Loading...
HomeMy WebLinkAboutNC0023868_Annual Nutrient Submittal_20220119Action History (UTC-05:00) Eastern Time (US & Canada) Submit Submit by Anonymous User 1/19/2022 3:33:34 PM (Supplemental Submittal) by Thedford, Wren 1/19/2022 4:14:00 PM (Supplemental Info Submittal) • Thedford, Wren assigned the task to Thedford, Wren 1/19/2022 4:13 PM • The task was assigned to Thedford, Wren, Bennett, Tilman B 1/19/2022 3:33 PM NPDES Wastewater EDMR Supplemental Information Upload NORTH CAROLINA Envlronm¢ntcl Qvofiry Initial Review Information Updated ID#:* IMPORTANT: REVIEWER SHOULD VERIFY and revise here if necessary. NC0023868 How should this project be handled?* File Discard Information Submitted on 1/19/2022 Submitter Information Name: Email Address:* Sharon Wagoner Who is submitting the information? swagoner@burlingtonnc.gov Submittal Information The Division of Water Resources (DWR) is providing this site to allow for the upload of required supplemental information associated with discharge monitoring reports (DMR). All DMR data is required to be submitted electronically through the eDMR system and should not be submitted here. Division staff will review all uploaded documents and will only maintain required information. Documents such as laboratory reports are not required to be submitted and will not be maintained in the system. Project Information: Please supply the permit number for this project. Existing ID#* Permit Number NC0023868 Examples: NCxxxxxxx or NCGxxxxxx Facility Name:* East Burlington Wastewater Treatment Plant County: Alamance Please upload all files that need to be submited.* Click the upload button or drag and drop files here to attach document Annual Nutrient Submit 2021.pdf 698.84KB Only pdf files are accepted. Comments about the attachments: * By checking the box and signing box below, I certify that: 0 I have given true, accurate, and complete information on this form; a I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND a I intend to electronically sign and submit the Supplemental Information form." Full Name: Sharon Wagoner Signature: a atav 9efergweet Date Submitted: 01/19/2022 City of Burlington Laboratory Telephone (336) 222-5133 P.O. Box 1358 Burlington, NC 27216-1358 January 14, 2022 To: NC DENR/ DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: 2021 Nutrient Loading Dear Sirs: The following are our calculated discharged & delivered total nitrogen and total phosphorus loadings for 2021 from the East Burlington and South Burlington Wastewater Treatment Plants. If you have any questions or need additional information, feel free to contact me at (336) 222-5133. East Burlington (NC 0023868) Total N: discharged 163383.3 lbs delivered (@77%) = 125805.1 lbs Total P: discharged 3435.0 lbs delivered (@69%)=2370.2 lbs South Burlington (NC 0023876) Total N: discharged 101462.1 lbs delivered (@80%) = 81169.7 lbs Total P: discharged 7093.4 lbs delivered (@73%)=5178.2 lbs Total loads delivered from both facilities for 2021: Total N=125805.1 + 81169.7 = 206974.8 pounds Total P= 2370.2 + 5178.2 = 7548.4 pounds Sharon Wagoner Laboratory Services Manager City of Burlington CC: Robert C Patterson — Water Resources Director Darrin Allred — East Burlington ORC Rick Asher — South Burlington ORC oo co M N 0 0 U z H CO W CITY OF BURLINGTON 2021 NUTRIENT DISCHARGE$ NPDESTP DEL LIMITS (Ibs/yr) * * * * * * * * * * * w LO N L.0 ri P delivered N N V 1� - [h LC) co CO CO V CO CO O r O pcy) co LM M OO co • N ( (D Q) N CO T .0-• Or 2370.2 p u c0 e a a e e e e e a 001 0 001 0 a1 a1 m LO LO LC) Lo ,.0co ‘.0LO a e a m a1 a1 LO e m LO TP LOAD Ibs/mo EOP LE, CO ri 00 N h a d- LID O a N n 6z ri N ri V m h Ct O m ri Ni CO N N N1!1 V N ri M ri <--I V n LO ,--I Cn O 00 d LO r-I H H C N en A TP Monthly Ave. mg/L CO O V C+ml N rl M Ln NI NY r1 ri N c�-1 ON O O O O O O O O O O O O ID d NPDES TN DEL LIMITS (Ibs/yr}_ * # # # f # # # # # # # 0 ID 00 4 N N Delivered co cV LC) CO Lo c.0, n• n• 0, TO Lf) O CS0 v Lo O M 0c0 ti n (~D O ~ Nco co CD 1.0 O Om ('? 140 C" 0 M M (0 .-- T ti co [7 Ca 6J O a-1 0ILA 111 i„ L 0 y v@' N N N a N N N N N n n n n n n n n n h h h h h h N h N N N N n n n N h h N n N TN LOAD Ibs/mo EOP LO N.: O rK H ('! 0 00 CO N Op 0 0 M ram-{ Ill V LO O V N •-i • N n LO n 00 01 m LO M M M V h CO LO a r�-I (T H OH H H L11 a CO 01 ' .1 m 01 00 L1 ,4n1 h H H CO M CO ol M 40 H TN Monthly Ave. mg/L LO NI Li) O CO LO CO O ri 0 0 y, LO V N r-i r-1 V N rsi 0 M r-i t M i i ri ri rrri e1 -1 Ti LP 00 LO O ri ri V N n rl ci Ti .-I H m ri Total Flow MG/Month 6co Lt'1 n h LD n N n LO +l M al Lfi fJ M a ri (-1 LO Md v1 CO LO 7 ,-I r-t H 1-1 O O 01 00 m i i i i i rrrr I rrr I r-1 1--Ir I N 41'1 H Month G 00 v � T E T 3 Q • u O m La. ., a g ¢ Ln o z ❑ ANNUAL LOAD/ AVG End of Pipe cncn 00 0 00 E 0J O 0 4-0 ril d } 0) 0 0 uo co M N O 0 u z t NPDES TP DEL LIMITS (Ibs/yr) a • * r it r it * * * N r♦ n factor P delivered O CY) O"+ CO CNP (il cD N (LO') OLr) V co co V co O of co [b coe-1 Lo in LLi n- n- CO CO r r N r 00 ul e e e e e 0 0 0 0 0 0 00 0 01 n1 m M M M M M M N N. n 0 M N. n n n n n n n n M ( n TP LOAD Ib/mo EOP 4 O to LO m n u-) Ih m h C)) p- oi m l0 0 rhi CO LO a L(1 00 LA LO 00 ^ O O � 00 N LO N N N la N 7093.4 TP Monthly Ave. mg/L NA L0 N co uS M 0- 10 h O al al m N m c0 A m Lri r-1 N r I r-1 d d 0 0 d d 0 0 d d 0 0 0.31 NPDES TN DEL UMITS (Ibs/yr) # # # # # # # # • # # # 154463 N Delivered Cs/ CO N CO CO co V CO CO V CO (0 ' CV n O co O] NI- In CD c•) [ri C7 N COO O [D O N io CcO 000 0 0) c0 CV CO CCOO V V Ef) h Oi (H0 00 0 u w a 0 a 0 e e e e e e e e 0,0 O O O O O O O O O O CO 00 CO 00 CO 00 c0 c0 00 00 00 00 a O CO TN LOAD Ibs/mo EOP 61 l0 «1 QS N N Ln Ln ri N 00 h CO n n 00 ~ m u's W M Lrl LO O O O M O d- 01 CO O r-1 a H - ri ri riccl ri lD lD lf1 LD lD LNp ell L-1 TN Monthly Ave. mg/L N N N N O n CO CO O III O LO M ri N CO CO N n 03 O 7 LO v v v vi vi ui V M V M V IA N V O U. l7 N c 0 I- 00 al 4- Ln ri CO d' r I .-1 411 M O r i O LCl p N i M O CO O a1 r CO LO O LO N al O CO CO h LO 40 N M M (N ri N ri r I ri ri r-I n DO l0 N Month C .4 V - 0) N - 3 DC d u 0 Ol 2. a'm a 2 3; a, 0 z❑ ANNUAL LOAD/ AVG End of Pipe co m E 0) t4 0 L d 0) 0 3 0