HomeMy WebLinkAboutNCC200231_NOT Closeout Documents_20220118ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
-
NORTH CAROLINA
Environmental Quality
February 1, 2021
SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER
NCTOINSPECTION REPORT
NCTP 3300 heal Estate Investment Co., LLC
Attn: Mr. Thom Dillard, Member
Post Office Box 10749
Goldsboro, North Carolina 27532
Dear Sir:
Attached is a copy of the inspection report prepared following an onsite inspection of the project
referenced on the report. This report is intended to inform you of the project's compliance with
the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES
Stormwater General Permit.
Please review this report carefully as it may contain corrective actions needed and/or comments
which will assist you in meeting the required performance standards.
It is our desire that any and all possible problems be discussed and resolved at the earliest
possible time. To facilitate this effort, please contact me at the address/phone number below
should you have any questions.
Sincerely,
Bradley West
Environmental Specialist
(252) 946-6481
Enclosure: Sediment/Construction Stormwater Inspection Report
^' North Carolina Department of Environmental Quality [ Division of Energy, Mineral and Land Resources
Washington Regional Office 1 943 Washington Square Mail I Washington, North Carolina 27889
ovsrt�,er,�a�m ema�n7 252946,6484
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Wayne Project: Team Chevrolet River basin: Neuse
Person financially responsible: NCTP 3300 Real Estate Investment Co. Inc. -Thom Project #: WAYNE-2020-010
Dillard, Member
Address: PO Box 10749, Goldsboro, NC 27532
1. Project Location: US 70 East, Goldsboro
Pictures: No
2. Weather and soil conditions: cloudy, cool, wet Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with.S.P.C.A. and rules? Yes If no, check violations below:
S. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
S. Contact made with (name), No one onsite Title:
Inspection report: Sent Report Date givenlsent: February 01, 2021
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No
10. Comments: additional self -monitoring or self -inspections are required. Project is released.
Termination of coverage under NPDES General Stormwater Permit for Construction
Activities should be requested by the permittee via a Notice of Termination.
Reported by: Bradley West Others present:
Date of inspection: January 28, 2021 Time arriving on site: 2:15 PM Time leaving site: 2:30 PM
cc: