HomeMy WebLinkAbout20140158 Ver 1_Application_20140217
Page 1 of 10
PCN Form – Version 1.3 December 10, 2008 Version
Office Use Only:
Corps action ID no. _____________
DWQ project no. _______________
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the
Corps: Section 404 Permit Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? Yes No
1d. Type(s) of approval sought from the DWQ (check all that apply):
401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit
401 Water Quality Certification – Express Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
Yes No
For the record only for Corps Permit:
Yes No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
Yes No
1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h
below.
Yes No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No
2. Project Information
2a. Name of project: Bridge # 419
2b. County: Randolph
2c. Nearest municipality / town: Asheboro
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state
project no: 17BP.8.R.19
3. Owner Information
3a. Name(s) on Recorded Deed: NA
3b. Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
Page 2 of 10
PCN Form – Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: Agent Other, specify:
4b. Name: Art C. King, DEO
4c. Business name
(if applicable): NCDOT Highway Division 8
4d. Street address: 902 North Sandhill Blvd
4e. City, state, zip: Aberdeen NC 28315
4f. Telephone no.: 910-944-2344
4g. Fax no.: 910-944-5623
4h. Email address: acking@ncdot.gov
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 3 of 10
PCN Form – Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
1b. Site coordinates (in decimal degrees):
Latitude: 35.746833
Longitude: - 79.791174
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: Haskett's Creek
2b. Water Quality Classification of nearest receiving water: Class; C
2c. River basin: Cape Fear
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Bridge is a on secondary road in an rural/urban transition area
3b. List the total estimated acreage of all existing wetlands on the property:
NA
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
71 ft.
3d. Explain the purpose of the proposed project:
to replace a deficient, outdated bridge with a new safer structure.
3e. Describe the overall project in detail, including the type of equipment to be used:
To replace the existing bridge with a new structure which will completely span the existing channel. Equipment used:
Track Loader, Tire loader, Dump truck , Crane, Backhoe.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments:
Yes No Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made? Preliminary Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documen tation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? Yes No Unknown
5b. If yes, explain in detail according to “help file” instructions.
6. Future Project Plans
6a. Is this a phased project? Yes No
6b. If yes, explain.
Page 4 of 10
PCN Form – Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
Wetlands Streams - tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number –
Permanent (P) or
Temporary (T)
2b.
Type of impact
2c.
Type of wetland
(if known)
2d.
Forested
2e.
Type of jurisdiction
(Corps - 404, 10
DWQ – non-404, other)
2f.
Area of impact
(acres)
W1 P T NA Yes
No
Corps
DWQ
W2 P T Yes
No
Corps
DWQ
W3 P T Yes
No
Corps
DWQ
W4 P T Yes
No
Corps
DWQ
W5 P T Yes
No
Corps
DWQ
W6 P T Yes
No
Corps
DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number -
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial
(PER) or
intermittent
(INT)?
3e.
Type of jurisdiction
(Corps - 404, 10
DWQ – non-404,
other)
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 P T relocation UT of Hasketts
Creek
PER
INT
Corps
DWQ 2-3ft 71 ft
S2 P T PER
INT
Corps
DWQ
S3 P T PER
INT
Corps
DWQ
S4 P T PER
INT
Corps
DWQ
S5 P T PER
INT
Corps
DWQ
S6 P T PER
INT
Corps
DWQ
3h. Total stream and tributary impacts 71 ft
3i. Comments: relocation is needed to accommdate widening of the bridge to meet current safety standards.
Page 5 of 10
PCN Form – Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number –
Permanent (P) or
Temporary (T)
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody type
4e.
Area of impact (acres)
O1 P T NA
O2 P T
O3 P T
O4 P T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
Pond ID
number
5b.
Proposed use or purpose
of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1 NA
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
Yes No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
Project is in which protected basin?
Neuse Tar-Pamlico Other:
Catawba Randleman
6b.
Buffer impact
number –
Permanent (P) or
Temporary (T)
6c.
Reason
for
impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1 impact
(square feet)
6g.
Zone 2 impact
(square feet)
B1 P T NA Yes
No
B2 P T Yes
No
B3 P T Yes
No
6h. Total buffer impacts
6i. Comments:
Page 6 of 10
PCN Form – Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
relocation of a limited legnth of adjacent stream channel to accommodate bridge widening.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
relocation of a limited legnth of adjacent stream channel to accommodate bridge widening.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If yes, mitigation is required by (check all that apply): DWQ Corps
2c. If yes, which mitigation option will be used for this
project?
Mitigation bank
Payment to in-lieu fee program
Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. Yes
4b. Stream mitigation requested: 71 linear feet
4c. If using stream mitigation, stream temperature: warm cool cold
4d. Buffer mitigation requested (DWQ only): NA square feet
4e. Riparian wetland mitigation requested: na acres
4f. Non-riparian wetland mitigation requested: na acres
4g. Coastal (tidal) wetland mitigation requested: na acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 10
PCN Form – Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 10
PCN Form – Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules? Yes No
1b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: Yes No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? 33 %
2b. Does this project require a Stormwater Management Plan? Yes No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e. Who will be responsible for the review of the Stormwater Management Plan?
Certified Local Government
DWQ Stormwater Program
DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government’s jurisdiction is this project?
3b. Which of the following locally-implemented stormwater management programs
apply (check all that apply):
Phase II
NSW
USMP
Water Supply Watershed
Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
attached?
Yes No
4. DWQ Stormwater Program Review
4a. Which of the following state-implemented stormwater management programs apply
(check all that apply):
Coastal counties
HQW
ORW
Session Law 2006-246
Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? Yes No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No
5b. Have all of the 401 Unit submittal requirements been met? Yes No
Page 9 of 10
PCN Form – Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal/state) land? Yes No
1b. If you answered “yes” to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
Yes No
1c. If you answered “yes” to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
Comments:
Yes No
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
or Riparian Buffer Rules (15A NCAC 2B .0200)?
Yes No
2b. Is this an after-the-fact permit application? Yes No
2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
additional development, which could impact nearby downstream water quality? Yes No
3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered “no,” provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 10 of 10
PCN Form – Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat? Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts? Yes No
5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh
Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
On site survey by NCDOT staff, SDV natural heritage data (esri) review
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? Yes No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
SDV natural heritage data (esri)
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NCDOT staff and SHPO review
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
Applicant/Agent's Printed Name
_______________________________
Applicant/Agent's Signature
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
Date
� �
°
U t °�
a �, �0
� N �
O O �\r
Z Z p� Z � U O �1
z � Z
� � o � � � �
�
O (� (6 m
N N V V
N o) a
V .L] O �
N
°J a 2 u� Y
oi > � w � E
� N p o
i i � Q O] Y� � } O N
N N
} � �
❑ ❑ ❑ ❑ a ❑ y ❑ `o ❑ m�
� N 4l C �
C W �,�J s 01 �p
d �`' ��c .,
� O N � N N VI y a
� N Q E ?i N E � c a � �jO
Q �� �n � a� t � m°� � rn ��
� � U O N N � C �� 4_ � �'� w
N w. O N " UJ G O P (`, C T.
c. � � � 'y m 3 E `o�o� 3 c o � �`o
d a� w � m
Ua�i a-Oi -d :N d �� .N � m p. y .N Q �� �Q;o
N Yo w � '� N� N v c o_>
A a m � o, a a`�i o d �� a�i o °o E Q'-'
T � y �. � � d T — � �
-p t0 tll U i/)
_ � W U L (0� � L O�' N 0 p- L T C �6 c
d c rn
U � m � L � C .0 U ��� L O E '(6 �(n
� 3 ^ m 3 w. o 0 3 � o � Q h
V 3 � c 16 m m � a� m,v_' � a� m -o � ° �,
V O � £ N ` � L C � � Y 6 � oi
C T � � � 'O �� (�. � d Q
y N O N � C � (a � p ��'v> >. � � c Q N
R m � � a� > Q `m a� aNi m m a o a� c '� � Y
rn m � -° � d a K � r... o -o d d w a�
. � a o t� � � o m u� �� o d' a LL � m
ayi m tn a� a� � y a� = � � f6 � L � 3 H Q r E E
0 � � ii � N o c � � `-�� � m �`m 3> `o W 01 0 � m
� ° w � o � V `o o m U `o c� a o � V LL � oi `� -o
R � � LL >, O �„ � T m � c°� v� m >. p � f0 � � d
m � -o o _ a a •c �= a a o � � � c
°' � 3 � � U a � � a� r � a m o a x « � o 0
� u a � N Z R � �n rn y �� � m t/� '° � °. �. a
a ° .Y � � a = o �`-°' r o> o`-' a� -o � u 3 -O y
m=.t � � . o o 'v
N � � 3 T � V � 41 � U� �(p � l0 N L � C
m O � � r°n � LL � m° '� a °1 « Z � N� p a�i � " o�
m a � =o m � ° m 16 `o �� o� o � �6 y �o �0 � Q
rn y �. o y � m �� " « °_ �' � y E� m � �' c °" x � �
A �:°. �' � � m � c N '� c 'C y E fn V � O N `� � u�i m
— � >(6 N �p s rn d "' l6 a�+ N� t f0 � i N �� U
C l0 �' T L (6 C N = L % N = > '_' � t 'O — N (6 /� , O.
w � r x � �- � x p w � � c°n 'x � °o> � z° � z _°o � w � �!�l Q
m � ci a �a .o �o ri LL cu � ci �
N N tn N � f0 (O CO f� I� I� 00 O] a0 N
C
��
i
�
0
0
N
O
N
�
�
N
U
N
�
�
O
N
%
I
O �
�
O z
oU
,� a
m
m
N
a
SHEET NO.PROJECT REFERENCE NO.
1-A
$
$
$
$
$
$
S
Y
S
T
I
M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
17BP.8.R.19
GENERAL NOTES: 2012 SPECIFICATIONS
EFFECTIVE: 01-17-12
REVISED: 07/30/12
GRADE LINE:
GRADING AND SURFACING:
THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED
SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. GRADE LINES MAY BE
ADJUSTED AT THEIR BEGINNING AND ENDING AND AT STRUCTURES AS DIRECTED BY THE
ENGINEER IN ORDER TO SECURE A PROPER TIE-IN.
CLEARING:
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY
METHOD III.
SHOULDER CONSTRUCTION:
ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF
SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD. NO. 560.01.
GUARDRAIL:
THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING
CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD CONSULT
WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL.
SUBSURFACE PLANS:
NO SUBSURFACE PLANS ARE AVAILABLE ON THIS PROJECT. THE CONTRACTOR SHOULD
MAKE HIS OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS.
END BENTS:
THE ENGINEER SHALL CHECK THE STRUCTURE END BENT PLANS, DETAILS, AND CROSS-
SECTION PRIOR TO SETTING OF THE SLOPE STAKES FOR THE EMBANKMENT OR EXCAVATION
APPROACHING A BRIDGE.
ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS.
RIGHT-OF-WAY MARKERS:
ALL RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY CONTRACT.
2012 ROADWAY ENGLISH STANDARD DRAWINGS
The following Roadway Standards as appear in "Roadway Standard Drawings"
Highway Design Branch - N. C. Department of Transportation -
Raleigh, N. C., Dated January, 2012 are applicable to this project
and by reference hereby are considered a part of these plans:
STD.NO. TITLE
DIVISION 2 - EARTHWORK
200.03 Method of Clearing - Method III
225.02 Guide for Grading Subgrade - Secondary and Local
DIVISION 3 - PIPE CULVERTS
300.01 Method of Pipe Installation
DIVISION 4 - MAJOR STRUCTURES
422.11 Reinforced Bridge Approach Fills - Sub Regional Tier
DIVISION 6 - ASPHALT BASES AND PAVEMENTS
654.01 Pavement Repairs
DIVISION 8 - INCIDENTALS
806.01 Concrete Right-of-Way Marker
840.20 Frames and Wide Slot Flat Grates
840.27 Brick Grated Drop Inlet Type ’B’ - 12" thru 36" Pipe
840.46 Traffic Bearing Precast Drainage Structure
840.66 Drainage Structure Steps
846.04 Drop Inlet Installation in Shoulder Berm Gutter
862.01 Guardrail Placement
862.02 Guardrail Installation
862.03 Structure Anchor Units
876.01 Rip Rap in Channels
876.02 Guide for Rip Rap at Pipe Outlets
876.04 Drainage Ditches with Class ’B’ Rip Rap
INDEX OF SHEETS, GENERAL NOTES, AND LIST OF STANDARDS
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
1025 Wade Avenue
Raleigh, NC 27605
Tel:919-789-9977
Fax:919-789-9591
License: C-2197
E N G I N E E R I N G &
C O N S T R U C T I O N
INDEX OF SHEETS
SHEET NUMBER SHEET
1 TITLE SHEET
1-A INDEX OF SHEETS, GENERAL NOTES, AND LIST OF
STANDARD DRAWINGS
1-B CONVENTIONAL SYMBOLS
1-C SURVEY CONTROL
2 PAVEMENT SCHEDULE, TYPICAL SECTIONS, AND
WEDGING DETAILS
3 SUMMARY OF QUANTITIES
3A DRAINAGE SUMMARY
3B EARTHWORK SUMMARY, GUARDRAIL SUMMARY,
PAVEMENT REMOVAL SUMMARY
4 PLAN SHEET
5 PROFILE SHEET
TMP-1 THRU TMP-3 TRAFFIC MANAGEMENT PLANS
SP-1 OFF- SITE DETOUR SIGN DESIGN
EC-1 THRU EC-4 EROSION CONTROL PLANS
X-1 THRU X-4 CROSS-SECTIONS
S-1 THRU S-14 STRUCTURE PLANS
UC-1 THRU UC-5 UTILITY CONSTRUCTION PLANS
6
/
2
1
/
0
0
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINACOMPUTED BY:
CHECKED BY:DATE:
DATE:SHEET NO.PROJECT REFERENCE NO.
3
3
:
2
2
:
0
5
P
M
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
j
a
r
e
d
.
m
e
d
l
i
n
NUMBER
ITEM
NUMBER
SECTION
DESCRIPTION QUANTITY UNITNUMBER
ITEM
NUMBER
SECTION
DESCRIPTION QUANTITY UNITNUMBER
ITEM
NUMBER
SECTION
DESCRIPTION QUANTITY UNIT
JCM 06/28/13
17BP.8.R.19
NUMBER
ITEM
NUMBER
SECTION
DESCRIPTION QUANTITY UNITNUMBER
ITEM
NUMBER
SECTION
DESCRIPTION QUANTITY UNITNUMBER
ITEM
NUMBER
SECTION
DESCRIPTION QUANTITY UNIT
5836000000-E
5835700000-E
5828000000-N
5804000000-E
5802000000-E
5801000000-E
5782000000-E
5781000000-E
5776000000-E
5775000000-E
5691500000-E
5691300000-E
5678600000-E
5672000000-N
5325800000-E
4810000000-E
4589000000-N
3656000000-E
3649000000-E
3270000000-N
3215000000-N
3150000000-N
3030000000-E
2556000000-E
2364200000-N
2286000000-N
1575000000-E
1525000000-E
1498000000-E
1489000000-E
1220000000-E
0366000000-E
0318000000-E
0196000000-E
0134000000-E
0050000000-E
0043000000-N
0318000000-E
0030000000-N
0000100000-N
1540
1540
1530
1530
1530
1530
1525
1525
1525
1525
1520
1520
1515
1515
1510
1205
SP
876
876
SP
862
862
862
846
840
840
620
610
610
610
545
310
300
270
240
226
226
300
SP
800
24" ENCASEMENT PIPE, 0.250" THICK
16" ENCASEMENT PIPE, 0.250" THICK
REMOVE UTILITY MANHOLE
ABANDON 12" UTILITY PIPE
ABANDON 10" UTILITY PIPE
ABANDON 8" UTILITY PIPE
UTILITY MANHOLE WALL, 5’ DIA
UTILITY MANHOLE WALL, 4’ DIA
5’ DIA UTILITY MANHOLE
4’ DIA UTILITY MANHOLE
12" SANITARY GRAVITY SEWER
8" SANITARY GRAVITY SEWER
8" LINE STOP
RELOCATE FIRE HYDRANT
8" WATER LINE
PAINT PAVEMENT MARKING LINES (4")
TRAFFIC CONTROL
GEOTEXTILE FOR DRAINAGE
RIP RAP, CLASS B
GUARDRAIL ANCHOR UNITS, TYPE 350
GUARDRAIL ANCHOR UNITS, TYPE III
ADDITIONAL GUARDRAIL POSTS
STEEL BEAM GUARDRAIL
SHOULDER BERM GUTTER
WIDE SLOT FLAT GRATE, 840.20
MASONARY DRAINAGE STRUCTURE
ASPHALT BINDER FOR PLANT MIX
ASPHALT CONC SURFACE COURSE, TYPE SF9.5A
ASPHALT CONC INTERMEDIATE COURSE, TYPE I19.0B
ASPHALT CONC BASE COURSE, TYPE B25.0B
INCIDENTAL STONE
15" RC PIPE CULVERTS, CLASS III
FOUNDATION CONDITIONING MATERIAL, MINOR STRUCTURES
GEOTEXTILE FOR SOIL STABILIZATION
DRAINAGE DITCH EXCAVATION
SUPPLEMENTARY CLEARING & GRUBBING
GRADING
FOUNDATION CONDITIONING MATERIAL, MINOR STRS
BRIDGE APPROACH FILL-SUB REGIONAL TIER, STATION -L- STA. 13+20.00
MOBILIZATION
64
70
1
54
98
482
22.5
0.9
2
1
193
130
2
1
335
1,400.0
1
314
54
4
4
5
25
54
2
2
35
160
180
330
100
72
8
50
25
1
1
140
1
1
LF
LF
EA
LF
LF
LF
LF
LF
EA
EA
LF
LF
EA
EA
LF
LF
LS
SY
TON
EA
EA
EA
LF
LF
EA
EA
TON
TON
TON
TON
TON
LF
TON
SY
CY
ACR
LS
TON
LS
LS
8763000000-E
8657000000-N
8622000000-E
8608000000-E
8505000000-E
8391000000-N
8364000000-E
8217000000-E
8210000000-N
8182000000-E
8121000000-N
8035000000-N
6117000000-N
6114500000-N
6108000000-E
6096000000-E
6093000000-E
6090000000-E
6087000000-E
6084000000-E
6071020000-E
6071010000-E
6042000000-E
6038000000-E
6037000000-E
6036000000-E
6030000000-E
6029000000-E
6024000000-E
6021000000-E
6018000000-E
6015000000-E
6012000000-E
6009000000-E
6006000000-E
6000000000-E
SPU-1
5871910000-E
5871900000-E
430
430
876
876
460
450
450
425
422
420
412
402
1675
1667
1665
1662
1661
1661
1660
1660
SP
SP
1632
SP
SP
1631
1630
SP
1622
1620
1620
1615
1610
1610
1610
1605
SP
1550
1550
3’-0" X 2’-0" PRESTRESSED CONC CORED SLABS
ELASTOMERIC BEARINGS
GEOTEXTILE FOR DRAINAGE
RIP RAP CLASS II (2’-0" THICK)
VERTICAL CONCRETE BARRIER RAIL
STEEL PILE POINTS
HP12X53 STEEL PILES
REINFORCING STEEL (BRIDGE)
BRIDGE APPROACH SLABS, STATION 13+14.00 -L-
CLASS A CONCRETE (BRIDGE)
UNCLASSIFIED STRUTURE EXCAVATION AT STATION 13+14.00 -L-
REMOVAL OF EXISTING STRUCTURE AT STATION 13+14.00 -L-
RESPONSE FOR EROSION CONTROL
SPECIALIZED HAND MOWING
FERTILIZER TOP DRESSING
SEED FOR SUPPLEMENTAL SEEDING
FERTILIZER FOR REPAIR SEEDING
SEED FOR REPAIR SEEDING
MOWING
SEEDING AND MULCHING
POLYACRYLAMIDE (PAM)
WATTLE
1/4" HARDWARE CLOTH
PERMANENT SOIL REINFORCING MAT
COIR FIBER MAT
MATTING FOR EROSION CONTROL
SILT EXCAVATION
SAFETY FENCE
TEMPORARY SLOPE DRAINS
FERTILIZER FOR TEMPORARY SEEDING
SEED FOR TEMPORARY SEEDING
TEMPORARY MULCHING
SEDIMENT CONTROL STONE
EROSION CONTROL STONE, CLASS B
EROSION CONTROL STONE, CLASS A
TEMPORARY SILT FENCE
BREAKDOWN & REBUILD MANHOLE
TRENCHLESS INSTALLATION OF 16" NOT IN SOIL
TRENCHLESS INSTALLATION OF 16" IN SOIL
700
1
197
177
140.25
10
150
4,898
1
40.4
1
1
13
10
0.25
50
0.25
50
0.5
0.5
10
50
300
105
400
6510
60
900
200
0.25
50
0.5
75
30
95
525
1
35
35
LF
LS
SY
TON
LF
EA
LF
LB
LS
CY
LS
LS
EA
MHR
TON
LB
TON
LB
ACR
ACR
LB
LF
LF
SY
SY
SY
CY
LF
LF
TON
LB
ACR
TON
TON
TON
LF
EA
LF
LF
750419_hyd_ec_tsh.dgn 4/15/2013 12:13:08 PM
750419_hyd_ec_02.dgn 4/15/2013 12:14:21 PM
750419_hyd_ec_03.dgn 4/15/2013 12:19:48 PM
750419_hyd_ec_03B.dgn 4/15/2013 12:20:16 PM
750419_hyd_ec_04.dgn 4/15/2013 12:52:15 PM
750419_hyd_ec_05.dgn 4/15/2013 12:55:25 PM
� v
�
�
a- � �
�
p., �
_ � � �\ �'�r
�~ � M 1�
� � � � S;
d' V
u � ` �.
f- . � �1"� Il.. � \,%
� (�i �..F r _
�` - "� (!1 f-O!
` � _
� Qiu�C
'_ �r., � �- cV ' _.
�� ��� /�
��:��
i1� u> w eu
�
`-,=a
N
�
� V r
u, � � �
;» a a
tL A..
Lj Y-
y� _' � �
��, ��
�6. �� �r- L � �7''_
� .,.. !=� '.^t �` Z
r' �_+-:;_v�
� � �..�: :�� t.I h-
� !y � r UJ
W ;"' ,.Y� � ' 7 r--
:t� ^
. Ca. lJ 'r- F-
r� -
-'� d 1! tn ;�
m O -i cr » w �
�n r-
fl
�
ti- a
.f +� 1 e�
� } ;�
e7 i,�`� ��_.
�,
�. .: ;� ch
<.. r; r ,
� �
V � w w
-'�
t 4
:!
� �'
i :)
r (v f
4' � �
� F � �
w.
sn�.
� �i u
r:� ` t—•
cvw c�
� r. ;� r-.
-� Q u t--
ru�v,
c� v� d> �u
<
� O
� �
cQ
� Y Q
� c_ ;}
\ ;__ � � Z
} � _ �' d
Q� �' _f '"� r--
p�, .v �
�,� �-t� ''',x
: v; ,.� V �:1
� � 4 L, y
� �.V�f! x�
IJJ - V �
� � V>
t,) a- i.a.s u.�
<