Loading...
HomeMy WebLinkAboutPitt 15 Carpenter,Kristi From:Ward, Garcy Sent:Wednesday, January 19, 2022 2:31 PM To:Aman, Michael C Cc:Steffens, Thomas A SAW Subject:Pitt 15 Michael, I’m in the process of reviewing your application for the replacement of Bridge No. 15 over Chicod Creek On S. Grimesland Rd in Pitt County. I will need the following information before I can finish processing your request:  Based on the amount of proposed buffer impacts, written approval will be required. The application was signed by the consultant therefore I will need an agent authorization letter.  How is stormwater being collected/routed off the bridge and discharged?  More extensive hand clearing is shown in the wetlands and buffers in the NE quad at Site 2. Why is this needed and can the amount of HC be reduced?  A roadside ditch with a 2:1 front slope and 3:1 back slope is shown in the buffer in the NW and SE quads. Can this be redesigned for 3:1 front and back slopes? I look forward to your response. Thanks, Garcy Ward Environmental Specialist Division of Water Resources 252-948-3917 1