HomeMy WebLinkAboutR3300_Beane_ConstructionDrawings_20211221PHASE 1 MOBILIZATION AND ESTABLISHMENT OF GENERAL EROSION CONTROL MEASURES 1. LIMITS OF DISTURBANCE IS 45.9 ACRES IN TOTAL. 2. Stockpile materials in designated staging areas. 3. Install silt fencing to the limits shown on the plans and at any other locations as directed by the Engineer. Silt fencing will be installed around the limits of all staging and stockpile areas. 4. Install safety fencing as shown on the plans and at all other locations as directed by the Engineer. PHASE 2 ROAD REMOVAL, CULVERT REMOVAL, AND DITCH FILLING (Numbered callouts and arrows on Erosion Control Sheets correspond to the following items. Arrows indicate direction of work.) 1. Remove Road 6 on northern side of FSI crossing. Remove (2) 48” CMP culverts (previously damaged) at FSI. Regrade and stabilize banks of FSI. Remove remaining section of Road 6 on southern side of FSI. 2. Remove Road 6 and Road 3B up to FSI crossing. Remove (1) 60” CPP at FSI. Regrade and stabilize banks of FSI. 3. Remove Road 3A up to the location of the (2) 48” CMP culverts located in FSI and the (1) 42” CMP culvert that connects T19 to FSI. Remove the (2) 48” CMP culverts in FSI. Regrade and stabilize banks of FSI. 4. Remove (1) 42” CMP connecting T19 and FSI, breaking any remaining connection with the upstream ditch network. Regrade and stabilize banks of FSI. 5. Remove Road 3A and fill adjacent ditch (T19) working in direction towards the intersection of Road 3A and Road 5A. 6. Remove Road 5A and fill T5 / T19 working in direction towards the intersection of Road 3A and Road 5A. Complete grading for D9. 7. Remove Road 3A and fill T17 and T18 working in direction towards the intersection of Road 3A and Road 4.Complete grading for D7 and D8. 8. Remove Road 3A and fill T13 and T18 working in direction towards the intersection of Road 3A and Road 4. 9. Remove (4) 24” CPP culverts at intersection of Roads 3a and 4 located in T13 and T17. Complete grading for D6. Remove Road 4 and fill T17 and T14/15 up to location of (1) 24” CPP culvert along T16/T17. 10. Remove (1) 24” CPP along T16/T17. Continue road removal and ditch filling of T14/T15 and T16/17 towardsintersection of Roads 2 and 4. Complete grading for D3. 11. Remove the (1) 12” CPP culvert located on T16. T16 is connected to FSH, so removing this connection breaks any connection to FSH and the upstream ditch network. 12. Remove a short section of Road 2 up to the location of (1) 18” CMP connecting T11 and T20. Remove (1) 18” CMP culvert and continue filling T20, T11, and T16 to the western edge of the R-3300 corridor. 13. Starting at the eastern edge of the R-3300 corridor, begin removing Road 2 and fill T11 and T16 working in direction towards the intersection of Roads 2 and 4. 14. Remove Road 2 and fill T11 and T12 working in direction towards the intersection of Road 2 and Gas Line Easement / Farm Road.15. Install ditch plugs in T4 starting on western edge of project and moving to the east toward the Gas Line Easement and Farm Road. 16. While performing work within each zone above ensure the following occurs: a. Perform required clearing and grubbing, including specified removal of dead mature trees and/or dead specimen trees. b. Segregate and stockpile topsoil and other soil material in accordance with the project specifications. c. Remove and dispose of all unused vegetation materials. e. All excavated soil materials not utilized will be stockpiled and maintained according to the project specifications. After the completion of construction, all unused soil materials shall be spread on site in designated areas at the direction of the Engineer. Spread soil to be stabilized using seeding per the project specifications. If any excavated soil materials need to be, are specified to, and actually are disposed of off-site by the Contractor, the Contractor is responsible for disposal of such soil materials in a permitted area, as well as for providing and implementing an erosion and sedimentation control plan and permit, or any other required permit(s), for the location(s) off site where such materials are disposed. PHASE 3 DEMOBILIZATION 1. Complete remaining minor grading and site planting preparation work, including ripping and/or disking, as specified in the project specifications. 2. All remaining disturbed areas, including areas that have been ripped and/or disked after temporary and/or permanent seeding activities, are to be amended, seeded, matted and/or mulched according to the project specifications. 3. After all construction requiring heavy equipment is completed, remove silt fence, restore construction access roads, staging areas, and stockpile areas. Immediately regrade, replace topsoil, and seed, amend, and mulch as specified in the project specifications. 4. Remove temporary construction entrances. Immediately regrade, seed, amend, and mulch as specified in the project specifications. 5. Remove all tree protection fencing. 6. Remove and dispose of all trash, metal, and debris from the site according to local, state and federal regulations. Depression Status Target Elevation Range (msl) ANotesD1 No grading n/aDo Not DisturbD2 No grading n/aDo Not DisturbD3 Grade (See Notes) 36.75 - 37.25Grade the SW perimeter to reduce the effects of spoil along T14 and Road 4D4 No grading n/aDo Not DisturbD5 No grading n/aDo Not DisturbD6 Grade (See Notes) 37.5 - 38.0Grade the SE perimeter abutting T17 where the spoil material exists. Grade the area abutting T15 where the spoil material exists. Grade the area along Road 4 between T15 and T17 to connect the two areas.D7 Grade (See Notes) 38.0 - 38.5Grade the SE perimeter abutting T17 where the spoil material exists. D8 Grade (See Notes) 37.5 - 38.0Grade the NW perimeter abutting T18 where the spoil material exists. D9 Grade (See Notes) 37.5 - 38.0Grade the NE perimeter abutting T18 where the spoil material exists. A - Target Elevations to be confirmed prior to grading activities. Depression Grading Information SUMMARY OF EARTHWORK FOR MITIGATION MITIGATION UNCLASSIFIED EXCAV. (CU.YD.) MITIGATION BORROW (CU.YD.) MITIGATION WASTE (CU.YD.) 38390 -20690 17700 APPROXIMATE QUANTITIES ONLY, MITIGATION UNCLASSIFIED EXCAVATION, MITIGATION BORROW EXCAVATION, MITIGATION FINE GRADING AND MITIGATION CLEARING AND GRUBBING WILL BE PAID FOR AT THE CONTRACT LUMP SUM PRICE FOR “GRADING FOR MITIGATION”. DESCRIPTION SECTION QTY. UNIT ITEM DESCRIPTION0001000000-E 200 1 LS CLEARING AND GRUBBING0036000000-E 225 1920 CY UNDERCUT EXCAVATION0000100000-N 800 1 LS MOBILIZATION0043000000-N SP 1 LS GRADING FOR MITIGATION6135000000-E SP 5.52 AC RIPPING6135000000-E SP 0.90 AC DISKING8622000000-E 876 70 SY GEOTEXTILE FOR DRAINAGE, TYPE 24400000000-E 1110 64 SF WORK ZONE SIGNS (STATIONARY)4405000000-E 1110 128 SF WORK ZONE SIGNS (PORTABLE)4455000000-N 1150 30 DAY FLAGGER0234000000-E SP 390 CY IMPERVIOUS SELECT MATERIAL6037000000-E SP 840 SY COIR FIBER MATTING6071012000-E SP 80 LF COIR FIBER WATTLE6029000000-E SP 3500 LF SAFETY FENCE6000000000-E 1605 3370 LF TEMPORARY SILT FENCE6006000000-E 1610 40 TON STONE FOR EROSION CONTROL, CLASS A6009000000-E 1610 120 TON STONE FOR EROSION CONTROL, CLASS B6012000000-E 1610 30 TON SEDIMENT CONTROL STONE6015000000-E 1615 45.9 AC TEMPORARY MULCHING6018000000-E 1620 5510 LB SEED FOR TEMPORARY SEEDING6021000000-E 1620 20 TON FERTILIZER FOR TEMPORARY SEEDING6030000000-E 1630 30 CY SILT EXCAVATION6084000000-E 1660 45.9 AC SEEDING AND MULCHING6087000000-E 1660 45.9 AC MOWING6090000000-E 1661 1380 LB SEED FOR REPAIR SEEDING6093000000-E 1661 5 TON FERTILIZER FOR REPAIR SEEDING6096000000-E 1662 80 LB SEED FOR SUPPLEMENTAL SEEDING6108000000-E 1665 40 TON FERTILIZER TOPDRESSING PHASE 1 MOBILIZATION AND ESTABLISHMENT OF GENERAL EROSION CONTROL MEASURES 1. LIMITS OF DISTURBANCE IS 45.9 ACRES IN TOTAL. 2. Stockpile materials in designated staging areas. 3. Install silt fencing to the limits shown on the plans and at any other locations as directed by the Engineer. Silt fencing will be installed around the limits of all staging and stockpile areas. 4. Install safety fencing as shown on the plans and at all other locations as directed by the Engineer. PHASE 2 ROAD REMOVAL, CULVERT REMOVAL, AND DITCH FILLING (Numbered callouts and arrows on Erosion Control Sheets correspond to the following items. Arrows indicate direction of work.) 1. Remove Road 6 on northern side of FSI crossing. Remove (2) 48” CMP culverts (previously damaged) at FSI. Regrade and stabilize banks of FSI. Remove remaining section of Road 6 on southern side of FSI. 2. Remove Road 6 and Road 3B up to FSI crossing. Remove (1) 60” CPP at FSI. Regrade and stabilize banks of FSI. 3. Remove Road 3A up to the location of the (2) 48” CMP culverts located in FSI and the (1) 42” CMP culvert that connects T19 to FSI. Remove the (2) 48” CMP culverts in FSI. Regrade and stabilize banks of FSI. 4. Remove (1) 42” CMP connecting T19 and FSI, breaking any remaining connection with the upstream ditch network. Regrade and stabilize banks of FSI. 5. Remove Road 3A and fill adjacent ditch (T19) working in direction towards the intersection of Road 3A and Road 5A. 6. Remove Road 5A and fill T5 / T19 working in direction towards the intersection of Road 3A and Road 5A. Complete grading for D9. 7. Remove Road 3A and fill T17 and T18 working in direction towards the intersection of Road 3A and Road 4.Complete grading for D7 and D8. 8. Remove Road 3A and fill T13 and T18 working in direction towards the intersection of Road 3A and Road 4. 9. Remove (4) 24” CPP culverts at intersection of Roads 3a and 4 located in T13 and T17. Complete grading for D6. Remove Road 4 and fill T17 and T14/15 up to location of (1) 24” CPP culvert along T16/T17. 10. Remove (1) 24” CPP along T16/T17. Continue road removal and ditch filling of T14/T15 and T16/17 towardsintersection of Roads 2 and 4. Complete grading for D3. 11. Remove the (1) 12” CPP culvert located on T16. T16 is connected to FSH, so removing this connection breaks any connection to FSH and the upstream ditch network. 12. Remove a short section of Road 2 up to the location of (1) 18” CMP connecting T11 and T20. Remove (1) 18” CMP culvert and continue filling T20, T11, and T16 to the western edge of the R-3300 corridor. 13. Starting at the eastern edge of the R-3300 corridor, begin removing Road 2 and fill T11 and T16 working in direction towards the intersection of Roads 2 and 4. 14. Remove Road 2 and fill T11 and T12 working in direction towards the intersection of Road 2 and Gas Line Easement / Farm Road.15. Install ditch plugs in T4 starting on western edge of project and moving to the east toward the Gas Line Easement and Farm Road. 16. While performing work within each zone above ensure the following occurs: a. Perform required clearing and grubbing, including specified removal of dead mature trees and/or dead specimen trees. b. Segregate and stockpile topsoil and other soil material in accordance with the project specifications. c. Remove and dispose of all unused vegetation materials. e. All excavated soil materials not utilized will be stockpiled and maintained according to the project specifications. After the completion of construction, all unused soil materials shall be spread on site in designated areas at the direction of the Engineer. Spread soil to be stabilized using seeding per the project specifications. If any excavated soil materials need to be, are specified to, and actually are disposed of off-site by the Contractor, the Contractor is responsible for disposal of such soil materials in a permitted area, as well as for providing and implementing an erosion and sedimentation control plan and permit, or any other required permit(s), for the location(s) off site where such materials are disposed. PHASE 3 DEMOBILIZATION 1. Complete remaining minor grading and site planting preparation work, including ripping and/or disking, as specified in the project specifications. 2. All remaining disturbed areas, including areas that have been ripped and/or disked after temporary and/or permanent seeding activities, are to be amended, seeded, matted and/or mulched according to the project specifications. 3. After all construction requiring heavy equipment is completed, remove silt fence, restore construction access roads, staging areas, and stockpile areas. Immediately regrade, replace topsoil, and seed, amend, and mulch as specified in the project specifications. 4. Remove temporary construction entrances. Immediately regrade, seed, amend, and mulch as specified in the project specifications. 5. Remove all tree protection fencing. 6. Remove and dispose of all trash, metal, and debris from the site according to local, state and federal regulations.