HomeMy WebLinkAboutNCC220385_ESC Approval Submitted_20220120Planning & Development Department
William Jason Guess
Erosion Control Officer
LETTER OF APPROVAL WITH MODIFICATIONS
January 18, 2022
B and E Airport, LLC
Mr. Greg Edney
59 Fairway Falls Road
Mills River, NC 28759
RE: Project Name: Centre at Airport Road
Acres Approved: 1.5 AC
Project 9: ER02022-00001
County: BUNCOMBE
City: ARDEN
Address: 1 BRIAN BLVD
River Basin: FRENCH BROAD
Stream Classification: C
Submitted By: MR. GREG EDNEY
Date Received by: JANUARY 10, 2022
Plan Type: COMMERCIAL
Dear Sir/Madam,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. This approval shall become
null and void if you have not made progress on the site within six months after the date of
approval. A one-time six month extension can be granted for good cause shown upon
receiving a written request from you before the expiration of the approved plan. This letter
of approval is being issued prior to the issuance of the stormwater permit due to
concurrent reviews, but any land disturbing activity associated with this project shall not
begin prior to issuance off all required permits including the stormwater permit and the
land disturbing permit.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under
the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at
Annette.lucas(cr�,ncdenr. og_v or Paul Clark at Paul.clarkgncdenr.gov. If the owner/operator
of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. The Land
Disturbing Permit must be posted at the job site. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan
to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
W. Jason Guess
Erosion Control Officer
Enclosures: NPDES NCGO1 Fact Sheet
Cc: John R. Anderson, P.E.
Planning & Development Department
William Jason Guess
Erosion Control Officer
MODIFICATIONS FOR APPROVAL
Project name: CENTRE AT AIRPORT ROAD
Project No. ER02022-00001
Location: 1 BRIAN BLVD.
Date Approved: JANUARY 18, 2022
Person financially responsible: MR. GREG EDNEY
1. An on -site preconstruction meeting is required prior to beginning any grading activities
on this parcel.
2. Temporary erosion control measures shall not be removed prior to adequate ground cover
verification from site inspector.
3. Any additional grading not included in the approved plans or modification to said plans
will require a new review by the Buncombe County Erosion Control Officer prior to
construction.
4. Contact erosion control inspector prior to finalization of project to verify site
stabilization.