Loading...
HomeMy WebLinkAbout20140159 Ver 1_Application_20140214.�� � � �� � STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAT MCCRORY GOVERTOR February 14, 2014 Mr. John Thomas US Army Corps of Engineers 3331 Heritage Trade Dr. Suite 105 Wake Forest, NC 27615 ANTHONY J. TATA SECRETARY SUBJECT: Nationwide Pemut #14 Bridge No. 69 on SR 1502 (Craver Road) over Reedy Creek (Class C) WBS project no.: 17BP.9.R.18 (DWQ pernut fee $570) Davidson County, NC Dear Mr. Thomas, We are requesting a Nationwide 14 permit for replacement of Bridge No. 69 with a triple barrel box culvert on SR 1502 (Craver Road) over Reedy Creek (Class C) in Davidson County. I have attached a preconstnxction notification application, construction plans, erosion control plans, a stormwater management plan, and No Survey Required forms from NCDOT Cultural Resources for Historic Architecture and Archeology. The project will permanently impact 112 linear feet and temporarily impact 75 linear feet of Reedy Creek. Stream flow will be isolated into one barrel, with 2' sills and floodplain benches constructed at the inlet and outlet of the overflow barrels in order to prevent stream over widening and facilitate aquatic passage. The low flow barrel will be buried 1' below the stream bed to ensure aquatic passage. The overflow basels will be backfilled with class 1 rip rap to the sill elevation. The culvert site will be dewatered during construction in accordance with NCDOT's Best Management Practices. By copy of this letter, we also request 401 review and approval from the NC Division of Water Resources with one copy of the application package provided to Amy Chapman, Transportation Pernutting Unit Supervisor, and Dave Wanucha, DOT Project Coordinator. Please charge the application fee of $570 to WBS project no. 17BP.9.R.18. By copy of this letter, we also request Marla Chambers, NC Wildlife Resources Commission, to comment directly to the Corps conceming the pemut request. If you have any questions, comments or need additional information after reviewing this material please contact me at (336) 747-7802. Thank you for your cooperation in this matter. Division of Highways • Division Nine • 375 Silas Creek Parkway, Winston-Salem, NC 27127 Telephone (336) 747-7800 • Fax (336) 703-6693 • Courier Box 13-12-04 SinCerely, ;j � _ ���� �- Amy Euliss Division Environxnental Officer, NCDOT Division 9 Attachxnents: Application Package CC: Amy Chapman, NCDENR-DWR, Transportation Pemutting Unit Supervisor- e-copy Dave Wanucha, NCDENR-DWR, Environmental Specialist- e-copy Matt Jones, P.E., Division Bridge Program Engineer- e-copy Phil Suggs, Division 9 Roadside Environmental Engineer- e-copy Marla Chambers, WRC- e-copy O�pF WA7F9oG ti > � O Y Offce Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: �X Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: NW14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes �X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑x 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ For the record only for Corps Permit: because written approval is not required? 401 Certification: ❑ Yes ❑X No ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank � Yes � No or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h � Yes ❑X No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Replace Bridge no. 69 on SR 1502 (Craver Road) 2b. County: Davidson 2c. Nearest municipality / town: Welcome 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state project no: 176P.9.R.18 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT Division 9 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if pat Ivey, Division Engineer applicable): 3d. Street address: 375 Silas Creek Parkway 3e. City, state, zip: Winston Salem NC 27127 3f. Telephone no.: 336-747-7800 3g. Fax no.: 3h. Email address: pivey@ncdot.gov Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: DEO 4b. Name: Amy Euliss 4c. Business name NCDOT Division 9 (if applicable): 4d. Street address: 375 Silas Creek Parkway 4e. City, state, zip: Winston Salem, NC 27127 4f. Telephone no.: 336-747-7802 4g. Fax no.: 336-703-6693 4h. Email address: aeuliss@ncdot.gov 5. Agent/Consultant Information (if applicable) Sa. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): NA 1b. Site coordinates (in decimal degrees): Latitude: 35.9309 Longitude: 80.272 1c. Propertysize: 0.4 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Reedy Creek 2b. Water Quality Classification of nearest receiving water: Class C 2c. River basin: Yadkin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The existing site has a state maintained britlge and roadway. The general land use is agriculture, with scattered residences. 3b. List the total estimated acreage of all existing wetlands on the property: 0.1 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 187 3d. Explain the purpose of the proposed project: Replace an existing bridge with a three barcel concrete 6ox culvert, with low flow isolated into one barrel through use of sills antl Floodplain henches. 3e. Describe the overall project in detail, including the type of equipment to be used: Replace an existing bridge with a three barrel concrete box culvert. Stantlard road builiding equipment wiil be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the � yes ❑X No ❑ Unknown Corps or State been requested or obtained for this property / ro'ect includin all rior hases in the ast? Comments: 4b. If the Corps made the jurisdictional determination, what type prelimina of determination was made? ❑ rY ❑ Final 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for �yes �X No ❑ Unknown this project (including all prior phases) in the past? Sb. If yes, explain in detail according to "help fle" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑X Streams—tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Tem ora T y�/1 P Fill Bottomland Hardwood Forest Yes Corps 0.02 N/p T Fill Bottomland Hardwootl Forest Yes Corps 0.02 �/�/3 - Choose one Choose one Yes/NO - Wq - Choose one Choose one YeslNO - �/�/5 - Choose one Choose one Yes/No - �/g - Choose one Choose one Yes/NO - 2g. Total Wetland Impacts: 0.04 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3 b. 3c. 3d. 3e. 3f. 3 g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (IN�? jurisdiction stream length Permanent (P) or width (linear Temporary (� (feet) feet) S1 P Fill Reedy Creek PER Corps 6 112 $p T Dewatering Reedy Creek PER Corps 6 75 S3 - Choose one - - S4 - Choose one - - S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts ie7 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or tyPe Tem ora T 01 - Choose one Choose 02 - Choose ane Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. Sa. 5b. Sc. 5d. Se. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one pz Choose one 5f. Total: Sg. Comments: 5h. Is a dam high hazard permit required? � Yes � No If yes, permit ID no: 5i. Expected pond surface area (acres): Sj. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse � Tar-Pamlico � Catawba � Randleman ❑ Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number— mitigation impact impact Permanent (P) or required? (square Tem ora T (square feet feet B1 - Yes/No B2 - Yes/No B3 - YeslNo 64 - Yes/No BS - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: rage o or iu D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifcally describe measures taken to avoid or minimize the proposed impacts in designing project. Low flow will be isolated to one barrel with sills and floodplain benches. The sills and benches will prevent stream overwidening, and facilitafe aquatic passage. Justifcation for bridge to culvert is provided in the attached Stormwater Management Plan. 1 b. Specifcally describe measures taken to avoid or minimize the proposed impacts through construction techniques. Erosion control will be maintained through NCDOT Erosion Control BMP manual. The instream work area will be dewatered. Surtaces waters wiil not come into contact with uncured concrete. 2. Com ensato Miti ation for Im acts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for �X Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑X Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑x Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Com lete if Usin a Miti ation Bank 3a. Name of Mitigation 8ank: NCDENR EEP Type: Stream Quantity: 224' 3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity: Type: Choose one Quantity: 3c. Comments: 4. Com lete if Makin a Pa ment to In-lieu Fee Pro ram 4a. Approval letter from in-lieu fee program is attached. ❑X Yes 4b. Stream mitigation requested: 224 linearfeet 4c. If using stream mitigation, stream temperature: warm 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigatio� requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: requested 112' at 2:1 ratio 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑X No 6b. If yes, then identiTy the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identifed � yes ❑X No within one of the NC Ri arian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. � Yes � No 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? Zp.g o�o 2b. Does this ro ect re uire a Stormwater Mana ement Plan? � Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The Stormwater Management Plan is atlached. 2e. Who will be responsible for the review of the Stormwater Management Plan? NCDWR TPU 3. Certified Local Government Stormwater Review 3a. In which local overnment's'urisdiction is this ro'ect? ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP � Water Supply Watershed � Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review �Coastal counties ❑HQW 4a. Which of the following state-implemented stormwater management programs apply �ORW (check all that apply): ❑Session Law 2006-246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been � Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No Sb. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the 0 yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been f nalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA f nal approval letter.) Minimum Criteria available upon request. ❑ Y@S ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑Yes �X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in �Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from NA the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � Yes OX No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - Sd. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and arohaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? See attached signed No Historic properties presenVaffected and No Architectural Survey required form form NCDOT cultural Resources. 8. Flood Zone Designation (Corps Requirement) Sa. Will this project occur in a FEMA-designated 100-year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: This project met the MOA requiremenfs as set forth by NC Floodplain Mapping. 8c. What source(s) did you use to make the floodplain determination? This tletermination was based �on the NC Floodplain Mapping Digital maps via their website. ,�,������:5s �� - ��1�-l�� ApplicanUAgenYs Printed Name Ap I ant/ genYs Signature Date (Agenf's signature is valid onty if an authorization letter from the a licant is rovided. Page 10 of 10 !(l *sI;f2\'(:-1' 12I�:(lt'iltL:t3 k�41t\T nuc�.tF.cr a�rc3iaai,a � i��;� i'rc,id_r �'n: Ji"Ti.\ \��,. �.%°��.�.R.�$ i' �. �.l._ h�'�Irnr7 � t.:5. i 1..T ;1 1'errriar Rr S�rtr� d:, r.�.:rt:,� ;.rt� �..� .. {HA)i1-tl�-Q41.6 ! �.';t��,ii � Q3Vl{�s�O[1 1 �::i i<qliol r. �'ia,4li1;'.� A,'�t�Li ('ti•.i�:r,!; ��'�; �:, ��,,,;�r �t,�,�: NWP 3 or 14 I�,�;;�, r i,,�.,�,i��r;ra,r: R�piace Bridg� No. Gl on SR 15t12 (Craver Raas!) uver Reedy �reek with off°site detour {no impraWem�nts pl�nn�ci) 5l',lF tii:llti' C)1�` C L 1;1"192,i i. I2FSOi"F2C;rS KC!'�I_1�' lirx�;t �,��srrrl�iiutt vi r_�i;e«r �e�rai�-ilro•�, r� �edr.� ,x1 r��i�r�ir, orrJ �»irrl,o�i<�rrs. H?C)1"�'�� rev[ev,�ed on 5 C3r_YObci 7ll`? �nd yiz:ded �o NR, .SL, L�, i�E, or SS prQper'lies in tMe �1r�ea �E Potenfial Effe�is (APF). �avi:,saa Cpunty curr�nt GIS r.��ppini�, aerial ��hotegraphy, and tax infor.naTion ir.dica[eu' prectomin2ntly b�,'oadlaad and cuitivatcd "r"eltis in Che APG, p:us ;?ver�l po�t-i4o� resnu.c2s {vi°�.a�e� o Cctober 2U17;, �1'he AP£ :nE<rsc:ts a pasc�l ar, �vt�icl� star.�ds �+ tirca 1925 house, iater rernodefeu, agpre.iimately E,OL� Fec��t south�r;es� �F L?ie 2xi;tittg bti�Jge and Ceycn� pro���C r,mpacL Canstrucied in 19Ci0, Br"sdo� Vc. 09 is a 20- Toat-lunq, sinc,,e-s,�an, steel strr�qer,'multi-beam F�rictge ar,d is �oc ellgibte `c�r the Natoa�l R�c�i�ler accordinc� rc? t27E �dC`7.) �� Fl,stcn� Bric7c Surv�y� as iC i� nut historically, architECturally, or t�c7r.olog`�al4y yg iifcant. t<oqg(� f•,aps "S�reet `Ji�n" co:iflrmed abser,ce cf cri;iral hista^:c ser�ctures%I���is^r,.�s ir� thr_ APt= (vie�.aed 5 Oct�bcr 2Qll]. � No archltect�rat survey is requirad tar the prnjecY as currentiy [tefined, dsr'frf F.�rj�1�n�<+nw1 r+/ ;� hs ;ix- ur<rPler�+i�� 1r7iurtyrr,Flr:ii pv'm�,�ai,'� <� rrlia�.lr �rlrr., irr+-,-,:�nur�errlt y;r'_./i�7ir1�� �L,•u ��z�r,. cu-e nn :rxrtkralitrreC irrs�tca�ir r*r-o�..�r;i;�� ��; ri�,=�� �d('F �,P� exiertds �QO f�ek from eacn erd af tne exi5ticu sidye (N-�} and iG�O €eet to either � dc ef Lhe SP, 15C2 (Craver apad} center �ine ; E`c"d� tc erv,cOnipa� : all pr�cp3sed canstrudion activilies. 7'fie epunty �rr.hir.ectural susuey arid rel�;ed ourilicatio�i �nClcde r�n ��:�pert�zs rn th�. kPE (Pa:., h. rc.a� r, '..:..� r,_�� 5„ �,,.:a:r.r.v: an <,zr.;,.��u,ai nst� � cn-t7� ,. _� ._:,r � p�,.:t�. Gc�,':r,ariL�=r�ng-on, NC]� 1'ie U:-a�.dsun:. i t}' I'i_iG.,'dIAcS�,C,]c.on, 1gi71i. C011:7f}` GIS;CcIX f�ldC2fl3�5 ��1�? c>,jaE?� �..,u�ls supp�rt f.ie at�sence oc <ignific��nt arch�tec[;�ra;� rtsources. No N2cional Register-fis:ed or �lic�ib[e prop�rYie�. are loc�ted v.,thir� thc A?E. Stioutd any aspert of the grojett design change, incfuddng the incorporatiare of aff-site detour improWements, please natify NCDdT Historic Aechitecture as �ddittanai revigw ifsen rzzay be necessary, 4C�k'E'(}32�!' t)(1C�i,11�:'rT.4Ti{)Y S�� :�;t,:�h�d: lacatian rnap t'1V'IJ[1`t.: Bi` 1�CI)U'f [:I.I�fI�R:�L ItPti(yCftCCSI'ROFL.tiSIOtiAL NO SURVEY REQIiiR�l� — HistorFc Struekures ''y r ; � %;-- ��r5;' "�'��.i�`���—'—._r�i���°�,.Z.��� ',llif) I (.�rlin;,il ke�,our�_cs Spc�lal;�C `�_�+ � � Project Trocking No. (lntemal Use) 11-09-0016 NO PREHISTORIC OR HISTORIC PROPERTIES PRESENT/AFFECTED FORM PROJECT INFORMATION Project No: Str. #280069 WBS No: FA. No: 17BP.9.R.18 n/a Federa! (USACE) Permit Required? Caunty: Document Davidson PCE or CE Funding: � State ❑ Federal � Yes ❑ No PermitType: NWP3orNW14 Project Description: Replace Bridge No. 69 over Reedy Creek on SRI502 (Craver Rd) in Davidson Counry, North Carolina. The archaeological APEjor the project measures 600jt in [englh (300ftfrom each bridge end point) by ISOft in width (75ft laterallyfrom each side oJthe SRI502 center-line). The project constitutes, as currently proposed, an in place replacem.ent utilizing an o.jf-site detour during construction activities. Some minar ditch-line impacts are scheduled to occur. SUMMARY OF FINDINGS The North Carolina Department of Transportation (NCDOT) reviewed the subject project and determined: Historic Architechue/L.andscapes - ❑ There aze no Na[ional Register-listed or Smdy Lis[ed properties willtin the projecPs azea of potential effects. ❑ There aze no properties less than fifiy years old tvhich are considered to meet Criteria Consideration G wi[hin [he projecPs area of potential effects. ❑ There are no properties within the projecPs area of poten[ial effects. ❑ There are properties over fifty years old within the area of poten[ial effects, but they do not meet !he criteria for listing on the National Register. ❑ All properties greater [han 50 years of age located in the APE have been considered and al1 compliance for historic architecNte with Section 106 of the National Historic Preservation Act and GS 121-12(a) has been comple[ed for this project. ❑ There are no historic properties presen[ or affected by this project. (Altach any no[es or documenLt as needetn Archaeology � There aze no Nationzl Register-listed or Study Listed properties wilhin the projecPs azea of potential effects. ❑ No subsurface azchaeological investigations aze required for this project. � Subsurface investigations did not reveal the presence of any archaeological resources. � Subsurface invesUga[ious did no[ reveal the presence of any archaeological resources considered eligible for the National Register. ❑ All idenufied Archaeological sites located within the APE have been considered and all compliance for azchaeological resources with Section 106 of the Nationa] Historic Preservation Act and GS 121-12(a) has been completed for this project. � There are no historic pmperties present or affected by this project. (AUach any notes or documents as neede� "No Huioric Prapenier Prerem"form far MinarTrantpormiion Hojecrs as Qunlified in tAe 2007 Programmaiic Agreemenr. XCDOT Archaealogr & Huloric Archirecnve Gro � v O � m �o'm �O<�mc 01s�3 fo'co�mm. d m � � fD m d c m� m m a m Q a�' ¢ y�� a. m m K��� o c� m c°1i 'm E d���, mm s� y'. m� m �3 �� E m �� a°'- u°1i �c � >> _'O O 3- N X N U. 4� N 1 �� m 3^' `° � �_. � � o rn� � � � �'o i n�O��D ���m�y "m°-m Fm�'�o 0 � 'o � a c �. � 2 3 � _ _ � o m � c �< fU � N ti"O N N Q O. [�(� :� .l�-�' O- ��� O N O N O n N N N N(D N`G d(L � d-imaa3�y��r^n� m mo� o.m� < tl^� j S d O. �� n O N O O? N�l0 .i1Z ° � m � � 3 ° a � m � � 3 n � m °,d � �o��Dm�'�mQm o�g,3 mmm mrooc � . � . m a Q'< a ��`��° nm HTmo�' m3�2���� � � �z . c- f m �c m . m o o. m c �°c� m�-OV�°^��3�o�omoa� 30�¢o m � a oFc �o�c ap � m 3� ma �c �� w Qd ' p¢ N N!D N O� O' N y C� p"Oj O f�l W=�' � y F N d 0 0� � s� � m o� � y m,� ro �. c� m°n m m � �� ��~ F N J J O(� d`G O N N.Z C C � � 3'� m 3 n=' � n o m m�� o° �'� n>> �p d� y y m�;� � a � m F�� ° o'�" io m °.� cQ°1°�m�d.mm�d ��3o°m m� o c � ti µ w F v���� D� m m � m An s�D.3-mo�.o`=c�i a° f o�o��y3 N� N d. ��< S� = C a. � p U N � 3 K� N. S f� (l � y Of �i N� N 4� C � N H�?, �� fD S� �, y�. D� p f N�.�i j O m � y n o � � � o m � m -. o Q �� f�� f m n�2 a y�(� `c �� m __ � � d— �a ooQ� d» °'=f on� "�.m m� v m"� s m°m y s n m o c o� N N S N �' � y f� ¢ N � N O S d.�J (� � N(D 3�� y c f. P� a �°� ���� a f0 �' m m n o < a� F°�� m 3� g m� m m o� �m s QmoN�� mmo �'mms�'o 3 g�� � � m o o� m m ot �'p 7 N y= ry l� �^ N.�. _' O. N C3i N U N ¢ c� ���? �� n m a m � d m y 3�a � o'mm.s3� ¢p1.9 .mm�c� �m�^°-' � N - Q ii" � N (J O�(� j� N �.'O 6(D � Q N 7 �� o m S c m°-� a3 n+ �� tim "m � 3 Tv°.`�;:� fD'nn-o�o�� � c fD `N N N� N F'O O O n�� N ID 3 C(D � O Gl N� 6 L, Q"O (,p = y j O N D � d E = N .� N d O t0 ��� Ov. N N S J N�' � N i��� S n � � m o � Q � �.o � o � � � � x � m ��m�3°���=3 mn'c�'�o°���� � �m�mc �3°mmd�o:'m�am='Oc �V �2 y. � Q n N C� f/i N y(p �� j O. � �xm �o i.�°mf °F�o�^°^�r�. f0 (D C � � "O S (0 � '.'Z ,O (U �, C .i � (�G O � � N 2� �� N<=� �j N S p) 'O ��� S d`G N O O '�]' - � .�-. y � d �. N Ol � � � � � ? � ^(0 y�� N N`.. 3 � O d� p_ � yO N S . d G D' � C� q'O i N O�2 �� p- Q�� O � �➢1 � d N(� � d N d' S �(O � m m a a p1 9°� o� m a m m� c � ra°n s o � '- 0 3 � °x � � < o. � < m m^ !^ ay Q F o � m m m 3 0�, A a a� 'o a =� m m Q n o'm 3�<^ m A n m m��� o� � c F' <° �p " n°� m f?" m m �c�i o a.m � � � � m n 3 a o . � � 3 � � m m . � � m � �o 0 0 � � ; n � ti `C �' rn m' m �. J 0 m � � � N y 0 � � Z n � A N � a m a Q N N N n N O � 0 v 3 m � m m � b b m � . � 7 y m O m m 3 �^ F Z � n � x i m V � ,ZJ A d A �' T � � �� Z + n � N _ V � O (n N � m 0 0 ,z; �_ 5` < Q7 � �s �: � 3�c � F 1d � �o Z '3 � $ m . m� O �1 m 93 z .i s O m O s m 3 m 0 a m °o � 3".� / Ms. Amy Euliss NCDOT Division 9 Environmental Of�icer North Carolina Deparhnent of Transportation 375 SIlas Creek Parkway Winston-Salem, North Cazolina 27127 DearMs. Euliss: �.- � Ecosystem PROGRAM Febmary 4, 2014 Subject: EEP Mitigation Acceptance Letter: Division 9 Project, Replace Bridge over Reedy Creek on SR 1502, Davidson County; WBS Element 17BP.9.R.19 The pucpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will pmvide the compensatory stream mitigation for the subject project. Based on the information received from you on February 4, 2014, the impacts are located in CU 03040103 of the Yadkin River basin in the Central Piedmont (CP) Eco-Region, and aze as follows: Yadkin Stream Wetlands Buffer (Sq. Ft.) 03040103 Non- Coastal Cp Cold Cool Warm Riparian Ri arian Marsh Zone I Zone 2 Impacu 0 0 112.0 0 0 0 0 0 (feeUacres) This impact and associa[ed mitigation need were under projected by the NCDOT in the 2013 impact data. EEP will commit to implement sufficient compensatory stream mitigation credits to offset the nnpacts associated with this project as detennined by the regulatory agencies using [he delivery timeline listed in Section F3.c.iii of the N.C. Depar[ment of Envuonment and Natura] Resources' Ecosystem Enhancemen[ Program In-Lieu Fee Insh-ument da[ed July 28, 201 Q If the above referenced impact amounts are revised, then this mirigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. 8420. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707- Sincerely, , ; , t` ! , _ i. . James�B. Stanfill EEP Asset Management Supervisor cc: Mr. John Thomas, USACE — Raleigh Regulatory Field Office Ms. Amy Chapman, Division of Water Quality Ms. Linda Fitzpatrick, NCDOT — PDEA File: SR 1502 — Bridge — Division 9 Re,sto��... �r2+i�u;c�cy... Pv�otect� o�.r,Y lta,te �'F�'� NCDENR North Camlina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-707-8976 / http:!/portal.ncdenr.org/web/eep � � � a � � � � V W O � � � l� U � � O V See Sl.eet 1-A For Index of 5/eets lNOT INCLUDED IN R/W PLAN51 See Sheel 1-B For Symbolagy Shyet � - - DETOUR ROUTE - STA. 11+50.00 BEGIN M CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. GRAPHIC SCALES 50 25 0 50 700 PLANS 50 25 0 50 700 PROFILE (HORIZONTAL) �7I°�`l[°1� �1F 1�T�lfg°][�1�[ ��l[$�1L,�l�T� .L1/ll�ll���A\' �ll' �ll�14� V'W � ll � DAVIDS011t C�U11tTY LOCATIOK• REPLACE EXISTIII(G BRIDGE 1V0. 69 SR 1502 - CRAVER RD. TYPE OF WORK GRADING, DRAINAGE, WIDENI11lG, BOX CULVERT Al\'D PAVEMEIVT MARKIIVGS SURFACE WATER IMPACTS PERMIT TO OLD US HWY 52 /0 \ � <' � � � , , � � � k � � � � .t � t � � +OO PUE 65' BOX CULVERT ,. 12+01.80 \ +33 ` +4Z � � 55 `: , 5/' ; \ . _ � � ti�` 0 � #. � � � � ;� � a 3 t t � � � � r — _ _ � � \` . 70 30' / -L- STA. 12+g0.00 END MILLING & C \\� �— i � ^ 17BP.9.R.18 � Nq� 83 NC GR/D END TIP PROJECT 17BP.9.R.18 CRAVER RD SR 1502 � +49.34 30' a'. 30' PuE +49.34 END BOX CULVERT 65' � ���F� DESIGN DATA PROJECT LEIYGTH ruwn rrc[r'vrtu en: PLFNS PREPMEO FOR: � DIVLSIOX OF HIGHWAYS ADT = 840 ��F �''��P1��°'E �ABtT 1000 Birct Ridge Dr. V = 45 MPH LENGTH ROADWAY TIP PROJECT 17BP.9.R.1$ = 0.040 MI �"; „o.,",a,"" Rataigh NC, 3]610 LENGTH STRUCTURE TIP PROJECT 17BP.9.R.18 = 0.005 MI +orz saamnxn SPBfIP(G110N5 TOTAL LENGTH TIP PROJECT 17BP.9.R.18 = 0.045 MI ��T OF WAY DAT6: DAVID KEISER, PE JANUARY,2013 PAO�Of'B"'O°'�" LETTlNG DATE: LAUREN JACKSON, EI PAO/bC! DHSIGN %NGINHeR NCDOT CONTACT.• �TTHEW JONES, PE DMSlON BAm(i8-PFOGRMI ALtNA(igR , RD rd.vNi.v�r� ROADWAY DESIGN EXG7NEER PERMIT DRAWING SHEETS 1 OF 4 INCOMPLETE PLANS PoR R/w ANNSITION PRELIMINARY PLANS DI['ISION OF ffiGHWAYS STA7L OP NORTH CAROLINA � No� . � i e• nr.r N �/1 0 � O 0 � � I i0 010 u5 MV/ 52 BL POINT DESC. NORTH EAST ELEVATION 1 28-0069-1 795989.2500 1623528.7490 755.78 3 28-0069-3 796327.5020 1623473.9447 752.96 2 28-0069-2 796655.1351 1623389.2513 757.72 750 N 740 COIR FIBER Q MATTING RE10 I CRnvEF ±` �t)�tl..y��nl��[y �y.' �o���� � ��_y,____ PUE LdRRY E. HEGE `�� O L STATION OFFSET OUTSIDE PROJECT LIMITS 12+41.86 16.14 RT �UTSIDE PROJECT LIMITS lVAIIUN = /JJbV E �623574 11+8/JO 1071Y RIGHT !N SOU7H 5/DE OF l2' 10 DAVIIDSI)N C�UNTY Il,�W IMPACT BRImGE sTnucruae rzaoonv LS U4I1-060 WBS t>8P.9A10 TIP IlBP.9.R.I8 -CLASS IRIP RPP AND GEOTEXTILE EST.I40 i0N5 EST.l02 SY Gi � I PCP � �\ �� MICHAEL H.CA<VER �� � —L— STA/2+8pA 35 � �5,,. N AIILLIN � i5 +48 � \�` RLAY _�_ 5l' +40� °� Esoe:,n� END jd +�rq �//o raore� . < �i Y �"¢e � nw�oEv Y Y� �� SO fXlERPPoSf /VO F "�gg=3 �° � ^•—w +4934 +70 d 3a uE 3a euE +4934 COIR FIBER 65 f3� 8.8g MAT7/NG \, 65 �eFy LAPFY E.HELE O CLA55 I RlP FAP ANO GEOTEXTILE EST.135 TONS Esr.90 sr cr z 11 12 13 14 I" � 0 0 m N z � in �a� NO. nronnuuc ENGINEER roYaT paA. PERMIT DRAWING SHEETS 2 OF 4 DATUM DESCRIPTION iNE LOC�LIZEO COOfl01NAiE SYSiEN DEVELOPEU FOR iN15 PROJEGi IS B�SEU IX1 iHE SiAiE PLRNE COOA�INAiES ES7RBLISNE� BY NC�Oi fIXi IIONNENi '2B-0069-1' MIiH XAO B3/NSRS Y007 STpiE PIANE GRID COONUINATES Of NORINING: i95989.250(ftl EASIING: 162152B.i491f11 ELEVAlION: i55.i01f11 iNE AVEPRGE C�I61NE� GRIU FALiqt USE� R1 iN15 PR0.1EC� ICRqINO i0 CR101 I5: 0.9999fl5651 iNE N.G LRBERi Gfl10 BEARING ANO LOCALIZEO XpRIZONiAL GflOUN� OIS7ANCE GROM '28-0069-i' 10 -EL- SiAiIR! 10�00.0� IS N ti'd5'S0.84' Y tOLBi' ALL L1�4AR �IIENSIONS ARE LOCALIZEO NpNiZONTAL UISTRNCES VENiILAL �AiUM USEO IS NAVp BB CULVERT HYDRAUL/C DATA DES/GN D/SCHFRGE = 950 CFS DES/GN FREWENCY = 25 YRS D£S/GN hW ELEVAT/ON = 7506 FT BASE DISCHARGE _ 1406 CFS BASE FREWENLY = /00 YRS BASE HW ELEVAT/ON = 75236 FT OVERTOPP/NG D/SCHARGE = 400 CFS OVERTOPP/NG FREWENLY= 500— YRS O✓ERTOPP/NG ELEVAT/ON = 7542 FT eM�z e�evar�oN = �sz�z N 796655 E /623389 L STATION 19+50 TO BM'2 N l5'28'25'W Dlst /3033' REBAR WITH ALUMINUM CAP STAMPED '28-0069-2' 6ET FLUSH Wl7H GROUNDI POINT LIES 5'WEST OF EGGE OF CRAVER ROAD 760 750 730 �� • • • • TO OLD US HWY 52 BM•l ELEVATION = 755bd N 796282 E 1623574 L 57AT/ON !l+8/JO 107.0' RIGHT RR SPIKE !N SO(/7�H 5/OE OF l2' OAK 0 COIR FIBER MATTING REID CRAVER LIN. FT = 33 = 0.02039848 � REID CRAVER ` `�� �r � fE�ES� B��SCH�ILT� � ��a � � � �c O � � � � \ � °�� � � � � � � � � � � �� ��� � 3EXSTING R/W� � � � � � \ �� � � ° ��' �—`� \I'' � � — — � —WLB— — — — — '?' . j \ � PUE BL POINT DESC. NORTH EAST 1 28-0069-1 795989.2500 1623528.7490 3 28-0069-3 796327.5020 1623473.9447 2 28-0069-2 796655.1351 1623389.2513 DAVIDSON CmUNTY LmW IMITACT BRIIDGiE STRUCTUAC RBOC69 IS �9-II-MA WB9 1IBP.9.H19 TIP 1]BP.9.0.16 SR I502 17' 85T � � �MAycRE �LIN.�T-18 ��r ABA�tD'oNEO -- z��cP ':. 4� OWNER UNKNOWN T GUY ID"402,25 � � OWNER UNKNOWN A1 POw& � 2� LIN. FT = 22 �U i� 3i,ao �� � �/ �� �� � LARRY E. HEGE S BM�I O ELEVATION L STAT]ON OFFSET 755.78 OUTSIDE PROJECT LIMITS 752.96 12+41.86 16.14 RT 757.72 OUTSIDE PROJECT LIMITS CLASS l RlP RAP AND GEOTEXTILE Esr. i4o roNs EST. l02 SY GT � � � i / 3�,. RC F "- � � � � � � ` LIN. FT = 90 � . � �s, � � ��F � � c� � ` 9G \ �.F90 � � � \ � STOKES E. HEGE JR MICHAE� R. CRAVER PEDESTAL DESTROYED G"9PC�` � � � ` EXISTINC � � � � �1., - �1T–� i � z o��n ENGINFfR ENGMEER INCOMPLwE E PLANS R PRELIMIN RYA PLANS W Nvf use {q NN9]R11Cnory PERMIT DRAWING SHEETS 3 OF 4 IN BM'2 ELEVATION = �577Z' Cp N 796655 E 1623389 � L 57A7/ON 14+50 TO BM'2 � N l5'28'25'W D/si 13033' REBAR WlrH /+LUMINUM C?P STAMPED IO '28-0069-2'(SET FLUSN WITN GROUNDJ 6l POlN7 UES 5'WEST OF ECGE OF � CRAVER RO?D � iN OWNER 11NKNOWN POWER ID"32542090 � � �_ � _ GRAU 350 W _ =T 70 ENTERPRISE RD � ---__ F� � ��-n069-3 EX�Sr�N� R�W � Li�.l FT = 24 c,� FF� w � E PUE —� � COIR FBER MAT T lNG LARRY E. HEGE O CLASS l RlP RAP AND GEOTEXTILE Esr. i35 ToNs EsT,90 sr �r �PERMANENT WETLAND IMPACT z. ��;A; TEMPORARYWETLAND IMPACT �PERMANENT CHANNEL IMPACT �TEMPORARY CHANNEL IMPACT 25 12.5 0 25 50 SCALE: 1"=25' PERMIT DRAWING SHEETS 4 OF 4 WETLAND PERMIT IMPACT SUMMARY WETLANDIMPACTS SURFACE WATERIMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- STA. 11+50.00 to -L- STA. 13+g6.00 3@ 8'x7' RCBC 0.02 0.02 112 75 TOTALS: 0.02 0.02 112 75 ROADSIDE ENVIRONMENTAL UNIT DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS uuwxxc 701Y STANDARD SPECIFICATIONS S865S BftOSION ANO 58DAf&Y! CONSROL PfANS COAIPLY WRH 1H6 AHGlILfS(ON3 58! PoHSfl BY SAS NLfiO/pW ' L CONSIRfICRON PHRMQ HPFELiNH AlIGl1SI l� ]OL ISSII� BY lRH NOA1H GUfOfA'A 08PAftSA1&Y! OP &YVpONA16N]' AA9 NANAAL F&SOURCCS DMSION OP WAIPF QUALIIY. NOTFS: ANV DEYIATON FROM OP�IONS GIVEN WILI REQUIRE PRIOR APPROVAL BY ENGINEER. ADDrt10NAL EkO510N CONTROL DP/ICES MAY NEE� TO eE INSTALLEO AS OIRECTEO 9Y THE ENGINEER. 20Il2 ST�tNID�LR�D ➢It.�WINGS 1605.01 Tempo�vy Sil� Feuce 1633.01 Tempo�vy Nuck �t C6wk Tme A 1606.01 8peeiel&ilima�Couo-olFeore 1630.06 9peria19tiWq�Beuu 1622.01 iempawy Be�me eud Sbce ��o• 163LO1 N.triv�imr.11euav �, rv�e� �_. � � � wErcANOs - -WLB $Fd ° n..�.,,.�;�. � , , 1605.01 Tampa.a�y S�li F��« .. .. .�„ µ-�� 1606A1 Sm�,.l Sed„�ene Cene,ol F.., . � 1622.01 Te��na..n B�.m: e�d Slope ➢r.:n.. ...... T� � 1630.02 S�la Be.;n T>c� B. ........... � i 1630.Od T�mpora.r Silt D;t�6 . ... ,„ 1630.05 Ta�neo...y D;.�:.;on . ......._ - ,a _ 1630.06 5����si St;ll;�g Bas�� 1632.03 Ro�k I�let Seef�e�e T..p Tyye C.. .. .� 1633.01 TPmyo�..r Re�k SJe C6e�k T�a� A... .. ..� T..myo�.,y Re�k SJe C6«k �P�yrA ,.;e6 O J'datt�rs e�A Wolra�:ylom�de (PAi1). ...... � 1633.02 T=mpo�..� Ra�k Sile C6e�k T>p�-B..... � Naee;e . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 J Wee�le ..Ith Pol>.���7eroide (PAMJ . � 163�.02 T�mno�•.r Aa�k Sed�Aenz Dem TrarB . � 1635.01 Ro=k P;ne Inlet Sed�me�t T..p Tya� A.. �. ��� C�> � �(�> �. � C�) .` � � ��� (�> �. REIC �.r � CR� -E' f�"g: 1.�.�\�.�F. ; � \ / �.. � � i � � �� /�� � O �;�,\ . � ,, T�P.E�� � o�HUI TZ � i `��� - -wLB- � -_�_•��'(e ��p � . ������..-'Y_. � Y' � 'Y . P I 'Y 'Y �Y �� �Y �Y �Y i�\ � , , � . � � � � � � � .. � �m K � � 3 �c � � .: � �. ._ � .� '� � , y�;�,�, Ai-1 . � �i' ]� -'Y.. �Y �1' �Y 'y �Y l \��_� '� ' � �c �_ � � �k � _� . �e - 'Y �/ B .. i -w�e- - - - - -@ .-- . __ _._ I� _ j - (n - , x _ ,- - W -JS �. .-,- - _._ ���� �� o,.,.Er �NKVCwv u+ �� �v �o a 2�5 ¢ GNt r U�'<NChV �MPERVIOUS � PC'N�"EL 0lKE IC'31,c -- PUE --- �(S� _,.=.F:Y E HF_G� CLASS lRIP RAP � AND GEOiEXrILE EST.l35 TONS EST.90 SY GT ��� � . '� \��. ��'C`�nf.��' �. �.�h.� �' ` CLASS lRIP RAP ��aNO cEOrExn�E _ - - Esr.i4o roNs ' Esr.io2 sr cr i � � �� PE�ES`-t-'--_---�/ � f�,. DESTFOVEU '` � ��n' Ol�NER _NRVO":N 1 / . '3WEC ID'375 �2010 �✓ 1 � �AT-1 � _ _ _ - . _ . �,v � --T (n � _ _ I _ k GRAU 350 - - --,y - . - � - ���.� - - -- _��-------� d U�f � PJ,IE - PUE - PUE � ��t�' _�RV �. ��.f G� ' S10KE� � ' '� . ��.. -., H=GE JR � A� - ��F F PROJfR REFERENCE NO. I SHFE! NO. WN SHEeT NO. VRE➢.IMINAR:ST P7.AN5 QEARING AND GR11991NG EROSION CONTROL f-00. CONST0.UCIION SNEEf 4 0 c, �_ � \ r, �, �� - s= � "' o � � CONSTRUCTION SEDUENCE - PHASE I � CONSTRLICTION SE�UENCE - PHASE II I. INSTALL PHASE ISTILLING BASIN I. PLACE PHASE IIIMPERV10�5 �IKES 2. PLACE PHASE IIMPEftVI0l15 DIKES 2. ONERT CHANNEL FLOW THROUGH NORTH BARREL 3. MAIN7AIN CHANNEL FLOW THROUGH EXISTING STREAM 3. CONSTRUCT UPSTREAM AN� �OWN STREAM PORTIONS OF CENTER AND 9. CONSTR�CT lIPSTREAM AND DOWN STREAM PORTIONS OF NORTH BARREL, SOl1TH BARRELS,WINGWALLS,AND CHANNEL IMPROVEMENTS WINGWALLS, AND CHANNEL IMPROVEMENTS 4. REMOVE SPECIAL STILLING BASIN 5. REMOVE PHASE IIMPERVIOUS DIKES 5. REMOVE PHASE IIIMPERVIOl15 DIKES `� $� � � iY� � OIKE � P�� '_ � �� _ . �l1AN�L fA(PRQKEME r5 - � �SPEC(AL� �� 7E� ��N e(MP(70��1/F�V _ _ /,ypERVl0U5 DIKE � IMPERVf0U5 � \ � � � 'Y 571(11NG �. �� � �� '�. � } � SPECIAL� `��� �t � � � ��, � � � ��easrN ` � � � �� �� � � � ��/�\easrrv�� . � . � � `V � �A�, oA�-7 �' � �� Y � a �� ���ohi1 � v' I � �� � ���. -- �� -��- �-�� � - ' - , .. -Y'-Y� �T� ��� a--' -- - � -� � .� - r _ 'Y _� � � � AT-7 � _ � � �/ �� '� B I �- _ AT-1 �_ � --- ,_ _ . _ ..- � � _- - _ _-- -_ -� �_�uKNC.,w � �A7��7 � OIKE &TEi_ i eC225 m � �� �"- ��� ,�/ � \\ \ \ CULVERT CONSTRUCTION SEQUENCE - PHASE I � _ - ' pIIIIES � I. Cl1LVERT CONSTRUCTION SHALL BE PERFORME� IN ONLY DRY OR ISOLATION SECTIONS OF CHANNEL. 2. IMPERVIOUS �IKES ARE TO BE USED TO ISOLATE WORK FROM STREAM FLOW AS NECESSARY. 3. ALL GRADED AREAS SHALL BE STABILIZED WITHIN 29 HOlIRS. 4. MAINTENANCE OF STREAM FLOW OPERATIONS SHALL BE INCIDENTAL TO THE WORK. THIS INCLUDES POLYETHYLENE SHEETING. DIVERSION PIPES, AND HOSES. 5. PUMPS AND HOSES SHALL BE SUFFICIENT 70 ❑EWATER THE WORK AREA. 6. THE CONTRACTOR SHALL NOT PUMP SEDIMENT- LA�EN WATER �IRECTLY INTO STREAM. FOR �E-WATERING OF CULVERT SI7E5, 7HE CONTRACTOR SHALL FILTER SEDIMENT-LADEN WATER THROUGH SPECIAL SE�IMENT BASIN. � � � AT,-7 %/ I: �/ I _ -\�. \ \ �- __ 4��� CULVERT CONSTRUCTION SEQUENCE - PHASE II � 5oale P' = 3U' 80' D SD' S0' ��rzzz :-��, AOADSIDE ENVIRONMENTAL UNIT DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS uuion�c 2012 STANDARD SPECIFICATIONS ]885H &XOS(ON A.YO S8UAIHM CONIROL PIANS COMPLY WIS/f I)(b' A8GlIL1S(ONS SSI £ORIA BY lH6 NC(]-0IIXW Gffi�RAL CONSIAlILTlON PHAM(I PPPBLT(['b AUGUS]' ]� ]Dll ISSII%U HY lHB NORZII CAFOIALI D�.1R .]'N8N]' OP HNVatOK1f8N! AAD NA]'URAL RFSOfIRCES DMS(ON OF W�UBR QUAIJIY. �wLB� —�,� i� � � wEr�aNOs — —WLB — S[d R 1]n. n6en e �� 1605.01 T�mpo�e.r S�le Fe��� . .... . ... 1606.01 Sna��.] Sed�m�nt Cane,ol F���e � 1622.01 T�mne�.=� Be,.�. e�d Slon= ➢�.�ns.. .... 1630.02 Si1tBe=ImTrn=S� ��----- -�---� � � 1630.03 T�mpo:e.> S:le DIt�A .. ... . .... ,.. 1630.05 T��neo�a.y Df.ar.fan....... .... _ � .� — 1630.06 Sp�aa15619.ag BESi� 1632.03 �to�k Inl�a 9�d����,e T�ep Typ� C. ... � 1633.01 T�.mno...r Ro�k Silt Ch«k T�p� .�4. .... .� 1'emn��.=r Ra�k S:le Che�k Trn='�# ..;t6 O Msee�nx ood Polrn=.rlem�de eP.^��I7..... � 1633.02 Tempoea�� Re�k 5ilc CFo�k 'Trna Il. . � R'.tclo_ . . . . . . . . . . . . . . � �Vaecl� ..ith Po1y.���lemfAe (PAM> -- � 163A.02 T�mye.en Ro�k S�diment Dam Tyre'B .... � 1635.01 Ro�k Psa� I�l�e Sed�m��t '4'..n 'P�a=-.� . .. �I . I �\ ��� � � ��� �. RE D C R ."c R _ C?i. 'F1. � � � \i'i C U Tz.PFS,i E. �C^UL�Z (� � — —w�a- —�'<e \i � � � � � � � � � � i � � � � � � � � � m`K � � � � � � � � �. 1 � � � �c � � � � \ k � � � � � � � � � ` ��—� w�e�—� �—�—� � ° � r � 5 � I 1 Wi a � � PUE �\ ������� ���� RC' � i �- r��CN,;tL �'.. CF2�"=�. � � � � +QJ �p_J I m P�F '" �1 �5—� u �N O / m � /� � � � � W REMOVE —JS —.. ._ �. _2d§°C�' 24„ OWNEr. JN6NON:0 —` �'�0�;~� GLI° .[7°<CZ.ZS '�7'�;� OWNEF UNKNOWh AT-1 q �'WwiE�_p5 IMPEkVl0U5 d�. i��3i,���Uh DIKE PUE �_— _. �,�� E. NEC_ �`J AMIT SACHAN LEVEL III NAME 3235 LEVEL III CERTIFICATION NO. C ;TOKfS E. HEG� J�' PEf7E�T..'. CE�TROYE� �w�,��a ��u�cmowN PO�.�R D`32E42090 � � AT-1 �� � X GRAU 350 7Trrr-e-ez-� � ITII� ill III III �� Q� � - PUE - — PUE �`. ��FO t ✓s ✓S C�FF � 2QD12 S'Il'.�NII3.9.R� S�EBAWINGS ]605.01 Tempaeeey Sil� Fmce 1W3.02 Tempo�e.v N«k 9i1� (]�eek Type B 1606.01 9ped.ISedimev�C000-olFevce ]622.01 Tamporvy eerms md 91oce �o+ 163L01 M.eengln.ml6aon � � x � W 7 PUE J _,7P.Y _. H=G� � ENGINEFR PRELIMINARY PLANS no0. C O m � �� - � � r, n c� - �x i "' c J> 0 NOTES: ANY OEVIAPON FROM ORrIONS GIVEN WILL REQUIRE PRIOR APPROVAL BY EN6INEER. AD�ITIONAL EROSION CONTROL DEVICES MAY NEE� TO BE IN5fALLED AS DIRECrED BY THE ENGINEER S�al� 1" = 30' SD' 0 30' b0' r�rir �t—� ���V����N �]F lH[��G]H[�A��Y� �°J[°A°]ClE �lF N�Il$°]Cl�][][ �A�$�]L�N� SOIL STABILIZATI011t MATTING FOR EROSI011t CONTROL CONST LINE FROM TO SIDE ESTIMATE (SYJ SHEET N0. STATION STATION 5U tOTAI. MIyGEI.I-ANE U5 MAifINb 10 0E INSfA I.EO A5 OIRE fE0 6Y 1NE NbINEER TOtAI. 5AY PRELIMINARY FLANS :e rox SUMMARY SHEET PERMANE11iT SOIL REINFORCEME11tT MAT CONSi LINE FROM TO SIDE ESTIMATE (SYJ SNEET N0. SrATION STATION 4 -�- 10-25 11�50 l.t 175 5U tOtAl. 175 AD01 f I ONAI- 5RM 10 6E I NSfAI.l.EO TOtAI. I 75 5AY 175 �IVI�I�N �F HIG�IW��'S S�[°A�'� �F N�RTH CAR�LIN.� SOIL STABILIZATI011t TIMEFRAMES PRELIMINARY PLANS Po0. LON9i0.V[TON SITE DESCRIPTION STABILIZATION TIME TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:IOR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50'IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE,EXCEPT FOR PERIMETERS AND H�W ZONES. 0 2.5 5 PROJ. REFERENCE NO. SHEEf NO. f--i�-1 178P.9. R. 18 X-1 5 1 1 I 1 7 2 IN OM 9,E E 4,A 5 I'R LIM NA Y �LA 5 b, - 2. �� ` _ _ � ti 9 \ — — 1 . i � �. IN W � — — — _ _ I _i_ 12 + �. 0 � � c>' . , , , , 0 2.5 5 PROJ. REFERENCE NO. SHEEf NO. �E;�:� i7BP.9.R.18 X-2 1 1 1 1 2 INC M ET P AN � RE IM NA �' LA S I - - \ - - - + � - :J — 13+ 0. 0 -- -- -- I � _, �� --- -- 13+ 0. 0 — -- - � 4• i -- � 12+ 0. 0 � -- -- > — ?� �� � � -- -- 12+ 0. 0 � �— �a£ � 5 � � 1 1 + + BENCH MARK "I: RAILROAO SPIKE IN NORTH EAST ROOT OF A Z9" H OAK TREE. STA. 11+qq.00-L- 35' LEFT. EL. 717.96 L -� - _ 'y `° ' -_ - b '� GUARDRAIL � _^ y f ,� � PAYA� TEM)DTYP ll ANO - " � BY � � � I � z 0 � AND PAY INOIAN GRQ� �/ X `� X�"� A. 13+50.00 -L- '� Jj J �` -IS"H R.C, PIPE \ THROUGH WING WALL ___ W \ � ' �FOR IJTILITY INFO LOCATION SKETCH 'E -L- � I . "' . - """.._."""' """"'"'_"'""_"""""""'_' ""'""'"__ __"" '" "_ "' .. EL.705.0a EL 705.0*- EL.705A* PROFILE ALONG � CULVERT DAiE � D4iE : ROADWAY DATA CRADE PT.EL.(il STA.13+50.00 -L BED EL.ca STA.13+50.00 -L- ROA�rypy SLOPES HYDRAULIC DATA DESICN OISCHARGE FRE�UENCY OF DESIGN FL000 OESIGN HIGH WATER ELEVATION DRAINAGE AREA BASE �ISCHARGE (0t00) BASE HIGH WATER ELEVATION =718.32 =704.90 =2:1 =650 C.F.S, 45 YR. =713.00 =1.6 5�. MI. =1020 C.F.S. =714.39 OVERTOPPINC FLOOD DATA OVERTOPPING DISCHARGE =2000 C.F.S. FREOUENCY OF OVERTOPPING FLOOD =500+ YR. OVERTOPPING HIGH WATER ELEVATION =717.30 TOTAL STRUCTURE OUANTITIES STAGE I STAGE II TOTAL CLA55 � CONCRETE BAFFEL Q0.868�y/FT (SiAGE I)2•829CY/FT 6iAGE IU 36.9 �,Y. 120.2 C.Y. 157.1 �,y, SILLS LT C.Y. 1.7 C.Y. 3.4 C.Y. WING ETC. �7•9 C.Y. 22•4 C.Y. 40.3 C.Y. SU6 TOTALS 56.5 C.Y. 1493 C.Y. 200.8 C.Y. REINFORCING STEEL BARREL Sl9Z L85. 14550 LBS. 20342 LBS. WINGS ETC. 1235 LBS. 1235 LBS. Z470 LBS. SU6 TOTALS 7027 LBS. 15785 �BS. 22H12 LBS. FOIINOATION CONOITIONING MATERIAI, 40 TONS 67 TONS l0'/ TONS WLVERT EXCAVATION WMP SUM PLALN RIP RAP CLA55 I 46.8 TONS i13 TONS IIB.1 TONS REMOVAL OF EXISTING STRIICTURE WMP SUM zs�-o°= 9\Il6P.R.9.li\ItBP.9.P.11: NOTES ASSUMED LIVE LOAD --------- HL-93 OR ALTERNATE LOADING. DESIGN FILL---------------- 3.93 FT. MA% DESIGN FILL 2.60 FT.MIN. FOR OTHER DESIGN DATA ANO NOTES SEE STANOAR� NOTE SHEET. 3"0 WEEP HOIES INDICATED i0 BE IN ACCORDANCE WITH THE SPECIFICATIONS. CONCRETE IN CULVERTS TO BE POURED IN THE FOLLOWING ORDER: STdGE I:1.NING FOOTINGS,FLOOR SLAB INCLU�ING 4"OF ALL VERTICAL WALLS. 2.THE REMAINING PORTIONS OF THE WALLS.SILLS.WINGS FULL HEIGHT. STACE II:I.NING FOOTINGS,FLOOR SIAB INCLU�ING 4"OF ALL VERTICAL WALLS. 2. THE REMAINING PORTIONS OF TNE VYA�LS, SIL�S, WINGS Fl1LL HEIGHT FOLLONED 8Y ROOF SLAB AN� HEADWALLS. THE RESIDENT ENGINEER SHALL CHECK THE LENGTH OF Ct1LVERT BEFORE STAKING IT OUT TO MAKE CERTAIN THAT IT Y7ILL PROPERLY TAKE CARE OF THE FILL. �IMENSIONS FOR WING LAYOUT AS WELL AS ADDITIDNAL REINFORCING STEEL EMBE��EO IN BARREL ARE SHOWN ON WING SHEET. AT THE CONTRACTOR'S OP7ION.HE MAY SPLICE THE VERTICAL REINFORCING STEEL A 3 FOOT STRIP OF FILTER FABRIC SHALL BE ATTACHED TO THE FILL FACE OF THE WING COVERING THE ENTIftE LENGTH OF THE E%PANSION JOINT. FOR C�LVERT �IVERSION DETAILS AND PAY ITEM,SEE EROSION CONTROL PLANS. FOR Sl1BMITTAL OF WORKING �RAWINGS,SEE SPECIAL PROVISIONS. FOR FALSEWORN AND FORMWORK,SEE SPECIAL PROVISIONS. FOR GROUT FOR STRUCTURES,SEE SPECIAL PROVISIONS. FOR CRANE SAFETY,SEE SPECIAI PROVISIONS, AT THE CONTRACTOR'S OPTION HE MAY SUBMIT.TO THE ENGINEER FOR APPROVAL PROVI�E THE SAME SIZE AN� NuMBER OF OARRELS AS I15ED ON THE CAST-IN-PLACE DESIGN.FOR OPTIONAL PRECAST REINFORCED CONCRETE BO% Cl1LVERT,SEE SPECIAL PROVISIONS. REMOVAL OF THE EXISTING BRIDGE SHALL 8E PERFOftME� IN A MANNER THAT PREVENTS DEBRIS FROM FALLING INTO THE WATER.THE CONTRACTOR SHALL SUBMIT OEMOLSTION PLANS FOR REVIEW AND REMOVE THE BRZDGE IN ACCDRDANCE WITH ARTICLE 402-2 OF THE STANDARD SPECIFICATIONS. THE EXISTING STRUCTl1RE CONSI5T5 OF t SPAN (d 30'-6'C WITH (9'-2°C�EAR ROADWAY AN� TIMBER �ECK ON STEEL I-BEAMS AN� �OUBLE CHANNELS ON MA55 CONCRETE ABUTMENTS VYITH STEEL SEATS AND LOCATEO AT THE PROPOSED STRUCTURE SHALL BE REMO4E0. THE IS"O PIPE THROl1GH THE WING WALL OF THE CULVERT SHALL BE LOCATED BY THE ENGINEER.iHE REINFORCING STEEL SHALL BE FIEL� BENT AS NECESSARY TO CLEAR THE PIPE. ,00R� uRai;`�, ,�,� ��� _ ''gsee�i `• _ _o: �0,30 :�€ �J9: �.� 'e,�;, O�CltvfF-_P; p, �c � 4 � �41 PROJECT N0. 17BP.9.R.17 DAVIDSON CouNrY STATION: 13+50.00 -L- SHEET 1 �F 6 REPLACES BRI�GE N0.79 su�e or xoxrx ceaa�a� DEPARTMENT OF TRANSPORTATION R4ElGX BARREL STANDARD TRIPLE 11 FT. X 10 FT. CONCRETE BOX CULVERT 109° SKEW STD. N0. C6223A C-I WAY FILL SLOPE 2:1 RS � =� L FACE AM FACE _ -L- J I N H c�i ao GRADE -0.25% TFi I O F-F =. zw Q HN N ;� a i � EIEV.T09.9 m hm N e a O� ti �i�°w¢ CONST. JT. �`LLw ao m:ia U (�JQy�j °483 BARS �EACH FACE STA� �CONST.JT. "___ �' . � �--f— ,]I — �o I 3"0 WEEP HOLES Cil l0'-0"t CTS.� �R WALL. INTERIOR WALL ;T SECTION NORMAL TO ROADWAY LENGTH OF CULVERT = 19,_9" 9" 198-°4A100 BARS CJ 4"CTS.(2 BAR RUM _ �ARK) BOTTOM OF ROOF SLAB 5�/ ° 149-"4A300 BARS CJ 5� "CT5.f2 BAR Rl1N) « TOP OF ROOF SLAB 45 t�a 7�/z"CTS.- CORNER BARS RIOR WALL ( SEE BARREL SECTION 1~ �_i"_____'_'__ L'�_ 0 O +OI 6 g a m @ �°m�_ ¢ o a i awz � O �� NmVJI¢K K � Q � V m rOmQ ON V�¢m � � V O =pW O ¢ P V a m _ _, ____ '_ o�___{_'_________'___� FILL SLOPE 2:1 -9-°SG1 BARS � 3"C1 3-°853 BARS �y � I I I I I �3-tl8"5" BARS � I _____1', I �-'-VY2 / / 57-4482 BARS fil 9"CTS. �" � _ FILL FACE °1 V U� Q Q '° 43-6481 BARS [J I'-0"CTS. w N�� � w STREAM FACE a V 1 m v� O � � � Q 6 `� VI � 2 � � Q m O O ` m _ ,,_o� o o Q , N � _ a a a ol ¢ � 0 � STAGE I � STAGE II END ELEVATION NORMAL TO SKEW wfi SKEW TRIANGLE •5 EI EACH � �.���� \ , . , � , � .���♦ ����i� � � 0'�i�i�i�i�i�i� � 1 � 1 �� �i� �����p��� . , .. � _O:i��y%i%_�i�R� � I �- + u � HIGH FLOW BARREL CONST. JTS -.n.^ LOW FLOW BARREL FLOW IGH FL049 BARR BACKFILL BAftREL—� WITH CLAS$ I RIPRAP PLAN SHOWING BARREL LAYOUT WITH SILLS NOTES: PLACE SILLS AT INLET AN� OIITLET OF EXTERIOR BARRELS ONLY. BACKFILL E%TERIOR BARRELS WITH CLA55 I RIP RAP TO A �EPiH �F Y. BACKFILL CENiER BARREL WITH CLASS I RIP RAP TO A DEPTH OF 1'. c A1 BARS A2 BARS ELEVATION ORPMN 9Y � O.A.�AVENPORi p0.iE : �/� �?/�� CHECKE� 9T : A.P POiEL p4iE : �9/09/13 0 ❑'-0" 8" 5'-6' CI BARS W 1'- 0"CiS. 6" 2"HTGH BEAM BOLSTERS � ( B.BJ (J 3'-0"CTS. ��BARRELST SYMM. ABOIIT A300 BARS � THIS LINE 1 A100 BARS CONST. '� � I �9}'q"HIGN JT. " i C.H.C.U. 2"CL 2"CL. I � BI BARS � B3 � I 82 BARS r w g5 ALL C�NTINOOUS o � � HIGH CHAIR UPPER , a I t C.H.C.U. t cJ 3,_0" `° �^ CTS. @ � i U I � 4 Q g-p� A2 BARS (SPLICEO m�, i WEEP HOLES WITH 83 BARS � a I STAGE I ONLY) #3�/q"HIGH C.H.C.U. �, �. � ( N ci A200 BARS A200 BARS� 4400 BARS A940 BARS ° CONST.JT.ISTAGE U 6" Cl BARS (a 1'- 0"CTS. 6" RIGHT ANGLE SECTION OF BARREL THERE ARE 139 "C" BARS IN SECTION OF BARREL. (LOOKING DOWNSTftEAM ) MI SECTION THROUGH SILL �Iek�014E15 MAY 9E PUSHED INTO CREEN CONCRETE AFTER SLAB HAS BEEN FLOAT FINISHED. CULVERT SILL DETAILS —�I'k `6"D" 4T A MAXIMUM SPACING OF 4'-0" 2 LAYERS OF 30 LB. R�OFING FELT TO PREVENT BONO 9\1lBPR9.IT11BP.9A.li_50 N.ppn v BAR TYPE STAGE I L OF MATERIAL eq .4 REINFORCING STEEL 5792 LBS STAGE II BILL OF MATERIAL BILL OF MATERIAL .q 2 9 STR IO'-1" 2 •4 STR 8•-9" 2 ^9 STR i•_6" .q i REINF�RCING STEEL 14550 LBS 4 STR IB'-9" 25 PROJECT N0. 17BP.9.R.17 DAVIDSON COUNTY SraTION: 13+50.00 -L- SHEET 3 �F 6 Si�IE Oi NOPM Cli0.IX.1 DEPARTMENT OF TRANSPORTATION nncn. BARREL STANDARD ��" "",,.,, T R I P L E e"oPtN C4NOq�°° e'x.! '$Z ,o:�aSE�, � 11 FT. X 10 FT. ;,, �„o :�; CONCR 109 B� KEW LVERT � ��&.: PEVISIONS SNEEi NO I'� na er, oere� xo er, oe*[� C-3 9- .. � ,�..�