HomeMy WebLinkAbout20061666 Ver 2_Approval Letter_20070802o~~~ w A r~9p~
~ '~ r
?1=i
O `~ `C
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
August 2, 2007
DWQ Project # 06-1666, Ver. 2
Wake County
Montclair, LLC
8368 Six Forks Road, #202
Raleigh, NC 27615
Subject Property: Rosemoor Subdivision
UT to Black Creek [030404, 27-45-(2), C, NSW]
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse
River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions
Dear Sir or Madam:
You have our approval, in accordance with the attached conditions and those listed below, to
place fill within or otherwise impact 0.3103 acres of 404/wetland and 0.00 square feet of Zone 1
Neuse River basin protected riparian buffers and 0.00 square feet of Zone 2 Neuse River basin
protected riparian buffers, as described in your application dated May 14, 2007, and received by
the Division of Water Quality (DWQ) on May 16, 2007, with additional information received on
July 20, 2007, to construct the proposed residential subdivision. After reviewing your
application, we have decided that the impacts are covered by General Water Quality Certification
Number(s) 3631 (GC3631). The Certification(s) allows you to use Nationwide Permit(s) NW29,
when issued by the US Army Corps of Engineers (USAGE). This letter shall also act as your
approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC
2B .0233. In addition, you should obtain or otherwise comply with any other required federal,
state or local permits before you go ahead with your project including (but not limited to)
Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed
with your proposed impacts or to conduct impacts to waters as depicted in your application
shall expire upon expiration'of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter and
is thereby responsible for complying with all conditions. If total fills for this project (now or in
the future) exceed one acre of wetland or 1501inear feet of stream, compensatory mitigation may
be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the
conditions listed in the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: httn://h2o.enr.state.nc.us/ncwetlands
An Equal OpportunitylAffirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Montclair, LLC
Page 2 of 4
August 2, 2007
The following impacts are hereby approved as long as all of the other specific and
general conditions of this Certification (or Isolated Wetland Permit) are met. No other
impacts are approved including incidental impacts:
T e of Im act Amount A roved Units Plan Location or Reference
404/Wetland 0.3103 (acres) PCN a e 8 of 12
Buffer -Zone 1 0.00 (s uare ft.) PCN a e 11 of 12
Buffer -Zone 2 0.00 (square ft.) PCN page 11 of 12
2. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre-Construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
3. Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion
control measures must be such that they equal, or exceed, the requirements specified
in the most recent version of the North Carolina Sediment and Erosion Control
Manual. The devices shall be maintained on all construction sites, borrow sites, and
waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control
measures and stormwater routing and treatment shall be on site at all times.
4. Sediment and Erosion Control Measures
Sediment and erosion control measures shall not be placed in wetlands or waters to the
maximum extent practicable. If placement of sediment and erosion control devices in
wetlands and waters is unavoidable, they shall be removed and the natural grade. restored
within six months of the date that the Division of Land Resources has released the project;
5. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within
these boundaries approved under this authorization shall be clearly marked with orange
warning fencing (or similar high visibility material) for the areas that have been approved
to infringe within the buffer, wetland or water prior to any land disturbing activities to
ensure compliance with 15A NCAC 2B .0233 and GC 3631;
Montclair, LLC
Page 3 of 4
August 2, 2007
6. Diffuse Flow (No Review)
All constructed stormwater conveyance outlets shall be directed and maintained as
diffuse flow at non-erosive velocities through the protected stream buffers such that it
will not re-concentrate before discharging into a stream as identified within 1 SA NCAC
2B .0233 (5). If this is not possible, it may be necessary to provide stormwater facilities
that are considered to remove nitrogen. This may require additional approval from this
Office.
7. Construction Stormwater Permit NCGO10000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division
of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control
program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is
automatically issued to the project. This General Permit allows stormwater to be
discharged during land disturbing construction activities as stipulated by conditions in the
permit. If your project is covered by this permit [applicable to construction projects that
disturb one (1) or more acres], full compliance with permit conditions including the
sedimentation control plan, self-monitoring, record keeping and reporting requirements
are required. A copy of this permit and monitoring report forms may be found at
http://h2o.enr.state.nc.us/su/Forms Documents.htm.;
8. Deed Notifications
Deed notifications or similar mechanisms shall be placed on all retained jurisdictional
wetlands, waters and protective buffers in order to assure compliance for future wetland,
water and buffer impact. These mechanisms shall be put in place at the time of recording
of the property, or of individual lots, whichever is appropriate. A sample deed
notification can be downloaded from the 401/Wetlands Unit web site at
http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be
modified as appropriate to suit to this project.
9. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant is required to
return the attached certificate of completion to the 401 Oversight/Express Review
Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center,
Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and/or civil penalties. The authorization to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application and as authorized by this
Certification, shall expire upon expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved
wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60
Montclair, LLC
Page 4 of 4
August 2, 2007
days of the date that you receive this letter. To ask for a hearing, send a written petition, which
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its
conditions are final and binding unless you ask for a hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the
approved buffer impacts) shall be referred in writing to the Director for a decision. The
Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B
.0233. If you have any questions, please telephone Cyndi Karoly or Ian McMillan at ~1~-733-
1786. // / `
CHS/ijm
Enclosures: GC3631
Certificate of Completion
Sincer ly,
oleen H. Sullins, Director
Division of Water Quality
cc: USACE Raleigh Regulatory Field Office
Lauren Cobb, DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Central Files
Blackburn Consulting Engineering, 234 East Main Street, Clayton, NC 27520
Filename: 061666 Ver2RosemoorSD(Wake~01_NBR
Certification of Completion
DWQ Project No.:
Applicant:
Project Name:
county:
Date of Issuance of Certification or Authorization:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from -all of these.
Applicant's Certification
I,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
Agent's Certification
I,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I, as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permiee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
hereby state that, to the best of my abilities, due care and diligence was
construction such that the construction was observed to be built within substantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,
Date:
hereby state that, to the best of my abilities, due care and diligence was
construction such that the construction was observed to be built within substantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,
Signature: Registration No. Date