HomeMy WebLinkAboutNC0023876_Nutrient Loading_20220119Action History (UTC-05:00) Eastern Time (US & Canada)
Submit
Submit
by Anonymous User 1/19/2022 3:27:26 PM (Supplemental Submittal)
by Thedford, Wren 1/19/2022 4:14:31 PM (Supplemental Info Submittal)
• Thedford, Wren assigned the task to Thedford, Wren 1/19/2022 4:14 PM
• The task was assigned to Thedford, Wren, Bennett, Tilman B 1/19/2022 3:27 PM
NPDES Wastewater EDMR Supplemental Information Upload
NORTH CAROLINA
Envlronm¢ntcl Qvofiry
Initial Review Information
Updated ID#:*
IMPORTANT: REVIEWER SHOULD VERIFY and revise here if necessary.
NC0023876
How should this project be handled?*
File Discard
Information Submitted on 1/19/2022
Submitter Information
Name:
Email Address:*
Sharon Wagoner
Who is submitting the information?
swagoner@burlingtonnc.gov
Submittal Information
The Division of Water Resources (DWR) is providing this site to allow for the upload of required supplemental information
associated with discharge monitoring reports (DMR). All DMR data is required to be submitted electronically through
the eDMR system and should not be submitted here. Division staff will review all uploaded documents and will only
maintain required information. Documents such as laboratory reports are not required to be submitted and will not be
maintained in the system.
Project Information:
Please supply the permit number for this project.
Existing ID#* Permit Number
NC0023876
Examples: NCxxxxxxx or NCGxxxxxx
Facility Name:*
South Burlington Wastewater Treatment Plant
County: Alamance
Please upload all files that need to be submited.*
Click the upload button or drag and drop files here to attach document
Annual Nutrient Submit 2021.pdf 698.84KB
Only pdf files are accepted.
Comments about the attachments:
* By checking the box and signing box below, I certify that:
0 I have given true, accurate, and complete information on this form;
a I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the
NC General Statutes (the "Uniform Electronic Transactions Act")
a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
a I intend to electronically sign and submit the Supplemental Information form."
Full Name: Sharon Wagoner
Signature:
a atav 9efergweet
Date Submitted: 01/19/2022
City of Burlington Laboratory
Telephone (336) 222-5133
P.O. Box 1358
Burlington, NC 27216-1358
January 14, 2022
To: NC DENR/ DWQ
Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
Subject: 2021 Nutrient Loading
Dear Sirs:
The following are our calculated discharged & delivered total nitrogen and total
phosphorus loadings for 2021 from the East Burlington and South Burlington
Wastewater Treatment Plants. If you have any questions or need additional
information, feel free to contact me at (336) 222-5133.
East Burlington (NC 0023868)
Total N: discharged 163383.3 lbs delivered (@77%) = 125805.1 lbs
Total P: discharged 3435.0 lbs delivered (@69%)=2370.2 lbs
South Burlington (NC 0023876)
Total N: discharged 101462.1 lbs delivered (@80%) = 81169.7 lbs
Total P: discharged 7093.4 lbs delivered (@73%)=5178.2 lbs
Total loads delivered from both facilities for 2021:
Total N=125805.1 + 81169.7 = 206974.8 pounds
Total P= 2370.2 + 5178.2 = 7548.4 pounds
Sharon Wagoner
Laboratory Services Manager
City of Burlington
CC: Robert C Patterson — Water Resources Director
Darrin Allred — East Burlington ORC
Rick Asher — South Burlington ORC
oo
co
M
N
0
0
U
z
H
CO
W
CITY OF BURLINGTON 2021 NUTRIENT DISCHARGE$
NPDESTP DEL
LIMITS (Ibs/yr)
* * * * * * * * *
* * w
LO
N
L.0
ri
P delivered
N N V 1� - [h LC) co CO CO V
CO CO O r O pcy)
co LM M OO co • N (
(D Q)
N CO
T .0-• Or
2370.2
p
u
c0
e a a e e e e e a
001 0 001 0 a1 a1 m
LO LO LC) Lo ,.0co ‘.0LO
a e a
m a1 a1
LO
e
m
LO
TP LOAD
Ibs/mo EOP
LE, CO ri 00 N h a d- LID
O a N n 6z ri N ri V
m h Ct O m ri Ni CO N
N N1!1 V N ri M ri <--I
V n LO
,--I Cn O
00 d LO
r-I H H
C
N
en
A
TP Monthly Ave.
mg/L
CO O V C+ml N rl M Ln NI NY r1 ri N c�-1 ON
O O O O O O O O O O O O
ID
d
NPDES TN DEL
LIMITS (Ibs/yr}_
* # # # f # # # #
# # #
0
ID
00
4
N
N Delivered
co cV LC)
CO Lo c.0, n• n• 0, TO Lf) O CS0 v Lo O
M 0c0 ti n (~D O ~ Nco
co CD 1.0 O Om ('? 140 C" 0 M M (0
.-- T ti co [7 Ca 6J O
a-1
0ILA
111
i„ L
0
y
v@'
N N N a N N N N N
n n n n n n n n n
h h h h h h N h N
N N N
n n n
N h h
N
n
N
TN LOAD
Ibs/mo EOP
LO
N.:
O
rK
H
('!
0
00
CO
N
Op
0
0
M
ram-{
Ill V LO O V N
•-i • N n LO n
00 01 m LO M M
M V h CO LO a
r�-I (T H OH H H
L11 a CO
01 ' .1
m 01 00
L1 ,4n1 h
H H
CO
M
CO
ol
M
40
H
TN Monthly Ave.
mg/L
LO NI Li) O CO LO CO O
ri 0 0 y, LO V N r-i
r-1 V N rsi 0 M r-i t M
i i ri ri rrri e1 -1 Ti
LP 00 LO
O ri ri
V N n
rl ci Ti
.-I
H
m
ri
Total Flow
MG/Month
6co Lt'1 n h LD n N n LO +l M
al Lfi fJ M a ri (-1 LO Md
v1 CO LO 7 ,-I r-t H 1-1 O O 01 00 m
i i i i i rrrr I rrr I r-1 1--Ir I
N
41'1
H
Month
G 00 v � T E T 3 Q • u O m
La. ., a g ¢ Ln o z ❑
ANNUAL LOAD/
AVG End of Pipe
cncn
00
0
00
E
0J
O
0
4-0
ril
d
}
0)
0
0
uo
co
M
N
O
0
u
z
t
NPDES TP DEL
LIMITS (Ibs/yr)
a
•
*
r
it
r
it
*
*
*
N
r♦
n
factor P delivered
O CY) O"+ CO CNP (il cD N (LO') OLr)
V co co V co O of co [b coe-1
Lo in LLi n- n- CO CO r r N r
00
ul
e e e e e 0 0 0 0 0 0
00
0 01 n1 m M M M M M M
N N. n 0 M N. n n n n n n n n
M
(
n
TP LOAD
Ib/mo EOP
4 O to LO m n u-) Ih m h C)) p-
oi m l0 0 rhi CO LO a L(1 00 LA LO
00 ^ O O � 00 N LO N N N la
N
7093.4
TP Monthly Ave.
mg/L
NA L0 N co uS M 0- 10 h O al al
m N m c0 A m Lri r-1 N r I r-1
d d 0 0 d d 0 0 d d 0 0
0.31
NPDES TN DEL
UMITS (Ibs/yr)
# # # # # # # # • # # #
154463
N Delivered
Cs/ CO N CO CO co V CO CO V CO
(0 ' CV n O co O] NI- In CD c•)
[ri C7 N COO O [D O N io CcO
000 0 0) c0 CV
CO CCOO V V Ef)
h
Oi
(H0
00
0
u
w
a 0 a 0 e e e e e e e e
0,0 O O O O O O O O O O
CO 00 CO 00 CO 00 c0 c0 00 00 00 00
a
O
CO
TN LOAD
Ibs/mo EOP
61 l0 «1 QS N N Ln Ln ri N 00 h
CO n n 00 ~ m u's W M Lrl LO
O O O M O d- 01 CO O r-1 a
H - ri ri riccl ri lD lD lf1 LD lD
LNp
ell
L-1
TN Monthly Ave.
mg/L
N N N N O n CO CO O III O LO
M ri N CO CO N n 03 O 7 LO
v v v vi vi ui V M V M V
IA
N
V
O
U. l7
N c
0
I-
00 al 4- Ln ri CO d' r I .-1 411 M
O r i O LCl p N i M O CO O a1 r
CO LO O LO N al O CO CO h LO 40
N M M (N ri N ri r I ri ri r-I
n
DO
l0
N
Month
C .4 V - 0) N - 3 DC d u 0 Ol
2. a'm a 2 3; a, 0 z❑
ANNUAL LOAD/
AVG End of Pipe
co
m
E
0)
t4
0
L
d
0)
0
3
0