCTION 01"7074 „ v H DETAILS 3R f Cn z m I m O n n CD cn D z m Jill r�� R R Rig sTONEGATE OEVELOPMENrsTRFw RES9oRATroN BLUE RIDGE ENVIRONMENTAL CONSULTANTS PA ENGINEERING I PUNNING I ENVIRONMENTAL pB98 PREPARED FOR vTHE STANDARD AT SOONE lLC � - � NCSELS ENGINEEROJG FIRM CCJIA6 In 16990 WEST CATAWBA AVE P S P 33 8 SURE 106 4C ...XXX CORNELIUI NC11111 I>0530U1NC0LLE0WE ORNE i161M�0EE . %iN J WCJQ930R0 NC 28W I�'1haeMx RELEASED FOR AGENCY REVIEW - NOT RELEASED FOR CONSTRUCTION 01"7074 „ v H DETAILS 3R f Cn z m I m O n n CD cn D z m RIPARIAN PLANTING PLAN BARE ROOTS nL M SELECTED FROM DE NAWE VEWATCN SFECFS LSTED BELOW TREES SHO" U PL WWAT A DENSITY SUFIC W M PFMM 320 TREES PERACRE AT I%nMTY M ACIBEW THIS DENSITY APPROXRATMY MI (IMO SFACIQ M MI"SPACM) TREES PER ACRE SHOULD BE PLANTED INITIALLY SHRUBS SHOULD BE P ANIFDATA DENSITY SOFFCIE T TO PROVOE 12DS'MW PEFtAC tE NDMOFM TAN M OF ANY SFESESSHALL BE USED PLUGS SHALL BE USEDAT THE SLOPETOES AS NEEDED FOR STAMRY AND HABITAT WOODY VEGETATION NATIVE MWESTERN NORTH CAROLINA SHRUBS CONYTONNAME TI ONRUSH OttmENTAIIS MffJOCANYMCKFAM HAMUIEUSVWGILANA 'TAGAIDER ANUS SEWLAATA TYRglAWl1OP SVM CARLIBLANA 'EDERBERIff SAMBV0IS CANADENSIS RED CHOKESERY MONMAABUIIFALA SUtY DOGW90D CORRSAVID" SEAM WILLOW SYASEMCFA WINTER ERRY BEAVEIUCEUTA 'NNE SARA PIWSOUWPUS TAPES 'MACK WALNUT 1XIANS MGRA PBLACKWLLOW S,%A wRA - BLACKGUM NYSSA SYLVATCA "GREEN ASH FRAKNU3 PENISYLVAMCA -RED MARE AMR RIIBAUe 'RNERNRCH BETUANIG'RA -SUVER MAKE ACERSACONWLM 'bWEEMW UDU DA BARSTTRAGRLM -SYCAMDRB RANTANUSOCCCERALN '1E/LSiFWN NBC= TSUCAMIADESIS TREES L SHRUBS PER RAN9 WATERSUFACE RIMDPLABN BENCH LNESTAKES IL ROODRAIN PLUGS HER PLANS 'SPEOF99 MUSE FOR UVESTAKES _TREES, DORMANT LIVE STAKE BANXFULL POOL FNIIFFLE TWLLWEG Pool J / r WATER SURFACE \ WUFACNE LIVE STAKES SUDS (FACING UPWARD) IN BASAL END CUT AT 45' Vr ro I. Ur IN DIAMETER 9 GENERAL NOTES. 1 UVE STAKES SHALL BE INSTALLED ALONG THE CUTER MEANDER BEND WHOM IH=TED ON THE D AW=ARD DETAILS, L LIVE STAKES SHALL BE CUT FROM AN APPROVED SOURCE WITH A SHARP TOOL STAKE SMALL BE FREE FROM DISEASE OR EXCESS DEAD TWIGS 2.5 TO 4 FEET IN LENGTH WITH A BASAL END 03 TO 13 NCH IN DIAMETER. PRIOR TO INSTALLATION BASAL END SHNL BE CUR AT A 45 DEGREE ANGLE AHD THE END SWILL BE CUT FLAT YRTIAUT CRACKS. L EVE STAKE$ SNARL BE INSTALLED BY GENTLY TAMPING INTO THE SOL LEAVING 4 TO S INCHES SMSED. STAKES SWLl BE RACED IN A RANDOM PATTERN AT A LATE OF 1 LIVE STAKE PER SQUARE YARD ALONG BAN L. 4 LIVE S TAKES SHALL BE INSTALLED WHEN THEY ARE DORMANT WHEN TYPICALLY OCCURS BETWEEN NWB¢'ER 15 AND MARCH I& RIPARIAN SEEDING SCHEDULE S EARLY SPRNG IFEB 1SMAY 151 FOR USE WITHIN 2S FWARIAN BUFFER. SEE ELSC SEEDING SCHEDULE PM NONBUFFER SEEDING SPECS. SEEDING MU[FL E SPECIES %COMPOSTION PA ICUMATRGATU M(sW71CHOGRASS 10 PANCLM DANDESTNUM (DEER IDNIGIM 10 ANCIJS EFFUSS (SOFT RUSH) 10 CAM VULPBWIDEA(FOX SEDGE) 10 SORGNASTRW WTAMS (INDIAN GRAM A CH SMMIDMM LATTFODUM (RIVER CATS) 10 ELY" NTSTRR poTTLEBRUSL GRASS) 10 VE NIOlA GIGANTEA (CANT RCNWEED) s RUSECK A KWA (BLACK EYED SUSAN) S E PATOWUM FSTUASUANIJOE FYE WEED) s RIMS TYR@A(STALRLODN SALAQ 5 VERSEA HASTATA (BLUE VERVAM s PENSTEMON DIGITALIS (TALL WRITE BEARD TONGUE) (fir TGL DIAMETER) 'A APPLICATION AMY AT A RATE OF ISMACRE ANGLECUT SCi AMENDMFNTB 3w,w APPLY LME AND FETTLQER ACCORONG TO SOIL TESTS OR APPLY 4OOD LBIACRE GROUND AGRICULTURAL LIMESTONE AND TWO LBIACRE 5-I0-10 FEATLIgR. MAINTENANCE, LY REFERTLIZE THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE RESEED FERTRYE AND MULCH DAMAGED AREAS IMMEDIATELY BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS PA.. ALL RIGHTS RESERVED THIS PLAN MAY NOT BE REJJSED SOLD LOANED OR GIVEN TO OTHERS E & SC TEMPORARY SEEDING SCHEDULE DO NOT USE wnM 2S RIPARIAN BUFFER ME RPARAN SEEDER SCHEDULE FM BUFFER SEEMS SPECS LATE WINTER S EARLY SPRNG IFEB 1SMAY 151 SPECIES RATED. mm RYE GPM 120 AM 16 i KOREAN LESPEDFIA SO SuMMiR WAY TSAUGUST 151 SPECIES RATE(LWACRE) GERMAN MILLET 40 OR IX6 TALL FESCUE SO FALL AuGtIST 75-0ECEMBER 151 SPECIES PATE SOACRFJ SOIL PREPARATpN SOIL TEST 60L TEST ID WILL DETERMINE WHETHER THE SOL PH AND NUTRIENT (PH OSPHARUL POTASSIUM CALCIUM AND MAGNESIUM) LEVELS ARE IN A RANGE THAT FAVOR TURWRASS GROWUL THE Sa TEST REPORT WILL INDICATE NEEDED AMOUNTS OF FERTLM AND/OR L41E CLEAN AND ROUGH GRADE REMOVE ALL DEBRIS FROM THE LOCATION TO BE PUNTED THIS INCLUDES ROCKS BOTTLES LARGE ROOTS AND OLD TREE TRUNKS. F EXTENSIVE GRADING IS NEEDED REMOVE THE TOPSOIL AND STOCKPILE R FOR REPLACEMENT AFTER THE ROUGH GRADE IS ESTABLISHED. RYE GRAIN 12D THE SUBSURFACE MAY BECOME COMPACTED DURING ROUGH GRADRA ESPECIALLY F THE GROUND IS WET THIS COMPACTED LAYER MUST BE BROKEN UP A SPRRNGTOOTN /ARROW WORKS WELL ON LIGHTLY COMPACTED SOLS A SELL AM EHDMDM SMALL ROIOTLLEL MAY BE NEEDED FOR MORE HEAVILY COMPACTED SITES. FOLLOW RECOMMENDATIONS O SOIL TEST OR APPLY 20M LBIAUGE GRCUID DEEP TRIAGE RDTOTUM LOOSENS COMPACTED SOL AND IMPROVES THE AGRICULTURAL LMESTOIE AND 750 L &ACRE 10-10-10 FERTLER. INCREASE FFRTIBERR SPEED AND DEPTH OF ROOTTNO. A TRMMR4 0MM OR SELFFRLWELUED RATE TO IDOO LBIACRE N THE FALL TILLER WILL ADEQUATELY TILL THE SOL TAKE CARE NOT TO DESTROY THE MwtH EXISTOA THUS N THE LAWN, CUTTING TOO MANY TREE ROOTS DURING SOL APPLY 4000M L &ACRE GRAN STRAW OR EGUIVAENT COVER OR ANDD¢R SUITABLE TILLAGE CAN SEVERELY DAMAGE OR ILL A TREE. TREES CAN ALSO BE MULCH IMS LATERAL ANCHOR STRAW BY TACKING WITH ASPHALT WTTI G, OR A MULCH SUFFOCATED BY DEEPLY COVERING THE ROOTS WITH BOB- F ADOTDNAL SOL IS ANCKDRNO TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A NECESSARY ATA TREE BIUSECONSIRUCT A'TREEWEUL MLILCHANMP24TOOL MAINTENANCE REPLACE THE TOPSOL ONCE THE SUBSURFACE IS ESTABLISHED RETURN THE REFERTLIiE F GRDffTH N NOT FULLY ADEQUATE RESEED FERTILIZER. AND MULCH /OPSOL AND SPREAD URNFORSLY OVER THE ENTIRE AREA ALLOW FOR AT LEAST IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TOPDRESS WITH 50 L &ACRE OF S TO 6 INCHES OF DEPTH AFTER THE SOL HAS SETTLED, THIS MEANS PLACING NMOGEN N MARCH F IT IS RECESS -IW TO EJ(TEND TEMPORARY COVER BEYOND ANNE ABOUT I ro 10 INCHES OF TOFSOL OVER THE SUBSURFACE IMPROVE THE SOIL BY 15. OVERSEES WITH 50 LIVACRE KOREAN LESPEDEDI N LATE FEBRUARY OR EARLY ADDING ORGANIC MATTER THIS NFROVES WATER RETENTION N SANDY SOILS MARCH. AND DRAINAGE N CLAY SOILS AND REDUCES FERTLIIFA LEADING, PLANTING BALLED- AND - BURLAPPED AND CONTAINER -GROWN TREES u PREPARE WATERN0 DEPRESSOR NSICE EXGVATEDAREA'_`. d/Jl�l PLANTING �� SOIL MIXMR _ PUNT AT THE SAME DEPTH AS 1YI¢N PREYOVSIY GRDW PLANTING BAR SHALL HAVE A BLADE WITH SPREAD OUT ROOTS OF BARE-ROOT SPECIMENS, S, SHALL BE 12K LOXL 4BL WIDE AND IN 16 i v (/ I STAKES �IT>LP �t• GENERAL NOTES 1 REFER ro NCESCPDM SECTION LIVESTAKEIBAREROOT PLANTING RANTING NOTES' PLANTING BAG OIRPIO PLANTING. SEEOlNG.9 SHALL BE KEPT IN A MOIST CANVAS BAD OR SLBLAR CONTAINER TO PREVENT THE 8007 SYSTEMS FROM DRYING. KBC PLANTING BAR STAKRIG M4Y REWRED 711fR011G11 UM PLANTING BAR SHALL HAVE A BLADE WITH MATiN4 RCq(OR C ACTED S06H A TRIANGULAR CROSS SECTION, AND A STARTER HOLE MAY BE REWIRED. SHALL BE 12K LOXL 4BL WIDE AND IN 16 i TWgLATCENTER I ROOT PRUNING LIVE STAKES ALL SEEDLINGS SHALL BE ROOT BAR AND PLACE B PRUNED F NECESSARY SO THAT ND KILL HANDLE S ROOTS EXTEND MORE THAN 10 IX6 NOTES (1004 BELOW THE ROOT COLLAR. DRUID VOIST RtOPOSEDSTREAMBED RPPWRNa GENERAL NOTES 1 LIVE STAKES BALL BE EVENLY SPACED 1 PER SQUARE CUT SQYO. L LIVE STAKES SHALL BE DRIVEN UNTIL BLA9IFACING UPWARD) APPROXIMATELY OF LIVE STAKE IS WITHN LIVE CIITTNG GROUND S. F STARTER HOLE IS NEEDED MUM AR (fir TGL DIAMETER) 'A POCKET l UTILIZE ALL ON SITE TRANSPUw MATERIALS ANGLECUT MADE AVAILABLE BY THE OWNER OUNCE 3w,w SOURCE O TRANSPLANT MATERIAL HAS BEEN HARVESTED THEN UTILIZE LIVE STAKDNG, LIVE STAKE BANK STA00IZATTOH WITH LIVE STARES DB&FPIANTNG M METHOD I I 9j r. TANG THE KBC PLANTING BAR (FOR FLOOORAN BUFFER RANTING AND UPLAND BUFFER 16 i il I I I INSERTPIANTING 2 2. REMOVE RANTING 3NSERTRATNO BAR AS SHOWN AND B BAR AND PLACE B BAR 29L TOWARD KILL HANDLE S SCAT P PLANTER FROM TO MPLANTER. C CORRECT DEPTH, R RPPWRNa GT GENE NOTES 1 REFORESTATION SHALL BE RANTED W TO 10 ON CENTER RANDOM SPACING AVERAGING S ON CENTER AFPROAMATELY43601 RANTS PER ACRE L OTHER PLANING METHOD CAN BE USED WITH THE PERMISSION OF THE PLANTING SUPERVISOR. SHRUB PLANTING 4 D2 PINESTRAW MLLCII PLANTING SOIL BRMI S34 " 4 �TyBz 1 RANT SHALL BEAR SAME RELATIONSHIP TO FINISH GRADE AS IT BOPS TO PREVDUS DUSTING GRADE L CARE SHALL BE TAKEN TO PUNT RHODODENDRON SPECIES SLIGHTLY ABOVE GRADE TO FACILITATE POSITIVE DRAINAGE AND REDUCE ROOT RDT OF FEDERAL COPYRIGHT LAWS PUNISHABLE BY FINES LIP TO 6 b7 U U z 3 o a Al z O U U) 1 0 U b O S 0 U Q) � J Lu tz O Z Y U W 0 211 7 2 0 11 i LLJ JEDWARDS Q J.CFLIRCII O rm 0 N (H) I M Q SHEET J D2 L OF FEDERAL COPYRIGHT LAWS PUNISHABLE BY FINES LIP TO 6 b7 U U z 3 o a Al z O U U) 1 0 U b O S 0 U Q) � J Lu tz O Z Y U W 0 211 7 2 0 11 i LLJ JEDWARDS Q J.CFLIRCII O rm 0 N (H) I M Q SHEET J D2 L