Loading...
HomeMy WebLinkAboutNCC200231_NOT Closeout Documents_20220118ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director - NORTH CAROLINA Environmental Quality February 1, 2021 SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER NCTOINSPECTION REPORT NCTP 3300 heal Estate Investment Co., LLC Attn: Mr. Thom Dillard, Member Post Office Box 10749 Goldsboro, North Carolina 27532 Dear Sir: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, Bradley West Environmental Specialist (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report ^' North Carolina Department of Environmental Quality [ Division of Energy, Mineral and Land Resources Washington Regional Office 1 943 Washington Square Mail I Washington, North Carolina 27889 ovsrt�,er,�a�m ema�n7 252946,6484 North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Wayne Project: Team Chevrolet River basin: Neuse Person financially responsible: NCTP 3300 Real Estate Investment Co. Inc. -Thom Project #: WAYNE-2020-010 Dillard, Member Address: PO Box 10749, Goldsboro, NC 27532 1. Project Location: US 70 East, Goldsboro Pictures: No 2. Weather and soil conditions: cloudy, cool, wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with.S.P.C.A. and rules? Yes If no, check violations below: S. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: S. Contact made with (name), No one onsite Title: Inspection report: Sent Report Date givenlsent: February 01, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No 10. Comments: additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Reported by: Bradley West Others present: Date of inspection: January 28, 2021 Time arriving on site: 2:15 PM Time leaving site: 2:30 PM cc: