HomeMy WebLinkAboutNCC205860_Notice of Termination_20220119Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 1/19/2022 11:14:08 AM (NOT Submittal)
Approve by Morman, Alaina 1/19/2022 5:04:57 PM (NOT Request Review - NCC205860)
• The task was assigned to Morman, Alaina. The due date is: January 24, 2022 5:00 PM
1/19/2022 11:14 AM
NORTH CAROLINA
Rrf OmFkm&tral Qualrly
Certificate of NCC205860
Coverage (COC) No.* Enter the Certificate of Coverage Number
2020 Annual Fee Status
2021 Annual Fee Status PAID
May be blank (if not yet billed).
2022 Annual Fee May be blank (if not yet billed).
Status
Information associated with this permit
Project Name
Line 75 MAOP Replacement
Address
N Green Street, Wadesboro, NC
County
Anson
Latitude
34.9771
Longitude
-80.0729
Permittee Listed
Duke Energy Carolinas, LLC
Legally Responsible
Joseph Barbee
Individual
NC Reference No.
NCG01-2020-5860
E&SC Plan ID
ANSON-2021-003
Original NOI Tracking
39289
No.
Date COC Issued
12/22/2020
Prior Rescission Date
Date populates only if COC was already rescinded at time of submittal.
Reason for Rescission/Termination Request:
Reason for • Project Closed -Out
Termination of Sale (Another Owner/Operator obtained new COC)
Coverage* Mistake or Invalid Coverage
Other
Additional More information about the basis of this request, if needed.
Explanation
Supporting Upload Supporting Documentation if applicable.
Documentation Must be PDF format
Project Close-out Information:
Final Close-out 12/15/2021
Inspection Approval
Project Close-out 2021-12-15 Line 75 MAOP Replacement Final DEQ
Approval 32.68KB
Inspection.pdf
Documentation
Must be PDF format
North Carolina General Statute 143-215.613 (i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
* I, as an authorized representative, hereby request rescission of coverage under the
NPDES Stormwater Permit for the subject facility. I am familiar with the information
contained in this request and to the best of my knowledge and belief such information
is true, complete and accurate.
"This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item
(6) of that permit.
Signature
Type Name* Joseph Barbee
Title * Project Manager
Organization* Duke Energy Carolinas, LLC
Date* 01 /19/2022
Email for Joseph. Barbee@duke-energy.com
Confirmation *
Contact Telephone* 7047314403
NOT Certification NCG01-eNOT-Certification-Form-20210514-DEMLR-
Form 817.83KB
SW (NCC205860)-signed.pdf
Must be PDF Format
Is this COC Already Ensure this COC has not been rescinded since submittal!
Rescinded?
Additional Email CC'd on Notification Emails
(Optional) alicia.depalma@duke-energy.com
Original Permittee CC'd on Notification Emails
Email joseph.barbee@duke-energy.com
Original Site Contact cc'd on Notificaiton Ennails
Email ted.cagle@duke-energy.com