HomeMy WebLinkAboutPitt 15
Carpenter,Kristi
From:Ward, Garcy
Sent:Wednesday, January 19, 2022 2:31 PM
To:Aman, Michael C
Cc:Steffens, Thomas A SAW
Subject:Pitt 15
Michael,
I’m in the process of reviewing your application for the replacement of Bridge No. 15 over Chicod Creek On S.
Grimesland Rd in Pitt County. I will need the following information before I can finish processing your request:
Based on the amount of proposed buffer impacts, written approval will be required. The application was signed
by the consultant therefore I will need an agent authorization letter.
How is stormwater being collected/routed off the bridge and discharged?
More extensive hand clearing is shown in the wetlands and buffers in the NE quad at Site 2. Why is this needed
and can the amount of HC be reduced?
A roadside ditch with a 2:1 front slope and 3:1 back slope is shown in the buffer in the NW and SE quads. Can
this be redesigned for 3:1 front and back slopes?
I look forward to your response.
Thanks,
Garcy Ward
Environmental Specialist
Division of Water Resources
252-948-3917
1